Items with Index Term: implementation

Number of items: 4433.

Ababio, B K and Lu, W (2023) Barriers and enablers of circular economy in construction: A multi-system perspective towards the development of a practical framework. Construction Management and Economics, 41(1), pp. 3-21. ISSN 01446193

Ababio, B K; Lu, W and Ghansah, F A (2023) Transitioning from green to circular procurement in developing countries: A conceptual framework for Ghana's construction sector. Building Research & Information, 51(7), pp. 798-815. ISSN 0961-3218

Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. PhD thesis, University of Pittsburgh, USA.

Abad, F and Naeni, L M (2020) A hybrid framework to assess the risk of change in construction projects using fuzzy fault tree and fuzzy event tree analysis. International Journal of Construction Management, 22(12), pp. 2385-2397. ISSN 1562-3599

Abankwa, Derek Asante (2021) What drives technology adaptation in construction firms? An investigation of the antecedents, adaptive behaviours, and outcomes. PhD thesis, University of Hong Kong, Hong Kong.

Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364

Abbas, M A; Ajayi, S O; Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(4), pp. 1306-1324. ISSN 1726-0531

Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364

Abbasianjahromi, H and Aghakarimi, M (2023) Safety performance prediction and modification strategies for construction projects via machine learning techniques. Engineering, Construction and Architectural Management, 30(3), pp. 1146-1164. ISSN 0969-9988

Abbasnejad, B; Nasirian, A; Duan, S; Diro, A; Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(5): 04024032, ISSN 0733-9364

Abbasnejad, B; Nepal, M P; Ahankoob, A; Nasirian, A and Drogemuller, R (2020) Building information modelling (BIM) adoption and implementation enablers in AEC firms: A systematic literature review. Architectural Engineering and Design Management, 17(5-6), pp. 411-433. ISSN 1745-2007

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.

Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X

Abdel Aziz, A M (2007) Successful delivery of public-private partnerships for infrastructure development. Journal of Construction Engineering and Management, 133(12), pp. 918-931. ISSN 0733-9364

Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdel-Hamid, M.; Abdelhaleem, H. M. and Abd El-Razek Fathy, A. E. (2025) Assessing the implementation of BIM for enhancing green building certification evaluations. Architectural Engineering and Design Management, 21(5), pp. 1040-1056. ISSN 1745-2007

Abdel-Razek, R H (1997) How construction managers would like their performance to be evaluated. Journal of Construction Engineering and Management, 123(3), pp. 208-213. ISSN 0733-9364

Abdel-Razek, R H (1998) Quality improvement in Egypt: Methodology and implementation. Journal of Construction Engineering and Management, 124(5), pp. 354-360. ISSN 0733-9364

Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2008) Insights into the overlap between constructionskills' footprint and other sector skills councils. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Abdelwahab, M A and Nassar, A H (2024) Legal barriers and associated solutions of BIM implementation in the Egyptian AEC industry. International Journal of Construction Management, 24(13), pp. 1431-1443. ISSN 1562-3599

Abdirad, H (2017) Metric-based BIM implementation assessment: A review of research and practice. Architectural Engineering and Design Management, 13(1), pp. 52-78. ISSN 1745-2007

Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): Two case studies. Engineering, Construction and Architectural Management, 26(1), pp. 104-117. ISSN 0969-9988

Abdirad, H and Nazari, A (2015) Barriers to effective implementation of quality management systems in public design projects in Iran. Architectural Engineering and Design Management, 11(6), pp. 457-474. ISSN 1745-2007

Abduh, M (2000) Utility assessment of electronic networking technologies for design -build projects. PhD thesis, Purdue University, USA.

Abdul Kareem, H I and Abu Bakar, A H (2013) Management procedures for realizing information technology benefits in Malaysia. International Journal of Construction Management, 13(3), pp. 1-13. ISSN 1562-3599

Abdul Karim, Mahmoud (2022) Postwar infrastructure reconstruction in Syria: How public-private partnership impacts economic growth. ArtD thesis, University of Florence, Italy.

Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.

Abdul Nasir, N A B; Hassan, A S; Khozaei, F and Abdul Nasir, M H B (2021) Investigation of spatial configuration management on social distancing of recreational clubhouse for COVID-19 in Penang, Malaysia. International Journal of Building Pathology and Adaptation, 39(5), pp. 782-810. ISSN 23984708

Abdul Nifa, F A (2013) Development of a framework for partnering through aligning organizational cultures in the Malaysian construction industry. PhD thesis, University of Salford, UK.

Abdul Rahman, N.; Belayutham, S. and Che Ibrahim, C. K. I. (2026) Socio-technical dynamics of barriers to sustainable railway projects in Malaysia. Built Environment Project and Asset Management, 16(3), pp. 637-654. ISSN 2044-124X

Abdul Razak, R.; Alias, A. R.; A.Rahman, R. and Lee, Y. S. (2026) Embedding circular economy in infrastructure through social strategies: PLS SEM approach. Journal of Engineering, Design and Technology, 24(5), pp. 1215-1234. ISSN 1726-0531

Abdul-Aziz, A R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(1), pp. 37-55. ISSN 1466433X

Abdul-Rahman, H (1996) Some observations on the management of quality among construction professionals in the UK. Construction Management and Economics, 14(6), pp. 485-495. ISSN 01446193

AbdulAzeez, A D; Etubi, U and Umar, B (2019) An assessment of multi-skilling in addressing skills shortage in Nigerian construction firms. African Journal of Built Environment Research, 3(1), pp. 1-13. ISSN 2414-0236

Abdullah, A M and Vickridge, I G (2000) The extent of multi-project management implementation in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Abdullah, A-N M (2019) Assessing economic, social, political and environmental issues related to mega-projects : A case study of Merowe Dam in Sudan. PhD thesis, University of Plymouth, UK.

Abdullah, M R and Egbu, C (2011) The application of analytical hierarchy process (AHP) as a decision tool in choosing the type of industrialised building system (IBS) for housing projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abdullah, W M W (2010) Critical factors in project success: A study of public sector construction projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.

Abdullahi, D; Renukappa, S; Suresh, S and Oloke, D (2022) Barriers for implementing solar energy initiatives in Nigeria: An empirical study. Smart and Sustainable Built Environment, 11(3), pp. 647-660. ISSN 2046-6099

Abela, A; McGrath, P; Hoxley, M and Goodhew, S (2013) A comparative analysis of implementation of the energy performance of buildings directive in the Mediterranean. International Journal of Law in the Built Environment, 5(3), pp. 222-240. ISSN 17561469

Abid, M S (1995) Reconstruction for low-income communities in earthquake zones: an investigation for the implementation of community-managed housing reconstruction programmes in low-income countries located in earthquakes zones. PhD thesis, Loughborough University, UK.

Abideen, D; Yunusa-Kaltungo, A; Manu, P and Cheung, C (2023) Expert verification of information requirements for integrating building information modelling with operation and maintenance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

Aboagye-Nimo, E and Raidén, A B (2019) Challenging standardisation by embracing ambiguities of site safety: The case of micro construction firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abohilal, S A (2017) Investigating the roles of leaders, managers and their mutual roles in aligning strategy and project management in public sector organisations: the case of the Kingdom of Saudi Arabia. PhD thesis, Brunel University, UK.

AbouMoemen, A A (2022) A BIM maturity-KPI assessment framework for a UK public sector local authority client. PhD thesis, University of Salford, UK.

Abraham, K A (2015) Influencing the design decision process: Information visualization in multi-criteria decision support systems for early-stage building design. PhD thesis, Stanford University, USA.

Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 0969-9988

Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.

Abu Awwad, K (2020) The implementation of building information modelling Level 2 in the UK construction industry: the case of small and medium enterprises. PhD thesis, Coventry University, UK.

Abu Seif, Majed D (2023) Trees on buildings: Investigating opportunities and challenges for implementation. PhD thesis, Griffith University, Australia.

Abu-Hijleh, S F and Ibbs, C W (1989) Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), pp. 430-443. ISSN 0733-9364

Abubakri, S; Mangat, P S; Grigoriadis, K and Starinieri, V (2025) Pore properties and moisture loss of repair mortars under low-impact microwave curing. International Journal of Building Pathology and Adaptation, 43(4), pp. 749-765. ISSN 2398-4708

Abuelma'atti, A (2012) A strategic approach to the implementation of information technologies in small and medium-sized architecture, engineering and construction enterprises. PhD thesis, University of Salford, UK.

Abuelmaatti, A and Ahmed, V (2010) The potential of collaborative environments implementation in small and medium enterprises for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region. PhD thesis, University of Liverpool, UK.

Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Abuzeinab, A (2015) Implementing green business models in the UK construction industry: opportunities and challenges. PhD thesis, University of Salford, UK.

Acar, E and Yalçın, N (2019) Task-related pro-environmental behaviours of architectural designers: LEED-based evidence from Turkey. Architectural Engineering and Design Management, 15(2), pp. 121-140. ISSN 1745-2007

Adam, V; Manu, P; Mahamadu, A M; Dziekonski, K; Kissi, E; Emuze, F and Lee, S (2022) Building information modelling (BIM) readiness of construction professionals: The context of the Seychelles construction industry. Journal of Engineering, Design and Technology, 20(3), pp. 823-840. ISSN 1726-0531

Adami, V S; Verschoore, J R and Antunes, J A V (2019) Effect of relational characteristics on management of wind farm interorganizational construction projects. Journal of Construction Engineering and Management, 145(3): 05018019, ISSN 0733-9364

Adamtey, S and Kereri, J O (2023) Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers. Journal of Engineering, Design and Technology, 21(5), pp. 1481-1500. ISSN 1726-0531

Addy, M; Adinyira, E and Ayarkwa, J (2018) Antecedents of building information modelling adoption among quantity surveyors in Ghana: An application of a technology acceptance model. Journal of Engineering, Design and Technology, 16(2), pp. 313-326. ISSN 1726-0531

Addy, M N; Addo, E T; Kwofie, T E and Yartey, J E (2023) Predicting the adoption of e-procurement in construction project delivery in Sub-Saharan Africa: An application of utaut2. Construction Innovation, 23(5), pp. 1038-1053. ISSN 1471-4175

Ade-Ojo, O C (2022) Awareness of the LEED requirements for green housing development among built-environment professionals in Nigeria. Built Environment Project and Asset Management, 12(4), pp. 521-536. ISSN 2044-124X

Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.

Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.

Adekunle, S A; Aigbavboa, C O and Ejohwomu, O A (2022) Understanding the BIM actor role: A study of employer and employee preference and availability in the construction industry. Engineering, Construction and Architectural Management, 31(13), pp. 160-180. ISSN 0969-9988

Adeleke, A (2017) Linking effective project management to business strategy in oil and gas industry through decision-making processes. PhD thesis, Northcentral University, USA.

Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.

Adetooto, J; Windapo, A and Pomponi, F (2024) The use of alternative building technologies as a sustainable affordable housing solution: Perspectives from South Africa. Journal of Engineering, Design and Technology, 22(5), pp. 1447-1463. ISSN 1726-0531

Adetooto, J; Windapo, A; Pomponi, F; Companie, F; Alade, K and Mtya, A (2024) Strategies to promote the acceptance of sandbag building technology for sustainable and affordable housing delivery: The South African case. Journal of Engineering, Design and Technology, 22(5), pp. 1505-1522. ISSN 1726-0531

Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.

Adeyeye, K (2024) From product to service–strategies for upscaling smart home performance monitoring. Building Research & Information, 52(1-2), pp. 107-128. ISSN 0961-3218

Adnan, N. A.; Ramali, F. N.; Yahya, N.; Amin, N. D. M.; Sabil, A.; Mohd Siraj, S. and Ismail, N. (2025) Preservation strategies for historic timber mosques: Structural integrity assessment on masjid jamek an nur, Batu Pahat, Johor. Journal of Construction in Developing Countries, 30(2), pp. 343-361. ISSN 1823-6499

Adogbo, K J (2013) Development of a framework for attracting and retaining women in construction practice. Unpublished PhD thesis, Ahmadu Bello University, Zaria, Nigeria.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.

Adshead, J (2009) An integrated approach to water protection and management: The European Union model. International Journal of Law in the Built Environment, 1(3), pp. 234-243. ISSN 1756-1450

Adu, E T and Opawole, A (2020) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology, 18(1), pp. 230-250. ISSN 1726-0531

Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531

Adu-Amankwa, N. A. N. and Rahimian, F. (2026) Harnessing blockchain-enabled digital twins for building commissioning: Examining practitioners' perspectives. Engineering, Construction and Architectural Management, 33(3), pp. 1891-1906. ISSN 0969-9988

Adukpo, Emmanuel Selorm (2018) The development of governance capabilities for project owners and operators : a dynamic capabilities perspective. PhD thesis, University of Hong Kong, Hong Kong.

Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.

Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175

Afxentiadis, D E (2010) Interpreting a major event organization's efforts to reliably manage information security risks: the case of the Athens 2004 Olympics. PhD thesis, London School of Economics and Political Science, UK.

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364

Agarwal, S; Kant, R and Shankar, R (2022) Humanitarian supply chain management: Modeling the pre and post-disaster relief operations. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 421-439. ISSN 1759-5916

Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2020) Integrated project delivery (IPD): Projecting a common good to key participants and the project. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Agbesi, K; Kissi, E and Adjei-Kumi, T (2020) Implementation of sustainable procurement practices in public sector construction organisation in Ghana. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.

Agdas, D and Ellis, R D (2010) The potential of xml technology as an answer to the data interchange problems of the construction industry. Construction Management and Economics, 28(7), pp. 737-746. ISSN 1466433X

Agumba, J N and Haupt, T C (2014) The implementation of health and safety practices: Do demographic attributes matter? Journal of Engineering, Design and Technology, 12(4), pp. 530-550.

Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.

Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Agyekum, A K; Fugar, F D K; Agyekum, K; Akomea-Frimpong, I and Pittri, H (2023) Barriers to stakeholder engagement in sustainable procurement of public works. Engineering, Construction and Architectural Management, 30(9), pp. 3840-3857. ISSN 0969-9988

Agyekum, K; Adinyira, E and Ampratwum, G (2020) Factors driving the adoption of green certification of buildings in Ghana. Smart and Sustainable Built Environment, 9(4), pp. 595-613. ISSN 2046-6099

Agyekum, K; Ghansah, F A; Tetteh, P A and Amudjie, J (2021) The role of project managers (pms) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, 19(1), pp. 245-262. ISSN 1726-0531

Agyekum, K; Pittri, H; Botchway, E A and Dompey, A M A (2024) Key attributes of designers' competencies for design-for-deconstruction implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 117-126. ISSN 17514304

Agyekum-Mensah, G; Knight, A and Pasquire, C (2012) Adaption of structured analysis design techniques methodology for construction project planning. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G; Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(1), pp. 89-102. ISSN 1466433X

Ahankoob, A; Manley, K and Abbasnejad, B (2022) The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM. International Journal of Construction Management, 22(4), pp. 588-599. ISSN 1562-3599

Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahern, E (2022) A framework for improving the process of building certification to enhance energy efficiency: the case of Ireland. DProf thesis, Anglia Ruskin University, UK.

Ahiabu, M K; Emuze, F and Das, D (2023) Perception of the benefits of sustainable construction in Ghana. Built Environment Project and Asset Management, 13(2), pp. 306-323. ISSN 2044-124X

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmad, A H (2008) Private housing development: refining rational choice. PhD thesis, University College London, UK.

Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.

Ahmad, H; An, M and Gaterell, M (2008) Km model to embed knowledge management activities into work activities in construction organisations. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ahmad, H S; An, M and Gaterell, M (2007) Development of km model to simplify knowledge management implementation in construction projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ahmad, H S M (2011) Development of knowledge management model for knowledge management implementation and application in construction projects. PhD thesis, University of Birmingham, UK.

Ahmad, Hesham Saleh Mahmoud (2011) Development of km model for knowledge management implementation and application in construction projects. PhD thesis, University of Birmingham, UK.

Ahmad, I (1990) Decision-support system for modeling bid/no-bid decision problem. Journal of Construction Engineering and Management, 116(4), pp. 595-608. ISSN 0733-9364

Ahmad, I U; Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(2), pp. 163-171. ISSN 01446193

Ahmad, I U and Sein, M K (1997) Construction project teams for TQM: A factor-element impact model. Construction Management and Economics, 15(5), pp. 457-467. ISSN 01446193

Ahmad, M A; Demian, P and Price, A D F (2012) Building information modelling implementation plans: A comparative analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahmad Shazali, A S and Tahar, K N (2020) Virtual 3D model of canseleri building via close-range photogrammetry implementation. International Journal of Building Pathology and Adaptation, 38(1), pp. 217-227. ISSN 23984708

Ahmad-Latiffi, A (2012) Performance measurement for construction businesses. PhD thesis, Loughborough University, UK.

Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988

Ahmed, A L (2019) Development of conceptual constructs for organisational BIM adoption and their systematic application within the UK architecture sector. PhD thesis, University of Sheffield, UK.

Ahmed, A M; Sayed, W; Asran, A and Nosier, I (2023) Identifying barriers to the implementation and development of sustainable construction. International Journal of Construction Management, 23(8), pp. 1277-1288. ISSN 1562-3599

Ahmed, I and McEvoy, D (2014) Post-tsunami resettlement in Sri Lanka and India: Site planning, infrastructure and services. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 53-65. ISSN 1759-5916

Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364

Ahmed, M U (2000) ‘Champions of collaboration’ in collaborative technological innovation. PhD thesis, Simon Fraser University, Canada.

Ahmed, Mohammed Ali (2020) An exploration of factors influencing quality management system implementation: The case of the Australian construction industry. PhD thesis, Queensland University of Technology, Australia.

Ahmed, S (2022) Risk management framework an analysis of risk management process in SMEs of the UK construction industry. PhD thesis, University of the West of Scotland, UK.

Ahmed, S; Hossain, M M and Haq, I (2021) Implementation of lean construction in the construction industry in Bangladesh: Awareness, benefits and challenges. International Journal of Building Pathology and Adaptation, 39(2), pp. 368-406. ISSN 23984708

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahmed, S and Sobuz, M H R (2020) Challenges of implementing lean construction in the construction industry in Bangladesh. Smart and Sustainable Built Environment, 9(2), pp. 174-207. ISSN 2046-6099

Ahmed, V S (2000) The effectiveness of computer assisted learning in construction. PhD thesis, Loughborough University, UK.

Ahuja, R.; Sawhney, A.; Jain, M.; Arif, M. and Rakshit, S. (2020) Factors influencing BIM adoption in emerging markets: The case of India. International Journal of Construction Management, 20(1), pp. 65-76. ISSN 1562-3599

Ahuja, R; Sawhney, A; Jain, M; Arif, M and Rakshit, S (2020) Factors influencing BIM adoption in emerging markets: the case of India. International Journal of Construction Management, 20(1), pp. 65-76. ISSN 1562-3599

Ahuja, Vanita (2007) It enhanced communication protocols for building project management by small and medium enterprises in the Indian construction industry. PhD thesis, Queensland University of Technology, Australia.

Aibinu, A and Papadonikolaki, E (2016) BIM implementation and project coordination in design-build procurement. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193

Aichouni, M; Messaoudene, N A; Al-Ghonamy, A and Touahmia, M (2014) An empirical study of quality management systems in the Saudi construction industry. International Journal of Construction Management, 14(3), pp. 181-190. ISSN 1562-3599

Ajayi, O O (2016) Maintenance management of prison facilities in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ajayi, S; Saad, A; Oyegoke, A and Alaka, H (2024) Enhancing productivity and sustainability through BIM-based plugins: A case study of AutoBIM carbon diagnostics system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ajayi, S O; Lister, N; Dauda, J A; Oyegoke, A and Alaka, H (2024) Influencing sub-contracted operatives' attitudes and behaviours towards improved health and safety culture in construction. Engineering, Construction and Architectural Management, 31(6), pp. 2286-2305. ISSN 0969-9988

Ajayi, S O; Oyebiyi, F and Alaka, H A (2023) Facilitating compliance with BIM ISO 19650 naming convention through automation. Journal of Engineering, Design and Technology, 21(1), pp. 108-129. ISSN 1726-0531

Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387

Ajisomo, T. O.; Saka, A.; Dauda, J. and Osuolale, M. (2025) Investigating circular economy barriers for construction and demolition waste in the construction industry: A Delphi and interpretive structural modelling approach. Construction Innovation, 26(4), pp. 1278-1308. ISSN 1471-4175

Ajslev, J Z N and Møller, J L (2023) The art of role-switching: Positioning practices and the relational roles of OSH coordinators in the Danish construction industry. Construction Management and Economics, 41(9), pp. 703-723. ISSN 01446193

Ajslev, J Z N; Wåhlin-Jacobsen, C D; Brandt, M; Møller, J L and Andersen, L L (2020) Losing face from engagement: an overlooked risk in the implementation of participatory organisational health and safety initiatives in the construction industry. Construction Management and Economics, 38(9), pp. 824-839. ISSN 01446193

Aka, A; Iji, J; Isa, R B and Bamgbade, A A (2021) Assessing the relationships between underlying strategies for effective building information modeling (BIM) implementation in Nigeria construction industry. Architectural Engineering and Design Management, 17(5-6), pp. 434-446. ISSN 1745-2007

Aka, A; Isah, A D; Eze, C J and Timileyin, O (2020) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(3), pp. 658-679. ISSN 0969-9988

Akadiri, O P (2011) Development of a multi-criteria approach for the selection of sustainable materials for building projects. PhD thesis, University of Wolverhampton, UK.

Akbari, S; Pour Rahimian, F; Sheikhkhoshkar, M; Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation, 20(4), pp. 545-567. ISSN 1471-4175

Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akindele, O E; Ajayi, S; Toriola-Coker, L; Oyegoke, A S; Alaka, H and Zulu, S L (2023) Sustainable construction practice in Nigeria: Barriers and strategies for improvement. Built Environment Project and Asset Management, 13(4), pp. 590-609. ISSN 2044-124X

Akinnola, P (2021) Improving project performance on construction projects through stakeholder management-an action research inquiry. PhD thesis, University of Liverpool, UK.

Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599

Akinradewo, O; Aigbavboa, C; Oke, A; Edwards, D and Kasongo, N (2023) Key requirements for effective implementation of building information modelling for maintenance management. International Journal of Construction Management, 23(11), pp. 1902-1910. ISSN 1562-3599

Akinradewo, O I; Aigbavboa, C O; Edwards, D J and Oke, A E (2022) A principal component analysis of barriers to the implementation of blockchain technology in the South African built environment. Journal of Engineering, Design and Technology, 20(4), pp. 914-934. ISSN 1726-0531

Akintola, A; Root, D and Venkatachalam, S (2017) Key constraints to optimal and widespread implementation of BIM in the South African construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Akintola, A; Venkatachalam, S and Root, D (2020) Understanding BIM's impact on professional work practices using activity theory. Construction Management and Economics, 38(5), pp. 447-467. ISSN 01446193

Akintola, A A; Venkatachalam, S; Root, D and Oti, A H (2021) Distilling agency in BIM-induced change in work practices. Construction Innovation, 21(3), pp. 490-522. ISSN 1471-4175

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Akmam Syed Zakaria, S and Amtered El-Abidi, K M (2021) Economic effects of migrant labor on industrialized building system (IBS) adoption in the Malaysian construction industry. Architectural Engineering and Design Management, 17(1-2), pp. 50-66. ISSN 1745-2007

Akomah, B B and Ramani, P V (2025) Confirmatory factor analysis of the positive factors influencing the performance of Ghanaian construction projects. Construction Innovation, 25(4), pp. 1250-1286. ISSN 1471-4175

Akomea-Frimpong, I; Jin, X; Osei Kyei, R; Tetteh, P A; Tumpa, R J; Ofori, J N A and Pariafsai, F (2024) A review of circular economy models and success factors on public-private partnership infrastructure development. Built Environment Project and Asset Management, 14(1), pp. 109-126. ISSN 2044-124X

Akotia, J and Fortune, C (2012) Early stage evaluation of the socio-economic benefits of built environment housing regeneration projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Aksorn, T and Hadikusumo, B H W (2007) Gap analysis approach for construction safety program improvement. Journal of Construction in Developing Countries, 12(1), pp. 77-97. ISSN 1823-6499

Akter, J; Datta, S D; Islam, M; Tayeh, B A; Sraboni, S A and Das, N (2025) Assessment and analysis of the effects of implementing building information modelling as a lean management tool in construction management. International Journal of Building Pathology and Adaptation, 43(4), pp. 877-894. ISSN 2398-4708

Al Ahbabi, M and Alshawi, M (2015) BIM for client organisations: A continuous improvement approach. Construction Innovation, 15(4), pp. 402-408. ISSN 1471-4175

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.

Al Dairi, J S S (2017) The design and development of a knowledge-based lean six sigma maintenance system for sustainable buildings. PhD thesis, University of Bradford, UK.

Al Hashemi, A (2011) Examining the relationship between migration, labour and crime in UAE: the case of Dubai. PhD thesis, University of Portsmouth, UK.

Al Hatmi, H (2012) Business relationships: A cross-culture management investigation in the UAE construction industry. PhD thesis, Liverpool John Moores University, UK.

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Al Hosni, I S; Amoudi, O and Callaghan, N (2020) An exploratory study on challenges of circular economy in the built environment in Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 104-113. ISSN 17514304

Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.

Al Neyadi, A (2019) Sustainable and digital strategies for enhancing United Arab Emirates construction industry competiveness. PhD thesis, University of Wolverhampton, UK.

Al Sanad, S A (2014) The promotion of sustainable construction practices in Kuwait. PhD thesis, University of Manchester, UK.

Al Shamsi, S K (2019) Managing construction projects in the United Arab Emirates to gain competitive advantage. PhD thesis, University of Wolverhampton, UK.

Al Solaiman, Sultan (2014) An empirical study of the factors impacting on the involvement of clients in Saudi Arabian construction projects. PhD thesis, Queensland University of Technology, Australia.

Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.

Al Yahya, M; Skitmore, M; Bridge, A; Nepal, M and Cattell, D (2018) e-Tendering readiness in construction: the posterior model. Construction Innovation, 18(2), pp. 183-205. ISSN 1471-4175

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.

Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Balushi, R A; Kaka, A and Fortune, C (2004) Project management processes and the achievement of organizational strategies: The case of telecomm. Operator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.

Al-Bizri, S and Gray, C (2010) Management framework for technology clusters implementation. Construction Management and Economics, 28(7), pp. 771-782. ISSN 1466433X

Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599

Al-Fahad, J Y (2012) Reform of building codes, regulations, administration and enforcement in Kuwait: within the legal, administrative, technical & social framework. PhD thesis, Loughborough University, UK.

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Ghassani, A M; Kamara, J M; Anumba, C J and Carrillo, P M (2006) Prototype system for knowledge problem definition. Journal of Construction Engineering and Management, 132(5), pp. 516-524. ISSN 0733-9364

Al-Hachami, Z (2020) Decision making in the oil and gas construction project management: structured VS discretionary. PhD thesis, University of Liverpool, UK.

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.

Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007

Al-Harasis, D H; Jabi, W and Sharmin, T (2025) Developing a taxonomy for sensory-informed architectural design qualities in autism. Building Research & Information, 53(4), pp. 532-551. ISSN 0961-3218

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Kayed, A. A.; Rotimi, F. E.; Purushothaman, M. B.; Pawley, M. and Ghaffarian Hoseini, A. (2026) Modelling the enablers of effective digital technology implementation for competitiveness enhancement among subcontracting organisations in new zealand's residential construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 894-919. ISSN 1726-0531

Al-Khiami, M. I.; Lindhard, S. M. and Wandahl, S. (2026) Cross-cultural analysis of movement patterns and work-related musculoskeletal disorders in Danish and Kuwaiti construction: Implications for targeted exoskeleton design. International Journal of Construction Management, 26(8), pp. 1690-1706. ISSN 1562-3599

Al-Khiami, M. I. and Lindhard, Sø M. (2026) On-site evaluation of back-support exoskeleton effectiveness in construction: A multiple case study of physical performance, ergonomic comfort, and user acceptance among masonry workers. Journal of Construction Engineering and Management, 152(10): 04026167, ISSN 0733-9364

Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq. PhD thesis, University of Southampton, UK.

Al-Mhdawi, M K S; Brito, M; Onggo, B S; Qazi, A; O'Connor, A and Namian, M (2023) Construction risk management in Iraq during the COVID-19 pandemic: Challenges to implementation and efficacy of practices. Journal of Construction Engineering and Management, 149(9): 04023086, ISSN 0733-9364

Al-Mohammad, M S; Haron, A T; Aloko, M N and Rahman, R A (2023) Factors affecting BIM implementation in post-conflict low-income economies: The case of Afghanistan. Journal of Engineering, Design and Technology, 21(1), pp. 299-318. ISSN 1726-0531

Al-Mohammad, M S; Haron, A T; Esa, M; Aloko, M N; Alhammadi, Y; Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: Evidence from countries with different income levels. Construction Innovation, 23(3), pp. 683-710. ISSN 1471-4175

Al-Muqdadi, F (2020) Assessing the potentials of heritage building information modelling (HBIM) in damaged heritage reconstruction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Al-Musleh, A M (2011) Development of a framework for total quality management principles in the construction companies with special reference to the construction companies in the state of Qatar. PhD thesis, Queen Mary University of London, UK.

Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Nakeeb, A A R (2000) An assessment of the effectiveness of quality assurance systems in the construction industry. PhD thesis, University of South Wales, UK.

Al-Omari, J A (1992) Critique of aspects of development theory using construction industry as a capital-surplus developing economy as an exemplar. PhD thesis, University of Reading, UK.

Al-Qayoudhi, S. A. S.; Kamal, E. M. and Said, I. (2026) Improving total quality management implementation at the University of Technology and Applied Sciences in the Sultanate of Oman. Journal of Construction in Developing Countries, 30(Supp.), pp. 15-37. ISSN 1823-6499

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Rqaibat, Sana'A Mohammad (2019) A framework for the implementation of digital technologies in the concept stage of the architectural design process. PhD thesis, Virginia Tech, USA.

Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia. PhD thesis, University of Washington, USA.

Al-Shabbani, Z (2019) Improving safety performance of highway maintenance crews through pre-task safety toolbox talks. PhD thesis, University of Kentucky, USA.

Al-Shammari, M A (2014) An appraisal of the protocol that was published by the construction industry council (CIC) to facilitate the use of building information modelling (BIM) on projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Al-Sinan, M A (2004) TQM and the construction industry: Saudi Arabia: a case study. PhD thesis, City, University of London, UK.

Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.

Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.

Al-Yami, A and Sanni-Anibire, M O (2021) BIM in the Saudi Arabian construction industry: State of the art, benefit and barriers. International Journal of Building Pathology and Adaptation, 39(1), pp. 33-47. ISSN 23984708

Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.

Al-Zubi, M (2011) The impact of organizational culture on knowledge sharing in the construction sector in Jordan. PhD thesis, University of Salford, UK.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management. PhD thesis, Iowa State University, USA.

AlHamouri, K; Caldas, C H; Hwang, B G; Krishnankutty, P and de Oliveira, D P (2021) Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities: A case study. International Journal of Construction Management, 21(11), pp. 1115-1129. ISSN 1562-3599

AlMunifi, A A and Almutairi, S (2021) Lessons learned framework for efficient delivery of construction projects in Saudi Arabia. Construction Economics and Building, 21(4), pp. 115-141. ISSN 2204-9029

AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.

Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(5), pp. 1377-1396. ISSN 0969-9988

Alade, W A (2020) Environmental and socio-economic impacts of Ojodu-Berger Road upgrade, Lagos, Nigeria. Journal of Construction Business and Management, 4(1), pp. 24-33. ISSN 2521-0165

Alajmi, A M R F (2009) The delivery of value for money in public sector projects in Qatar. PhD thesis, University of Leeds, UK.

Alamil, H M (2022) Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations. PhD thesis, University of Wolverhampton, UK.

Alamoudi, A K; Abidoye, R B and Lam, T Y M (2024) An evaluation of stakeholders' participation process in developing smart sustainable cities in Saudi Arabia. Smart and Sustainable Built Environment, 13(5), pp. 1074-1095. ISSN 2046-6099

Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.

Alansari, A M (2019) Risk assessment for marine construction projects. PhD thesis, Claremont Graduate University, USA.

Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988

Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alazemi, W (2013) Total quality management within the construction industry of Kuwait: the role of Total Quality Management and its usage. PhD thesis, Loughborough University, UK.

Albalawi, R K (2023) Comprehensive analysis of the multiskilling strategy among craft professionals in the construction industry. PhD thesis, University of Colorado at Boulder, USA.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry. PhD thesis, Aston University, UK.

Albayoudh, K A F (2003) Assessment of total quality management in the Saudi construction industry organisations. PhD thesis, Loughborough University, UK.

Albert, A (2013) Strategies for construction hazard recognition. PhD thesis, University of Colorado at Boulder, USA.

Albert, A; Hallowell, M R; Lingard, H and Kleiner, B M (2015) Multiple baseline testing: Experimental method for drawing causal inferences in construction engineering and management research. Journal of Construction Engineering and Management, 141(7): 4015012, ISSN 0733-9364

Alchaer, E and Issa, C A (2020) Engineering productivity measurement: A novel approach. Journal of Construction Engineering and Management, 146(8): 0001875, ISSN 0733-9364

Aldhanhani, M A A (2018) Enablers and barriers to knowledge sharing in the UAE infrastructural projects. PhD thesis, British University in Dubai, UAE.

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Employee reactions to adoption of alternative project delivery methods within the AEC industry. International Journal of Construction Education and Research, 19(1), pp. 4-21. ISSN 1557-8771

Aldossari, K M A (2020) Organizational change management for the adoption of alternative project delivery methods within the AEC industry. PhD thesis, Arizona State University, USA.

Alencastro, J; Fuertes, A and de Wilde, P (2020) Quality management in UK social housing projects: Addressing thermal performance. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alencastro, J; Fuertes, A and de Wilde, P (2024) Investigating the influence of quality management on building thermal performance. Engineering, Construction and Architectural Management, 31(8), pp. 3356-3376. ISSN 0969-9988

Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries. PhD thesis, Brunel University, UK.

Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007

Algarni, A M; Arditi, D and Polat, G (2007) Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728-735. ISSN 0733-9364

Alghadeer, Abdulaziz I (2013) Influence of socio-cultural and technological factors on the adoption of the project management office (pmo) in Saudi Arabia: An innovation diffusion perspective. PhD thesis, Griffith University, Saudi Arabia.

Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.

Alhallaq, M. and Artan, D. (2026) Assessing contractors' circular economy performance: Barriers and system requirements. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708

Alhammadi, Y (2017) Developing and evaluation the implementation of construction management research in the Saudi construction industry. PhD thesis, Arizona State University, USA.

Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.

Alhazmi, T and McCaffer, R (2000) Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184. ISSN 0733-9364

Alhemoud, A M (1996) The development and testing of a comprehensive tool for assessing the effectiveness of occupational safety and health programs. PhD thesis, University of Cincinnati, USA.

Alhozaimy, A M and Al-Negheimish, A I (1999) Introducing and managing quality scheme for rmc industry in Saudi Arabia. Journal of Construction Engineering and Management, 125(4), pp. 249-255. ISSN 0733-9364

Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.

Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector. PhD thesis, University of Portsmouth, UK.

Alhusban, M; Elghaish, F; Hosseini, M R and Mayouf, M (2025) Revamping established project procurement approaches to support BIM implementation. Smart and Sustainable Built Environment, 14(3), pp. 672-695. ISSN 2046-6099

Alhusban, M; Nasereddin, M; Alghossoon, A and Hatamleh, M T (2025) A hybrid conceptual procurement framework for BIM uptake to enhance buildings' sustainability performance in the Jordanian public sector. International Journal of Building Pathology and Adaptation, 43(1), pp. 93-116. ISSN 2398-4708

Ali, A; Wang, H; Soomro, M A and Islam, T (2020) Shared leadership and team creativity: Construction industry perspective. Journal of Construction Engineering and Management, 146(10): 04020122, ISSN 0733-9364

Ali, A H and Kineber, A F (2025) Unveiling and modelling the impact of safety drivers on the overall success of construction projects in developing countries. International Journal of Construction Management, 25(11), pp. 1357-1379. ISSN 1562-3599

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Ali, Atif (2010) Investigating project management practices in public sector organisations of a less developed country. PhD thesis, RMIT University, Australia.

Ali, G M; Olearczyk, J; Bouferguene, A and Al-Hussein, M (2021) Implementation of combined loading to calculate ground bearing pressure under crawler crane tracks. Journal of Construction Engineering and Management, 147(7): 04021051, ISSN 0733-9364

Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.

Alim, S (1985) Fuzzy expert systems in civil engineering. PhD thesis, Imperial College London, UK.

Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304

Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499

Alinaitwe, H M (2009) Prioritising lean construction barriers in Uganda's construction industry. Journal of Construction in Developing Countries, 14(1), pp. 15-30. ISSN 1823-6499

Aliu, J and Oke, A E (2023) Construction in the digital age: Exploring the benefits of digital technologies. Built Environment Project and Asset Management, 13(3), pp. 412-429. ISSN 2044-124X

Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599

Aliyu, A A (2014) Product stewardship as a novel sustainability pathway for the UK precast concrete industry. PhD thesis, Loughborough University, UK.

Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.

Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.

Alkatheeri, A (2018) An investigative study on the relationship between organizational factors and knowledge management effectiveness in UAE public organizations: the case study of Abu Dhabi. PhD thesis, University of Wolverhampton, UK.

Alketbi, S R (2020) Effective implementation of value engineering in the housing construction programmes of the UAE. PhD thesis, University of Wolverhampton, UK.

Alkhaldi, M (2019) Impact of human errors on accidents in the oil and gas industry in Bahrain. PhD thesis, University of Salford, UK.

Alkhard, A (2016) Analysis of influencing factors on safety culture in the construction industry of Saudi Arabia. PhD thesis, University of Florida, USA.

Alkhard, A (2024) Leveraging digital asset management and meta-data integration for enhanced asset management. Construction Economics and Building, 24(3), pp. 76-94. ISSN 2204-9029

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Allport, R J (2015) Pre-implementation planning: The weak link in rail projects 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 205-212. ISSN 17514304

Allport, R J and Anderson, R J (2011) Managing strategic risk: the worldwide experience of metros. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 173-180. ISSN 17514304

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(1), pp. 57-64. ISSN 1562-3599

Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175

Almarri, K; Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), pp. 2307-2325. ISSN 0969-9988

Almarri, K and Boussabaine, H (2025) Critical success factors for public–private partnerships in smart city infrastructure projects. Construction Innovation, 25(2), pp. 224-247. ISSN 1471-4175

Almatari, H A Q; Chan, M and Masrom, M A N (2024) Factors inhibiting the adoption of industrial revolution 4.0 in malaysian construction industry. Smart and Sustainable Built Environment, 13(4), pp. 1041-1065. ISSN 2046-6099

Almutiri, Y R (2016) Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia. PhD thesis, University of Salford, UK.

Aloini, D; Dulmin, R; Mininno, V and Ponticelli, S (2012) A conceptual model for construction supply chain management implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Along, N Z B; Ahmed, I and MacKee, J (2024) Flood knowledge management by multiple stakeholders: An example from Malaysia. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 141-157. ISSN 1759-5916

Alosaimi, H (2019) Embedding knowledge management strategies in the Kingdom of Saudi Arabia construction industry. PhD thesis, University of Wolverhampton, UK.

Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms. PhD thesis, Illinois Institute of Technology, USA.

Alothman, A and Vilventhan, A (2025) Development of building information model-enabled facility management for metro rail stations. Journal of Construction Engineering and Management, 151(3): 05024018, ISSN 0733-9364

Alpmen, A S (2013) Development and implementation of a proactive safety performance evaluation system for general contractors. PhD thesis, Wayne State University, USA.

Alqahtani, A (2019) An appraisal of the role of project management offices in promoting knowledge management within KSA construction companies. PhD thesis, University of Salford, UK.

Alqahtani, A (2019) An appraisal of the role of project management offices (PMO) in promoting knowledge management (km) within KSA construction companies. PhD thesis, University of Salford, UK.

Alqarni, M (2017) Developing a framework to improve the implementation of geospatial technology in the planning and delivery of infrastructure for residential areas in Saudi Arabia: a case study of Riyadh city. PhD thesis, Northumbria University, UK.

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.

Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.

Alreshidi, E (2015) Towards facilitating team collaboration during construction project via the development of cloud-based BIM governance solution. PhD thesis, Cardiff University, UK.

Alsahli, A (2011) A framework for successful implementation of IT for the construction organizations in Saudi Arabia. PhD thesis, University of Salford, UK.

Alsedairy, F S (2019) Dynamics of mega infrastructure decision-making in Saudi Arabia. PhD thesis, University of Edinburgh, UK.

Alsehaimi, A O and Sanni-Anibire, M O (2026) Industry 4.0 technologies: An examination of benefits, challenges and critical success factors for implementation in the Saudi construction industry. Construction Innovation, 26(2), pp. 607-630. ISSN 1471-4175

Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988

Alsemari, M A A A and Ramegowda, M (2025) BIM-based approach to manage basra oil company projects. Smart and Sustainable Built Environment, 14(6), pp. 1824-1845. ISSN 2046-6099

Alshahrani, A Y (2020) Interpretive investigation into the implementation of sustainable business models within Saudi housing construction industry. PhD thesis, University of Salford, UK.

Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175

Alshehri, A R (2016) Quality management system for building maintenance. PhD thesis, Heriot-Watt University, UK.

Alsheikh-Salem, Y M-B (2022) The development of a sustainability risk assessment model for construction projects: A case study on the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.

Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 0969-9988

Alsulaiman, Y; Bowles, G and Ogunlana, S (2014) Evaluating risk management in independent water and power plant projects in Saudi Arabia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness. PhD thesis, Heriot-Watt University, UK.

Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Altayeb, S A (1990) Drug testing and its impact on the incident rate in the construction industry. PhD thesis, Clemson University, USA.

Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process. PhD thesis, University of Alberta, Canada.

Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation, 19(1), pp. 110-124. ISSN 1471-4175

Alves, T d C L; Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525. ISSN 0969-9988

Alyatama, M (2021) Application of agile project management in Kuwait oil and gas capital projects. PhD thesis, University of Northampton, UK.

Alzaben, A A (2016) Under the shadow of sharia law: the implementation of Government Procurement Agreement provisions by Saudi Arabian government tenders and procurement law. PhD thesis, University of Hull, UK.

Amade, B; Ogbonna, A C and Nkeleme, E I (2022) An investigation of the factors affecting successful enterprise resource planning (ERP) implementation in Nigeria. Journal of Construction in Developing Countries, 27(1), pp. 41-63. ISSN 1823-6499

Amadi, C; Carrillo, P and Tuuli, M (2020) PPP projects: Improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(2), pp. 544-560. ISSN 0969-9988

Amakali, T R; Cook, G and Larsen, G D (2012) Striving for inclusive design in the built environment: Learning strategy adopted by policy implementers at local authorities in England. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Amarasinghe, I A and Hadiwattege, C (2022) Enablers for facilitating life cycle assessment: Key stakeholder perspectives of Sri Lankan construction industry. Built Environment Project and Asset Management, 12(4), pp. 590-612. ISSN 2044-124X

Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988

Amavasai, A (2023) Beyond the deterministic approach: On the feasibility of data assimilation methods in geotechnics. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ambekar, S; Roy, D; Hiray, A; Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: A case of construction, real estate, infrastructure and project (crip) sectors. Engineering, Construction and Architectural Management, 29(7), pp. 2878-2902. ISSN 0969-9988

Ambituuni, A. (2026) Infrastructure transparency initiative and anticorruption in public infrastructure projects: A principal-agent perspective to the antecedents that enable (or hinder) the effectiveness of transparency. Engineering, Construction and Architectural Management, 33(7), pp. 5934-5957. ISSN 0969-9988

Ameh, H and Lamond, J (2025) Public preference of flood-resilient housing technologies in Nigeria: A case study of Kogi State. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 87-103. ISSN 1759-5908

Ameyaw, C; Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(3), pp. 268-285. ISSN 1366-4387

Amini, M; Mahdavinejad, M and Bemanian, M (2019) Future of interactive architecture in developing countries: Challenges and opportunities in case of Tehran. Journal of Construction in Developing Countries, 24(1), pp. 163-184. ISSN 1823-6499

Amiri, Mojtaba and Saghatforoush, Ehsan (2026) From exploration to prioritization: Advancing BIM-IOT integration for construction health and safety improvement. Journal of Construction Business and Management, 8(S1), pp. 125-139. ISSN 2521-0165

Amiri, O; Rahimi, M; Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: A hybrid approach. International Journal of Building Pathology and Adaptation, 42(3), pp. 369-385. ISSN 23984708

Amiri Ara, R; Paardenkooper, K and van Duin, R (2022) A new blockchain system design to improve the supply chain of engineering, procurement and construction (EPC) companies: a case study in the oil and gas sector. Journal of Engineering, Design and Technology, 20(4), pp. 887-913. ISSN 1726-0531

Amiril, A (2014) The importance and implementation of sustainability factors in Malaysian railway projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Amirtash, P; Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for international engineering, procurement and construction projects. Built Environment Project and Asset Management, 11(2), pp. 330-349. ISSN 2044-124X

Amirudin, R B (1998) The application of a knowledge-based engineering approach to the structural design of steel framed office buildings. PhD thesis, University of Reading, UK.

Ammar, Ashtarout (2023) Digital twins for ancillary transportation asset data management. PhD thesis, University of Kentucky, USA.

Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Amoah, C (2023) Quality management framework for government social housing construction in South Africa. International Journal of Building Pathology and Adaptation, 41(6), pp. 217-236. ISSN 23984708

Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599

Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708

Amos, D; Musa, Z N and Au-Yong, C P (2020) Performance measurement of facilities management services in Ghana's public hospitals. Building Research & Information, 48(2), pp. 218-238. ISSN 0961-3218

Ampratwum, G; Agyekum, K; Adinyira, E and Duah, D (2021) A framework for the implementation of green certification of buildings in Ghana. International Journal of Construction Management, 21(12), pp. 1263-1277. ISSN 1562-3599

Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029

Amudjie, J; Agyekum, K; Adinyira, E; Amos-Abanyie, S and Botchway, E A (2025) Implementing the principles of circular economy in the construction industry: Exploratory and confirmatory factor analyses of strategies. Construction Innovation, 25(3), pp. 761-786. ISSN 1471-4175

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Anastassakou, M (2008) Organisational benefits using explicit project management tools, techniques and knowledge. PhD thesis, University College London, UK.

Ancapi, F B (2023) Ex ante analysis of circular built environment policy coherence. Buildings & Cities, 4(1), pp. 575-593. ISSN 2632-6655

Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988

Andersen, C E; Kanafani, K; Zimmermann, R K; Rasmussen, F N and Birgisdóttir, H (2020) Comparison of GHG emissions from circular and conventional building components. Buildings & Cities, 1(1), pp. 379-392. ISSN 2632-6655

Andersen, L P; Karlsen, I L; Kines, P; Joensson, T and Nielsen, K J (2015) Social identity in the construction industry: Implications for safety perception and behaviour. Construction Management and Economics, 33(8), pp. 640-652. ISSN 01446193

Andersen, T O M and Gaarslev, A (1996) Perspectives on artificial intelligence in the construction industry. Engineering, Construction and Architectural Management, 3(1-2), pp. 3-14. ISSN 0969-9988

Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.

Andreas, B (2019) A framework for understanding the policy process for construction. PhD thesis, Loughborough University, UK.

Angelidi, A (2007) Delays in construction projects in Greece: Causes, effects and project management tools. PhD thesis, University College London, UK.

Aniftos, S C (1996) International standards: United States construction industry competitiveness. PhD thesis, Polytechnic University, USA.

Anjomshoa, E (2025) The application of building information modeling (BIM) system in the smartification of green and sustainable buildings. Engineering, Construction and Architectural Management, 32(8), pp. 5194-5227. ISSN 0969-9988

Ankomah, E N; Ayarkwa, J and Agyekum, K (2020) Status of lean construction implementation among small and medium building contractors (SMBCs) in Ghana. Journal of Engineering, Design and Technology, 18(6), pp. 1691-1709. ISSN 1726-0531

Annor, John (2025) Building pathways to the future: Leveraging collaborative instruction platforms to address global and regional challenges in construction workforce education. PhD thesis, University of Wyoming, USA.

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(3), pp. 1-20. ISSN 2204-9029

Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Ansell, M (2009) A study of a collaborative framework arrangement for highways renewals schemes. EngD thesis, Loughborough University, UK.

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Antoniadis, D (2009) Managing complexity in project teams. PhD thesis, Loughborough University, UK.

Antoniadis, D N; Edum-Fotwe, F T; Thorpe, A and McCaffer, R (2009) Complexity effect of project team member selection practices in construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Anugwo, I C; Shakantu, W; Saidu, I and Adamu, A (2018) Potentiality of the South African construction smme contractors globalising within and beyond the SADC construction markets. Journal of Construction Business and Management, 2(1), pp. 41-49. ISSN 2521-0165

Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.

Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988

Anvuur, A M; Kumaraswamy, M M and Mahesh, G (2011) Building relationally integrated value networks (RIVANS). Engineering, Construction and Architectural Management, 18(1), pp. 102-120. ISSN 0969-9988

Anzagira, L F; Duah, D; Badu, E; Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: The case of Ghana. Journal of Engineering, Design and Technology, 22(3), pp. 1012-1029. ISSN 1726-0531

Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Aouad, G F; Bakis, N; Amaratunga, D; Osbaldiston, S; Sun, M; Kishk, M; Al-Hajj, A and Pollock, R (2001) An integrated life cycle costing database: A conceptual framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Apinayan, K.; Perera, B. A. K. S.; Weerasooriya, D. and Ranadewa, K. A. T. O. (2026) Adaptability of BIM technology for detailed cost estimation in Sri Lankan construction industry. Journal of Engineering, Design and Technology, 24(3), pp. 633-665. ISSN 1726-0531

Apostolopoulos, C (2015) Risk assessment for change management within project management: a hierarchical model process approach. PhD thesis, City, University of London, UK.

Appell, H (2020) Workers of Europe unite!? Explaining the form of European labor organization: The construction industry. PhD thesis, Freie Universitaet Berlin, Germany.

Aquere, A L; Dinis-Carvalho, J and Lima, R M (2013) Project cell: Cellular organization of the building design process. Journal of Construction Engineering and Management, 139(5), pp. 538-546. ISSN 0733-9364

Arabi, S; Eshtehardian, E and Shafiei, I (2022) Using Bayesian networks for selecting risk-response strategies in construction projects. Journal of Construction Engineering and Management, 148(8): 04022067, ISSN 0733-9364

Arafa, E A B (2015) The impact of knowledge management on project success. PhD thesis, University of Portsmouth, UK.

Arafat, G H (1991) Concept evaluation in structural design utilizing multiattribute utility theory and a knowledge-based approach. PhD thesis, Wayne State University, USA.

Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Aranda-Mena, G (2003) Mapping workers' cognitive structures of construction site hazards. PhD thesis, University of Reading, UK.

Araujo, L G; Piña, A B S; Aidar, L A G; Coelho, G O and Carvalho, M T M (2019) Recommendations and guidelines for implementing PPP projects: Case of the electricity sector in Brazil. Built Environment Project and Asset Management, 9(2), pp. 262-276. ISSN 2044-124X

Aravindraj, S and Vinodh, S (2014) Forty criteria based agility assessment using scoring approach in an Indian relays manufacturing organization. Journal of Engineering, Design and Technology, 12(4), pp. 507-518.

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988

Arayici, Y; Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(3), pp. 179-200. ISSN 1471-4175

Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099

Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175

Arbabi, H; Salehi-Taleshi, M J and Ghods, K (2020) The role of project management office in developing knowledge management infrastructure. Engineering, Construction and Architectural Management, 27(10), pp. 3261-3287. ISSN 0969-9988

Arditi, D (1983) Diffusion of network planning in construction. Journal of Construction Engineering and Management, 109(1), pp. 1-12. ISSN 0733-9364

Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364

Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364

Arico, Manuela (2025) Application of scan-to-BIM approaches to HBIM digitisations in architectural heritage environment for documentation, management and conservation purposes. PhD thesis, Università degli Studi di Palermo, Italy.

Arif, M; Bendi, D; Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: An exploratory study. Construction Innovation, 12(2), pp. 133-155. ISSN 1471-4175

Arif, M; Egbu, C; Haleem, A; Kulonda, D and Khalfan, M (2009) State of green construction in India: Drivers and challenges. Journal of Engineering, Design and Technology, 7(2), pp. 223-234. ISSN 1726-0531

Arif, M; Khalfan, M; Barnard, J H and Heller, N A (2012) Assessing knowledge retention in construction organisations: Cases from the UAE. Construction Economics and Building, 12(2), pp. 55-71. ISSN 2204-9029

Arjun, R A S and Vinodh, S (2016) A case study on application of oreste for agile concept selection. Journal of Engineering, Design and Technology, 14(4), pp. 781-801.

Arnold, J A (2000) Information interoperation for internet-based component engineering analysis. PhD thesis, Stanford University, USA.

Arnold, P and Javernick-Will, A (2013) Projectwide access: Key to effective implementation of construction project management software systems. Journal of Construction Engineering and Management, 139(5), pp. 510-518. ISSN 0733-9364

Arora, M; Prakash, A; Mittal, A and Singh, S (2024) Examining the slow acceptance of HR analytics in the Indian engineering and construction industry: A SEM-ann-based approach. Engineering, Construction and Architectural Management, 31(5), pp. 1973-1993. ISSN 0969-9988

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599

Arowoiya, V A; Oke, A E; Ojo, L D and Adelusi, A O (2024) Driving factors for the adoption of digital twin technology implementation for construction project performance in Nigeria. Journal of Construction Engineering and Management, 150(1): 05023014, ISSN 0733-9364

Arvanitis, L.; Al-Tarazi, D.; Agyekum, K.; Kissi, E.; Manu, P.; Mahamadu, A. M.; Booth, C.; Prabhakaran, A. and Pittri, H. (2025) BIM maturity and its influence on BIM implementation challenges: The perspectives of UK contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 231-243. ISSN 1751-4304

Asad, M M; Hassan, R B; Sherwani, F; Rind, I A and Maiji, Y (2020) Development of a novel safety and health educational management information system (HAZ-PRO) for oil and gas production operation: A proposed framework. Journal of Engineering, Design and Technology, 18(5), pp. 959-971. ISSN 1726-0531

Asadian, E; Azeez, S; Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(5): 04024029, ISSN 0733-9364

Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies. PhD thesis, University of the West of England, Bristol, UK.

Asare, S O; Fobiri, G and Bondinuba, F K (2025) Enhancing fairness, transparency and accountability during tendering under Ghana's procurement system: A systematic review. Built Environment Project and Asset Management, 15(1), pp. 33-50. ISSN 2044-124X

Asefi, Maziar (2007) Transformable architectural structures: Background, development, evaluation and design. PhD thesis, University of Liverpool, UK.

Ashkanani, S (2023) Project management of large and complex-projects: The case of “lng megaprojects in the state of Qatar”. PhD thesis, Hamad Bin Khalifa University, Qatar.

Asiedu, R. O.; Amoakwa, A. B.; Ameyaw, C.; Owusu-Manu, D. G.; Daniels, P. A. and Gyimah, S. (2026) Environmental, social, and governance considerations in sustainable construction project delivery. Construction Economics and Building, 26(2), ISSN 2204-9029

Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499

Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387

Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.

Aslam, M; Baffoe-Twum, E and Malik, S (2024) Benchmarking lean construction conformance in Pakistan's construction industry. Engineering, Construction and Architectural Management, 31(5), pp. 2077-2100. ISSN 0969-9988

Aslam, M; Gao, Z and Smith, G (2022) Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, 22(8), pp. 1559-1570. ISSN 1562-3599

Aslani, F; Amini Hosseini, K and Fallahi, A (2020) A framework for earthquake resilience at neighborhood level. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 557-575. ISSN 1759-5916

Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.

Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364

Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364

Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364

Assaf, M; Al-Hussein, M and Li, X (2024) Critical review of virtual reality applications in offsite construction research. Journal of Construction Engineering and Management, 150(11): 03124007, ISSN 0733-9364

Atkinson, E; Spillane, J; Bradley, J and Brooks, T (2022) Challenges in the adoption of mobile information communication technology (m-ICT) in the construction phase of infrastructure projects in the UK. International Journal of Building Pathology and Adaptation, 40(3), pp. 327-344. ISSN 23984708

Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.

Attallah, S O (2014) A life cycle analysis approach for the enhancement of sustainability decision-making in the construction industry using agent-based modeling. PhD thesis, Purdue University, USA.

Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988

Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304

Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Aurellado, E A (2010) ISO 9001.2000 as change strategy for a growing construction company. PhD thesis, Southeast Asia Interdisciplinary Development Institute, Philippines.

Awagah, Nicholas K (2024) An integrated framework for mentoring artisans in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Awale, R and Rowlinson, S (2014) A conceptual framework for achieving firm competitiveness in construction: A 'creating shared value' (CSV) concept. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Awale, R and Rowlinson, S (2015) An exploratory study of a CSV concept for achieving firm competitiveness in Hong Kong construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation. PhD thesis, University of Alabama, USA.

Awuah, E (2020) A conceptual risk management framework for public private partnership in developing countries: A Ghanaian and South African perspective. PhD thesis, University of South Africa, South Africa.

Awuzie, B and McDermott, P (2016) A systems approach to assessing organisational viability in project-based organisations. Built Environment Project and Asset Management, 6(3), pp. 268-283. ISSN 2044-124X

Awuzie, B; McDermott, P and Farag, F (2018) Achieving social value through construction frameworks: the effect of client attributes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 25-31. ISSN 17514304

Awuzie, B O (2014) A viable infrastructure delivery systems model for achieving socio-economic benefits in the Nigerian oil and gas industry. PhD thesis, University of Salford, UK.

Awuzie, B O and McDermott, P (2015) A conceptual model for evaluating infrastructure-based temporary multi-organisations. Built Environment Project and Asset Management, 5(1), pp. 103-120. ISSN 2044-124X

Awuzie, B O and McDermott, P (2016) The role of contracting strategies in social value implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 106-114. ISSN 17514304

Awwad, K A; Shibani, A and Ghostin, M (2022) Exploring the critical success factors influencing BIM level 2 implementation in the UK construction industry: The case of SMEs. International Journal of Construction Management, 22(10), pp. 1894-1901. ISSN 1562-3599

Axon, S and Morrissey, J (2020) Just energy transitions? Social inequities, vulnerabilities and unintended consequences. Buildings & Cities, 1(1), pp. 393-411. ISSN 2632-6655

Ayala Collazo, I C (2023) An analysis of governing factors affecting diversity in local government capital improvement program implementation. DPA thesis, University of Baltimore, USA.

Ayat, M; Ullah, M; Pervez, Z; Lawrence, J; Kang, C W and Ullah, A (2025) Analyzing the differential impact of variables on the success of solicited and unsolicited private participation in infrastructure projects using machine learning techniques. Engineering, Construction and Architectural Management, 32(12), pp. 7909-7937. ISSN 0969-9988

Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.

