Items with Index Term: incentivization
Anthony Jnr, B (2025) A decentralized prototype framework for peer-to-peer based electric car sharing services towards sustainable road transportation. Smart and Sustainable Built Environment, 14(4), pp. 1172-1193. ISSN 2046-6099
Anvuur, A M and Kumaraswamy, M K (2010) Promises, pitfalls and shortfalls of the guaranteed maximum price approach: A comparative case study. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Chang, C Y; Pan, W and Howard, R (2017) Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis. Journal of Construction Engineering and Management, 143(8): 04017044, ISSN 0733-9364
Che Ibrahim, C K I; Manu, P; Belayutham, S; Cheung, C; Mohamad, M Z and Yunusa-Kaltungo, A (2022) Design for safety organisational capability in Malaysia: A multi-stakeholder perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.
Cheung, S O and Ma, Q (2026) Economic incentives and psychological empowerment in construction contracting: Complementing or undermining. Journal of Construction Engineering and Management, 152(4): 04026022, ISSN 0733-9364
Ebekozien, A and Samsurijan, M S (2024) Incentivisation of digital technology takers in the construction industry. Engineering, Construction and Architectural Management, 31(4), pp. 1373-1390. ISSN 0969-9988
Fernando, S; Panuwatwanich, K and Thorpe, D (2021) Introducing an innovation promotion model for construction projects. Engineering, Construction and Architectural Management, 28(3), pp. 728-746. ISSN 0969-9988
Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ly, Reachsak (2025) Leveraging artificial intelligence and distributed ledger technologies toward smart and autonomous buildings. PhD thesis, Virginia Tech, USA.
Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988
McDonnell, A and Sinnott, D (2010) Barriers and enablers to energy efficient retrofitting of dwellings in Ireland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ohueri, C C; Masrom, M A N; Habil, H and Ambashe, M S (2025) IoT-based digital twin best practices for reducing operational carbon in building retrofitting: A mixed-method approach. Engineering, Construction and Architectural Management, 32(3), pp. 2044-2065. ISSN 0969-9988
Oyemomi, B; Hare, B and Tong, M (2016) Exploring human resource incentivisation for public sector construction project delivery in Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Tennakoon, G A; Rameezdeen, R and Chileshe, N (2024) Walking the talk towards sustainable consumption: Interventions to promote theĀ uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(7), pp. 2878-2899. ISSN 0969-9988
Turner, J R (2004) Farsighted project contract management: Incomplete in its entirety. Construction Management and Economics, 22(1), pp. 75-83. ISSN 01446193
Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Wang, Y and Zhou, G (2025) Incentives of the digital platform of experimental resource-sharing for megaprojects. Engineering, Construction and Architectural Management, 32(12), pp. 7972-7993. ISSN 0969-9988
Wennstroem, A; Havenvid, M I; Eriksson, P E and Larsson, J (2023) Incentivising supplier innovation in mega infrastructure projects: Exploring the result of innovation bonuses. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364
Zhu, L; Cheung, S O; Gao, X; Li, Q and Liu, G (2020) Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8): 05020009, ISSN 0733-9364
Up a level