Items with Index Term: in-situ
Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work. PhD thesis, University of Michigan, USA.
Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364
Al-Maiyah, S; Brett Martinson, D and Elkadi, H (2024) Evaluation of the indoor environment in a historic museum during the COVID-19 lockdown in Northwest England. Building Research & Information, 52(7), pp. 748-764. ISSN 0961-3218
Ali, A H; El Rifaee, M; Abdulai, S F and Elmousalami, H H (2026) A holistic model for assessing key success factors in mitigating challenges to modular integrated construction. International Journal of Construction Management, 26(2), pp. 256-276. ISSN 1562-3599
An, X; Zheng, F; Wang, Z; Li, Z; Jiao, Y and An, H (2025) Dynamic risk assessment approach for deep foundation pit construction based on the integration of multisource data using D-S evidence theory. Journal of Construction Engineering and Management, 151(10): 04025155, ISSN 0733-9364
Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193
Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Aranda-Mena, G (2003) Mapping workers' cognitive structures of construction site hazards. PhD thesis, University of Reading, UK.
Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364
Ayeleso, A O and van Zyl, R R (2016) Photocurrents obtained from a triple planar probe sensor for in situ extreme ultraviolet (euv) radiation measurements on low earth orbiting cubesats. Journal of Engineering, Design and Technology, 14(3), pp. 641-651.
Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218
Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099
Bienvenido-Huertas, D; Rubio-Bellido, C; Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(8), pp. 928-947. ISSN 0961-3218
Bordalo, R; De Brito, J; Gaspar, P L and Silva, A (2011) Service life prediction modelling of adhesive ceramic tiling systems. Building Research & Information, 39(1), pp. 66-78. ISSN 0961-3218
Brizendine, A L (1997) Risk based analysis of levees. PhD thesis, West Virginia University, USA.
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Bulut, M B; Wilkinson, S; Khan, A; Jin, X H and Lee, C L (2022) Thermal performance of retrofitted secondary glazed windows in residential buildings: two cases from Australia. Smart and Sustainable Built Environment, 11(4), pp. 1182-1192. ISSN 2046-6099
Cai, H; Kuczek, T; Dunston, P S and Li, S (2017) Correlating intelligent compaction data to in situ soil compaction quality measurements. Journal of Construction Engineering and Management, 143(8): 04017038, ISSN 0733-9364
Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.
Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364
Chabbi, R; Ferhoune, N and Bouabdallah, F (2023) Diagnostic of degraded reinforced concrete bridges explaining the environmental condition effect and reinforcement method. International Journal of Building Pathology and Adaptation, 41(4), pp. 825-848. ISSN 23984708
Chandrasekara, C M K N K; Weerasinghe, K D N; Pathirana, S and Piyadasa, R U K (2018) Stresses over surface water sources in a human dominated environment: A case study in Hamilton canal, Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 184-197. ISSN 1759-5916
Chen, H; Hu, H; Tang, M; Yang, X and Zhu, J (2018) Hybrid bored prestressed concrete cased piles: Equipment and construction procedures. Journal of Construction Engineering and Management, 144(12): 06018006, ISSN 0733-9364
Chennarapu, H; Garala, T K; Chennareddy, R; Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction quality control of earth fills using dynamic cone penetrometer. Journal of Construction Engineering and Management, 144(9): 04018086, ISSN 0733-9364
Chew, M Y L (2021) Façade inspection for falling objects from tall buildings in Singapore. International Journal of Building Pathology and Adaptation, 41(6), pp. 162-183. ISSN 23984708
Coffey, M (1995) The propensity for participation in mechanical and electrical sub-contractors in the British construction industry. PhD thesis, University of Strathclyde, UK.