Ayodele, T O and Kajimo-Shakantu, K (2022) Challenges and drivers to data sharing among stakeholders in the South African construction industry. Journal of Engineering, Design and Technology, 20(6), pp. 1698-1715. ISSN 1726-0531

Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387

Ayoub, H; Sweis, G; Abu-Khader, W and Sweis, R (2023) A framework to evaluate sustainable construction principles in government building projects: The case of Jordan. Engineering, Construction and Architectural Management, 30(9), pp. 4080-4098. ISSN 0969-9988

Azari Najafabadi, R (2013) An evaluation framework for the integrated design process of sustainable high-performance buildings. PhD thesis, University of Washington, USA.

Azcarate Aguerre, J F (2023) Facades-as-a-service: A cross-disciplinary model for the (re)development of circular building envelopes. PhD thesis, Delft University of Technology, Netherlands.

Azcarate-Aguerre, J F; Conci, M; Zils, M; Hopkinson, P and Klein, T (2022) Building energy retrofit-as-a-service: A total value of ownership assessment methodology to support whole life-cycle building circularity and decarbonisation. Construction Management and Economics, 40(9), pp. 676-689. ISSN 01446193

Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.

Azhar, S and Choudhry, R M (2016) Capacity building in construction health and safety research, education, and practice in Pakistan. Built Environment Project and Asset Management, 6(1), pp. 92-105. ISSN 2044-124X

Azhar, S; Khalfan, M and Maqsood, T (2012) Building information modeling (BIM): Now and beyond. Construction Economics and Building, 12(4), pp. 15-28. ISSN 2204-9029

Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.

Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099

Aziz, Z (2005) Context-aware information delivery for mobile construction workers. PhD thesis, Loughborough University, UK.

Azmi, N A; Sweis, G; Sweis, R and Sammour, F (2023) Exploring blockchain-enabled smart contracts technology implementation within ready-mixed concrete plants industry in Saudi Arabia. International Journal of Construction Management, 23(14), pp. 2400-2408. ISSN 1562-3599

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Azzouz, A; Copping, A; Shepherd, P and Duncan, A (2016) Using the arup BIM maturity measure to demonstrate BIM implementation in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Azzouz, A; Hill, P and Papadonikolaki, E (2018) Digital innovation in Europe: Regional differences across one international firm. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Babalola, A and Harinarain, N (2024) Policy barriers to sustainable construction practice in the Nigerian construction industry: An exploratory factor analysis. Journal of Engineering, Design and Technology, 22(1), pp. 214-234. ISSN 1726-0531

Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531

Babalola, O O (2011) A model based framework for semantic interpretation of architectural construction drawings. PhD thesis, Georgia Institute of Technology, USA.

Babatunde, O K (2013) Cross cultural management of quality performance of Chinese construction firms in Nigeria. PhD thesis, National University of Singapore, Singapore.

Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.

Babatunde, S O; Adeniyi, O and Awodele, O A (2017) Investigation into the causes of delay in land acquisition for PPP projects in developing countries. Journal of Engineering, Design and Technology, 15(4), pp. 552-570.

Babatunde, S O and Ekundayo, D (2019) Barriers to the incorporation of BIM into quantity surveying undergraduate curriculum in the Nigerian universities. Journal of Engineering, Design and Technology, 17(3), pp. 629-648. ISSN 1726-0531

Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988

Babatunde, S O; Perera, S; Ekundayo, D and Adeleke, D S (2020) An investigation into BIM uptake among contracting firms: An empirical study in Nigeria. Journal of Financial Management of Property and Construction, 26(1), pp. 23-48. ISSN 1366-4387

Babatunde, S O; Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(1), pp. 81-110. ISSN 1471-4175

Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2015) Barriers to public private partnership projects in developing countries: A case of Nigeria. Engineering, Construction and Architectural Management, 22(6), pp. 669-691. ISSN 0969-9988

Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2016) Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria. Built Environment Project and Asset Management, 6(1), pp. 74-91. ISSN 2044-124X

Babatunde, S O; Udeaja, C and Adekunle, A O (2021) Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms. International Journal of Building Pathology and Adaptation, 39(1), pp. 48-71. ISSN 23984708

Babon-Ayeng, P; Kissi, E; Tannor, R A; Aigbavboa, C and Badu, E (2024) Critical success factors (CSFs) for the adoption of green construction concepts in road construction in Ghana. International Journal of Construction Management, 24(13), pp. 1465-1474. ISSN 1562-3599

Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.

Back, W E; Grau, D and Mejia-Aguilar, G (2013) Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), pp. 288-306. ISSN 1557-8771

Bacon, M (2014) Occupancy analytics: A new basis for low-energy-low-carbon hospital design and operation in the UK. Architectural Engineering and Design Management, 10(1-2), pp. 146-163. ISSN 1745-2007

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(2), pp. 215-230. ISSN 2044-124X

Badathuruge, Chamari Pamoshika Jayarathna (2023) Transforming logistics systems towards sustainability and circular economy. PhD thesis, Queensland University of Technology, Australia.

Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.

Badger, W W and Mulligan, D E (1995) An implementation model of an alliance. Journal of Construction Procurement, 1(1), pp. 21-37. ISSN 1358-9180

Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.

Badu, E; Edwards, D J; Owusu-Manu, D and Brown, D M (2012) Barriers to the implementation of innovative financing (IF) of infrastructure. Journal of Financial Management of Property and Construction, 17(3), pp. 253-273. ISSN 1366-4387

Badu, E; Owusu-Manu, D G; Edwards, D J and Holt, G D (2013) Analysis of strategic issues underpinning the innovative financing of infrastructure within developing countries. Journal of Construction Engineering and Management, 139(6), pp. 726-737. ISSN 0733-9364

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bagheri, M; Roth, L; Siebke, L; Rohde, C and Linke, H J (2024) Implementing housing policies for a sufficient lifestyle. Buildings & Cities, 5(1), pp. 300-315. ISSN 2632-6655

Bahmani, H; Ao, Y; Yang, D; Wang, D; Li, M; Long, Y and Peng, P (2025) Implications for improving evacuation safety in primary school corridors: A video-based analysis on evacuees' speed and density. Engineering, Construction and Architectural Management, 32(12), pp. 8472-8493. ISSN 0969-9988

Bai, L; Shi, H; Kang, S and Zhang, B (2023) Project portfolio risk analysis with the consideration of project interdependencies. Engineering, Construction and Architectural Management, 30(2), pp. 647-670. ISSN 0969-9988

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Bailey, M; Booth, C A; Horry, R; Vidalakis, C; Mahamadu, A M and Awuah, K G B (2020) Opinions of small and medium UK construction companies on environmental management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 23-34. ISSN 17514304

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Bajar, K; Kamat, A; Shanker, S and Barve, A (2024) Blockchain technology: A catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(1), pp. 133-178. ISSN 2046-6099

Bajjou, M S and Chafi, A (2018) Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556. ISSN 1726-0531

Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988

Bajpai, A and Misra, S C (2023) A framework for continuation of digitalization in construction: A PLS-SEM approach. Engineering, Construction and Architectural Management, 30(10), pp. 4715-4734. ISSN 0969-9988

Bajpai, A and Misra, S C (2024) Evaluation of success factors to implement digitalization in the construction industry. Construction Innovation, 24(4), pp. 865-891. ISSN 1471-4175

Bajracharya, A (2009) Implementation of innovation on construction projects: A behavioral perspective. PhD thesis, National University of Singapore, Singapore.

Bakar, F A; Cheung, C M; Kaltungo, A Y; Mohandes, S R and Lou, E (2024) Key organisational attributes for developing a maturity model: Adopting immersive technologies in construction safety training. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Bakatjan, S; Arikan, M and Tiong, R L K (2003) Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Engineering and Management, 129(1), pp. 89-97. ISSN 0733-9364

Bakogiannis, A (2005) Managing stakeholders: A case study in Athens, Greece. PhD thesis, University College London, UK.

Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988

Balasubramanian, S (2017) Green supply chain management: an investigation on the construction sector. PhD thesis, Middlesex University, UK.

Baldissera, P and Delprete, C (2020) From PBL to innovation: A decennial case-study from an HPV student team. Journal of Engineering, Design and Technology, 18(4), pp. 773-786. ISSN 1726-0531

Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.

Balgheeth, Y (2016) Enhancing existing health and safety processes in public sector construction projects within Saudi Arabia using building information modelling approaches. PhD thesis, University of Salford, UK.

Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.

Ballal, T M A and Sher, W D (2003) Artificial neural network for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(4), pp. 263-271. ISSN 0969-9988

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Ballesteros-Pérez, P; Phua, F T T and Mora-Melià, D (2019) Human resource allocation to multiple projects based on members' expertise, group heterogeneity, and social cohesion. Journal of Construction Engineering and Management, 145(2): 04018134, ISSN 0733-9364

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Balogun, T B and Shahid, T (2022) Exploring the adoption of platform-based design for manufacture and assembly in the UK construction sector: A stakeholder perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Baloi, D (2003) Sustainable construction: Challenges and opportunities. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.

Bangaru, S S; Wang, C; Zhou, X; Jeon, H W and Li, Y (2020) Gesture recognition-based smart training assistant system for construction worker earplug-wearing training. Journal of Construction Engineering and Management, 146(12): 04020144, ISSN 0733-9364

Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Banks, N A (2006) “The last bastion of discrimination”: The New York city building trades and the struggle over affirmative action, 1961–1976. PhD thesis, Columbia University, USA.

Bansal, V K (2012) Application areas of GIS in construction projects and future research directions. International Journal of Construction Management, 12(4), pp. 17-36. ISSN 1562-3599

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.

Barai, N and Faruk, M (2025) Analyzing physical environment of child friendly spaces in emergencies: In the context of rohingya crisis at cox's bazar, Bangladesh. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 224-241. ISSN 1759-5908

Barbosa, Elisabeti de Fátima Teixeira (2024) Influence of user's behavior on thermoenergetic performance in higher education buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barima, O and Rowlinson, S M (2010) Critical, manifest variables in virtual construction project value delivery. Engineering, Construction and Architectural Management, 17(2), pp. 197-209. ISSN 0969-9988

Barkokebas, B; Khalife, S; Al-Hussein, M and Hamzeh, F (2021) A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Engineering, Construction and Architectural Management, 28(8), pp. 2155-2175. ISSN 0969-9988

Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.

Baron, N and Cherenet, Z (2018) Perceptions and pathways of resilience in Addis Ababa. International Journal of Building Pathology and Adaptation, 36(4), pp. 337-352. ISSN 23984708

Barqawi, M; Chong, H Y and Lopez, R (2023) Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays. International Journal of Construction Management, 23(16), pp. 2788-2803. ISSN 1562-3599

Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364

Barrett, M (2009) Forum policy challenges for building stocks. Building Research & Information, 37(2), pp. 201-205. ISSN 0961-3218

Barros, Natalia Nakamura (2024) Integrative model of life cycle assessment with internet of things, BIM and machine learning. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barry, S; Cronin, W; Spillane, J P and Bradley, J G (2021) Compliance with COVID-19 regulations in micro-enterprises and SMEs in the Irish construction sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Barry, W; Leite, F and O'Brien, W J (2015) Late deliverable risk catalog: Evaluating the impacts and risks of late deliverables to construction sites. Journal of Construction Engineering and Management, 141(4): 04014087, ISSN 0733-9364

Barth, Karina Bertotto (2023) Performance measurement systems to support the implementation of the lean philosophy in production management in construction. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099

Bartlett, H V (2006) Understanding the implementation of sustainability principles in UK educational building projects. PhD thesis, University of Cambridge, UK.

Bartley, E A (2013) Assessing the potential application of online social networks for the construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.

Basaran, Y.; Aladag, H. and Isik, Z. (2026) Machine learning-based dynamic model for on-site subcontractor performance management. Engineering, Construction and Architectural Management, 33(7), pp. 5592-5624. ISSN 0969-9988

Bashir, A M (2013) A framework for utilising lean construction strategies to promote safety on construction sites. PhD thesis, University of Wolverhampton, UK.

Bashir, Muhammad Rizwan (2022) Big data management and analytics framework for IoT-enabled smart buildings. PhD thesis, University of Technology Sydney, Australia.

Basri, H (1994) An expert system for preliminary landfill design in developing countries. PhD thesis, University of Leeds, UK.

Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007

Bastem, S S and Cekmis, A (2022) Development of historic building information modelling: A systematic literature review. Building Research & Information, 50(5), pp. 527-558. ISSN 0961-3218

Batista, L T; Franco, J R Q; Fakury, R H; Porto, M F; Alves, L V R and Kohlmann, G S (2024) BIM-IoT-FM integration: strategy for implementation of sustainable water management in buildings. Smart and Sustainable Built Environment, 13(5), pp. 1096-1116. ISSN 2046-6099

Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.

Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.

Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X

Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.

Bayat, F.; Noorzai, E. and Golabchi, M. (2019) Identifying the most important public–private partnership risks in afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387

Bayat, F; Noorzai, E and Golabchi, M (2019) Identifying the most important public-private partnership risks in Afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387

Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364

Bazzan, J; Echeveste, M; Formoso, C T and Kowalski, J D S (2024) A data-driven customer complaint management model for residential building companies. Architectural Engineering and Design Management, 20(6), pp. 1381-1402. ISSN 1745-2007

Beatham, S (2003) Development of an integrated business improvement system for construction. EngD thesis, Loughborough University, UK.

Becerik, B (2004) Suggestions for improving adoption of online collaboration and project management technology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.

Becerik-Gerber, B; Jazizadeh, F; Li, N and Calis, G (2012) Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management, 138(3), pp. 431-442. ISSN 0733-9364

Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.

Beemsterboer, S and Koch, C (2017) A human touch: Examining the roles of middle managers for innovation in contractors. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.

Behnisch, M and Ultsch, A (2009) Urban data-mining: Spatiotemporal exploration of multidimensional data. Building Research & Information, 37(5-6), pp. 520-532. ISSN 0961-3218

Beitelmal, W; Molenaar, K R; Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(6), pp. 1184-1202. ISSN 0969-9988

Beitelmal, W H (2016) Towards an infrastructure asset management organizational model for developing countries. PhD thesis, University of Colorado at Boulder, USA.

Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007

Belayutham, S and Ibrahim, C K I C (2019) Barriers and strategies for better safety practices: The case of construction SMEs in Malaysia. Construction Economics and Building, 19(1), pp. 20-39. ISSN 2204-9029

Belayutham, S; Ibrahim, K I and Hussain, A (2019) Shaping the future of prevention through design (PTD) practice in the Malaysian construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Belayutham, S; Zabidin, N S and Ibrahim, C K I C (2018) Dynamic representation of barriers for adopting building information modelling in Malaysian tertiary education. Construction Economics and Building, 18(4), pp. 24-44. ISSN 2204-9029

Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market. PhD thesis, University of Strathclyde, UK.

Bello, A. O. (2026) Towards achieving circular economy in the Nigerian construction industry: Policymakers perspectives and conceptual framework development. Smart and Sustainable Built Environment, 15(3), pp. 1391-1411. ISSN 2046-6099

Bello, A O; Isa, R B; Oke, A E; Arogundade, S and Lewis, J M O (2026) Circular economy implementation in the construction industry: An examination of the barriers in a developing country. International Journal of Building Pathology and Adaptation, 44(1), pp. 143-162. ISSN 2398-4708

Bello, A O; Okanlawon, T T; Gbenga, P O; Abdulraheem, A A and Olagoke, O T (2026) Critical success factors (csfs) for the implementation of distributed ledger technology (dlt) in the Nigerian construction industry. Construction Innovation, 26(2), pp. 531-550. ISSN 1471-4175

Bello, A O; Abdulraheem, A A; Agboola, S A and Afolabi, O P (2025) Factors influencing the adoption of distributed ledger technology in developing countries: An examination of Nigerian construction industry. International Journal of Construction Education and Research, 21(3), pp. 290-320. ISSN 1557-8771

Bello, A O; Eje, D O; Idris, A; Semiu, M A and Khan, A A (2024) Drivers for the implementation of modular construction systems in the AEC industry of developing countries. Journal of Engineering, Design and Technology, 22(6), pp. 2043-2062. ISSN 1726-0531

Bello, A O; Isa, R B; Afolabi, O P; Arogundade, S and Khan, A A (2025) Drivers for the implementation of circular economy in the Nigerian aeco industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(3), pp. 953-972. ISSN 1726-0531

Bello, A O; Khan, A A; Idris, A and Awwal, H M (2024) Barriers to modular construction systems implementation in developing countries' architecture, engineering and construction industry. Engineering, Construction and Architectural Management, 31(8), pp. 3148-3164. ISSN 0969-9988

Bello, A O and Ayegba, C (2025) Adoption of building information modelling for post-construction in Nigeria: Examination of barriers and strategies development. International Journal of Building Pathology and Adaptation, 43(6), pp. 1501-1521. ISSN 2398-4708

Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Ben-Alon, L (2020) Natural buildings: Integrating earthen building materials and methods into mainstream construction. PhD thesis, Carnegie Mellon University, USA.

Bendi, D (2017) Developing an offsite readiness framework for Indian construction organisations. PhD thesis, University of Salford, UK.

Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175

Bengtsson, S H (2017) Innovation in the construction industry: Factors, actors and the client's role. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Benmansour, C and Hogg, K (2002) An investigation into the barriers to innovation and their relevance within the construction sector. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Benn, M and Stoy, C (2024) Challenges impairing the data quality of information deliverables in BIM during the planning phase of office buildings in Germany. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Bentivegna, V; Curwell, S; Deakin, M; Lombardi, P; Mitchell, G and Nijkamp, P (2002) A vision and methodology for integrated sustainable urban development: Bequest. Building Research & Information, 30(2), pp. 83-94. ISSN 0961-3218

Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988

Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599

Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.

Berker, T and Woods, R (2025) Resistance against zero-emission neighbourhood infrastructuring: Key lessons from Norway. Buildings & Cities, 6(1), pp. 345-358. ISSN 2632-6655

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.

Bertolin, C and Berto, F (2024) Sustainable management of heritage buildings in long-term perspective (symbol): Current knowledge and further research needs. International Journal of Building Pathology and Adaptation, 42(1), pp. 1-17. ISSN 23984708

Bertz, M D (1998) Situated learning methodologies and assessment in civil engineering structures education. PhD thesis, Georgia Institute of Technology, USA.

Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450

Betts, M (1991) Achieving and measuring flexibility in project information retrieval. Construction Management and Economics, 9(3), pp. 231-245. ISSN 01446193

Bevan, E A M and Yung, P (2015) Implementation of corporate social responsibility in Australian construction SMEs. Engineering, Construction and Architectural Management, 22(3), pp. 295-311. ISSN 0969-9988

Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.

Bhandari, S; Hallowell, M R; Alruqi, W and Salas, R (2021) Modeling the relationship between personal risk tolerance, work-related risk tolerance, and risk-taking behavior of construction workers. Journal of Construction Engineering and Management, 147(4), ISSN 0733-9364

Bhanu, A C (2024) Integrating artificial intelligence and augmented reality for enhanced task performance in the construction industry. PhD thesis, Clemson University, USA.

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(5), pp. 1397-1422. ISSN 0969-9988

Bhavsar, V; Thomas Alex, S; Vaishnav, P K; Jose, A; Koshy, N G and Atiwadkar, S (2022) Investigation of critical factors influencing construction of airports: The case of India. International Journal of Construction Management, 22(15), pp. 2905-2913. ISSN 1562-3599

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Bhutto, K H (2004) The application of integrated management systems by contracting organisations. PhD thesis, Sheffield Hallam University, UK.

Bhutto, Khalid Hussain (2004) The application of integrated management systems (IMS) by contracting organisations. PhD thesis, Sheffield Hallam University, UK.

Biagi, Silvia (2025) BIM for public administration: Critical investigation of the European situation and implementation perspectives for the Italian case. PhD thesis, Università degli Studi di Pisa, Italy.

Bibby, L (2003) Improving design management techniques in construction. EngD thesis, Loughborough University, UK.

Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988

Bidhendi, A.; Poshdar, M.; Babaeian Jelodar, M.; Rahimian, F. and González, V. A. (2026) Human-centric integrated change management framework for digital transformation in construction. Engineering, Construction and Architectural Management, 33(3), pp. 2048-2070. ISSN 0969-9988

Biggins, D (2018) An exploratory investigation into how project management methods are chosen and implemented by organisations in the UK. PhD thesis, University of Manchester, UK.

Bijivemula, S K R; Sai, S J and Chepuri, A (2024) A structural equation model of stakeholder roles in the implementation of green construction strategies in the Indian construction industry. International Journal of Construction Management, 24(5), pp. 486-494. ISSN 1562-3599

Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364

Birgonul, M T and Ozdogan, I (1998) A proposed framework for governmental organizations in the implementation of build-operate-transfer (BOT) model. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Birkes, A Y (1999) Multimedia data definition and requirements for construction applications. PhD thesis, Georgia Institute of Technology, USA.

Birnie, J (1998) Risk allocation to the construction firm within a private finance initiative (PFI) project. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Birnie, J (1999) Private Finance Initiative (PFI): UK construction industry response. Journal of Construction Procurement, 5(1), pp. 5-14. ISSN 1358-9180

Biscaya, S V N (2012) Coordination and management of information for construction design projects: a framework for Portugal. PhD thesis, University of Salford, UK.

Biswas, A (2019) Exploring Indian post-disaster temporary housing strategy through a comparative review. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 14-35. ISSN 1759-5916

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Blay, K B; Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-level 2 projects: Benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(5), pp. 581-596. ISSN 2044-124X

Blaza, S (1995) Implementing an integrated management information system in a medium sized construction firm. PhD thesis, Sheffield Hallam University, UK.

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), pp. 72-83. ISSN 1471-4175

Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007

Boadu, Elijah Frimpong (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana. PhD thesis, University of New South Wales, Australia.

Boamah, F A; Zhang, J and Miah, M H (2023) The impact of tacit knowledge sharing on the success of construction companies operations. Journal of Engineering, Design and Technology, 21(6), pp. 1767-1784. ISSN 1726-0531

Boateng, R. K.; Booth, C. A.; Horry, R. E.; Wiejak-Roy, G. A.; Agyekum, K.; Al-Tarazi, D.; Joseph, R.; Manu, P. and Prabhakaran, A. (2025) Implementing environmental management systems (ISO 14001) in the construction sector of Ghana. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 244-254. ISSN 1751-4304

Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.

Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: A case of breaking tradition for a more strategic approach? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Bohn, J S and Teizer, J (2010) Benefits and barriers of construction project monitoring using high-resolution automated cameras. Journal of Construction Engineering and Management, 136(6), pp. 632-640. ISSN 0733-9364

Bolchover, J and Mundle, K (2026) Post-disaster reconstruction: Infill housing prototypes for kathmandu. Buildings & Cities, 7(1), pp. 273-292. ISSN 2632-6655

Boles, W W; Maxwell, D A; Scott, W D; Heermann, P D; Yarborough, T and Underwood, J (1995) Construction automation and robotics–pathway to implementation. Journal of Construction Engineering and Management, 121(1), pp. 143-152. ISSN 0733-9364

Bon, R and Hutchinson, K (2000) Sustainable construction: Some economic challenges. Building Research & Information, 28(5-6), pp. 310-314. ISSN 0961-3218

Bonanomi, Marcella Maria Melania Teodora (2018) Digital transformation of multidisciplinary design firms: A systematic analysis-based approach to change management. PhD thesis, Politecnico di Milano, Italy.

Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193

Borba, Maria Lucia Guilherme (2014) Technical-scientific and sociopolitical aspects of urban water management: Stormwater drainage in the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.

Borthwick, F (2002) The impact of the European Construction Products Directive on UK construction product manufacturers. PhD thesis, De Montfort University, UK.

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: Building services evaluation. Building Research & Information, 48(2), pp. 207-217. ISSN 0961-3218

Boser, R A and El-Gafy, M (2011) Accelerating waste minimization in residential construction: A source separation case study. International Journal of Construction Education and Research, 7(1), pp. 58-70. ISSN 1557-8771

Bosfield, R; Gibson, G E and Din, Z U (2026) Open repository development framework for knowledge sharing: Best practices in the architecture, engineering, and construction industry. International Journal of Construction Management, 26(1), pp. 12-28. ISSN 1562-3599

Bosfield, R (2014) Feasibility of an open source repository for increasing the usage of best practices in the architecture-engineering-construction industry. PhD thesis, Arizona State University, USA.

Bosserman, B E and Ford, M E (1984) Development of computerized specifications. Journal of Construction Engineering and Management, 110(3), pp. 375-384. ISSN 0733-9364

Bou Hatoum, Makram Bou (2023) Value propositions, adoption factors, and implementation considerations: Building a path towards construction innovation. PhD thesis, University of Kentucky, USA.

Bouachera, T; Kishk, M and Power, L (2007) Towards a generic framework for whole life costing in the oil industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.

Bowes, D C (2020) An aspirations-led capabilities approach to women's career pathways in quantity surveying. PhD thesis, University of Westminster, UK.

Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988

Boyd, P; Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: Incorporating building integrated photovoltaics. Construction Management and Economics, 33(5-6), pp. 349-360. ISSN 01446193

Boyes, G (2021) Towards BIM/GIS interoperability: a theoretical framework and practical generation of spaces to support infrastructure Asset Management. PhD thesis, University College London, UK.

Bradley, A; Li, H; Qin, H; Xi, W; Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openbim ISO standards development. Construction Innovation, 22(4), pp. 705-726. ISSN 1471-4175

Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193

Branch, H K (2018) Strategies construction project managers use to create environmental sustainability in construction projects. PhD thesis, Walden University, USA.

Branco Pedro, J; Meijer, F and Visscher, H (2009) The Portuguese building regulation system: A critical review. International Journal of Law in the Built Environment, 1(2), pp. 156-171. ISSN 1756-1450

Brand, M C and Davenport, P (2011) Proposal for a "dual scheme" model of statutory adjudication for the Australian building and construction industry. International Journal of Law in the Built Environment, 3(3), pp. 252-268. ISSN 1756-1450

Brandalise, F M P; Formoso, C T and Viana, D D (2022) Development of a typology for understanding visual management concepts and their relationships. Journal of Construction Engineering and Management, 148(7): 04022041, ISSN 0733-9364

Brandon, P (2012) Sustainable development: Ignorance is fatal: what don't we know? Smart and Sustainable Built Environment, 1(1), pp. 14-28. ISSN 2046-6099

Brandon, P S and Loforte Ribeiro, F (1997) The assessment of applications for the house renovation grant system (hrgs): A multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(1), pp. 41-57. ISSN 0969-9988

Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(1), pp. 57-69. ISSN 01446193

Brandão, R; Hosseini, M R; Macêdo, A N; Melo, A C and Martek, I (2022) Public administration strategies that stimulate reverse logistics within the construction industry: A conceptual typology. Engineering, Construction and Architectural Management, 29(8), pp. 2924-2949. ISSN 0969-9988

Brauner, M (2020) Developing an optimized sustainability assessment tool for building information modelling (BIM) systems: incorporation of hygrothermal modelling into BIM. PhD thesis, Auckland University of Technology, New Zealand.

Brennan M, C A (2013) Development of a measure to assess attitudes towards sustainable development in the built environment: A pilot. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bresnen, M and Marshall, N (2000) Partnering in construction: A critical review of issues, problems and dilemmas. Construction Management and Economics, 18(2), pp. 229-237. ISSN 01446193

Bresnen, M and Marshall, N (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 8(5-6), pp. 335-345. ISSN 0969-9988

Bresnen, M and Swan, J (2002) Understanding the implementation of new management initiatives in the construction firm. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(2), pp. 198-215. ISSN 1471-4175

Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.

Bright, S (2010) Carbon reduction and commercial leases in the UK. International Journal of Law in the Built Environment, 2(3), pp. 218-231. ISSN 1756-1450

Brito, D M D; Ferreira, E D A M and Costa, D B (2021) Framework for building information modeling adoption based on critical success factors from Brazilian public organizations. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Broft, Rafaella; Badi, Sulafa M and Pryke, Stephen David (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187-204. ISSN 2044-124X

Brooks, T (2020) Implementation and effectiveness of the ISO 9001 quality management system in the construction sector in the UK and Ireland. PhD thesis, Queen's University Belfast, UK.

Brooks, T; Gunning, J G; Spillane, J P and Cole, J (2021) Regulatory decoupling and the effectiveness of the ISO 9001 quality management system in the construction sector in the UK–a case study analysis. Construction Management and Economics, 39(12), pp. 988-1005. ISSN 01446193

Brooks, T and Spillane, J (2017) Lies, damned lies and quality management systems: A pilot case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Brooks, T; Spillane, J; Tansey, P and Hendron, C (2016) The impact of the recent economic recession on the operation of the NEC contract in Northern Ireland. Construction Management and Economics, 34(6), pp. 393-417. ISSN 01446193

Brooks, T and Spillane, J P (2015) The impact of the recent economic recession on the NEC contract in Northern Ireland: A preliminary study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Brumme, J (2013) The role of organisational behaviour in establishing a corporate academy in the construction industry. PhD thesis, University of Pretoria, South Africa.

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988

Bu, Guoping (2013) Development of an integrated deterioration method for long-term bridge performance prediction. PhD thesis, Griffith University, Australia.

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Budayan, C; Koc, K; Erk, E Y and Tokdemir, O B (2025) Uncovering value creation factors for healthcare public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(8), pp. 5456-5483. ISSN 0969-9988

Bueno, C; Pereira, L M and Fabricio, M M (2018) Life cycle assessment and environmental-based choices at the early design stages: An application using building information modelling. Architectural Engineering and Design Management, 14(5), pp. 332-346. ISSN 1745-2007

Buhl, H; Andersen, M and Harty, J (2020) Construction industry 4.0: Entangling colliding practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Buhl, H; Andersen, M and Klitgaard, A (2019) Boundary objects: Supporting better collaborative practice and research. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Bukari, C; Kheni, N A; Boateng, I; Owusu-Ansah, C M and Simpson, K B (2026) Integrating knowledge management with total quality management to enhance construction project delivery in Ghana. Construction Economics and Building, 26(1), ISSN 2204-9029

Bunemer, Ricardo (2020) Construction 4.0 proposal for digital technological innovations for the civil construction sector: Case study of a smart house. PhD thesis, Universidade Estadual de Campinas, Brazil.

