Items with Index Term: indirect cost

Number of items: 59.

Abu Dabous, S; Zadeh, T and Ibrahim, F (2024) A failure mode, effects and criticality analysis-based method for formwork assessment and selection in building construction. International Journal of Building Pathology and Adaptation, 42(5), pp. 1019-1040. ISSN 2398-4708

Abuhishmeh, K S K (2023) Risk assessment of reinforced concrete sewer pipes under external loading and adverse environmental conditions using an adaptive neuro-fuzzy system. PhD thesis, University of Texas at Arlington, USA.

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method. PhD thesis, University of Alberta, Canada.

Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.

Almeida, Y. and Calejo, R. (2026) Innovation in public works management: Proposal for a performance evaluation model based on cost and deadline indicators. Construction Management and Economics, 44(9), pp. 721-740. ISSN 0144-6193

Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988

Bobick, T G (2004) Falls through roof and floor openings and surfaces, including skylights: 1992-2000. Journal of Construction Engineering and Management, 130(6), pp. 895-907. ISSN 0733-9364

Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.

Braz, João Carlos Rocha (2014) Technical and economic evaluation of structural systems to eight floors residential buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364

Clawson, Bobie Sue Anna (2024) The influence of walking surface types on gait parameters, kinematics and worker perceptions in relation to slips, trips, and fall incidents in the construction industry. PhD thesis, Indiana University of Pennsylvania, USA.

De La Fuente, A; Casanovas-Rubio, M D M; Pons, O and Armengou, J (2019) Sustainability of column-supported RC slabs: Fiber reinforcement as an alternative. Journal of Construction Engineering and Management, 145(7): 04019042, ISSN 0733-9364

De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193

Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387

Edwards, D J; Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(1), pp. 65-75. ISSN 01446193

Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364

Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.

Graig, N (2007) The prevailing trends of defects and snagging in new homes in the UK. PhD thesis, Glasgow Caledonian University, UK.

Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(2), pp. 373-419.

Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Hinze, J and Appelgate, L L (1991) Costs of construction injuries. Journal of Construction Engineering and Management, 117(3), pp. 537-550. ISSN 0733-9364

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364

Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry. PhD thesis, University of Michigan, USA.

Kallman, J W (1998) Loss control project decision models for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Koehn, E and Musser, K (1983) OSHA regulations effects on construction. Journal of Construction Engineering and Management, 109(2), pp. 233-244. ISSN 0733-9364

Laefer, D F and Manke, J P (2008) Building reuse assessment for sustainable urban reconstruction. Journal of Construction Engineering and Management, 134(3), pp. 217-227. ISSN 0733-9364

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304

Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364

Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X

Marzouk, M and Moselhi, O (2004) Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), pp. 105-113. ISSN 0733-9364

Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364

Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364

Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Oliver, N N and Brümmer, D G (2007) Factors influencing water consumption in South African schools. Journal of Engineering, Design and Technology, 5(1), pp. 81-94. ISSN 1726-0531

Pagliara, F; El-Ansari, W and Henke, I (2025) A methodology to estimate the benefits and costs of stakeholder engagement in a transport decision-making process. Smart and Sustainable Built Environment, 14(2), pp. 326-341. ISSN 2046-6099

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988

Sasidharan, M P (2020) A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks. PhD thesis, University of Birmingham, UK.

Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364

Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988

Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.

Wade III, L R (2004) Effect of exposure to an inclined surface and height on gait kinematics and postural stability. PhD thesis, Auburn University, USA.

Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193

Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

This list was generated on Sat Aug 22 01:33:37 2026 UTC.