Collett, M; Hardy, A; Meulemans, J and Glew, D (2022) Evaluating the performance of a high thermal mass dwelling: Comparing predictions and in-situ measurements. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Crawley, J; Domoney, L; O'Donovan, A; Wingfield, J; Dinu, C; Kinnane, O and O'Sullivan, P (2026) Towards a universal framework for heat pump monitoring at scale. Buildings & Cities, 7(1), pp. 75-91. ISSN 2632-6655
Dave, N; Sahu, V and Misra, A K (2020) Development of geopolymer cement concrete for highway infrastructure applications. Journal of Engineering, Design and Technology, 18(5), pp. 1321-1333. ISSN 1726-0531
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364
Ekanayake, E M A C; Shen, G; Kumaraswamy, M and Owusu, E K (2022) A fuzzy synthetic evaluation of vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 29(6), pp. 2358-2381. ISSN 0969-9988
Elkhayat, Y.; Moran, P.; Barrett, S.; Barry, P. and Goggins, J. (2026) Developing a methodology with a tool for calculating and reducing the upfront carbon emissions of buildings: Ireland as a case study. Architectural Engineering and Design Management, 22(1), pp. 168-187. ISSN 1745-2007
Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Elsayed, M; Romagnoni, P; Pelsmakers, S; Castaño-Rosa, R and Klammsteiner, U (2023) The actual performance of retrofitted residential apartments: Post-occupancy evaluation study in Italy. Building Research & Information, 51(4), pp. 411-429. ISSN 0961-3218
Fagbenro, R. K.; Sunindijo, R. Y. and Illankoon, C. (2026) Prefabrication in construction: A pathway to improved mental health and well-being for workers. Engineering, Construction and Architectural Management, 33(15), pp. 249-275. ISSN 0969-9988
Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364
Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Ferreira, C; Canhoto Neves, L; Silva, A and de Brito, J (2019) Stochastic Petri-net models to predict the degradation of ceramic claddings. Building Research & Information, 47(6), pp. 697-715. ISSN 0961-3218
Flood, C and Scott, L (2020) Thermal analysis and post construction verification. International Journal of Building Pathology and Adaptation, 38(1), pp. 51-67. ISSN 23984708
Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.
Gajendran, T; Brewer, G; Runeson, G and Dainty, A (2011) Investigating informality in construction: Philosophy, paradigm and practice. Construction Economics and Building, 11(2), pp. 84-98. ISSN 2204-9029
Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364
Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(2), pp. 169-184. ISSN 01446193
Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Gupta, R; Barnfield, L and Hipwood, T (2014) Impacts of community-led energy retrofitting of owner-occupied dwellings. Building Research & Information, 42(4), pp. 446-461. ISSN 0961-3218
Guribie, F L; Kheni, N A and Sule, M (2022) Structural equation modeling of the critical driving forces of offsite construction in Ghana. Built Environment Project and Asset Management, 12(4), pp. 667-683. ISSN 2044-124X
Guven, G and Ergen, E (2013) Factors affecting the selection of data storage approach in radio frequency identification applications. Construction Innovation, 13(1), pp. 117-138. ISSN 1471-4175
Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988
Hendriks, E (2020) Assessing knowledge adoption in post-disaster reconstruction. PhD thesis, Eindhoven University of Technology, Netherlands.
Higuera-Trujillo, J L; Llinares Millán, C; Montañana i Aviñó, A and Rojas, J C (2020) Multisensory stress reduction: A neuro-architecture study of paediatric waiting rooms. Building Research & Information, 48(3), pp. 269-285. ISSN 0961-3218
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Hyde, R (1995) Buildability as a design concept for architects: A case study of laboratory buildings. Engineering, Construction and Architectural Management, 2(1), pp. 45-56. ISSN 0969-9988
Idrus A.B, N J B (2002) Construction related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20(1), pp. 13-19. ISSN 01446193
Itzhak-Ben-shalom, H.; Saroglou, T.; Multanen, V.; Vanunu, A.; Karnieli, A.; Katoshevski, D.; Davidovitch, N. and Meir, I. A. (2025) Environmental variables and air quality: Implications for planning and public health. Buildings & Cities, 6(1), pp. 597-618. ISSN 2632-6655
Jack, R; Loveday, D; Allinson, D and Lomas, K (2018) First evidence for the reliability of building co-heating tests. Building Research & Information, 46(4), pp. 383-401. ISSN 0961-3218
Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X
Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.