Buniya, M K; Wuni, I Y; Yousif, O S and Al-Mhdawi, M K S (2026) Quantifying the impact index of key barriers to safety program initiatives in the Iraqi construction industry. Construction Innovation, 26(1), pp. 286-309. ISSN 1471-4175

Burati, J L; Matthews, M F and Kalidindi, S N (1991) Quality management in construction industry. Journal of Construction Engineering and Management, 117(2), pp. 341-359. ISSN 0733-9364

Burati, J L; Matthews, M F and Kalidindi, S N (1992) Quality management organizations and techniques. Journal of Construction Engineering and Management, 118(1), pp. 112-128. ISSN 0733-9364

Burcar, I and Radujkovic, M (2005) Risk registers in construction in Croatia. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.

Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.

Burney, D and Claflin, A (2016) Practical considerations for implementing research on the indoor built environment. Building Research & Information, 44(3), pp. 342-344. ISSN 0961-3218

Burnside-Lawry, J and Carvalho, L (2016) A stakeholder approach to building community resilience: Awareness to implementation. International Journal of Disaster Resilience in the Built Environment, 7(1), pp. 4-25. ISSN 1759-5916

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.

Buser, M and Andersson, R (2023) Including circular value propositions in business portfolio: Examples from Swedish AEC companies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Buser, M and Carlsson, V (2015) Renewing renovation: Looking at renovation of owners occupied houses with socio-materiality lenses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Buser, M; Gottlieb, S C; de Gier, A and Andersson, R (2021) From concept to practice: Implementation of circular building as a process of translation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Buys, F and Nkado, R (2006) A survey of maintenance management systems in South African tertiary educational institutions. Construction Management and Economics, 24(10), pp. 997-1005. ISSN 1466433X

Bygballe, L E; Endresen, M and Fålun, S (2018) The role of formal and informal mechanisms in implementing lean principles in construction projects. Engineering, Construction and Architectural Management, 25(10), pp. 1322-1338. ISSN 0969-9988

Byrne, J; Clarke, L and Van Der Meer, M (2005) Gender and ethnic minority exclusion from skilled occupations in construction: A Western European comparison. Construction Management and Economics, 23(10), pp. 1025-1034. ISSN 01446193

Bélafi, Z D (2018) Analysis and modelling of occupant behaviour to support building design and performance optimisation. PhD thesis, Budapest University of Technology and Economics, Hungary.

Caetano, I.; Pinto, D.; Amândio, M.; Silva, J.; Sanhudo, L.; Azenha, M.; El Sibaii, M.; Granja, J.; Patrício, H.; Ganhão, F. and Poças Martins, J. (2026) Algorithmic workflow for digitising inspection data in railway tunnel maintenance. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Cai, W.; Hua, D.; Li, S.; Xue, S. and Xu, Z. (2026) 3D reconstruction of building interiors based on scan-to-BIM and generative design for as-built building. Engineering, Construction and Architectural Management, 33(3), pp. 1959-1979. ISSN 0969-9988

Cai, H; Rahman, A; Su, X and Zhang, H (2014) A GIS-microscopic simulation approach for optimizing road barrier placement and configuration in university campus emergency evacuation. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 362-379. ISSN 1759-5916

Cai, J; Li, Z; Dou, Y; Li, T and Yuan, M (2023) Understanding adoption of high off-site construction level technologies in construction based on the TAM and ttf. Engineering, Construction and Architectural Management, 30(10), pp. 4978-5006. ISSN 0969-9988

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Cai, S; Ma, Z; Skibniewski, M J and Guo, J (2020) Construction automation and robotics: From one-offs to follow-ups based on practices of Chinese construction companies. Journal of Construction Engineering and Management, 146(10): 05020013, ISSN 0733-9364

Caixeta, M C B F and Fabricio, M M (2013) A conceptual model for the design process of interventions in healthcare buildings: A method to improve design. Architectural Engineering and Design Management, 9(2), pp. 95-109. ISSN 1745-2007

Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988

Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364

Calderon, C and Keirstead, J (2012) Modelling frameworks for delivering low-carbon cities: Advocating a normalized practice. Building Research & Information, 40(4), pp. 504-517. ISSN 0961-3218

Calhoun, M E (2015) Synergistic effects among leading indicators of construction safety management. PhD thesis, University of Alaska Fairbanks, USA.

Callaghan, N; Avery, T and Mulville, M (2017) Smart motorway' innovation for achieving greater safety and hard shoulder management. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Campagnac, E (2000) The contracting system in the French construction industry: Actors and institutions. Building Research & Information, 28(2), pp. 131-140. ISSN 0961-3218

Campion, N A (2015) Advancing life cycle assessment: Perspectives from the building and healthcare industries. PhD thesis, University of Pittsburgh, USA.

Camrass, K (2022) Urban regenerative thinking and practice: A systematic literature review. Building Research & Information, 50(3), pp. 339-350. ISSN 0961-3218

Cao, D; Shao, S; Huang, B and Wang, G (2022) Multidimensional behavioral responses to the implementation of BIM in construction projects: An empirical study in China. Engineering, Construction and Architectural Management, 29(2), pp. 819-841. ISSN 0969-9988

Cao, D and Wang, G (2014) Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: Roles of cross-project learning and pre-contractual opportunism. International Journal of Construction Education and Research, 10(4), pp. 268-284. ISSN 1557-8771

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Capitanio, M (2018) More green space in Japanese shopping streets: Assessing the manifold potential of green roofs in Shimokitazawa, Tokyo. Smart and Sustainable Built Environment, 7(2), pp. 212-222. ISSN 2046-6099

Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988

Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.

Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193

Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(2), pp. 140-156. ISSN 01446193

Carbonari, G (2018) Sustainable facilities management with the support of building information modelling. PhD thesis, University of Greenwich, UK.

Cardoso, Aline Michelle (2022) Stakeholder management in building information modeling projects in the construction industry: Proposal of a framework for stakeholder identification and classification. PhD thesis, Universidade Nove de Julho, Brazil.

Carlsson, V (2017) SME contractors on the stage for energy renovations? A dramaturgical perspective on SME contractors’ roles and interactions with house owners. PhD thesis, Chalmers University of Technology, Sweden.

Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387

Carmichael, S (2002) The development of implementation processes for partnering in construction. PhD thesis, University of Salford, UK.

Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users perception. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carrillo, P (2004) Managing knowledge: Lessons from the oil and gas sector. Construction Management and Economics, 22(6), pp. 631-642. ISSN 01446193

Carrière, S; Weigend Rodríguez, R; Pey, P; Pomponi, F and Ramakrishna, S (2020) Circular cities: The case of Singapore. Built Environment Project and Asset Management, 10(4), pp. 491-507. ISSN 2044-124X

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Carter, D J (2004) Developments in tubular daylight guidance systems. Building Research & Information, 32(3), pp. 220-234. ISSN 0961-3218

Carter, K and Fortune, C (2003) Procuring sustainable projects: A grounded approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Cartwright, N (2016) Scientific models versus social reality. Building Research & Information, 44(3), pp. 334-337. ISSN 0961-3218

Cassandro, J; Mirarchi, C and Pavan, A (2025) A comprehensive literature review of 5D building information modelling using latent dirichlet allocation analysis. Construction Innovation, 25(7), pp. 331-357. ISSN 1471-4175

Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. PhD thesis, University of Texas at Austin, USA.

Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364

Castaño-Rosa, R and Nerweyi, D (2025) Bringing post-occupancy evaluation up front to enhance energy efficiency in residential buildings. Building Research & Information, 53(8), pp. 1075-1091. ISSN 0961-3218

Castelblanco, G; Guevara, J; Mangano, G and Rafele, C (2024) Financial system dynamics model for multidimensional flexibility in toll road PPPs: a life-cycle analysis. Construction Management and Economics, 42(9), pp. 802-821. ISSN 01446193

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Castillo, T; Alarcón, L F and Salvatierra, J L (2018) Effects of last planner system practices on social networks and the performance of construction projects. Journal of Construction Engineering and Management, 144(3): 04017120, ISSN 0733-9364

Castillo Campoverde, T O (2018) Multidimensional analysis of the interaction between the organization, management pratices and performance in construction. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Castle, C M (1999) Construction project networks: A study of internet-based interorganizational information systems in the building industry. DDes thesis, Harvard University, USA.

Castán Broto, V; Olazabal, M and Ziervogel, G (2024) Disrupting the imaginaries of urban action to deliver just adaptation. Buildings & Cities, 5(1), pp. 199-214. ISSN 2632-6655

Cecilia, M M (2016) Requirements for the effective statutory adjudication practice in the South African construction industry. PhD thesis, University of Pretoria, South Africa.

Cedstrand, E (2023) Evaluating occupational health interventions: Design, implementation, and effects. PhD thesis, Karolinska Institutet, Sweden.

Celis-D'Amico, F; Echeverria-Valiente, E; Garcia-Alvarado, R; Escorcia-Oyola, O and da Casa-Martín, F (2025) CASA+: Highly energy-efficient housing system for the central-south of Chile. Construction Innovation, 25(2), pp. 306-327. ISSN 1471-4175

Cerić, A and Ivić, I (2025) Communication challenges and blockchain in building energy efficiency retrofits: Croatia case. Engineering, Construction and Architectural Management, 32(1), pp. 1-15. ISSN 0969-9988

Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988

Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.

Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364

Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193

Chakraborty, B and Das, S (2014) MGNEGRA and water management: Sustainability issues of built forms in rural India. Journal of Construction in Developing Countries, 19(2), pp. 33-50. ISSN 1823-6499

Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.

Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement? International Journal of Law in the Built Environment, 8(2), pp. 161-175. ISSN 1756-1450

Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.

Chan, D M; Chan, A P C; Lam, P T I; Lam, E W M and Wong, J M W (2007) Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry. Journal of Financial Management of Property and Construction, 12(3), pp. 139-150. ISSN 1366-4387

Chan, D W M; Hung, H T W; Chan, A P C and Lo, T K K (2014) Overview of the development and implementation of the mandatory building inspection scheme (MBIS) in Hong Kong. Built Environment Project and Asset Management, 4(1), pp. 71-89. ISSN 2044-124X

Chan, D W M; Olawumi, T O and Ho, A M L (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(9), pp. 1838-1854. ISSN 0969-9988

Chan, D W M; Olawumi, T O; Saka, A B and Ekundayo, D (2024) Comparative analysis of the barriers to smart sustainable practices adoption in the construction industry between Hong Kong and Nigeria. International Journal of Construction Management, 24(14), pp. 1499-1509. ISSN 1562-3599

Chan, E H W; Suen, H C H and Chan, S L (2005) An integrated project extranet design prototype: E-AEC for architects, engineers and contractors in Hong Kong and Mainland China. Journal of Construction Research, 6(2), pp. 253-271. ISSN 1609-9451

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, Man-Yin Ede (2018) Enablers for knowledge management implementation by large construction organisations in Hong Kong. PhD thesis, Griffith University, Australia.

Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364

Chan, T K and Hiap, P T (2012) A balanced scorecard approach to measuring industry performance. Journal of Construction in Developing Countries, 17(S1), pp. 23-41. ISSN 1823-6499

Chan, T K and Sundaraj, G (2009) Performance measures for the Malaysian construction industry development board. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chan, W T P (2009) Construction industry development and government policy. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, Zenobia Tin Yan (2024) Alms and influence the dynamics of inducements and concessions in international politics. PhD thesis, Princeton University, USA.

Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988

Chang, C Y and Chen, S (2016) Transitional public-private partnership model in China: Contracting with little recourse to contracts. Journal of Construction Engineering and Management, 142(10): 05016011, ISSN 0733-9364

Chang, C Y; Chou, H Y and Wang, M T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(6), pp. 647-656. ISSN 1466433X

Chang, C Y; Pan, W and Howard, R (2017) Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis. Journal of Construction Engineering and Management, 143(8): 04017044, ISSN 0733-9364

Chang, L M; Georgy, M E and AbdelRazig, Y A (2000) Warranting quality of steel bridge coating. Journal of Construction Engineering and Management, 126(5), pp. 374-380. ISSN 0733-9364

Chang, S-W (2002) Development and assessment of the Tier II work force strategy implementation index. PhD thesis, University of Texas at Austin, USA.

Chang, W and Xue, C Q L (2021) Government and its aid buildings: The governmental influence on the design and management of China-aided stadium projects after 2000. Architectural Engineering and Design Management, 17(1-2), pp. 36-49. ISSN 1745-2007

Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: Theory and applications in Hong Kong. Journal of Construction Procurement, 11(2), pp. 94-111.

Chang Recavarren, L G (2023) Establishing the effect of building design on construction work. PhD thesis, Arizona State University, USA.

Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.

Charalambous, N; Panayi, C; Mady, C; Augustinčić, T and Berc, D (2025) Youth engagement in urban living labs: Tools, methods and pedagogies. Buildings & Cities, 6(1), pp. 1061-1080. ISSN 2632-6655

Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988

Charles, Robert Douglas (2025) An investigation into the performance and implementation of the early contractor involvement procurement model within the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Charles, S; Vidyaratne, H and Melagoda, D G (2020) Prospects and restraints of green roofs for high-rise buildings in Sri Lanka. Built Environment Project and Asset Management, 10(2), pp. 246-260. ISSN 2044-124X

Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Charousaei, M; Faizi, M and Khakzand, M (2025) The impact of the visual layout of university open space on students' behavior and satisfaction level: The case of Iran University of Science and Technology. Smart and Sustainable Built Environment, 14(4), pp. 992-1016. ISSN 2046-6099

Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.

Chawathe, T; Devkar, G and Yesudasan, L (2024) Investigating the application of lean tools in the design of healthcare facilities. Architectural Engineering and Design Management, 20(4), pp. 868-890. ISSN 1745-2007

Che Ibrahim, C K I and Belayutham, S (2020) A knowledge, attitude and practices (KAP) study on prevention through design: A dynamic insight into civil and structural engineers in Malaysia. Architectural Engineering and Design Management, 16(2), pp. 131-149. ISSN 1745-2007

Che Ibrahim, C K I; Mohamad Sabri, N A; Belayutham, S and Mahamadu, A (2019) Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry. Built Environment Project and Asset Management, 9(1), pp. 15-28. ISSN 2044-124X

Che Wan Putra, C W F (1998) CAPE construction application protocol for data transfer: a building data model. PhD thesis, University of Salford, UK.

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387

Chellappa, V and Luximon, Y (2026) Computer-aided technologies for posture-based ergonomic risk assessment in construction: A systematic review. International Journal of Construction Management, 26(2), pp. 316-331. ISSN 1562-3599

Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, C; Lv, L; Wang, Z and Qiao, R (2023) Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects. Engineering, Construction and Architectural Management, 30(9), pp. 3876-3894. ISSN 0969-9988

Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(3), pp. 207-221. ISSN 1745-2007

Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988

Chen, H; Lei, Y; Wu, X and Liu, Y (2025) Evaluation of fuzzy uncertainty risk identification for waste-to-energy public-private partnership projects on the basis of the cloud model and fuzzy cognitive map. Journal of Construction Engineering and Management, 151(12): 04025191, ISSN 0733-9364

Chen, J J and Chambers, D (1999) Sustainability and the impact of Chinese policy initiatives upon construction. Construction Management and Economics, 17(5), pp. 679-687. ISSN 01446193

Chen, K (2015) A strategic decision making framework for organisational BIM implementation. PhD thesis, Cardiff University, UK.

Chen, K (2018) The quest for the holy grail : bridging BIM and building for information management in construction. PhD thesis, University of Hong Kong, Hong Kong.

Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction: The underlying mechanism and implementation. Engineering, Construction and Architectural Management, 26(7), pp. 1518-1532. ISSN 0969-9988

Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), pp. 138-163. ISSN 1471-4175

Chen, L; Yuan, B and Wang, X (2024) Simulation analysis of the constraints on the green retrofit of existing buildings and strategies for its promotion: a hybrid method based on ISM and SD. Building Research & Information, 52(5), pp. 515-532. ISSN 0961-3218

Chen, Le (2007) Linking knowledge management to organisational business performance in construction. PhD thesis, Griffith University, Australia.

Chen, N (2017) An investigation of the influence of project complexity on communications in engineering construction projects. PhD thesis, University of Hong Kong, Hong Kong.

Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364

Chen, Q (2007) An object model framework for interface management in building information models. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364

Chen, X (2019) Developing a third party investment partnership framework to encourage low carbon building projects in China. PhD thesis, Northumbria University, UK.

Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2023) Developing a readiness model and a self-assessment tool for adopting digital technologies in construction organizations. Building Research & Information, 51(3), pp. 241-256. ISSN 0961-3218

Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599

Chen, X; Chang-Richards, A Y; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technology-enabled AEC project management: practical use cases, deployment patterns and emerging trends. Engineering, Construction and Architectural Management, 32(6), pp. 4125-4154. ISSN 0969-9988

Chen, X; Chang-Richards, A Y; Pelosi, A; Jia, Y; Shen, X; Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: A systematic review. Engineering, Construction and Architectural Management, 29(8), pp. 3181-3209. ISSN 0969-9988

Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.

Chen, Y; Cai, X; Li, J; Lin, P; Song, H; Liu, G; Cao, D and Ma, X (2023) The values and barriers of BIM implementation combination evaluation based on stakeholder theory: A study in China. Engineering, Construction and Architectural Management, 30(7), pp. 2814-2836. ISSN 0969-9988

Chen, Y; Dib, H; Cox, R F; Shaurette, M and Vorvoreanu, M (2016) Structural equation model of building information modeling maturity. Journal of Construction Engineering and Management, 142(9): 04016032, ISSN 0733-9364

Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364

Chen, Y; Ruikar, K and Carrillo, P M (2008) Electronic procurement benchmarking exercise in the AEC industry sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chen, Y J (2012) Strategic implications of e-business in the construction industry. PhD thesis, Loughborough University, UK.

Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.

Chen, Z (2003) An integrated analytical approach to environmental management in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chen, Z; Boateng, P and Ogunlana, S O (2019) A dynamic system approach to risk analysis for megaproject delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 232-252. ISSN 17514304

Chen, Z; Chen, K and Cheng, J C P (2023) ISM-based analysis of VR-AEC adoption barriers and their inner mechanisms. Engineering, Construction and Architectural Management, 30(9), pp. 4271-4293. ISSN 0969-9988

Chen, Z; Li, H; Shen, Q and Xu, W (2004) An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry. Construction Management and Economics, 22(1), pp. 55-73. ISSN 01446193

Chen, Z; Zhao, Y; Zhou, X; Hao, S and Li, J (2023) Identifying the risk factors and their interactions of human–robot collaboration implementation during engineering project construction: Evidence from China. Engineering, Construction and Architectural Management, 30(7), pp. 3073-3094. ISSN 0969-9988

Chen, Z; li, H; Kong, S C W and xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(1), pp. 27-39. ISSN 1471-4175

Cheng, M; Chong, H Y; Liu, G and Li, Q (2025) Strategies of perceived justice for added value in public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(12), pp. 8548-8570. ISSN 0969-9988

Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(4), pp. 292-303. ISSN 0969-9988

Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.

Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Cheng, J C P; Chen, K and Chen, W (2020) State-of-the-art review on mixed reality applications in the AECO industry. Journal of Construction Engineering and Management, 146(2): 03119009, ISSN 0733-9364

Cheng, L Y; Wen, D C and Jiang, H C (2014) The performance excellence model in construction enterprises: An application study with modelling and analysis. Construction Management and Economics, 32(11), pp. 1078-1092. ISSN 01446193

Cheng, M Y and Tsai, M H (2003) Reengineering of construction management process. Journal of Construction Engineering and Management, 129(1), pp. 105-114. ISSN 0733-9364

Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.

Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364

Chesworth, B; London, K and Gajendran, T (2011) Understanding lean implementation: Perspectives and approaches of an American construction organisation. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.

Chigara, B and Moyo, T (2023) The impact of COVID-19 on the construction sector in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 91-111. ISSN 1823-6499

Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.

Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.

Chileshe, N (2004) The application of TQM within small and medium sized construction related organisations. PhD thesis, Sheffield Hallam University, UK.

Chileshe, N (2006) Investigating practitioner's understanding of TQM in small and medium construction companies. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chileshe, N (2007) Quality management concepts, principles, tools and philosophies: A valid methodology for deployment within UK construction-related SMEs. Journal of Engineering, Design and Technology, 5(1), pp. 49-67. ISSN 1726-0531

Chileshe, N and Dzisi, E (2012) Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of Engineering, Design and Technology, 10(2), pp. 276-298. ISSN 1726-0531

Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), pp. 140-154. ISSN 1726-0531

Chileshe, N and John Kikwasi, G (2014) Risk assessment and management practices (ramp) within the Tanzania construction industry: Implementation barriers and advocated solutions. International Journal of Construction Management, 14(4), pp. 239-254. ISSN 1562-3599

Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: The case of Tanzania. Built Environment Project and Asset Management, 11(1), pp. 71-87. ISSN 2044-124X

Chileshe, N and Kavishe, N (2022) Human capacity building strategies for improving PPP implementation in Tanzanian construction projects. Built Environment Project and Asset Management, 12(6), pp. 906-923. ISSN 2044-124X

Chileshe, N and Kikwasi, G J (2014) Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management, 21(3), pp. 291-319. ISSN 0969-9988

Chileshe, N; Njau, C W; Kibichii, B K; Macharia, L N and Kavishe, N (2022) Critical success factors for public-private partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), pp. 1606-1617. ISSN 1562-3599

Chileshe, N; Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(2), pp. 134-157. ISSN 0969-9988

Chileshe, N; Rameezdeen, R; Lehmann, S and Hosseini, M r (2014) Reverse logistics (RL) implementation among contractors in Australia: Practices and barriers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499

Chileshe N, K G J (2013) Perception of barriers to implementing risk assessment and management practices by construction professionals in Tanzania. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success factors for iso9000 implementation. Journal of Construction Engineering and Management, 129(6), pp. 599-609. ISSN 0733-9364

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(2), pp. 114-131. ISSN 0969-9988

Chinda, Thanwadee (2008) A system dynamics approach to construction safety culture. PhD thesis, Griffith University, Australia.

Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193

Chmutina, K; Lizarralde, G; von Meding, J K and Bosher, L (2023) Standardised indicators for "resilient cities": The folly of devising a technical solution to a political problem. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 514-535. ISSN 1759-5916

Cho, C-S; Mazze, C E; Dika, S L and Gehrig, G B (2015) Enhancing construction education: Implementing habitat for humanity projects as service-learning for construction materials. International Journal of Construction Education and Research, 11(1), pp. 4-20. ISSN 1557-8771

Cho, J G (2008) Open source project managment: From the integrated control perspective. PhD thesis, Claremont Graduate University, USA.

Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Choi, H H and Mahadevan, S (2008) Construction project risk assessment using existing database and project-specific information. Journal of Construction Engineering and Management, 134(11), pp. 894-903. ISSN 0733-9364

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Choi, J O; Chen, X B and Kim, T W (2019) Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), pp. 93-105. ISSN 1562-3599

Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.

Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.

Choi, Y; Kim, D C; Kim, S S; Nam, M S and Kim, T H (2013) Implementation of noise-free and vibration-free PHC screw piles on the basis of full-scale tests. Journal of Construction Engineering and Management, 139(8), pp. 960-967. ISSN 0733-9364

Chong, H Y and Cheng, M (2023) Smart contract implementation in building information modeling-enabled projects: Approach to contract administration. Journal of Construction Engineering and Management, 149(5): 05023004, ISSN 0733-9364

Chong, H Y; Fan, S L; Sutrisna, M; Hsieh, S H and Tsai, C M (2017) Preliminary contractual framework for BIM-enabled projects. Journal of Construction Engineering and Management, 143(7): 04017025, ISSN 0733-9364

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.

Chou, C C; Caldas, C H; O'Connor, J T; Sroka, A W and Goldman, G K (2009) Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts. Journal of Construction Engineering and Management, 135(9), pp. 812-818. ISSN 0733-9364

Chowdhury, S; Ren, Z; Rouhana, F; Wang, J and Zhu, J (2024) Exploring sustainability in resource management: Implementation of a water-energy-human nexus framework at a university campus. Journal of Construction Engineering and Management, 150(10): 04024140, ISSN 0733-9364

Chowdhury, S; Zhu, J; Rasoulkhani, K; Mostafavi, A; Jaselskis, E; Stoa, R; Li, Q; Banerjee, S; Alsharef, A and Brannen, L (2020) Guidelines for robust adaptation to environmental regulations in infrastructure projects. Journal of Construction Engineering and Management, 146(10): 04020121, ISSN 0733-9364

Christermaller, F; Ibrahim, C K I C; Manu, P; Belayutham, S; Mahamadu, A-M and Yunusa-Kaltungo, A (2022) Implementation of design for safety (dfs) in construction in developing countries: A study of designers in Malaysia. Construction Economics and Building, 22(2), pp. 1-26. ISSN 2204-9029

Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.

Christudason, A and Kenna, P (2010) Can housing rights be applied to modern housing systems? International Journal of Law in the Built Environment, 2(2), pp. 103-117. ISSN 1756-1450

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Chung, B (2007) An analysis of success and failure factors for ERP systems in engineering and construction firms. PhD thesis, University of Maryland, College Park, USA.

Chung, B; Skibniewski, M J and Kwak, Y H (2009) Developing ERP systems success model for the construction industry. Journal of Construction Engineering and Management, 135(3), pp. 207-216. ISSN 0733-9364

Chung, H C P and Adeyeye, K (2018) Structural flood damage and the efficacy of property-level flood protection. International Journal of Building Pathology and Adaptation, 36(5), pp. 471-499. ISSN 23984708

Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Cidik M S, B D T N (2013) Understanding the polarized perspectives in BIM enabled projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Clark, G G (1993) Rule-based integrated building management systems. PhD thesis, Brunel University, UK.

Cloete, Brent; Agumba, Justus; Adebowale, Oluseyi Julius and Meyer, Chris (2026) From readiness to implementation: A framework for BIM adoption in facilities management organisations. Journal of Construction Business and Management, 8(2), pp. 43-53. ISSN 2521-0165

Coates, S P (2013) BIM implementation strategy framework for small architectural practices. PhD thesis, University of Salford, UK.

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.

Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364

Conejos, S; Chew, M Y L; Tay, K; Tay, S and Safiena, S (2023) Green maintainability assessment of building-integrated photovoltaic (BIPV) applications: Lessons learnt. International Journal of Building Pathology and Adaptation, 41(2), pp. 320-346. ISSN 23984708

Connaughton, J N (1993) Making and implementing industrial building investment decisions. PhD thesis, University of Greenwich, UK.

Connaughton J, W S (2013) Improving collaboration in construction: An opportunity for action research. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.

Corley, J and Deasley, P (2003) Factors affecting teamworking in construction service delivery projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.

Correia, J M; Sutrisna, M and Zaman, A U (2020) Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia: A proposed research agenda. Journal of Engineering, Design and Technology, 18(6), pp. 1449-1468. ISSN 1726-0531

Correia, J M F; De Oliveira Neto, G C; Leite, R R and Da Silva, D (2021) Plan to overcome barriers to reverse logistics in construction and demolition waste: Survey of the construction industry. Journal of Construction Engineering and Management, 147(2): 04020172, ISSN 0733-9364

Costa, Rafael de Oliveira (2021) Applicability of international environmental law in the construction of corporate social responsibility. PhD thesis, Universidade de São Paulo, Brazil.

Costantino, N and Pellegrino, R (2015) Public-private partnership implementation: Cross-case analysis. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 164-176. ISSN 17514304

Courtney, R and Winch, G M (2003) Re-engineering construction: The role of research and implementation. Building Research & Information, 31(2), pp. 172-178. ISSN 0961-3218

Couto, A and Couto, J (2007) Why deconstruction is not adequately considered in Portuguese building refurbishment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Craig, D (2002) A model for customer-focused culture change in the speculative house-building industry: Executive summary. EngD thesis, University of Warwick, UK.

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.

Cromie, S I (1992) Forecasting the demand for aggregates in England and Wales, the role of forecasts of demand in the aggregate planning system. PhD thesis, University of Dundee, UK.

Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Crowley, A J (1998) The development & implementation of a product model for constructional steelwork. PhD thesis, University of Leeds, UK.

Curran, M; Spillane, J and Clarke-Hagan, D (2018) External stakeholders in urban construction development projects: Who are they and how are they engaged? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193

Cutrim, Sérgio Sampaio (2017) Port planning and governance in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

D'Incognito, M; Costantino, N and Migliaccio, G C (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management, 5(2), pp. 202-216. ISSN 2044-124X

Dabirian, S; Moussazadeh, M; Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(4), pp. 606-618. ISSN 1562-3599

Dabok, M M (2022) A training and skills development conceptual framework for construction technicians in Nigeria. PhD thesis, University of Central Lancashire, UK.

Dadashnejad, A A and Valmohammadi, C (2018) Investigating the effect of value stream mapping on operational losses: A case study. Journal of Engineering, Design and Technology, 16(3), pp. 478-500. ISSN 1726-0531

Daddow, T and Skitmore, M (2004) Value management in practice: An interview survey. Construction Economics and Building, 4(2), pp. 11-18. ISSN 2204-9029

Daget, Y T and Zhang, H (2020) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(1), pp. 296-320. ISSN 0969-9988

Dahalan, N H; Rahman, R A; Ahmad, S W and Che Ibrahim, C K I (2025) Public monitoring of environmental management plan implementation in road construction projects: Key performance indicators. Journal of Engineering, Design and Technology, 23(3), pp. 766-791. ISSN 1726-0531

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Performance indicators for public evaluation of environmental management plan implementation in highway construction projects. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 425-449. ISSN 1759-5916

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Public assessment for environmental management plan implementation: Comparative study of performance indicators of road and highway construction projects. Journal of Construction Engineering and Management, 150(7): 05024006, ISSN 0733-9364

Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364

Dakhil, A (2013) The contribution of the construction industry to economic development in Libya. PhD thesis, Liverpool John Moores University, UK.

Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.

Dalla Valle, Anna (2019) Environment-driven change management in AEC firms: Life cycle perspective in practice. PhD thesis, Politecnico di Milano, Italy.

Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364

Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X

Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), pp. 17-32.

Dania, A A (2017) Sustainable construction at the firm level: case studies from Nigeria. PhD thesis, University of Reading, UK.

Daniel, E I; Nwankwo, N; Adah, C; Oshodi, O; Emuze, F; Chinyio, E and Umeokafor, N (2026) An exploratory study into UK construction industry response to digitalised health and safety management. Journal of Engineering, Design and Technology, 24(1), pp. 45-63. ISSN 1726-0531

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.

Dann, N; Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(1), pp. 97-104. ISSN 01446193

Dao, M A (2008) Determinants of firm compliance with environmental laws : A case study of Vietnam. PhD thesis, National University of Singapore, Singapore.

Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Darabseh, M Q M A (2024) Construction assets management using BIM and blockchain: Managing design assets intellectual property. PhD thesis, Universidade do Porto, Portugal.

Darby, S (2010) Smart metering: What potential for householder engagement? Building Research & Information, 38(5), pp. 442-457. ISSN 0961-3218

Darwai, V R; Mandavgane, S A and Lohia, P (2022) Systems based approach to a small scale dairy farm (goshala): A case study. Built Environment Project and Asset Management, 12(3), pp. 503-518. ISSN 2044-124X

Das, D K (2024) Conceptualising environmental justice in the construction of road transport infrastructure in the global South: An Indian context. International Journal of Construction Management, 24(4), pp. 400-410. ISSN 1562-3599

Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708

Dat Tien, D; GhaffarianHoseini, A; Naismith, N; Ghaffarianhoseini, A; Zhang, T and Tookey, J (2021) Examining critical perspectives on building information modelling (BIM) adoption in New Zealand. Smart and Sustainable Built Environment, 10(4), pp. 594-615. ISSN 2046-6099

Dauber, V F (2001) Classical lean constructs and their transferability to the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.

Dauda, J A; Ajayi, S; Omotayo, T; Oladiran, O O and Ilori, O M (2024) Implementation of lean for small- and medium-sized construction organisational improvement. Smart and Sustainable Built Environment, 13(3), pp. 496-511. ISSN 2046-6099

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387

Davidson, R (2021) Innovation within private finance initiative projects: the influence of governance throughout the first stage of post-contract implementation. PhD thesis, University of Brighton, UK.

Davies, K; McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(1), pp. 78-93. ISSN 0969-9988

Davies, R and Harty, C (2013) Measurement and exploration of individual beliefs about the consequences of building information modelling use. Construction Management and Economics, 31(11), pp. 1110-1127. ISSN 1466433X

Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Davila Delgado, J M and Oyedele, L O (2020) BIM data model requirements for asset monitoring and the circular economy. Journal of Engineering, Design and Technology, 18(5), pp. 1269-1285. ISSN 1726-0531

Davis, K (2016) Reconciling views of project success: a multiple stakeholder model. PhD thesis, Kingston University, UK.

Davis, K A (2004) Information technology change in the architecture, engineering, and construction industry: An investigation of individuals' resistance. PhD thesis, Virginia Tech, USA.

Davis, K A and Songer, A D (2009) Resistance to IT change in the AEC industry: Are the stereotypes true? Journal of Construction Engineering and Management, 135(12), pp. 1324-1333. ISSN 0733-9364

Davis, P R (2007) Maintaining relationship based procurement. Construction Economics and Building, 7(2), pp. 37-44. ISSN 2204-9029

Davis, S; Davis, T; Howell, D and Leitzke, D (2020) Building engineers and construction managers: The impact of international service projects on the development of undergraduate students. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Day, A (1996) The maquette, the model and the computer: Organizational futures for design and construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 15-28. ISSN 0969-9988

De La Cruz, M P; Del Caño, A and De La Cruz, E (2006) Downside risks in construction projects developed by the civil service: The case of Spain. Journal of Construction Engineering and Management, 132(8), pp. 844-852. ISSN 0733-9364

De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364

De Luca, A; Chen, L and Gharehbaghi, K (2021) Sustainable utilization of recycled aggregates: Robust construction and demolition waste reduction strategies. International Journal of Building Pathology and Adaptation, 39(4), pp. 666-682. ISSN 23984708

De Silva, S H; Ranadewa, K A T O and Rathnasinghe, A P (2025) Barriers and strategies for implementing lean six sigma in small- and medium sized enterprises (SMEs) in construction industry: A fuzzy TOPSIS analysis. Construction Innovation, 25(2), pp. 510-551. ISSN 1471-4175

De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.

DeJesus, I (2024) Strategies for implementing organizational change in the construction industry. DBA thesis, Walden University, USA.

Debela, G Y (2021) Assessment of government policies and regulations in the process of adopting Public-Private Partnership for infrastructure development in Ethiopia. PhD thesis, University of Birmingham, UK.

Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599

Dehdasht, G; Ferwati, M S; Mohandes, S R; El-Sabek, L and Edwards, D J (2023) Towards expediting the implementation of sustainable and successful lean paradigm for construction projects: A hybrid of dematel and SNA approach. Engineering, Construction and Architectural Management, 30(9), pp. 4294-4318. ISSN 0969-9988

Del Solar, P; Del Río, M; Villoria, P and Nadal, A (2016) Analysis of recurrent defects in the execution of ceramic-coatings cladding in building construction. Journal of Construction Engineering and Management, 142(4): 04015093, ISSN 0733-9364

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Delgado, J M P Q; Ramos, N M M; Barreira, E and Simões, M L (2014) Probabilistic risk assessment methodology of exterior surfaces defacement caused by algae growth. Journal of Construction Engineering and Management, 140(12): 05014012, ISSN 0733-9364

Delgado, O A H (1998) Decision making for the selection of investment projects. PhD thesis, University of Nottingham, UK.

Delgado-Hernández, D J (2005) A framework for building quality into construction projects. PhD thesis, University of Birmingham, UK.

Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988

Deloly, C; Gall, A R; Moore, G; Bretelle, L; Milner, J; Mohajeri, N; Osrin, D; Salvia, G; Symonds, P; Tsoulou, I; Zimmermann, N; Wilkinson, P and Davies, M (2021) Relationship-building around a policy decision-support tool for urban health. Buildings & Cities, 2(1), pp. 717-733. ISSN 2632-6655

Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Demirkesen, S; Sadikoglu, E and Jayamanne, E (2021) Assessing psychological safety in lean construction projects in the United States. Construction Economics and Building, 21(3), pp. 159-175. ISSN 2204-9029

Demirkesen, S and Tezel, A (2022) Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(3), pp. 1470-1503. ISSN 0969-9988

Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.

Deng, F; Smyth, H and Anvuur, A (2012) A critical review of pms in construction: Towards a research agenda. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Deng, J; Zhao, Y; Li, X; Wang, Y and Zhou, Y (2023) Network embeddedness, relationship norms, and cooperative behavior: Analysis based on evolution of construction project network. Journal of Construction Engineering and Management, 149(9): 04023070, ISSN 0733-9364

Deng, X (2008) Research on agent construction management mode and principal-agent relationship. PhD thesis, Wuhan University, China.

Deng, Y and Poon, S W (2014) Mega-event flagships in transformation: Learning from Expo 2010 Shanghai China. Journal of Engineering, Design and Technology, 12(4), pp. 440-460.

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Denny-Smith, G (2021) How compliance imperatives stifle the impact of social procurement. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Denny-Smith, G; Williams, M; Loosemore, M; Riza Yosia, S and Piggott, L (2024) What social value do indigenous contractors create? Construction Management and Economics, 42(1), pp. 16-34. ISSN 01446193

Derakhshanfar, Hossein (2021) A delay risk management framework for construction projects: Learning from past experiences. PhD thesis, University of South Australia, Australia.

Desta, S; Root, D and Diederichs, C J (2006) The practice of project management office (PMO) concept within the German architect, engineer, contractor (AEC) sector. Journal of Engineering, Design and Technology, 4(1), pp. 46-59. ISSN 1726-0531

Devkar, G; Palliyaguru, R and Oyegoke, A S (2020) The effects of institutional frameworks on implementation of PPP projects: A comparative perspective in Australia and India. International Journal of Construction Management, 20(6), pp. 720-736. ISSN 1562-3599

Devkar, G A and Kalidindi, S N (2013) External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1), pp. 58-73. ISSN 2044-124X

Dewan, S and Singh, L (2020) Use of blockchain in designing smart city. Smart and Sustainable Built Environment, 9(4), pp. 695-709. ISSN 2046-6099

Dewundara Maha Galappaththi Arachchige, N M S (2021) Innovation in construction project-based firms through the lens of exploratory and exploitative learning : effects of social capital and collaborative environment. PhD thesis, University of Hong Kong, Hong Kong.

Dey, A; Islam, S T; Paul, B; Bandyopadhyay, S; Sengupta, P; Sanyal, N; Mondal, K P; Jubaer, A and Mitra, R (2022) Waterlogging mitigation and safe water supply: Lessons learnt from low-lying areas of basirhat municipality, India. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 386-403. ISSN 1759-5916

Dharmapalan, V; Gambatese, J A; Fradella, J and Moghaddam Vahed, A (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141(4): 04014090, ISSN 0733-9364

Dharmapuri Tirumala, R; Dangol, N; Tiwari, P and Vaz-Serra, P (2021) Comparative analysis of outcomes under PPP and traditional modes of delivery: A study of schools in Melbourne. Construction Management and Economics, 39(11), pp. 894-911. ISSN 01446193

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Diaz Schery, C. A.; Caiado, R. G. G.; Ivson, P.; Santos, R. S. and Thadeu Corseuil, E. (2026) An integrative framework for BIM, digital twin and generative AI convergence in construction: A multi-dimensional analysis of synergies and enabling factors. Smart and Sustainable Built Environment, pp. 1-39. ISSN 2046-6099

Diaz Schery, C A; Caiado, R G G; Aguilar Vargas, S and Rodriguez Vignon, Y (2025) Paths to BIM-based digital transformation: A bibliometric and systematic review of critical factors. Engineering, Construction and Architectural Management, 32(7), pp. 4357-4383. ISSN 0969-9988

Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.

Dickinson, H and Swaffield, L (2004) Implementing a segregation-based waste management system on site: Does it reduce site waste disposal costs? Journal of Financial Management of Property and Construction, 9(2), pp. 75-90. ISSN 1366-4387

Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects. PhD thesis, Heriot-Watt University, UK.

Dike, I (2017) A critical exploration of the impact of building information modelling on the culture and performance of UK construction supply chains. PhD thesis, Coventry University, UK.

Ding, Q (2018) Using social media to evaluate public acceptance of infrastructure projects. PhD thesis, University of Maryland, College Park, USA.

Ding, S; Hu, H; Chai, Z and Wang, W (2024) Secure and formalized blockchain-IPFS information sharing in precast construction from the whole supply chain perspective. Journal of Construction Engineering and Management, 150(1): 04023150, ISSN 0733-9364

Ding, Z; Zuo, J; Wu, J and Wang, J Y (2015) Key factors for the BIM adoption by architects: A China study. Engineering, Construction and Architectural Management, 22(6), pp. 732-748. ISSN 0969-9988

Dioguardi, G (1983) Macrofirms: Construction firms for the computer age. Journal of Construction Engineering and Management, 109(1), pp. 13-24. ISSN 0733-9364

Dion, H; Evans, M and Farrell, P (2023) Hospitals management transformative initiatives; towards energy efficiency and environmental sustainability in healthcare facilities. Journal of Engineering, Design and Technology, 21(2), pp. 552-584. ISSN 1726-0531

Direitinho, Romao Manuel Leitao Carrapato (2020) Civil construction waste (RCC) management model supported by the analytic hierarchy process (AHP) method. PhD thesis, Universidade Federal de São Carlos, Brazil.

Disney, O; Roupé, M and Johansson, M (2023) Driving circularity with total BIM: An integrated approach to data-driven design. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Disney, O; Roupé, M; Johansson, M and Domenico Leto, A (2024) Embracing BIM in its totality: A total BIM case study. Smart and Sustainable Built Environment, 13(3), pp. 512-531. ISSN 2046-6099

Dixit, A; Chauhan, R and Shaw, R (2025) Application of smart systems and emerging technologies for disaster risk reduction and management in Nepal. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 328-343. ISSN 1759-5908

Dixit, S; Stefańska, A and Singh, P (2023) Manufacturing technology in terms of digital fabrication of contemporary biomimetic structures. International Journal of Construction Management, 23(11), pp. 1828-1836. ISSN 1562-3599

Dizdaroglu, D; Yigitcanlar, T and Dawes, L (2012) A micro-level indexing model for assessing urban ecosystem sustainability. Smart and Sustainable Built Environment, 1(3), pp. 291-315. ISSN 2046-6099

Djalante, R and Thomalla, F (2012) Disaster risk reduction and climate change adaptation in Indonesia: Institutional challenges and opportunities for integration. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 166-180. ISSN 1759-5916

Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.

Do, S T; Nguyen, V T and Likhitruangsilp, V (2023) Rsiam risk profile for managing risk factors of international construction joint ventures. International Journal of Construction Management, 23(7), pp. 1148-1162. ISSN 1562-3599

Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.

Dobrovnik, M.; Herold, D. M. and Kummer, S. (2026) Perception differences in dynamic capabilities for digital supply chain transformation across managerial hierarchies: A DEMATEL-based analysis in the construction industry. Construction Innovation, 26(9), pp. 204-232. ISSN 1471-4175

Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175

Doloi, H (2014) Rationalizing the implementation of web-based project management systems in construction projects using PLS-SEM. Journal of Construction Engineering and Management, 140(7): 04014026, ISSN 0733-9364

Domdouzis, K; Anumba, C and Thorpe, A (2004) Wireless sensor networking in the construction industry: Prospects and problems. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Domínguez-Herrera, M M; González-Morales, O and González-Díaz, E (2023) Social responsibility of construction company as strategy for sustainability in island territories. Construction Economics and Building, 23(1-2), pp. 30-55. ISSN 2204-9029

Dong, Z.; Lu, W.; Wu, L.; Jiang, C. and Fu, Y. (2026) Efficiency-enhanced machine learning on blockchain (MLOB) framework for real-time construction activities recognition. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Donkers, A; Yang, D; Guendouz, S and Wang, B (2024) Making sense of smart features in the smart office: A stated choice experiment of office user preferences. Building Research & Information, 52(4), pp. 388-401. ISSN 0961-3218

Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the Bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), pp. 53-75. ISSN 1823-6499

Dorrah, D H (2024) Development of integrated decision support framework for payment management and negotiation in construction projects. PhD thesis, University of Toronto, Canada.

Dossick, C S and Sakagami, M (2008) Implementing web-based project management systems in the United States and Japan. Journal of Construction Engineering and Management, 134(3), pp. 189-196. ISSN 0733-9364

Dou, Y; Yan, X; Dong, B; Zhong, L and Lin, H (2026) Predicting the interorganizational diffusion of prefabricated construction technology: Agent-based modeling and simulation. Journal of Construction Engineering and Management, 152(3): 04025266, ISSN 0733-9364

Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Doume Ekale, M; Pavard, A; Benabderrahmane, K A and Andrew Poirier, E (2026) BIM adoption and implementation in the civil and transportation infrastructure sector: Analysis of governmental roadmaps and action plans. International Journal of Construction Management, 26(6), pp. 925-943. ISSN 1562-3599

Dowsett, R. M. and Harty, C. F. (2019) Assessing the implementation of BIM–an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 0144-6193

Dowsett, R (2016) Assessing the success of BIM implementation. DEng thesis, University of Reading, UK.

Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Dowsett, R and Harty, C (2016) Making the link between bim's benefits and implementation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655

Dowsett, R M and Harty, C F (2014) The wider implementation issues of BIM within a multifaceted property and real estate consultancy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dowsett, R M and Harty, C F (2019) Assessing the implementation of BIM: an information systems approach. Construction Management and Economics, 37(10), pp. 551-566. ISSN 01446193

Dowsett R M, H C F (2013) Evaluating the benefits of BIM for sustainable design: A review. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Dsouza, M; Phadtare, A; Vyas, S S; Shinde, Y and Jadhav, A (2024) Toward resilient development in rural area: some strategic recommendations based on contextual findings in Bhokardan Taluka, Jalna. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 699-727. ISSN 1759-5916

Du, Q; Zhang, Y; Zeng, L; Ma, Y and Li, S (2025) Dynamic assessment of the abatement effects of the low-carbon practices in the prefabricated building supply chain. Engineering, Construction and Architectural Management, 32(7), pp. 4918-4945. ISSN 0969-9988

Du, Y; Yuan, J; Wang, S; Liu, Y and Zeng, N (2025) Leveraging blockchain to anchor information for supervision in PPP projects: A conceptual framework. Engineering, Construction and Architectural Management, 32(4), pp. 2745-2770. ISSN 0969-9988

Du Plessis, C (2005) Action for sustainability: Preparing an African plan for sustainable building and construction. Building Research & Information, 33(5), pp. 405-415. ISSN 0961-3218

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Duan, Y; Ye, M; Zhang, Q and Lu, S (2025) Informal institutional pressures and ESG implementation by international contractors: The moderating effects of joint ventures. Journal of Construction Engineering and Management, 151(10): 04025139, ISSN 0733-9364

Duarte, Carolina Mendonça de Moraes (2022) Innovation management in construction and development companies. PhD thesis, Universidade Estadual de Campinas, Brazil.

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.

Duffy, K; Graham, B and Thomas, K (2007) Assessing the potential for construction collaboration technologies (cct) in small to medium enterprises in the Irish construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218

Duncan, R; Neale, R H and Bagilhole, B M (1999) Equal opportunities and the reconciliation of work and family within the construction process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Duncheva, T and Bradley, F F (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(8): 04019043, ISSN 0733-9364

Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Durdyev, S; Koc, K; Karaca, F and Gurgun, A P (2023) Strategies for implementation of green roofs in developing countries. Engineering, Construction and Architectural Management, 30(6), pp. 2481-2502. ISSN 0969-9988

Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364

Easson, Michael Bernard (2016) The application of a theory of real options (tro) to the decision-making of mega urban transport projects (mutps). PhD thesis, University of Melbourne, Australia.

Eaton, D; Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(2), pp. 63-67. ISSN 1471-4175

Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175

Ebekozien, A (2022) Construction companies' compliance to personal protective equipment on junior staff in Nigeria: Issues and solutions. International Journal of Building Pathology and Adaptation, 40(4), pp. 481-498. ISSN 23984708

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2021) Low-cost housing policies and squatters struggles in Nigeria: The Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11), pp. 1088-1098. ISSN 1562-3599

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Low-cost housing demand-supply gap: Government housing planners perspective on possible solutions. International Journal of Construction Management, 22(9), pp. 1736-1745. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Ahmed, M A H; Akinradewo, O and Omoh-Paul, I (2024) Managing construction project risks in turbulent times: a stakeholders' perspective. International Journal of Building Pathology and Adaptation, 42(7), pp. 35-54. ISSN 23984708

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B; Ayo-Odifiri, S O and Amadi, G C (2024) Disasters recovery and rehabilitation in informal settlements: The role of fourth industrial revolution technologies. International Journal of Construction Management, 24(11), pp. 1155-1165. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B and Rohayati, M I (2024) Investigating safety violations on Nigerian construction sites. International Journal of Construction Management, 24(13), pp. 1454-1464. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C; Thwala, W D; Samsurijan, M S; Ahmed, M A H; Aliu, J and Adekunle, S A (2024) Appraising the application of cryptocurrency technologies in the Nigerian built environment: stakeholders' perspective. International Journal of Building Pathology and Adaptation, 42(7), pp. 93-112. ISSN 23984708

Ebekozien, A; Aigbavboa, C O; Aigbedion, M; Ogbaini, I F and Aginah, I L (2023) Integrated project delivery in the Nigerian construction sector: An unexplored approach from the stakeholders' perspective. Engineering, Construction and Architectural Management, 30(4), pp. 1519-1535. ISSN 0969-9988

Ebekozien, A; Aigbavboa, C O; Thwala, W D D; Aigbedion, M I and Ogbaini, I F (2023) An appraisal of generic skills for Nigerian built environment professionals in workplace: The unexplored approach. Journal of Engineering, Design and Technology, 21(6), pp. 1841-1856. ISSN 1726-0531

Ebekozien, A and Samsurijan, M S (2024) Incentivisation of digital technology takers in the construction industry. Engineering, Construction and Architectural Management, 31(4), pp. 1373-1390. ISSN 0969-9988

Eberhardt, L C M; Birkved, M and Birgisdottir, H (2022) Building design and construction strategies for a circular economy. Architectural Engineering and Design Management, 18(2), pp. 93-113. ISSN 1745-2007

Ebiloma, D. O.; Aigbavboa, C. O. and Anumba, C. (2026) Key drivers of digital twin maintenance management for healthcare facilities in Nigeria. Engineering, Construction and Architectural Management, 33(3), pp. 1871-1890. ISSN 0969-9988

Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771

Ebrahimigharehbaghi, S (2022) Understanding the decision-making process in homeowner energy retrofits: From behavioural and transaction cost perspectives. PhD thesis, Delft University of Technology, Netherlands.

Edike, U E (2023) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 1197-1211. ISSN 1726-0531

Edirisinghe, R and Lingard, H (2016) Exploring the potential for the use of video to communicate safety information to construction workers: Case studies of organizational use. Construction Management and Economics, 34(6), pp. 366-376. ISSN 0144-6193

Edirisinghe, R; London, K A; Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet? Engineering, Construction and Architectural Management, 24(6), pp. 1119-1154. ISSN 0969-9988

Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364

Edwards, D J; Martek, I; Ejohwomu, O; Aigbavboa, C and Hosseini, M R (2021) Hand-arm vibration management: An operational health and safety strategy framework. International Journal of Building Pathology and Adaptation, 39(5), pp. 811-830. ISSN 23984708

Egbelakin, T K and Wilkinson, S (2010) Sociological and behavioural impediments to earthquake hazard mitigation. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 310-321. ISSN 1759-5916

Egbelakin, T K; Wilkinson, S; Potangaroa, R and Ingham, J (2011) Challenges to successful seismic retrofit implementation: A socio-behavioural perspective. Building Research & Information, 39(3), pp. 286-300. ISSN 0961-3218

Egbu, C O; Botterill, K and Bates, M (2001) The influence of knowledge management and intellectual capital on organizational innovations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

Eid, M E M (2004) Rethinking relationships in the construction industry: integrating sustainable development into project management processes. PhD thesis, University of Edinburgh, UK.

Eiris Pereira, R and Gheisari, M (2019) Site visit application in construction education: A descriptive study of faculty members. International Journal of Construction Education and Research, 15(2), pp. 83-99. ISSN 1557-8771

Eissa, R and El-Adaway, I H (2024) Accelerating the circular economy transition: A construction value chain-structured portfolio of strategies and implementation insights. Journal of Construction Engineering and Management, 150(8): 04024077, ISSN 0733-9364

Ejidike, C C; Mewomo, M C; Olawumi, T O; Wang, S and Buniya, M K (2025) Barriers to the adoption of smart building technology in developing countries: An empirical survey. Journal of Construction Engineering and Management, 151(6): 04025067, ISSN 0733-9364

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ekanayake, E M A C; Shen, G; Kumaraswamy, M; Owusu, E K and Xue, J (2022) Capabilities to withstand vulnerabilities and boost resilience in industrialized construction supply chains: A Hong Kong study. Engineering, Construction and Architectural Management, 29(10), pp. 3809-3829. ISSN 0969-9988

Ekung, S; Odesola, I A and Adewuyi, T (2022) Green cost premium for attaining energy-efficiency rating in Nigeria's hot-humid residential buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 248-268. ISSN 23984708

El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364

El Ghandour, W (2007) Integrated information-based construction simulation system. PhD thesis, University of Alberta, Canada.

El Ghandour, Wael (2007) Integrated information-based construction simulation system (iicss). PhD thesis, University of Alberta, Canada.

El Reifi, M H (2016) A novel lean briefing process for effective design management. PhD thesis, Loughborough University, UK.

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

El-Aroud, A S (1980) Road network investment model for developing countries. PhD thesis, Pennsylvania State University, USA.

El-Batal, R S (1995) Reasoning by abstraction for public works contracts using a blackboard architecture. PhD thesis, Polytechnic University, USA.

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

El-Itr, Z and Kangari, R (1994) Minority contractors: Framework for new policy development. Journal of Construction Engineering and Management, 120(3), pp. 632-648. ISSN 0733-9364

El-Itr, Z M (1992) Equal business opportunity programs in the construction industry: A framework for development and implementation. PhD thesis, Georgia Institute of Technology, USA.

El-Mahdy, D and Ali, M (2024) Assessing the solar radiation performance of self-shaded 3D-printed clay-based façades. Architectural Engineering and Design Management, 20(2), pp. 249-268. ISSN 1745-2007

El-Mashaleh, M S; Hyari, K H; Bdour, A N and Rababeh, S M (2016) A multi-attribute decision-making model for construction enterprise resource planning system selection. International Journal of Construction Education and Research, 12(1), pp. 66-79. ISSN 1557-8771

El-Medany, W M (2014) A cost-effective programmable soc for network security using xilinx spartan 3an fpga. Journal of Engineering, Design and Technology, 12(2), pp. 280-291. ISSN 1726-0531

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.

El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.

El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175

El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007

Elazhary, M and El-adaway, I H (2025) Enhancing management of transportation projects: Integration factors for using smart contracts. Journal of Construction Engineering and Management, 151(12): 04025201, ISSN 0733-9364

Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387

Elbashbishy, T S; Ali, G G and El-adaway, I H (2022) Blockchain technology in the construction industry: Mapping current research trends using social network analysis and clustering. Construction Management and Economics, 40(5), pp. 406-427. ISSN 01446193

Eldin, N and Hikle, V (2003) Pilot study of quality function deployment in construction projects. Journal of Construction Engineering and Management, 129(3), pp. 314-329. ISSN 0733-9364

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Eldin, N N (1989) Measurement of work progress: Quantitative technique. Journal of Construction Engineering and Management, 115(3), pp. 462-474. ISSN 0733-9364

Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364

Eldin, N N (1997) Concurrent engineering: A schedule reduction tool. Journal of Construction Engineering and Management, 123(3), pp. 354-362. ISSN 0733-9364

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193

Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364

Elfving, J A (2022) A decade of lessons learned: Deployment of lean at a large general contractor. Construction Management and Economics, 40(7-8), pp. 548-561. ISSN 01446193

Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988

Elghaish, F; Matarneh, S T; Talebi, S; Abu-Samra, S; Salimi, G and Rausch, C (2022) Deep learning for detecting distresses in buildings and pavements: A critical gap analysis. Construction Innovation, 22(3), pp. 554-579. ISSN 1471-4175

Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Elias, R; Issa, R R A and Wu, W (2023) Progress on building information modeling education and talent acquisition. International Journal of Construction Education and Research, 19(4), pp. 363-382. ISSN 1557-8771

Eliwa, H K; Jelodar, M B; Poshdar, M and Zavvari, A (2024) Organizational infrastructure and information and communication technology infrastructure alignment in construction organizations. Journal of Construction Engineering and Management, 150(7): 04024057, ISSN 0733-9364

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elkbuli, M; Azmy, N and Lee, C K (2025) Enhancing project manager communication soft skills and risk management practices in Libyan oil and gas construction projects: The role of experience. Journal of Engineering, Design and Technology, 23(3), pp. 1017-1038. ISSN 1726-0531

Elmualim, A and Gilder, J (2014) BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3-4), pp. 183-199. ISSN 1745-2007

Eltigani, Hadi Mohammed Ahmed (1995) An investigation into the impact of quality management systems upon construction productivity at the site level. PhD thesis, University of Strathclyde, UK.

Eltinay, N and Egbu, C (2017) Disaster risk reduction conceptual framework: Open data for building resilience in critical infrastructure. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.

Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Emuze, F; Norgbey, W S and Smallwood, J (2015) Provincial roads capex programme in South Africa: Planning and management inadequacies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Emuze F, S J (2013) Construction motor vehicle accidents in South Africa: Causes and impact. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Emuze F, S J (2013) How can supply chain management proliferate in South African construction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Enegbuma, W I; Aliagha, G U; Ali, K N and Badiru, Y Y (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21(2), pp. 113-129. ISSN 1823-6499

Ensar, A and Selin, G (2021) Individual and organisational level drivers and barriers to building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 89-109. ISSN 1823-6499

Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(4), pp. 222-227. ISSN 0961-3218

Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708

Entner, D; Prante, T; Vosgien, T; Zăvoianu, A C; Saminger-Platz, S; Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology, 17(6), pp. 1085-1109. ISSN 1726-0531

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Erdogan, B (2008) Organisational change management for the implementation of collaboration environments. PhD thesis, Loughborough University, UK.

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques. PhD thesis, University of Maryland, College Park, USA.

Erfani, A; Cui, Q and Cavanaugh, I (2021) An empirical analysis of risk similarity among major transportation projects using natural language processing. Journal of Construction Engineering and Management, 147(12): 04021175, ISSN 0733-9364

Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Eriksson, P E (2025) How clients choose procurement strategies and organizational control systems in the Swedish housing sector. Journal of Financial Management of Property and Construction, 30(1), pp. 22-41. ISSN 1366-4387

Eriksson, P E; Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(6), pp. 598-611. ISSN 0969-9988

Eriksson, P E; Nilsson, T and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(6), pp. 527-539. ISSN 0969-9988

Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X

Eriqat, M O; Sweis, R J and Sweis, G J (2025) The challenges of adopting emerging technologies in the AEC industry a literature review and bibliometric analysis. Construction Innovation, 25(6), pp. 1680-1706. ISSN 1471-4175

Ershadi, Mahmoud (2021) Analysing and modelling the critical success factors of project management offices in the construction industry. PhD thesis, University of Newcastle, Australia.