Jarkas, A M (2010) Buildability factors influencing micro-level formwork labour productivity of slab panels in building floors. Architectural Engineering and Design Management, 6(3), pp. 161-174. ISSN 1745-2007
Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X
Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of walls. International Journal of Construction Management, 10(4), pp. 101-117. ISSN 1562-3599
Jarkas, A M (2010) The effects of buildability factors on rebar fixing labour productivity of isolated foundations. International Journal of Construction Management, 10(2), pp. 33-51. ISSN 1562-3599
Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531
Jarkas, A M (2011) Buildability factors that influence micro-level formwork labour productivity of beams in building floors. Journal of Construction in Developing Countries, 16(1), pp. 1-18. ISSN 1823-6499
Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364
Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364
Jarkas, A M and Horner, R M W (2011) Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management and Economics, 29(5), pp. 483-493. ISSN 1466433X
Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625-639. ISSN 01446193
Jegard, L.; Castaño-Rosa, R. and Pelsmakers, S. (2026) Impact of glazed balcony design on daylight in Finnish apartments. Buildings & Cities, 7(1), pp. 576-596. ISSN 2632-6655
Kendir-Beraha, Elif (2015) Learning from the construction site: An epistemological investigation of stonemasons and architects in action. PhD thesis, RMIT University, Australia.
Lam, P T I and Wong, F W H (2011) A comparative study of buildability perspectives between clients, consultants and contractors. Construction Innovation, 11(3), pp. 305-320. ISSN 1471-4175
Langevine, R (2006) A decision support system for the maintenance management of buildings. PhD thesis, University of Alberta, Canada.
Lara, Beatriz Leão Evangelista de (2024) Construction and demolition waste prevention analysis of benefits in the context of social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.
Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364
Li, T.; Ling, F. Y. Y.; Li, Z.; Dou, Y. and Guo, Z. (2026) Portfolio optimization of prefabricated interior building component systems: A multistakeholder perspective. Journal of Construction Engineering and Management, 152(9): 04026154, ISSN 0733-9364
Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.
Lim, S H and Chan, T K (2020) Enhancing student motivation and learning with monetary prizes in a construction management undergraduate subject. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.
Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007
Ma, S; Li, Z; Li, L; Zhang, S and Zheng, R (2024) Deciphering the key characteristics of on-site industrialized construction: Inspiration from China. Journal of Construction Engineering and Management, 150(4): 05024003, ISSN 0733-9364
Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.
Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.
Pan, W and Gibb, A G F (2009) Maintenance performance evaluation of offsite and in situ bathrooms. Construction Innovation, 9(1), pp. 7-21. ISSN 1471-4175
Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X
Parkinson, T and de Dear, R (2016) Thermal pleasure in built environments: Spatial alliesthesia from contact heating. Building Research & Information, 44(3), pp. 248-262. ISSN 0961-3218
Pekmezci, B Y and Polat Pekmezci, I (2022) Development of shear strength index test probe: Its application on historic structures. International Journal of Building Pathology and Adaptation, 40(5), pp. 693-711. ISSN 23984708
Pelsmakers, S; Croxford, B and Elwell, C A (2019) Suspended timber ground floors: Measured heat loss compared with models. Building Research & Information, 47(2), pp. 127-140. ISSN 0961-3218
Pelsmakers, S; Vereecken, E; Airaksinen, M and Elwell, C C A (2019) Void conditions and potential for mould growth in insulated and uninsulated suspended timber ground floors. International Journal of Building Pathology and Adaptation, 37(4), pp. 395-425. ISSN 23984708
Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.
Pouraghajan, M; Omrani, S and Drogemuller, R (2025) Enhancing decision-making in Australian concrete construction: A decision support model using an entropy-TOPSIS approach. Engineering, Construction and Architectural Management, 32(9), pp. 5913-5942. ISSN 0969-9988
Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.