Esa, M (2015) The influence of project manager’s cognitive styles on project success in the Malaysian construction industry. PhD thesis, University of Malaya, Malaysia.

Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.

Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Esmaeili, B and Hallowell, M R (2012) Diffusion of safety innovations in the construction industry. Journal of Construction Engineering and Management, 138(8), pp. 955-963. ISSN 0733-9364

Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.

Espada, R J; Apan, A and McDougall, K (2015) Vulnerability assessment and interdependency analysis of critical infrastructures for climate adaptation and flood mitigation. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 313-346. ISSN 1759-5916

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.

Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531

Evans, M; Farrell, P; Elbeltagi, E and Dion, H (2023) Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (gid) in multinational organisations: Lean IPD&gid transformative initiatives. Journal of Engineering, Design and Technology, 21(3), pp. 778-818. ISSN 1726-0531

Evdorides, H and Shoji, M (2013) Public-private partnerships for road infrastructure services in Zambia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 277-286. ISSN 17514312

Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: Main contractors' perspective. Built Environment Project and Asset Management, 13(1), pp. 105-122. ISSN 2044-124X

Ey, W; Zuo, J and Han, S (2014) Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(3), pp. 148-155. ISSN 1562-3599

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Eyiah-Botwe, E; Aigbavboa, C O and Thwala, W D (2020) Curbing PPP construction projects' failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(1), pp. 50-63. ISSN 2044-124X

Eze, E C; Aghimien, D O; Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(6), pp. 2205-2223. ISSN 0969-9988

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2010) Development of an ICT-based logistics framework for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.

Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.

Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.

Fageha, M K and Aibinu, A A (2014) Prioritising project scope definition elements in public building projects. Construction Economics and Building, 14(3), pp. 18-33. ISSN 2204-9029

Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study. PhD thesis, Heriot-Watt University, UK.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.

Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden. PhD thesis, KTH Royal Institute of Technology, Sweden.

Famakin, I O; Aigbavboa, C and Molusiwa, R (2023) Exploring challenges to implementing health and safety regulations in a developing economy. International Journal of Construction Management, 23(1), pp. 89-97. ISSN 1562-3599

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007

Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364

Fang, Z (2002) Behavioral analysis of project team performance in China. PhD thesis, University of Hong Kong, Hong Kong.

Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364

Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.

Fapohunda, J A and Chileshe, N (2014) Essential factors towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(4), pp. 461-474.

Faqih, F; Zayed, T and Alfalah, G (2022) Technology-based multi-tiered building diagnosis framework. International Journal of Building Pathology and Adaptation, 40(1), pp. 101-133. ISSN 23984708

Farag, F; McDermott, P and Huelin, C A (2016) The development of an activity zone conceptual framework to improve social value implementation in construction projects using human activity systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Farghaly, K (2020) Building information modelling and asset management: Semantic and syntactic interoperability. PhD thesis, Oxford Brookes University, UK.

Farias, Izaura Pereira (2014) Proposal of a construction waste management model for the eastern zone of the city of Teresina, Piauí. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.

Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364

Farouk Kineber, A; Othman, I B; Oke, A E and Chileshe, N (2022) Modelling the relationship between value management's activities and critical success factors for sustainable buildings. Journal of Engineering, Design and Technology, 20(2), pp. 414-435. ISSN 1726-0531

Farran, H H (1993) A study of the implementation and impact of turn-key management contracts in hospitals in the kingdom of Saudi Arabia. PhD thesis, Swansea University, UK.

Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(1), pp. 40-60. ISSN 0969-9988

Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), pp. 1902-1909. ISSN 1562-3599

Farrow, C B and Reyes, M D (2022) Land-grant university strategic plans: Are university-level service-learning goals aligned with construction programs’ goals? International Journal of Construction Education and Research, 18(4), pp. 333-351. ISSN 1557-8771

Faruqi, S and Smith, N J (1997) Karachi light rail transit: A private finance proposal. Engineering, Construction and Architectural Management, 4(3), pp. 233-246. ISSN 0969-9988

Fasna, M F F and Gunatilake, S (2020) Roles and functions of stakeholders in implementing energy retrofits in the hotel sector. International Journal of Building Pathology and Adaptation, 38(5), pp. 737-751. ISSN 23984708

Fasna, M F F and Gunatilake, S (2020) Overcoming barriers for building energy efficiency retrofits: Insights from hotel retrofits in Sri Lanka. Built Environment Project and Asset Management, 10(2), pp. 277-295. ISSN 2044-124X

Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.

Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.

Fatokun, A; Akintoye, A and Liyanage, C (2015) Renegotiation of public private partnership road contracts: Issues and outcomes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.

Fauzi, F Z and Kusumasari, B (2020) Public-private partnership in Western and non-Western countries: A search for relevance. Journal of Financial Management of Property and Construction, 26(1), pp. 87-102. ISSN 1366-4387

Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.

Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.

Feige, A; Wallbaum, H and Krank, S (2011) Harnessing stakeholdermotivation: Towards a Swiss sustainable building sector. Building Research & Information, 39(5), pp. 504-517. ISSN 0961-3218

Feng, K; Xiong, W; Wang, S; Wu, C and Xue, Y (2017) Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9): 04017067, ISSN 0733-9364

Fernandes, C. N.; Ramalho, P. C. and Lima-Silva, F. (2026) Climate-related risks: Implications for municipal governments in Brazil. Buildings & Cities, 7(1), pp. 559-575. ISSN 2632-6655

Fernandes, A G G (2014) Improving and embedding project management practice in organisations. PhD thesis, University of Southampton, UK.

Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364

Fernando, M H V; Costa, D D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 244-259. ISSN 2044-124X

Fernando, N; Jayathilake, P; De Silva, M; Gunathilake, W; Devapura, N and Wise, B (2024) Built environment stakeholders and climate change adaptation: the case of Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 636-648. ISSN 1759-5916

Fernie, S; Weller, S; Green, S D; Newcombe, R and Williams, M (2001) Learning across business sectors: Context, embeddedness and conceptual chasms. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ferreira, F; Briga, P; Ramos Teixeira, S and Almeida, F (2025) A platform sandbox for the assessment of municipal sustainable development goals. Journal of Engineering, Design and Technology, 23(2), pp. 599-617. ISSN 1726-0531

Fettermann, D C; Borriello, A; Pellegrini, A; Cavalcante, C G; Rose, J M and Burke, P F (2021) Getting smarter about household energy: The who and what of demand for smart meters. Building Research & Information, 49(1), pp. 100-112. ISSN 0961-3218

Few, J and Elwell, C A (2023) Applying the CO2 concentration decay tracer gas method in long-term monitoring campaigns in occupied homes: Identifying appropriate unoccupied periods and decay periods. International Journal of Building Pathology and Adaptation, 41(1), pp. 96-108. ISSN 23984708

Fialho, Beatriz Campos (2021) Design for smart maintenance enabled by BIM and IoT. PhD thesis, Universidade de São Paulo, Brazil.

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fini, A A F; Akbarnezhad, A; Rashidi, T H and Travis Waller, S (2017) Job assignment based on brain demands and human resource strategies. Journal of Construction Engineering and Management, 143(5): 04016123, ISSN 0733-9364

Fiorani, Viviane Miranda Araujo (2016) Building sites environmental compensations in urban areas: Focusing the anthropic environment. PhD thesis, Universidade de São Paulo, Brazil.

Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364

Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(6), pp. 2602-2620. ISSN 0969-9988

Fjeldstad, O H; Ali, M and Katera, L (2019) Policy implementation under stress: Central-local government relations in property tax administration in Tanzania. Journal of Financial Management of Property and Construction, 24(2), pp. 129-147. ISSN 1366-4387

Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.

Flood, I and Issa, R R A (2010) Empirical modeling methodologies for construction. Journal of Construction Engineering and Management, 136(1), pp. 36-48. ISSN 0733-9364

Flores Lara, J C; El Fadel, M and Khalfan, M M A (2025) Integrating industry 4.0 and circular economy in the UAE construction sector: A policy-aligned framework. Built Environment Project and Asset Management, 15(3), pp. 535-556. ISSN 2044-124X

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Flyen, C; Hauge, Å L; Almås, A J and Godbolt, Å L (2018) Municipal collaborative planning boosting climate resilience in the built environment. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 58-69. ISSN 1759-5916

Fobiri, G; Musonda, I and Muleya, F (2025) Unlocking the full potential of reality capture for construction project cost monitoring: A mixed review. Journal of Engineering, Design and Technology, 23(3), pp. 830-853. ISSN 1726-0531

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Fogleman, V (2014) The contaminated land regime: Time for a regime that is fit for purpose (Part 1). International Journal of Law in the Built Environment, 6(1-2), pp. 43-68. ISSN 1756-1450

Fogleman, V (2014) The contaminated land regime: Time for a regime that is fit for purpose (Part 2). International Journal of Law in the Built Environment, 6(1-2), pp. 129-151. ISSN 1756-1450

Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364

Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364

Forde, B and Stiemer, S F (1985) Steel construction evaluation by MLR-strategies. Journal of Construction Engineering and Management, 111(2), pp. 149-156. ISSN 0733-9364

Fore, S and Mudavanhu, T (2011) Application of RCM for a chipping and sawing mill. Journal of Engineering, Design and Technology, 9(2), pp. 204-226. ISSN 1726-0531

Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X

Formoso, C T; Santos, A D and Powell, J A (2002) An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, 3(1), pp. 35-54. ISSN 1609-9451

Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193

Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988

Foskett, F. and Alwisy, A. (2026) Socio-industrial analysis of cross-sector robotics adoption obstacles for light-gauge steel construction. Engineering, Construction and Architectural Management, pp. 1-40. ISSN 0969-9988

Fouchal, F; Ellis, K; Hassan, T and Firth, S (2013) ICT-enabled energy efficiency: a lens onto practices of other sectors. Smart and Sustainable Built Environment, 2(2), pp. 158-178. ISSN 2046-6099

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Francis, M; Ramachandra, T and Rotimi, J O B (2016) Strategies to minimise the effects of delayed payments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 199-207. ISSN 17514304

Francis, T R; Wilkinson, S; Mannakkara, S and Chang-Richards, A (2018) Post-disaster reconstruction in Christchurch: A "build back better" perspective. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 239-248. ISSN 1759-5916

Francis, V and Lingard, H (2002) The case for family-friendly work practices in the Australian construction industry. Construction Economics and Building, 2(1), pp. 28-36. ISSN 2204-9029

Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.

Franze, Anthony (2024) Augmented fabrication: An Australian industry 4.0 augmented reality (ar) framework. PhD thesis, Queensland University of Technology, Australia.

Fredriksson, A; Sezer, A A and Sundquist, V (2024) Construction logistics status and actors’ opinions: An industry wide survey in Sweden. Construction Innovation, 24(7), pp. 319-340. ISSN 1471-4175

Fredslund, L M and Gottlieb, S C (2018) Engaging the construction supply chain: A pluralistic perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Freire, J and Alarcón, L F (2002) Achieving lean design process: Improvement methodology. Journal of Construction Engineering and Management, 128(3), pp. 248-256. ISSN 0733-9364

Friend, R M; Thinphanga, P; Macclune, K; Henceroth, J; van Gai Tran, P and Nghiem, T P (2015) Urban transformations and changing patterns of local risk: Lessons from the Mekong region. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 30-43. ISSN 1759-5916

Frommweiler, C and Poirier, E (2025) Facilitating the building commissioning process using building information modeling: An action-research project. Engineering, Construction and Architectural Management, 32(1), pp. 601-620. ISSN 0969-9988

Frutos, J D and Borenstein, D (2003) Object-oriented model for customer-building company interaction in mass customization environment. Journal of Construction Engineering and Management, 129(3), pp. 302-313. ISSN 0733-9364

Fuentes-Del-burgo, J; Fernández, J P R and Navarro-Astor, E (2024) Kanban applied to construction: A literature review. Construction Economics and Building, 24(4-5), pp. 43-57. ISSN 2204-9029

Fuertes, A and Khatabakhshrad, M (2024) Health and safety risk management in a changing climate: Contrasting supervisors and workers perceptions and approaches to heat coping strategies on construction sites. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Fugar, F D K and Agyakwah-Baah, A B (2010) Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), pp. 103-116. ISSN 2204-9029

Fullen, M D (2009) The development, diffusion and evaluation of a fall hazard safety training program for residential construction workers utilizing instructor led and new media delivery. EdD thesis, West Virginia University, USA.

Fuller, P A (2011) Improving lessons learnt outcomes in multi-phase project environments. PhD thesis, Loughborough University, UK.

Fuller, P A; Dainty, A R J; Thorpe, T and MacDonald, R (2009) Event-based measurement of learning in projects: A methodology. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Fuller, P A; Dainty, A R J; Thorpe, T and Slater, I (2007) Learning organisations: Can they be shown to exist through the realisation of quantifiable benefits? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Fung, C K A (1996) Development of a TQM model for improving business performance based on surveys conducted in Hong Kong, Japan and the UK. PhD thesis, De Montfort University, UK.

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Furber, A M (2013) Social and cultural context of rural water and sanitation projects: Case studies from Ghana. PhD thesis, University of Edinburgh, UK.

Futcher, K (2001) Managing portfolios of projects. PhD thesis, Loughborough University, UK.

Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364

Gabe, J (2016) Successful greenhouse gas mitigation in existing Australian office buildings. Building Research & Information, 44(2), pp. 160-174. ISSN 0961-3218

Gade, A N; Larsen, T S and Selman, A D (2021) Leaving no one behind: A glimpse into the state of adoption of the Sustainable Development Goals in the Danish construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Gade, A N and Opoku, A (2020) Challenges for implementing the Sustainable Development Goals in the Danish construction industry: Building owners' perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Gade, R (2022) Achieving sustainable construction through construction & demolition waste minimisation in residential building projects. PhD thesis, Auckland University of Technology, New Zealand.

Gajendran, T and Brewer, G (2007) Integration of information and communication technology: Influence of the cultural environment. Engineering, Construction and Architectural Management, 14(6), pp. 532-549. ISSN 0969-9988

Gajendran, T and Brewer, G (2012) Cultural consciousness and the effective implementation of information and communication technology. Construction Innovation, 12(2), pp. 179-197. ISSN 1471-4175

Galaitsi, S E; Rand, K; Yeates, E; Talbot, C; O'Donnell, A; Pinigina, E and Linkov, I (2023) Stakeholder collaboration in the forecast-informed reservoir operations (firo) pilot project at lake mendocino, California. Built Environment Project and Asset Management, 13(6), pp. 880-895. ISSN 2044-124X

Gale, A W (1994) Women in construction: An investigation into some of the aspects of image and knowledge as determinants of the under representation of women in construction management in the British construction industry. PhD thesis, University of Bath, UK.

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Gallardo, C A S; Granja, A D and Picchi, F A (2014) Productivity gains in a line flow precast concrete process after a basic stability effort. Journal of Construction Engineering and Management, 140(4): B4013004, ISSN 0733-9364

Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364

Gambatese, J A; Behm, M and Hinze, J W (2005) Viability of designing for construction worker safety. Journal of Construction Engineering and Management, 131(9), pp. 1029-1036. ISSN 0733-9364

Gambatese, J A and Hallowell, M (2011) Factors that influence the development and diffusion of technical innovations in the construction industry. Construction Management and Economics, 29(5), pp. 507-517. ISSN 1466433X

Gambatese, J A and James, D E (2001) Dust suppression using truck-mounted water spray system. Journal of Construction Engineering and Management, 127(1), pp. 53-59. ISSN 0733-9364

Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364

Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364

Gambo, N; Inuwa, I I; Usman, N; Said, I and Shuaibu, U S (2021) Factors affecting budget implementation for successful delivery of primary health care building facilities within Nigerian health sector. International Journal of Construction Management, 21(5), pp. 476-489. ISSN 1562-3599

Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gamil, Y and Abdul Rahman, I (2019) Awareness and challenges of building information modelling (BIM) implementation in the Yemen construction industry. Journal of Engineering, Design and Technology, 17(5), pp. 1077-1084. ISSN 1726-0531

Gamil, Y; Abdullah, M A; Abdul Rahman, I and Asad, M M (2020) Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), pp. 1091-1102. ISSN 1726-0531

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gao, C. M.; Wong, K. Y. and Mohd Maulana, M. I. I. (2026) Remanufacturing in the construction industry: Key factors, job competencies, and implementation framework. International Journal of Building Pathology and Adaptation, 44(5), pp. 1329-1360. ISSN 2398-4708

Gao, S.; Low, S. P. and Tok, S. K. W. (2026) Applications of lean principles in the operations of architectural and engineering design firms: An exploratory study in Singapore. Engineering, Construction and Architectural Management, 33(4), pp. 2649-2668. ISSN 0969-9988

Gao, H; Zhong, B; Luo, H and Chen, W (2022) Computational geometric approach for BIM semantic enrichment to support automated underground garage compliance checking. Journal of Construction Engineering and Management, 148(1): 05021013, ISSN 0733-9364

Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects. PhD thesis, Stanford University, USA.

Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364

Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.

Gao, S; Chan, T K and Hendy, P (2025) Adoption of the digitalised last planner system in infrastructure projects: An Australian case study. Construction Innovation, 25(3), pp. 994-1013. ISSN 1471-4175

Gao, S and Low, S P (2015) Implementing Toyota way principles for construction projects in China: A case study. International Journal of Construction Management, 15(3), pp. 179-195. ISSN 1562-3599

Gao, S and Low, S P (2015) Toyota way style human resource management in large Chinese construction firms: A qualitative study. International Journal of Construction Management, 15(1), pp. 17-32. ISSN 1562-3599

Garba, A and Kishk, M (2014) Renewable energy technology means of providing sustainable electricity in Nigerian rural areas: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Garcia, R (2018) California energy policy alternatives for commercial buildings to create energy resiliency, reduce carbon emissions, and lessen dependency on electrical utilities for the future California economy. EdD thesis, Brandman University, USA.

Garcia Punhagui, Katia Regina (2014) Potential reducing of CO2 emissions and embodied energy in housing construction in Brazil by increasing the use of wood. PhD thesis, Universidade de São Paulo, Brazil.

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

Garg, R; Chhikara, R; Singh, R; Agrawal, G; Talwar, V and Mehra, V (2021) A qualitative study to understand the factors affecting the adoption of glass fiber-reinforced gypsum (gfrg) as a sustainable building technology: Insights from Indian construction industry. Construction Innovation, 21(2), pp. 321-344. ISSN 1471-4175

Garip, S B; Güzelci, O Z; Garip, E and Kocabay, S (2024) A genetic algorithm-based design model to provide reduced risk areas for housing interiors. Construction Innovation, 24(1), pp. 49-66. ISSN 1471-4175

Garnett, N A (2001) Changing construction performance using lean construction: An action research approach. PhD thesis, University of Reading, UK.

Gasue, R; Aklashie, S; Dompey, A M A; Agyekum, K and Opoku, D (2026) Implementing materials passports in the construction industry: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 15-35. ISSN 2398-4708

Gebremeskel, M N; Kim, S Y; Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), pp. 2925-2947. ISSN 0969-9988

Gehrig, G B (1985) Organizational practices and theories: Alignment of construction executive's beliefs with company policies. PhD thesis, Colorado State University, USA.

Genc, O (2021) Symbioconstruction: A bibliography-driven dynamic construction industry symbiosis database. Journal of Construction Engineering and Management, 147(8): 04021077, ISSN 0733-9364

Genfi, N and Tokbolat, S (2023) The integration of green building technologies into the construction sector of developing countries: The case of Ghana. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Geng, S.; Chau, H. W.; Jamei, E. and Vrcelj, Z. (2026) Enablers and challenges of smart heritage implementation: The case of chinatown Melbourne. Smart and Sustainable Built Environment, 15(5), pp. 1695-1721. ISSN 2046-6099

Geoghegan, H J; Jensen, F W; Kershaw, T and Codinhoto, R (2022) Innovation realisation for digitalising Dutch small architecture practices: state of the art review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 176-191. ISSN 17514304

George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175

Georgy, M E (2000) Utility-based neurofuzzy approach for engineering performance assessment in industrial construction projects. PhD thesis, Purdue University, USA.

Gerber, J K and Yacoubian G.S, Jr (2001) Evaluation of drug testing in the workplace: Study of the construction industry. Journal of Construction Engineering and Management, 127(6), pp. 438-444. ISSN 0733-9364

Gerding, D; Wamelink, H and Leclercq, E (2020) Implementation of circularity in the building process: A case study research into organizing the actor network and decision-making process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Gerges, M (2020) Building information modelling for fire evacuation in high-rise residential buildings. PhD thesis, Loughborough University, UK.

Geroy, L S A and Pesigan, A M (2011) Disaster risk reduction for health facilities in the Western Pacific region. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 268-277. ISSN 1759-5916

Gerrish, T; Ruikar, K; Cook, M; Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(2), pp. 190-208. ISSN 0969-9988

Getuli, V; Capone, P and Bruttini, A (2021) Planning, management and administration of hs contents with BIM and VR in construction: An implementation protocol. Engineering, Construction and Architectural Management, 28(2), pp. 603-623. ISSN 0969-9988

Getuli, V; Capone, P; Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(3), pp. 504-530. ISSN 1471-4175

Geus, Lucio Marcos de (2016) A support model for defining the location of voluntary delivery points for small construction and demolition waste generators. PhD thesis, Pontifícia Universidade Católica do Paraná, Brazil.

Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.

Ghadiminia, N (2021) Integration of cybersecurity in BIM-enabled facilities management organisations. PhD thesis, Birmingham City University, UK.

GhaffarianHoseini, A; Tien, D D; Naismith, N; Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (Green Star). Engineering, Construction and Architectural Management, 24(4), pp. 696-714. ISSN 0969-9988

Ghafoor, S.; Kocaturk, T.; Hosseini, M. R.; Weiss, M. and Barnett, M. (2026) Navigating complexity: Systems thinking insights on deploying the pss for circular economy housing. Architectural Engineering and Design Management, 22(1), pp. 1-18. ISSN 1745-2007

Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Ghanbari Parsa, A R (1989) The interaction of planning policies and construction technologies in Iran with reference to China & Japan. PhD thesis, University of Newcastle upon Tyne, UK.

Ghanbaripour, A N; Langston, C and Yousefi, A (2017) Implementation of 3D integration model for project delivery success: Case study. Journal of Construction Engineering and Management, 143(8): 05017012, ISSN 0733-9364

Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.

Ghansah, F A; De-Graft, O-M and Ayarkwa, J (2021) Project management processes in the adoption of smart building technologies: A systematic review of constraints. Smart and Sustainable Built Environment, 10(2), pp. 208-226. ISSN 2046-6099

Ghansah, F A and Lu, W (2024) Major opportunities of digital twins for smart buildings: A scientometric and content analysis. Smart and Sustainable Built Environment, 13(1), pp. 63-84. ISSN 2046-6099

Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2021) Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (sbts) in the developing countries. Construction Innovation, 21(4), pp. 685-707. ISSN 1471-4175

Ghansah, F A; Owusu-Manu, D G; Edwards, D J; Thwala, W D; Yamoah Agyemang, D and Ababio, B K (2024) A framework for smart building technologies implementation in the Ghanaian construction industry: A PLS-SEM approach. Building Research & Information, 52(1-2), pp. 148-163. ISSN 0961-3218

Ghansah, F A (2025) Digital twins for smart building at the facility management stage: A systematic review of enablers, applications and challenges. Smart and Sustainable Built Environment, 14(4), pp. 1194-1229. ISSN 2046-6099

Gharaibeh, L; Eriksson, K M; Lantz, B; Matarneh, S and Elghaish, F (2024) Toward digital construction supply chain-based industry 4.0 solutions: Scientometric-thematic analysis. Smart and Sustainable Built Environment, 13(1), pp. 42-62. ISSN 2046-6099

Gharehbaghi, K; Georgy, M; Robson, K M; Wilkinson, S and Farnes, K (2022) Versatility in sustainable building design (sbd) practices: An empirical study. International Journal of Building Pathology and Adaptation, 40(5), pp. 728-752. ISSN 23984708

Gharouni Jafari, K. and Noorzai, E. (2026) Challenging the status quo: Critical barriers to integrated project delivery implementation in Iran. Architectural Engineering and Design Management, 22(1), pp. 83-98. ISSN 1745-2007

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.

Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Ghodki, M K; Swarup, A and Pal, Y (2020) A new IR and sprinkler based embedded controller directed robotic arm for automatic cleaning of solar panel. Journal of Engineering, Design and Technology, 18(4), pp. 905-921. ISSN 1726-0531

Gholami, E (2017) Exploiting BIM in energy efficient domestic retrofit: evaluation of benefits and barriers. PhD thesis, University of Liverpool, UK.

Gholami, M; Mofidi Shemirani, M and Fayaz, R (2018) A modelling methodology for a solar energy-efficient neighbourhood. Smart and Sustainable Built Environment, 7(1), pp. 117-132. ISSN 2046-6099

Gholami Rostam, Mehdi (2024) Energy efficiency assessment in building designs integrating climate resilience and long-term environmental sustainability. PhD thesis, University of New South Wales, Australia.

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Ghosh, A; Abawajy, J and Chowdhury, M (2024) Redefining the construction managerial landscape to facilitate Industry 4.0 implementation: Scientometric mapping of research frontiers. Construction Innovation, 24(3), pp. 657-683. ISSN 1471-4175

Ghosh, A; Edwards, D J; Hosseini, M R; Al-Ameri, R; Abawajy, J and Thwala, W D (2021) Real-time structural health monitoring for concrete beams: A cost-effective 'industry 4.0' solution using piezo sensors. International Journal of Building Pathology and Adaptation, 39(2), pp. 283-311. ISSN 23984708

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Ghostin, M (2020) Exploring an implementation framework for building information modelling to support sustainable development in the Lebanese construction industry: a qualitative approach. PhD thesis, Coventry University, UK.

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Gibson, G E and Bell, L C (1990) Electronic data interchange in construction. Journal of Construction Engineering and Management, 116(4), pp. 727-737. ISSN 0733-9364

Gichuiri, J W (2001) Process modelling: An evaluation approach in support of effective management of construction project information. PhD thesis, University of Salford, UK.

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gillich, A (2025) Market transformations: Gas conversion as a blueprint for net zero retrofit. Buildings & Cities, 6(1), pp. 359-377. ISSN 2632-6655

Gillott, C; Davison, B and Densley Tingley, D (2022) Drivers, barriers and enablers: Construction sector views on vertical extensions. Building Research & Information, 50(8), pp. 909-923. ISSN 0961-3218

Gilly, B A; Touran, A and Asai, T (1987) Quality control circles in construction. Journal of Construction Engineering and Management, 113(3), pp. 427-439. ISSN 0733-9364

Gines, J A (2024) Mass timber utilization in architecture: Carbon sequestration, building materials and construction practices. PhD thesis, Mississippi State University, USA.

Gingue, N B (2022) The effects of the implementation of the use of data analytics on performance in the field of facilities management: A systematic review. DBA thesis, University of Maryland University College, USA.

Giri, O P; Sainju, P R and Htet, A (2025) Evaluating occupational health and safety practices in an airport construction project in Nepal. Built Environment Project and Asset Management, 15(1), pp. 149-164. ISSN 2044-124X

Gladovic, C (2026) Hard hats, soft skills: A responsive scaffold model for construction management education. Construction Economics and Building, 26(1), ISSN 2204-9029

Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.

Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175

Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Goel, A (2025) Construction management students' perception of BIM adoption and its implications in a non-mandated country. International Journal of Construction Management, 25(3), pp. 278-288. ISSN 1562-3599

Gogo, S E (2021) The role of leadership in the transformation of health and safety culture in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Goh, C S (2014) Development of a capability maturity model for sustainable construction. PhD thesis, University of Hong Kong, Hong Kong.

Goh, C S and Abdul-Rahman, H (2013) The identification and management of major risks in the Malaysian construction industry. Journal of Construction in Developing Countries, 18(1), pp. 19-32. ISSN 1823-6499

Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364

Gohardani, N (2014) An approach towards sustainable building. PhD thesis, KTH Royal Institute of Technology, Sweden.

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

Gomda, Hardi Idris (2024) Leadership and implementation of sustainable construction in Ghana. DELead thesis, University of Charleston - Beckley, USA.

Gomes, V and Da Silva, M G (2005) Exploring sustainable construction: Implications from Latin America. Building Research & Information, 33(5), pp. 428-440. ISSN 0961-3218

Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499

Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.

Goncalves, Andriani Tavares Tenorio (2019) Integrated solid waste management index for decision support in municipalities. PhD thesis, Universidade Federal de Itajubá, Brazil.

Goncalves, Gustavo Henrique Vital (2022) Scenarios and support system for consortium management of construction waste applied to water resources management unit 12. PhD thesis, Universidade Federal de São Carlos, Brazil.

González, J F and Gongal, A (2021) Unidirectional pedestrian circulation: Physical distancing in informal settlements. Buildings & Cities, 2(1), pp. 655-665. ISSN 2632-6655

Goodfellow-Smith, M (2019) How can finance and insurance institutions help deliver sustainable city infrastructure? PhD thesis, University of Birmingham, UK.

Goodrum, P M; Haas, C T; Caldas, C; Zhai, D; Yeiser, J and Homm, D (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), pp. 678-688. ISSN 0733-9364

Goonetillake, J F (2019) A framework for the integration of information requirements within infrastructure digital construction. PhD thesis, Cardiff University, UK.

Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.

Gosling, J; Towill, D and Naim, M (2012) Learning how to eat an elephant: Implementing supply chain management principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gotangco, C K; Jardeleza, J M; Lopez, C; Labaria, E C; Wickert, J and Shadiya, F (2020) Factors influencing disaster risk and resilience education in Asian HEIs. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 400-412. ISSN 1759-5916

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193

Goulding, J S (2000) GAPP-IT: A generic it training model for construction. PhD thesis, University of Salford, UK.

Goulding, J S and Alshawi, M (2004) A process-driven IT training model for construction: Core development issues. Construction Innovation, 4(4), pp. 243-254. ISSN 1471-4175

Govan, P and Damnjanovic, I (2016) The resource-based view on project risk management. Journal of Construction Engineering and Management, 142(9): 04016034, ISSN 0733-9364

Gowri, K and Depanni, S (1998) The health and safety expert system (HASES): An expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(1), pp. 92-101. ISSN 0969-9988

Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029

Gowthami, N R; Sridhar, C N V and Venkata Ramana, N (2022) An empirical implementation model of total quality management in construction: Southern India. International Journal of Construction Management, 22(15), pp. 3023-3033. ISSN 1562-3599

Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Graser, K; Kahlert, A and Hall, D M (2021) Dfab house: Implications of a building-scale demonstrator for adoption of digital fabrication in AEC. Construction Management and Economics, 39(10), pp. 853-873. ISSN 01446193

Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.

Grau Torrent, D (2008) Development of a methodology for automating the identification and localization of engineered components and assessment of its impact on construction craft productivity. PhD thesis, University of Texas at Austin, USA.

Greenhalgh, S (2016) The effects of 3D printing in design thinking and design education. Journal of Engineering, Design and Technology, 14(4), pp. 752-769.

Greenwood, D; Horne, M; Thompson, E M; Allwood, C M; Wernemyr, C and Westerdahl, B (2008) Strategic perspectives on the use of virtual reality within the building industries of four countries. Architectural Engineering and Design Management, 4(2), pp. 85-98. ISSN 1745-2007

Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(1), pp. 22-39. ISSN 1471-4175

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry. EdD thesis, George Washington University, USA.

Griffith, A (2011) Fulfilling contractors' corporate social responsibilities using standards-based management systems. International Journal of Construction Management, 11(2), pp. 37-47. ISSN 1562-3599

Griffith, A and Bhutto, K (2008) Contractors' experiences of integrated management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 93-98. ISSN 17514312

Griffith, A and Phillips, N (2001) The influence of the construction (design and management) regulations 1994 upon the procurement and management of small building works. Construction Management and Economics, 19(5), pp. 533-540. ISSN 01446193

Grimm, Alec G (2023) Modeling and monitoring construction site sediment control measures to improve design, performance, and longevity. PhD thesis, Ohio State University, USA.

Grist, E (2014) The implementation of innovative and sustainable construction materials. EngD thesis, University of Bath, UK.

Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Grosskopf, K R (2004) Teaching methods improvement using industry focus groups: A case study in construction financing. International Journal of Construction Education and Research, 1(1), pp. 13-25. ISSN 1557-8771

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.

Gu, J and Wu, Z (2026) Promoting project digital responsibility for sustainable digital construction: A perspective on the coupling of influencing factors. Journal of Construction Engineering and Management, 152(5): 04026050, ISSN 0733-9364

Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364

Gu, J and Guo, F (2024) Promoting digital sustainability through project digital responsibility implementation: An empirical analysis. Journal of Construction Engineering and Management, 150(3): 04023172, ISSN 0733-9364

Guadalupe, H (2020) Safety design management processes to mitigate design errors. PhD thesis, Walden University, USA.

Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.

Guerin, C and Spillane, J P (2021) The role of the construction project manager in developing a culture of suicide prevention. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 6-13. ISSN 17514304

Guerrero, J R and Lindblad, H (2018) Client strategies for stimulating innovation in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gugssa, M; Li, L; Pu, L; Gurbuz, A; Luo, Y and Wang, J (2025) Enabling near-real-time safety glove detection through edge computing and transfer learning: comparative analysis of edge and cloud computing-based methods. Engineering, Construction and Architectural Management, 32(7), pp. 4700-4717. ISSN 0969-9988

Guilbert, A (2024) Energy sufficiency and recognition justice: A study of household consumption. Buildings & Cities, 5(1), pp. 489-505. ISSN 2632-6655

Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.

Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988

Gumz, J and Fettermann, D C (2022) What improves smart meters' implementation? A statistical meta-analysis on smart meters' acceptance. Smart and Sustainable Built Environment, 11(4), pp. 1116-1136. ISSN 2046-6099

Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.

Gunawardena, K and Steemers, K (2023) Assessing the influence of neighbourhood-scale vertical greening application. Buildings & Cities, 4(1), pp. 103-123. ISSN 2632-6655

Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364

Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364

Gunning, J G and McAleenan, C (2010) Safe-T-Cert: An Irish solution to the universal problem of assuring construction safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Guo, F; Jahren, C T; Hao, J and Zhang, C (2020) Implementation of CIM-related technologies within transportation projects. International Journal of Construction Management, 20(5), pp. 510-519. ISSN 1562-3599

Guo, F; Jahren, C T and Turkan, Y (2021) Electronic document management systems for the transportation construction industry. International Journal of Construction Education and Research, 17(1), pp. 52-67. ISSN 1557-8771

Guo, S; Wang, J and Wu, H (2021) Profit distribution of IPD projects using fuzzy alliance. Engineering, Construction and Architectural Management, 28(8), pp. 2069-2089. ISSN 0969-9988

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X

Gupta, P K and Verma, H (2020) Risk perception in PPP infrastructure project financing in India. Journal of Financial Management of Property and Construction, 25(3), pp. 347-369. ISSN 1366-4387

Gupta, R; Barnfield, L and Hipwood, T (2014) Impacts of community-led energy retrofitting of owner-occupied dwellings. Building Research & Information, 42(4), pp. 446-461. ISSN 0961-3218

Gupta, R and Gregg, M (2012) Appraisal of UK funding frameworks for energy research in housing. Building Research & Information, 40(4), pp. 446-460. ISSN 0961-3218

Gurevich, U; Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(6), pp. 610-630. ISSN 0961-3218

Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988

Guribie, F L; Akubah, J T; Tengan, C and Blay Jnr, A V K (2022) Demand for green building in Ghana: A conceptual modeling and empirical study of the impediments. Construction Innovation, 22(2), pp. 342-360. ISSN 1471-4175

Guribie, F L; Kheni, N A and Sule, M (2022) Structural equation modeling of the critical driving forces of offsite construction in Ghana. Built Environment Project and Asset Management, 12(4), pp. 667-683. ISSN 2044-124X

Gurmu, A; Kamardeen, I and Mahmood, M N (2023) Blended pedagogical model for effective teaching of building measurement and estimating. International Journal of Construction Management, 23(7), pp. 1138-1147. ISSN 1562-3599

Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364

Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(1), pp. 77-86. ISSN 1562-3599

Gurmu, A T (2021) Hybrid model for assessing the influence of safety management practices on labor productivity in multistory building projects. Journal of Construction Engineering and Management, 147(11): 04021139, ISSN 0733-9364

Gurmu, A T and Aibinu, A A (2017) Construction equipment management practices for improving labor productivity in multistory building construction projects. Journal of Construction Engineering and Management, 143(10): 04017081, ISSN 0733-9364

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988

Guthrie, J L (2000) Group-level reengineering process. EngD thesis, University of Kansas, USA.

Gutierres, Henrique Elias Pessoa (2019) Methodological proposal for the evaluation of geomorphological impacts based on the environmental impact studies of the Serro Azul and Igarapeba dams in the state of Pernambuco. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Gutub, S (2019) Framework for the implementation process of public-private partnerships (P3s) in highway projects. PhD thesis, University of Washington, USA.

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Gyampoh-Vidogah, R; Moreton, R and Proverbs, D (2003) Implementing information management in construction: Establishing problems, concepts and practice. Construction Innovation, 3(3), pp. 157-173. ISSN 1471-4175

Göswein, V; Arehart, J; Phan-Huy, C; Pomponi, F and Habert, G (2022) Barriers and opportunities of fast-growing biobased material use in buildings. Buildings & Cities, 3(1), pp. 745-755. ISSN 2632-6655

Günay, G (2025) Development of standards for modular construction: Learning from the freight container. PhD thesis, Middle East Technical University, Turkey.

Haass, Omid (2018) Resilience and emergence in contemporary project evaluation: An epic battle between professional and political logics. PhD thesis, Griffith University, Brazil.

Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.

Habtu, T. M.; A. Elsaigh, W. and Musonda, I. (2026) Toward a strategic framework for AI-BIM adoption in Ethiopian road infrastructure management. Engineering, Construction and Architectural Management, 33(15), pp. 564-589. ISSN 0969-9988

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.

Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan. PhD thesis, University of Westminster, UK.

Hadidi, L and Abzakh, A (2022) Toward an understanding of BPR perception in the construction industry: The employee attitude toward job enlargement and enrichment in Saudi Arabia. Engineering, Construction and Architectural Management, 29(1), pp. 204-221. ISSN 0969-9988

Hadidi, L; Assaf, S; Aluwfi, K and Akrawi, H (2017) The effect of ISO 9001 implementation on the customer satisfaction of the engineering design services. International Journal of Building Pathology and Adaptation, 35(2), pp. 176-190.

Hadjistephanou, P (2007) The Olympic Games: a demonstration of the positive and negative side of project management. PhD thesis, Keele University, UK.

Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.

Hadzaman, N A H; Takim, R and Nawawi, A H (2015) BIM roadmap strategic implementation plan: Lesson learnt from Australia, Singapore and Hong Kong. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Haggag, A G; Zaki, S H and Selim, A M (2023) Emergency camps design using analytical hierarchy process to promote the response plan for the natural disasters. Architectural Engineering and Design Management, 19(3), pp. 305-322. ISSN 1745-2007

Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.

Haji Md Yusof, I (2019) Development of lean design process for building construction projects. PhD thesis, University of Birmingham, UK.

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Hajizadeh, S. and Seyis, S. (2026) Multi-climate zone approach to sustainable retrofitting for optimizing energy efficiency and CO2 reduction in Australian detached houses. International Journal of Building Pathology and Adaptation, 44(4), pp. 885-909. ISSN 2398-4708

Hajj, C E; Jawad, D and Montes, G M (2021) Analysis of a construction innovative solution from the perspective of an information system theory. Journal of Construction Engineering and Management, 147(9): 03121003, ISSN 0733-9364

Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives. PhD thesis, University of Strathclyde, UK.

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects. PhD thesis, University of Alberta, Canada.

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Hall, A T; Durdyev, S; Koc, K; Ekmekcioglu, O and Tupenaite, L (2023) Multi-criteria analysis of barriers to building information modeling (BIM) adoption for SMEs in new zealand construction industry. Engineering, Construction and Architectural Management, 30(9), pp. 3798-3816. ISSN 0969-9988

Hallal, I and Sahnoune, T (2023) Urban mix in housing neighbourhoods: Challenges, evaluation method and diagnosis of ayouf in jijel, Algeria. International Journal of Disaster Resilience in the Built Environment, 14(2), pp. 229-248. ISSN 1759-5916

Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.

Hallowell, M R and Calhoun, M E (2011) Interrelationships among highly effective construction injury prevention strategies. Journal of Construction Engineering and Management, 137(11), pp. 985-993. ISSN 0733-9364

Hallowell, M R and Gambatese, J A (2010) Population and initial validation of a formal model for construction safety risk management. Journal of Construction Engineering and Management, 136(9), pp. 981-990. ISSN 0733-9364

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hamdan, Azreen Sharina (2025) Developing a tailored framework for digital transformation in UK small, micro and medium construction enterprises: Evidence from greater manchester. PhD thesis, University of Salford, UK.

Hamerski, D C; Tarcisio Abreu, S; Carlos Torres, F and Isatto, E L (2024) The contributions of the last planner system to resilient performance in construction projects. Construction Management and Economics, 42(4), pp. 328-345. ISSN 01446193

Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.

Hamida, M B (2025) Circular and adaptable building transformation: Reconceptualization, practice exploration, framework co‑development and implementation. PhD thesis, Delft University of Technology, Netherlands.

Hamida, M B and Hassanain, M A (2022) Investigation of AEC/FM practices in adaptive reuse projects. International Journal of Building Pathology and Adaptation, 40(4), pp. 636-660. ISSN 23984708

Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(3), pp. 624-648. ISSN 1726-0531

Hamidpour, E (2025) Title: Risk factors hindering the application of value engineering in Iranian construction projects. International Journal of Construction Management, 25(16), pp. 1998-2006. ISSN 1562-3599

Hamilton, I G; Summerfield, A J; Lowe, R; Ruyssevelt, P; Elwell, C A and Oreszczyn, T (2013) Energy epidemiology: A new approach to end-use energy demand research. Building Research & Information, 41(4), pp. 482-497. ISSN 0961-3218

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Hammond, S; Bowen, P and Cattell, K (2016) The roadside work-seeker phenomenon in the South African informal construction sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Hampson, K; Peters, R; Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: The national museum of Australia. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hamta, N; Ehsanifar, M and Sarikhani, J (2021) Presenting a goal programming model in the time-cost-quality trade-off. International Journal of Construction Management, 21(1), pp. 1-11. ISSN 1562-3599

Hamzeh, F; Abdul, G O; Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(6), pp. 935-949. ISSN 0969-9988

Hamzeh, F; Rached, F; Hraoui, Y; Karam, A J; Malaeb, Z; El Asmar, M and Abbas, Y (2019) Integrated project delivery as an enabler for collaboration: A middle East perspective. Built Environment Project and Asset Management, 9(3), pp. 334-347. ISSN 2044-124X

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, B and Leite, F (2021) Measuring the impact of immersive virtual reality on construction design review applications: Head-mounted display versus desktop monitor. Journal of Construction Engineering and Management, 147(6): 04021042, ISSN 0733-9364

Han, S-H (2004) A working prototype of distributed collaborative architectural design system. PhD thesis, University of Michigan, USA.

Hanafi, M H; Farrell, P; Yusoff, M N; Abdullah, S and Abdul Razak, A (2018) Installation systems of on-site prefabricated concrete components: A qualitative approach. International Journal of Construction Management, 18(5), pp. 343-350. ISSN 1562-3599

Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations. PhD thesis, Heriot-Watt University, UK.

Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364

Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Hanna, A S; Yeutter, M and Aoun, D G (2014) State of practice of building information modeling in the electrical construction industry. Journal of Construction Engineering and Management, 140(12): 05014011, ISSN 0733-9364

Hansen, K L; Gann, D M and Gro K, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(2), pp. 115-126. ISSN 0969-9988

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Hardwicke, J and King, A (2014) The use of evidence based design in NHS construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Hari, S; Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(6), pp. 533-567. ISSN 0969-9988

Harinarain, Nishani and Babalola, Ayotunde (2026) Constraining sustainability: A critical examination of construction policy and practice in Nigeria. Journal of Construction Business and Management, 8(S1), pp. 111-124. ISSN 2521-0165

Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.

Harper, R S and Koehn, E (1998) Managing industrial construction safety in southeast Texas. Journal of Construction Engineering and Management, 124(6), pp. 452-457. ISSN 0733-9364

Harrington, S and Mulville, M (2021) A risk framework for the delivery of long-term performance through the large-scale energy focused retrofit of housing. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Harris, James Egerson (2025) Relationship between time assessment, cost projection, and project performance in the U.S. Government. DBA thesis, Walden University, USA.

Harris, M A (2007) Developing a scorecard to evaluate the use of personal fall arrest systems. PhD thesis, University of Florida, USA.

Harris, P T and Holt, G D (1999) The management of sustainable social housing refurbishment strategies in the West Midlands region of the UK. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Harrop, J N (2018) Sustainability, awareness and the built environment. PhD thesis, Cranfield University, UK.

Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams. PhD thesis, Stanford University, USA.

Hartmann, T (2011) Goal and process alignment during the implementation of decision support systems by project teams. Journal of Construction Engineering and Management, 137(12), pp. 1134-1141. ISSN 0733-9364

Hartmann, T and Levitt, R E (2010) Understanding and managing three-dimensional/four-dimensional model implementations at the project team level. Journal of Construction Engineering and Management, 136(7), pp. 757-767. ISSN 0733-9364

Harty, C (2005) Innovation in construction: A sociology of technology approach. Building Research & Information, 33(6), pp. 512-522. ISSN 0961-3218

Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X

Haruna, A.; Likhitruangsilp, V.; Pinich, S. and Ioannou, P. G. (2025) Critical success factors for circular economy implementation toward sustainable construction: An iterative stationary approach. Architectural Engineering and Design Management, 21(6), pp. 1416-1434. ISSN 1745-2007

Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.

Hasan, A and Jha, K N (2016) Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India. Journal of Construction Engineering and Management, 142(2): 04015064, ISSN 0733-9364

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988

Hasan, L N; Lizarralde, G and Lachapelle, E (2025) The legitimation of private net zero emission building standards in the context of global decarbonization goals. Construction Management and Economics, 43(5), pp. 360-380. ISSN 0144-6193

Hasan, M and Fadli, F (2025) Street re-design for the adoption of autonomous vehicles: Case of the city of doha, qatar. Smart and Sustainable Built Environment, 14(3), pp. 776-793. ISSN 2046-6099

Hasan, M R; Sagar, M S I and Ray, B C (2023) Barriers to improving construction and demolition waste management in Bangladesh. International Journal of Construction Management, 23(14), pp. 2333-2347. ISSN 1562-3599

Hasan, N (2006) Developing a balanced scorecard model for evaluation of project management and performance. PhD thesis, University of Birmingham, UK.

Hasanzadeh, S; De La Garza, J M and Geller, E S (2020) Latent effect of safety interventions. Journal of Construction Engineering and Management, 146(5): 04020033, ISSN 0733-9364

Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: A grounded theory study. International Journal of Construction Education and Research, 18(3), pp. 270-292. ISSN 1557-8771

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassan, N M and Alashwal, A (2025) Developing a model for the implementation of designing out waste in construction. Architectural Engineering and Design Management, 21(1), pp. 154-170. ISSN 1745-2007

Hassan Ali, A; Farouk Kineber, A; Elshaboury, N; Arashpour, M and Osama Daoud, A (2025) Analysing multifaceted barriers to modular construction in sustainable building projects: a comprehensive evaluation using multi-criteria decision making. International Journal of Construction Management, 25(1), pp. 1-17. ISSN 1562-3599

Hassanain, M A; Al-Marzooq, A; Alshibani, A and Zami, M S (2026) Factors influencing IoT adoption for sustainable facilities management in Saudi Arabia: A stakeholder assessment. Smart and Sustainable Built Environment, 15(1), pp. 319-342. ISSN 2046-6099

Hassanain, M A (2002) Integrated systems for maintenance management. PhD thesis, University of British Columbia, Canada.

Hassanain, M A; Alamoudi, A; Al-Hammad, A M and Abdallah, A (2020) Barriers to the implementation of poe practices in the Saudi Arabian building industry. Architectural Engineering and Design Management, 16(2), pp. 150-165. ISSN 1745-2007

Hassanain, M A; Bin-Mohanna, A; Al-Hammad, A-M and Sanni-Anibire, M O (2017) Challenges to the implementation of building management systems in Saudi Arabia. Built Environment Project and Asset Management, 7(2), pp. 130-142. ISSN 2044-124X

Hassane Assaad, R (2021) Innovative modeling and management of infrastructure systems, engineering and construction operations, and offsite construction technology using computational data analytics. PhD thesis, Missouri University of Science and Technology, USA.

Hasso, M H (1996) Strategic systems model for the management of United States international engineering and construction growth. PhD thesis, Worcester Polytechnic Institute, USA.

Hastak, M; Vanegas, J A and Puyana-Camargo, M (1993) Time-based competition: Competitive advantage tool for A/E/C firms. Journal of Construction Engineering and Management, 119(4), pp. 785-800. ISSN 0733-9364

Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts. PhD thesis, Ohio State University, USA.

Haupt, T C (2001) The performance approach to construction worker safety and health. PhD thesis, University of Florida, USA.

Haupt, T C (2003) A study of management attitudes to a performance approach to construction worker safety. Journal of Construction Research, 4(1), pp. 87-100. ISSN 1609-9451

He, C (2018) Public procurement: award mechanisms and implementation process. PhD thesis, Loughborough University, UK.

He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.

He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193

He, W; Li, W; Xu, S; Wang, W and An, X (2021) Time, cost, and energy consumption analysis on construction optimization in high-rise buildings. Journal of Construction Engineering and Management, 147(10): 04021128, ISSN 0733-9364

Hearne, R (2013) Realising the "right to the city": Developing a human rights based framework for regeneration of areas of urban disadvantage. International Journal of Law in the Built Environment, 5(2), pp. 172-187. ISSN 17561469

Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364

Hegazy, T; Zaneldin, E and Grierson, D (2001) Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127(4), pp. 322-329. ISSN 0733-9364

Henderson, J R and Ruikar, K (2010) Technology implementation strategies for construction organisations. Engineering, Construction and Architectural Management, 17(3), pp. 309-327. ISSN 0969-9988

Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X

Hepworth, A (2021) Decision-making in immature projects organisational environment: A mental model approach that influences conscientious critical thinking. PhD thesis, University of Liverpool, UK.

Herazo, Benjamin (2017) The influence of sustainability in project management practices in the building sector. PhD thesis, Université de Montréal, Canada.

Herbert, Y; Dale, A and Stashok, C (2022) Canadian cities: Climate change action and plans. Buildings & Cities, 3(1), pp. 854-873. ISSN 2632-6655

Hernandez Delgado, O A (1998) Decision-making for the selection of investment projects. PhD thesis, University of Nottingham, UK.

Hernandez Mendez, A (2018) Improving project performance through implementation of agile methodologies in the renewable energy construction industry. DEngr thesis, George Washington University, USA.

Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2021) Analyzing the association between lean design management practices and BIM uses in the design of construction projects. Journal of Construction Engineering and Management, 147(4): 04021010, ISSN 0733-9364

Herrera Valencia, R F (2020) Impact of BIM/lean on the interaction of construction project design teams. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Hessami, A R; Faghihi, V; Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(8), pp. 726-738. ISSN 01446193

Hesse, A D (1991) The management of risks in the procurement of very large construction projects (Britain and New Commonwealth): Comparative change in procurement methods for very large construction projects. PhD thesis, University College London, UK.

Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.

Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X

Hewlett, B; Sherratt, F and Edmondson, V (2022) Managing designing for safety: A framework for whole-Team decision making and risk control. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 15-26. ISSN 17514304

Heylighen, A; Martin, W M and Cavallin, H (2007) Building stories revisited: Unlocking the knowledge capital of architectural practice. Architectural Engineering and Design Management, 3(1), pp. 65-74. ISSN 1745-2007

Hezel, Claudia Regina (2014) Impact assessment of the requirements of the contractor in integrated management systems for industrial assembly companies in the oil industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Hidayat, B (2013) The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. PhD thesis, University of Salford, UK.

Higham, A and Fortune, C J (2012) Investment appraisal tools and sustainability evaluation in social housing. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Higuera-Trujillo, J L; Llinares Millán, C; Montañana i Aviñó, A and Rojas, J C (2020) Multisensory stress reduction: A neuro-architecture study of paediatric waiting rooms. Building Research & Information, 48(3), pp. 269-285. ISSN 0961-3218

Hijazi, A A; Das, P; Li, Y; Moehler, R C and Maxwell, D W (2026) A contingency approach to platform implementation: Platform types, attributes, and value chain integration. Building Research & Information, 54(1), pp. 4-23. ISSN 0961-3218

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hilali, A; Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(8), pp. 1574-1592. ISSN 0969-9988

Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hill, Natoya (2025) A systematic literature review: Exploring the integration of artificial intelligence in construction management. DSc thesis, Middle Georgia State University, USA.

Hillestad, D (2022) Building owners and managers organizational maturity self-assessment for a facility condition assessment program. PhD thesis, Arizona State University, USA.

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387

Hlatshwayo, T N s (2024) Enabling legislative coherence in the Eswatini construction industry. PhD thesis, Nelson Mandela University, South Africa.

Ho, M F; Drew, D; McGeorge, D and Loosemore, M (2004) Implementing corporate ethics management and its comparison with the safety management system: A case study in Hong Kong. Construction Management and Economics, 22(6), pp. 595-606. ISSN 01446193

Hochachka, G; Logan, K G; Raymond, J and Mérida, W (2022) Climate action in urban mobility: Personal and political transformations. Buildings & Cities, 3(1), pp. 1019-1041. ISSN 2632-6655

Hochscheid, E; Falardeau, M; Lapalme, J; Boton, C and Rivest, L (2023) Practitioners' concerns about their liability toward BIM collaborative digital mockups: Case study in civil engineering. Journal of Construction Engineering and Management, 149(9): 05023010, ISSN 0733-9364

Hoeber, H and Alsem, D (2016) Life-cycle information management using open-standard BIM. Engineering, Construction and Architectural Management, 23(6), pp. 696-708. ISSN 0969-9988

Holt, G D and Goulding, J S (2017) PROD2UCT: An outcome-oriented dissertation study model for construction engineering students. Journal of Engineering, Design and Technology, 15(1), pp. 104-117.

Holtzhower, D L (2015) Decision model to optimize wastewater treatment in the built environment. PhD thesis, University of Florida, USA.

Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach. PhD thesis, University of Washington, USA.

Honda, Wilson Saburo (2016) Sustainability certificate of corporate offices buildings in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Hong, Y; Hammad, A; Zhong, X; Wang, B and Akbarnezhad, A (2020) Comparative modeling approach to capture the differences in BIM adoption decision-making process in Australia and China. Journal of Construction Engineering and Management, 146(2): 04019099, ISSN 0733-9364

Hong, Y; Hammad, A W A and Akbarnezhad, A (2019) Impact of organization size and project type on BIM adoption in the Chinese construction market. Construction Management and Economics, 37(11), pp. 675-691. ISSN 01446193

Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988

Hong, Ying Civil (2018) Modelling and evaluating the adoption of building information modelling in Australian and Chinese small and medium-sized construction organisations. PhD thesis, University of New South Wales, Australia.

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.

Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364

Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916

Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193

Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.

Hossain, M M and Ahmed, S (2022) Developing an automated safety checking system using BIM: A case study in the Bangladeshi construction industry. International Journal of Construction Management, 22(7), pp. 1206-1224. ISSN 1562-3599

Hosseini, M R; Chileshe, N; Jepson, J and Arashpour, M (2016) Critical success factors for implementing risk management systems in developing countries. Construction Economics and Building, 16(1), pp. 18-32. ISSN 2204-9029

Hove, G (2015) Perceptions of small business executives on determinants of performance in the construction industry in Gauteng, South Africa. DBL thesis, University of South Africa, South Africa.

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.

Howarth, T; Stoneman, G and Hill, C (2000) A review of the construction (design and management) regulations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hsiao, C-C (2000) Constructing a sustainable impact assessment methodology: an evaluation of Taiwanese EIA of high-rise building. PhD thesis, University of Edinburgh, UK.

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection. PhD thesis, University of Maryland, College Park, USA.

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, M and Milner, D (2021) Factors influencing existing medium-sized commercial building energy retrofits to achieve the net zero energy goal in the United States. Building Research & Information, 49(5), pp. 525-542. ISSN 0961-3218

Hu, X; Chong, H Y; Wang, X and London, K (2019) Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145(8): 03119003, ISSN 0733-9364

Hua, Y (2017) Cultural dynamics of information communication technology (ICT) adoption in construction. PhD thesis, University of Hong Kong, Hong Kong.

Hua, Y; Kang, F; Zhang, S and Li, J (2023) Impacts of task interdependence and equivocality on ICT adoption in the construction industry: A task-technology fit view. Architectural Engineering and Design Management, 19(1), pp. 92-109. ISSN 1745-2007

Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(6), pp. 423-438. ISSN 1745-2007

Hua, Y; Zhang, Y and Ma, P (2024) The mediating effect of BIM application on the link between organizational support and BIM user satisfaction. Architectural Engineering and Design Management, 20(3), pp. 636-655. ISSN 1745-2007

Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988

Huang, C (2005) The development of an integrated paradigm and a decision support framework for IT innovation adoption. Unpublished PhD thesis, University of Reading, UK.

Huang, J (2012) The effects of the development of Private Finance Initiatives in the UK and their relevance in the implementation of Build-Operate-Transfer projects in Chinese road and water sectors. PhD thesis, De Montfort University, UK.

Huang, J; Abadi, M and Yeow, J (2023) Policies for the transition to circular construction: A systematic literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Huang, K; Jia, G; Liu, D and Ma, Y (2018) The transformation mechanism of work-related stress into unsafe behaviour in construction industry: Based on DEA method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.

Huang, N; Du, Q; Bai, L and Chen, Q (2025) Optimizing collaborative decision-making of multi-agent resources for large-scale projects: From a matching perspective. Engineering, Construction and Architectural Management, 32(1), pp. 16-37. ISSN 0969-9988

Huang, N; Du, Q; Zou, P X W and Huang, Y (2023) Analysis of key factors influencing green highway project development focusing on network interaction and project success: Evidence from China. Engineering, Construction and Architectural Management, 30(8), pp. 3203-3223. ISSN 0969-9988

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Huang, Y; Trinh, M T and Le, T (2021) Critical factors affecting intention of use of augmented hearing protection technology in construction. Journal of Construction Engineering and Management, 147(8): 0002116, ISSN 0733-9364

Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X

Hughes, C and Crosby, N (2012) The challenge of self-regulation in commercial property leasing: A study of lease codes in the UK. International Journal of Law in the Built Environment, 4(1), pp. 23-44. ISSN 1756-1450

Hughes, M L (2020) Evaluating the impact of knowledge transfer on project delays for construction project delivery: A qualitative case study. PhD thesis, Northcentral University, USA.