Prieto, A J; Silva, A; de Brito, J and Macias-Bernal, J M (2018) Serviceability of facade claddings. Building Research & Information, 46(2), pp. 179-12. ISSN 0961-3218
Proverbs, D G and Faniran, O O (2001) International construction performance comparisons: A study of European' and Australian contractors. Engineering, Construction and Architectural Management, 8(4), pp. 284-291. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193
Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988
Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708
Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708
Ribeiro, C; Pereira, P F; Ramos, N M M; Flores-Colen, I and Valentim, N (2024) Assessment of the impacts of balconies on indoor environmental quality in mild climate conditions, Portugal. Building Research & Information, 52(3), pp. 292-310. ISSN 0961-3218
Romanello, G (2018) Stability analysis of mobile cranes and determination of outriggers loading. Journal of Engineering, Design and Technology, 16(6), pp. 938-958. ISSN 1726-0531
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Sacks, R; Perlman, A and Barak, R (2013) Construction safety training using immersive virtual reality. Construction Management and Economics, 31(9), pp. 1005-1017. ISSN 1466433X
Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.
Silva, A; Dias, J L; Gaspar, P L and De Brito, J (2011) Service life prediction models for exterior stone cladding. Building Research & Information, 39(6), pp. 637-653. ISSN 0961-3218
Soetanto, R; Glass, J; Dainty, A R J and Price, A D F (2007) Structural frame selection: Case studies of hybrid concrete frames. Building Research & Information, 35(2), pp. 206-219. ISSN 0961-3218
Stewart, M G (1993) Modeling human performance in reinforced concrete beam construction. Journal of Construction Engineering and Management, 119(1), pp. 6-22. ISSN 0733-9364
Summa, S.; Mircoli, A.; Potena, D.; Ulpiani, G.; Diamantini, C. and Di Perna, C. (2022) Combining artificial intelligence and building engineering technologies towards energy efficiency: The case of ventilated façades. Construction Innovation, 24(7), pp. 44-64. ISSN 1471-4175
Suresh, N S; Kumar, M and Arul Daniel, S (2020) Multi-agent strategy for low voltage DC supply for a smart home. Smart and Sustainable Built Environment, 9(2), pp. 73-90. ISSN 2046-6099
Umar, M; Ofem, M I; Anwar, A S and Salisu, A G (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(4), pp. 809-827. ISSN 1726-0531
Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Wang, Y; Xue, X; Yu, T and Wang, Y (2021) Mapping the dynamics of China's prefabricated building policies from 1956 to 2019: A bibliometric analysis. Building Research & Information, 49(2), pp. 216-233. ISSN 0961-3218
Wu, S; Xie, H; Zeng, Z; Wang, M; Zhao, H and Liu, Y (2023) Influence of pea-gravel layer on segment ring support performance in shield TBM tunnels: A discrete-continuous coupling simulation and model test. Journal of Construction Engineering and Management, 149(10): 04023097, ISSN 0733-9364
Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908
Yang, C Y; Xu, M X and Chen, W F (2007) Reliability analysis of shotcrete lining during tunnel construction. Journal of Construction Engineering and Management, 133(12), pp. 975-981. ISSN 0733-9364
Yavuz, Z B (2012) Impacts of participant related factors on rebar supply chain performance in SMEs. PhD thesis, Middle East Technical University, Turkey.
Yoon, S; Kim, Y; Park, M and Ahn, C R (2023) Effects of spatial characteristics on the human-robot communication using deictic gesture in construction. Journal of Construction Engineering and Management, 149(7): 04023049, ISSN 0733-9364
Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007
Zanelli, A; Kolo, E; Monticelli, C; Rosina, E; Poli, T; Speroni, A; Mainini, A G and Cadena, J D B (2021) A removable textile hybrid structural screen for the windows of castello sforzesco, milan: When experimental metrics inform the bespoke 'design-to-construction' process in historical contexts. Architectural Engineering and Design Management, 17(3-4), pp. 196-215. ISSN 1745-2007
Zhai, X; Reed, R and Mills, A (2014) Addressing sustainable challenges in China: The contribution of off-site industrialisation. Smart and Sustainable Built Environment, 3(3), pp. 261-274. ISSN 2046-6099
Zhang, Q Q; Chen, Z G; Li, J L and Liu, S W (2021) Pressure-cast-in-situ pile with spray-expanded frustum: Construction equipment and process. Journal of Construction Engineering and Management, 147(6): 06021002, ISSN 0733-9364
Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175
Up a level