Hugo, J and Farhadian, M (2026) Living labs and building testing labs: Enabling climate change adaptation. Buildings & Cities, 7(1), pp. 126-142. ISSN 2632-6655

Hui, E C M and Ivan, I M H (2008) A risk-based option pricing strategy for property valuation: An empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(1), pp. 48-59. ISSN 1366-4387

Hulme, T W and Burchell, A J (1992) Bored tunneling for Singapore metro. Journal of Construction Engineering and Management, 118(2), pp. 363-384. ISSN 0733-9364

Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.

Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364

Hurst, A G (2009) CPD and work-based learning for construction managers: Is it accessible? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hussain, A.; Che Ibrahim, C. K. I.; Belayutham, S.; Manu, P. and Cheung, C. (2026) Exploring regulatory capabilities for design for safety in construction: The case of Malaysia. Built Environment Project and Asset Management, 16(2), pp. 221-241. ISSN 2044-124X

Hussein, M K; Yusof, M J M and Jaafar, N S (2020) An observational study on forest landscape conservation in Malaysia via the establishment of forestry educational centres. Journal of Construction in Developing Countries, 25(2), pp. 153-173. ISSN 1823-6499

Huynh, N. M.; Bui, P. T.; Le-Hoai, L. and Tang, M. N. (2026) Prioritizing actions to mitigate causes of material waste in construction using quality function deployment. Construction Economics and Building, 26(2), ISSN 2204-9029

Hwang, B G and Ho, J W (2012) Front-end planning implementation in Singapore: Status, importance, and impact. Journal of Construction Engineering and Management, 138(4), pp. 567-573. ISSN 0733-9364

Hwang, B G; Tan, H F and Sathish, S (2013) Capital project performance measurement and benchmarking in Singapore. Engineering, Construction and Architectural Management, 20(2), pp. 143-159. ISSN 0969-9988

Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364

Hwang, S (2022) Sharing tacit knowledge in small-medium regional construction companies in the U.S.: The current status and the impact of organizational ecology. International Journal of Construction Management, 22(9), pp. 1746-1755. ISSN 1562-3599

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771

Hällström, A A F (2023) Collaborative project delivery models in infrastructure construction. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X

Höök, M and Stehn, L (2014) Exploring the management of multiple business models in one company. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.

Ibbotson, K and Farrell, P (2019) The challenges of prioritising low carbon in public sector flood and coastal erosion risk management (FCERM) construction. International Journal of Building Pathology and Adaptation, 37(5), pp. 615-628. ISSN 23984708

Ibbs, C W and Terveer, K R (1984) Integrated construction preventive maintenance system. Journal of Construction Engineering and Management, 110(1), pp. 43-59. ISSN 0733-9364

Ibrahim, K; Okanlawon, T T; Oyewobi, L O; Badamasi, A; Dodo, M and Jimoh, R A (2026) Construction 4.0: Enhancing sustainable construction practices by evaluating digital twin barriers in the Nigerian AEC industry. Engineering, Construction and Architectural Management, 33(1), pp. 258-283. ISSN 0969-9988

Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2009) Evaluation of key practices under the local improvement finance trust (lift) initiative for UK healthcare facilities. Engineering, Construction and Architectural Management, 16(5), pp. 504-518. ISSN 0969-9988

Ibrahim, C K I C; Manu, P; Belayutham, S; Cheung, C; Mohamad, M Z; Yunusa-Kaltungo, A; Ismail, S and Hussain, A (2023) Factors influencing dfs adoption: The case of Malaysian construction organisations. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ibrahim, F S; Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(3), pp. 21-42. ISSN 2204-9029

Ibrahim, M (2016) Analyzing decision making in alternative contracting for highway pavement rehabilitation projects. PhD thesis, Florida International University, USA.

Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.

Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Ignacio, J T S; Gotangco Gonzales, C K and Lee-Chua, Q (2024) A systems thinking approach to e-learning on climate change: Capacity-building for junior high school teachers in the Philippines. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 409-424. ISSN 1759-5916

Ihm, S Y; Lee, H J; Lee, E J and Park, Y H (2021) A policy knowledge- and reasoning-based method for data-analytic city policymaking. Building Research & Information, 49(1), pp. 38-54. ISSN 0961-3218

Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Ihuah, P W (2015) Conceptual framework for the sustainable management of social (public) housing estates in the Niger Delta region of Nigeria. PhD thesis, University of Salford, UK.

Ikediashi, D; Udo, G and Ofoegbu, M (2020) Post-occupancy evaluation of University of Uyo buildings. Journal of Engineering, Design and Technology, 18(6), pp. 1711-1730. ISSN 1726-0531

Ikediashi, D I (2024) Facilities management strategic roles and services quality performance in Nigeria’s banking sector. Journal of Engineering, Design and Technology, 22(5), pp. 1591-1615. ISSN 1726-0531

Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708

Iles, D and Ryall, P (2016) How can the United Kingdom construction industry implement sustainable procurement strategies? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Iliescu, S (2000) A case-based reasoning approach to the designing of building envelopes. PhD thesis, Concordia University, Canada.

Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.

Ilter, D and Dikbas, A (2008) The use of key attrıbutes ın alternatıve dıspute resolutıon (ADR) process desıgn. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Imoudu, E W; Godwin, A U and Nita, A K (2014) Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective. Construction Innovation, 14(4), pp. 408-432. ISSN 1471-4175

Imriyas, K; Low, S P; Teo, A L and Chan, S L (2008) Premium-rating model for workers' compensation insurance in construction. Journal of Construction Engineering and Management, 134(8), pp. 601-617. ISSN 0733-9364

Imriyas, K; Pheng, L S and Teo, E A L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(6), pp. 563-584. ISSN 1466433X

Imriyas, K; Pheng, L S and Teo, E A L (2007) A fuzzy knowledge-based system for premium rating of workers' compensation insurance for building projects. Construction Management and Economics, 25(11), pp. 1177-1195. ISSN 01446193

Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364

Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531

Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364

Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.

Inuwa, I I (2018) Unethical professional practices in tendering of public building procurement in Bauchi Metropolis, Nigeria. African Journal of Built Environment Research, 2(1), pp. 55-73. ISSN 2414-0236

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.

Ioannou, P G and Carr, R I (1988) Advanced building technology matrix system. Journal of Construction Engineering and Management, 114(4), pp. 517-531. ISSN 0733-9364

Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364

Iqbal, M.; Lin, Z.; Ahmed, R. I.; Ahmad, N. and Hussain, K. (2026) Exploring the paths to big data analytics implementation success in construction projects: An integrated approach. Engineering, Construction and Architectural Management, 33(7), pp. 5418-5444. ISSN 0969-9988

Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. PhD thesis, University of Birmingham, UK.

Isa, S S M and Abidin, N Z (2021) Eco-innovation adoption in Malaysian contractor firms: Understanding the components and drivers. Construction Economics and Building, 21(3), pp. 221-242. ISSN 2204-9029

Ishak, S S M and Newton, S (2016) An innovation resistance factor model. Construction Economics and Building, 16(3), pp. 87-103. ISSN 2204-9029

Isikdag, U (2006) Towards the implementation of building information models in geospatial context. PhD thesis, University of Salford, UK.

Isikdag, U; Underwood, J; Aouad, G and Trodd, N (2007) Investigating the role of building information models as a part of an integrated data layer: A fire response management case. Architectural Engineering and Design Management, 3(2), pp. 124-142. ISSN 1745-2007

Iskandarani, H; Proverbs, D G and Xiao, H (2023) Towards improving the design and planning of post-conflict housing reconstruction projects: A conceptual framework. Built Environment Project and Asset Management, 13(2), pp. 253-269. ISSN 2044-124X

Ismail, S and Azzahra, H F (2014) Rationales for public private partnership (PPP) implementation in Malaysia. Journal of Financial Management of Property and Construction, 19(3), pp. 188-201. ISSN 1366-4387

Ismail, S; Che Ibrahim, C K I; Belayutham, S and Mohammad, M Z (2022) Analysis of attributes critical to the designer's prevention through design competence in construction: The case of Malaysia. Architectural Engineering and Design Management, 18(3), pp. 325-343. ISSN 1745-2007

Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X

Ismail, Sushilawati (2018) Developing a framework for sustainable industrialised building systems for infrastructure projects in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Ismail, Z A (2019) An integrated computerised maintenance management system (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), pp. 326-343. ISSN 23984708

Ismail, Z A (2021) Implementation of BIM technology for knowledge transfer in IBS building maintenance projects. International Journal of Building Pathology and Adaptation, 39(1), pp. 115-134. ISSN 23984708

Issa, M H (2011) The Canadian green building initiative: Post occupancy evaluation of Canadian green schools. PhD thesis, University of New Brunswick, Canada.

Issa, R R A and Haddad, J (2008) Perceptions of the impacts of organizational culture and information technology on knowledge sharing in construction. Construction Innovation, 8(3), pp. 182-201. ISSN 1471-4175

Isuri Anuradha, A; Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), pp. 304-329. ISSN 2044-124X

Itoya, E (2012) Carbon emissions evaluation for highway management and maintenance. EngD thesis, Loughborough University, UK.

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jabour Al Hazmi, H S (2011) National culture and knowledge sharing practices: Empirical study in the context of the procurement of educational building projects in Saudi Arabia. PhD thesis, Griffith University, Australia.

Jackson, J I (2009) Collaboration in planning sustainable developments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 69-74. ISSN 17514312

Jacobs, C and Miller, S (2003) An integrated approach to project work: An exploration of assessment practices from lecturer perspectives. Journal of Engineering, Design and Technology, 1(1), pp. 75-87. ISSN 1726-0531

Jacobs, Y L (2024) Barriers to the implementation of lean construction in South Africa. PhD thesis, University of Pretoria, South Africa.

Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ICT in construction projects: A Swedish case study. Construction Management and Economics, 28(1), pp. 13-23. ISSN 1466433X

Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007

Jacques de Sousa, L; Poças Martins, J; Sanhudo, L and Santos Baptista, J (2024) Automation of text document classification in the budgeting phase of the construction process: A systematic literature review. Construction Innovation, 24(7), pp. 292-318. ISSN 1471-4175

Jadallah, H (2021) Educational theory-embedded training for construction industry professionals. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Jadidoleslami, S. and Saghatforoush, E. (2026) Interdependencies unveiled: MICMAC analysis of BIM-AI synergies in construction. Journal of Construction Engineering and Management, 152(7): 04026086, ISSN 0733-9364

Jadidoleslami, S; Saghatforoush, E; Heravi, A and Preece, C (2022) A practical framework to facilitate constructability implementation using the integrated project delivery approach: A case study. International Journal of Construction Management, 22(7), pp. 1225-1239. ISSN 1562-3599

Jafar Ramaji, I (2016) An integrated building information modeling (BIM) framework for multi-story modular buildings. PhD thesis, Pennsylvania State University, USA.

Jafari Ramiani, A; Sarvari, H; Chan, D W M; Nassereddine, H and Lotfata, A (2024) Critical success factors for private sector participation in accomplishing abandoned public sports facilities projects in Iran. International Journal of Construction Management, 24(6), pp. 586-600. ISSN 1562-3599

Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175

Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.

Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X

Jain, P; Tambuskar, D P and Narwane, V (2024) Identification of critical factors for big data analytics implementation in sustainable supply chain in emerging economies. Journal of Engineering, Design and Technology, 22(3), pp. 926-968. ISSN 1726-0531

Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.

Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jamir Singh, P S; Oke, A E; Aliu, J; Isaiah Kayode, T; Azura Ramli, R; Haizzan Yahaya, M and Idris, A (2026) A study on substance abuse awareness and usage trends within the construction sector. Construction Innovation, 26(3), pp. 674-692. ISSN 1471-4175

Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.

Jang, W S and Skibniewski, M J (2009) Cost-benefit analysis of embedded sensor system for construction materials tracking. Journal of Construction Engineering and Management, 135(5), pp. 378-386. ISSN 0733-9364

Jang, Y; Kim, K; Leite, F; Ayer, S and Cho, Y K (2021) Identifying the perception differences of emerging construction-related technologies between industry and academia to enable high levels of collaboration. Journal of Construction Engineering and Management, 147(10): 06021004, ISSN 0733-9364

Janné, M (2020) Construction logistics in a city development setting. PhD thesis, Linköping University, Sweden.

Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(1), pp. 89-109. ISSN 1471-4175

Jansen, B (2024) The circular kitchen: Perspectives for design and implementation. PhD thesis, Delft University of Technology, Netherlands.

Jansson, G; Johnsson, H and Engström, D (2014) Platform use in systems building. Construction Management and Economics, 32(1-2), pp. 70-82. ISSN 01446193

Jansson, G; Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(2), pp. 236-255. ISSN 1471-4175

Jaradat, S and Beunders, N (2023) Participatory design in refugee camps: Ethnographic case studies from Greece. Engineering, Construction and Architectural Management, 30(3), pp. 1080-1097. ISSN 0969-9988

Jaradat, S and Sexton, M (2016) BIM articulation in different-sized architectural firms. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jaramillo, L V (2019) Implementations of resilience engineering for natural system disturbances: A panarchical perspective. PhD thesis, University of New Mexico, USA.

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(5), pp. 527-543. ISSN 1466433X

Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531

Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364

Jarkas, A M (2012) Influence of buildability factors on rebar installation labor productivity of columns. Journal of Construction Engineering and Management, 138(2), pp. 258-267. ISSN 0733-9364

Jarkas, A M (2016) Effect of buildability on labor productivity: A practical quantification approach. Journal of Construction Engineering and Management, 142(2): 06015002, ISSN 0733-9364

Jarrah, R T (2007) Planning for, facilitating, and evaluating design effectiveness. PhD thesis, University of Texas at Austin, USA.

Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364

Jasiński, A (2021) Impact of BIM implementation on architectural practice. Architectural Engineering and Design Management, 17(5-6), pp. 447-457. ISSN 1745-2007

Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988

Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.

Jayanetti, J. K. D. D. T.; Fernando, M. H.; Ranadewa, K. A. T. O. and Perera, B. A. K. S. (2026) Fusion of machine learning to enhance the adaptability of lean construction maturity models (lcmms). Journal of Engineering, Design and Technology, 24(5), pp. 1298-1321. ISSN 1726-0531

Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X

Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988

Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.

Jeffries, M; Gameson, R; Chen, S E and Elliott, T (2001) The justification and implementation of project alliances: Reflections from the Wandoo B development. Journal of Construction Procurement, 7(2), pp. 31-41. ISSN 1358-9180

Jeljeli, M N; Russell, J S; Guy Meyer, H W and Vonderohe, A P (1993) Potential applications of geographic information systems to construction industry. Journal of Construction Engineering and Management, 119(1), pp. 72-86. ISSN 0733-9364

Jemal, K. M.; Aibinu, A. and Oraee, M. (2026) Technological enablers of lighting-as-a-service business model for circular lighting: A qualitative study. Smart and Sustainable Built Environment, pp. 1-23. ISSN 2046-6099

Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.

Jennings, Iain C (1997) Systemic integration in construction project organisations. PhD thesis, University of Melbourne, Australia.

Jennings, M J and Betts, M (1996) Competitive strategy for quantity surveying practices: The importance of information technology. Engineering, Construction and Architectural Management, 3(3), pp. 163-186. ISSN 0969-9988

Jensen, P A and Jóhannesson, E I (2013) Building information modelling in Denmark and Iceland. Engineering, Construction and Architectural Management, 20(1), pp. 99-110. ISSN 0969-9988

Jervis, E K (2015) Lowering CO2 emissions: a framework for overcoming institutional pressures and diffusing low carbon strategy throughout the construction supply chain. PhD thesis, University of Liverpool, UK.

Jesumoroti, C; Olanrewaju, A and Khor, S C (2024) Defects in Malaysian hospital buildings. International Journal of Building Pathology and Adaptation, 42(5), pp. 835-856. ISSN 2398-4708

Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.

Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.

Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X

Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364

Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.

Jia, A Y; Loosemore, M; Gilbert, D and Rowlinson, S (2016) Shielding workers from heat stress: Reconciling the paradoxes of protection and production logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Jia, M and Zhao, L (2025) Evolutionary analysis of information-based construction management promotion using a government-enterprise evolutionary game model. Engineering, Construction and Architectural Management, 32(1), pp. 349-373. ISSN 0969-9988

Jiang, S; Zhang, J; Shi, J and Wu, Y (2026) Adaptive information retrieval for enhanced building safety management leveraging BIM. Engineering, Construction and Architectural Management, 33(1), pp. 336-360. ISSN 0969-9988

Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988

Jiang, W; Zhao, X and Zuo, J (2021) Confucian principles and performance: A contractors' leadership model. International Journal of Construction Management, 21(8), pp. 834-844. ISSN 1562-3599

Jiang, X; Zhou, H; Li, M; Lu, K; Lyu, S; Omrani, S and Skitmore, M (2024) Sustainable construction projects management in the AEC industry: Analysis and visualization. International Journal of Construction Management, 24(4), pp. 384-399. ISSN 1562-3599

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 189-216. ISSN 1823-6499

Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.

Jin, R; Hancock, C M; Tang, L and Wanatowski, D (2017) BIM investment, returns, and risks in China's AEC industries. Journal of Construction Engineering and Management, 143(12): 04017089, ISSN 0733-9364

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, X; Shen, G; Luo, L and Zhou, X (2025) Influence of policies on stakeholders to drive the success of modular integrated construction in Hong Kong. Engineering, Construction and Architectural Management, 32(5), pp. 2814-2843. ISSN 0969-9988

Jin, Z; Gambatese, J; Liu, D and Dharmapalan, V (2019) Using 4D BIM to assess construction risks during the design phase. Engineering, Construction and Architectural Management, 26(11), pp. 2637-2654. ISSN 0969-9988

Jingmond, M and Ågren, R (2015) Unravelling causes of defects in construction. Construction Innovation, 15(2), pp. 198-218. ISSN 1471-4175

Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.

Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.

Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Johar, N (2017) Community participation: A cementing process, theorizing various dimensions and approaches. Journal of Construction in Developing Countries, 22(S1), pp. 47-61. ISSN 1823-6499

Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(2), pp. 321-340. ISSN 0969-9988

John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364

John, S T; Mohan, A; Philip, M S; Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(5), pp. 1991-2010. ISSN 0969-9988

Johnson, H M; Singh, A and Young, R H F (1998) Fall protection analysis for workers on residential roofs. Journal of Construction Engineering and Management, 124(5), pp. 418-428. ISSN 0733-9364

Johnston, D; Farmer, D; Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(2), pp. 147-159. ISSN 0961-3218

Johnston, D W; Ahluwalia, N T and Gwyn, M B (2007) Improving the professional engineering licensure process for construction engineers. Journal of Construction Engineering and Management, 133(9), pp. 669-677. ISSN 0733-9364

Jones, K (2019) A framework for assessing interventions to promote the implementation of material innovations on construction projects. PhD thesis, University College London, UK.

Jones, K; Desai, A; Brosnan, N; Cooper, J and Ali, F (2017) Built asset management climate change adaptation model. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 263-274. ISSN 1759-5916

Jones, L (2023) The golden thread of information and fire safety in construction: Making our buildings safer through the development of a robust design specification strategy and BIM framework integration. PhD thesis, University of Derby, UK.

Jones, P (2018) A 'smart' bottom-up whole-systems approach to a zero-carbon built environment. Building Research & Information, 46(5), pp. 566-577. ISSN 0961-3218

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jordan, E; Gross, M E; Javernick-Will, A N and Garvin, M J (2011) Use and misuse of qualitative comparative analysis. Construction Management and Economics, 29(11), pp. 1159-1173. ISSN 1466433X

Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.

Joseph, S; Ralwala, A; Wachira-Towey, I and Mutisya, E (2023) Sustainable construction transition (SCT) policy regime in Kenya. Journal of Construction Business and Management, 6(1), pp. 1-16. ISSN 2521-0165

Joutsiniemi, A; Vaattovaara, M and Airaksinen, J (2021) Empowered by planning law: Unintended outcomes in the Helsinki region. Buildings & Cities, 2(1), pp. 837-855. ISSN 2632-6655

Jowett, B; Edwards, D J and Kassem, M (2024) Field BIM and mobile BIM technologies: A requirements taxonomy and its interactions with construction management functions. Construction Innovation, 24(1), pp. 134-163. ISSN 1471-4175

Jowett, B R (2023) A framework for the implementation of mobile BIM technology at project and organisational level supporting lean construction approaches. PhD thesis, University of Northumbria at Newcastle, UK.

Joy Vasantha Rani, S P and Aruna Prabha, K (2010) Stochastic logic computation based rbfnn with adaptive hidden layer structure. Journal of Engineering, Design and Technology, 8(2), pp. 206-220. ISSN 1726-0531

Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.

Juan, Y K; Chi, H Y and Chen, H H (2021) Virtual reality-based decision support model for interior design and decoration of an office building. Engineering, Construction and Architectural Management, 28(1), pp. 229-245. ISSN 0969-9988

Jung, C; Ismail, M A; Arar, M and AlQassimi, N (2026) Mitigating indoor air pollution in uae's high-rise apartment buildings: A study on eco-friendly materials and adsorbents. Smart and Sustainable Built Environment, 15(1), pp. 40-61. ISSN 2046-6099

Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Jørgensen, B and Emmitt, S (2008) Lost in transition: The transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(4), pp. 383-398. ISSN 0969-9988

Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kadir Pakir, A H (2003) Integration: A study in the context of low cost housing projects in Malaysia with special reference to the state of penang. PhD thesis, University College London, UK.

Kahvandi, Z; Melhado, S and Viana, M L (2023) Solutions to overcome integrated project delivery implementation barriers: A meta-synthesis approach. Journal of Construction in Developing Countries, 28(1), pp. 63-89. ISSN 1823-6499

Kahvandi, Z; Saghatforoush, E; Ravasan, A Z and Viana, M L (2020) A review and classification of integrated project delivery implementation enablers. Journal of Construction in Developing Countries, 25(2), pp. 219-236. ISSN 1823-6499

Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175

Kalantari, S; Shepley, M M; Rybkowski, Z K and Bryant, J (2017) Designing for operational efficiency: Facility managers' perspectives on how their knowledge can be better incorporated during design. Architectural Engineering and Design Management, 13(6), pp. 457-478. ISSN 1745-2007

Kale, S (2009) Fuzzy intellectual capital index for construction firms. Journal of Construction Engineering and Management, 135(6), pp. 508-517. ISSN 0733-9364

Kale, S and Karaman, E A (2011) Evaluating the knowledge management practices of construction firms by using importance-comparative performance analysis maps. Journal of Construction Engineering and Management, 137(12), pp. 1142-1152. ISSN 0733-9364

Kalla, M; Kalaycioglu, O; Hecht, R; Schneider, S and Schmidt, C (2024) Station biophilia–assessing the perception of greenery on railway platforms using a digital twin. Building Research & Information, 52(1-2), pp. 164-180. ISSN 0961-3218

Kalla, M; Kalaycioglu, O; Hecht, R; Schneider, S and Schmidt, C (2024) Station biophilia: Assessing the perception of greenery on railway platforms using a digital twin. Building Research & Information, 52(1-2), pp. 164-180. ISSN 0961-3218

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988

Kallow, M A; Bodla, A A; Ejaz, A and Ishaq, M R (2023) How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 23(16), pp. 2779-2787. ISSN 1562-3599

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kamal, E M (2011) Absorptive capacity and implementation of new technology in Malaysian small and medium sized construction companies. PhD thesis, University of Reading, UK.

Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), pp. 1-13. ISSN 1823-6499

Kamal, E M; Lou, E C W; Yusof, N and Osmadi, A (2022) Absorptive capacity of Malaysian SME construction organisations. Architectural Engineering and Design Management, 18(3), pp. 313-324. ISSN 1745-2007

Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kamardeen, I (2007) A fuzzy knowledge-based system for premium-rating of workers' compensation insurance for construction projects. PhD thesis, National University of Singapore, Singapore.

Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(1), pp. 8-25. ISSN 0969-9988

Kamardeen, I (2013) Motivation-driven learning and teaching model for construction education. Construction Economics and Building, 13(1), pp. 36-49. ISSN 2204-9029

Kamari, A; Kotula, B M and Schultz, C P L (2022) A BIM-based LCA tool for sustainable building design during the early design stage. Smart and Sustainable Built Environment, 11(2), pp. 217-244. ISSN 2046-6099

Kamm, J D (2017) A study of technological change in the construction industry through understanding the importance of innovation, risk and stakeholder alignment in construction lending. PhD thesis, Indiana State University, USA.

Kan, C; Fang, Y; Anumba, C J and Messner, J I (2018) A cyber-physical system (CPS) for planning and monitoring mobile cranes on construction sites. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 240-250. ISSN 17514304

Kanagaraj, S; Thiyagarajan, H; Vasudevan, A and Moghul, M (2022) Road map for implementing circular construction practices in India: an overview. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 166-175. ISSN 17514304

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kang, K; Xiao, J and Moon, S (2025) Evaluating safety risks in pedestrian facilities for different ride modes: Application of a deep learning-based 3D scanning system. Journal of Construction Engineering and Management, 151(11): 04025183, ISSN 0733-9364

Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193

Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364

Kao, C-C (2004) The briefing process: an organizational knowledge-creation perspective. PhD thesis, University of Reading, UK.

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Karacigan, A; Cağlayan, S; Tezel, A and Özorhon, B (2025) Strategic roadmap to achieve successful implementation of blockchain technology in construction contract management. Journal of Construction Engineering and Management, 151(11): 04025185, ISSN 0733-9364

Karadag, I; Güzelci, O Z and Alaçam, S (2023) Edu-ai: A twofold machine learning model to support classroom layout generation. Construction Innovation, 23(4), pp. 898-914. ISSN 1471-4175

Karakhan, A A and Gambatese, J A (2017) Identification, quantification, and classification of potential safety risk for sustainable construction in the United States. Journal of Construction Engineering and Management, 143(7): 04017018, ISSN 0733-9364

Karakhan, A A and Gambatese, J A (2017) Integrating worker health and safety into sustainable design and construction: Designer and constructor perspectives. Journal of Construction Engineering and Management, 143(9): 04017069, ISSN 0733-9364

Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.

Karamoozian, M. and Zhang, H. (2026) Pushing the boundaries of prefabricated shell building design with building information modeling (BIM) and ultra-high performance concrete (uhpc). Engineering, Construction and Architectural Management, 33(3), pp. 2564-2585. ISSN 0969-9988

Karasu, T; Aaltonen, K and Haapasalo, H (2023) The interplay of IPD and BIM: A systematic literature review. Construction Innovation, 23(3), pp. 640-664. ISSN 1471-4175

Karatas, A; Stoiko, A and Menassa, C C (2016) Framework for selecting occupancy-focused energy interventions in buildings. Building Research & Information, 44(5-6), pp. 535-551. ISSN 0961-3218

Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.

Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364

Karmakar, S (2025) Third-party quality control concept, methodology, and implementation in the building and housing construction industry in India. International Journal of Construction Management, 25(9), pp. 1021-1031. ISSN 1562-3599

Karri, S K; Ponnada, M R and Veerni, L (2024) Durability and microstructure study of alkali-activated slag concrete with quartz sand subjected to different exposure conditions. Journal of Engineering, Design and Technology, 22(1), pp. 42-59. ISSN 1726-0531

Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364

Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364

Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988

Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.

Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(4), pp. 446-466. ISSN 0969-9988

Karunasena, G; Gajanayake, A; Wijeratne, W M P U; Milne, N; Udawatta, N; Perera, S; Crimston, A and Aliviano, P (2024) Liquid waste management in the construction sector: A systematic literature review. International Journal of Construction Management, 24(1), pp. 86-96. ISSN 1562-3599

Karunasena, G; Rathnayake, R M N U and Senarathne, D (2016) Integrating sustainability concepts and value planning for sustainable construction. Built Environment Project and Asset Management, 6(2), pp. 125-138. ISSN 2044-124X

Karunasena, G I (2012) Capacity building for post disaster waste management: Construction and demolition waste. PhD thesis, University of Salford, UK.

Kasana, D V (2021) Evaluating organizational readiness to implement change within the workplace. PhD thesis, University of North Carolina at Charlotte, USA.

Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364

Kashiwagi, D; Chong, N; Costilla, M; McMenimen, F and Egbu, C (2004) Impact of six sigma on construction performance. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.

Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599

Kassem, M; Kelly, G; Dawood, N; Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(3), pp. 261-277. ISSN 2044-124X

Kavishe, N and Chileshe, N (2019) Readiness assessment of public-private partnerships implementation within Tanzanian housing projects: Challenges, strategies and approaches. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988

Kavuri, A S; Soetanto, R; Goodier, C; Murguia, D and Szczygiel, M (2020) Scenarios for the digitalisation of the construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kayan, B A; Forster, A M and Banfill, P F G (2016) Green maintenance for historic masonry buildings: An option appraisal approach. Smart and Sustainable Built Environment, 5(2), pp. 143-164. ISSN 2046-6099

Kazaz, Billur (2022) Improvements in construction stormwater treatment using flocculants. PhD thesis, Auburn University, USA.

Kazmierczak, A and Bichard, E (2010) Investigating homeowners' interest in property-level flood protection. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 157-172. ISSN 1759-5916

Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.

Keenan, M and Rostami, A (2021) The impact of quality management systems on construction performance in the North West of England. International Journal of Construction Management, 21(9), pp. 871-883. ISSN 1562-3599

Kein, A T T; Ofori, G and Briffett, C (1999) ISO 14000: Its relevance to the construction industry of Singapore and its potential as the next industry milestone. Construction Management and Economics, 17(4), pp. 449-461. ISSN 01446193

Kelly, S (2004) Making it work and making do: A study of best practice, computing and routine work in building firms. PhD thesis, Lancaster University, UK.

Kelvin Ibrahim, M and Aliu, J O (2026) Bridging the digital divide: Strategies for successful technology implementation in the UK construction sector. International Journal of Construction Management, 26(6), pp. 1017-1032. ISSN 1562-3599

Keraminiyage, K and Piyatadsananon, P (2013) Achieving success in post-disaster resettlement programmes through better coordination between spatial and socio-economic/cultural factors. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 352-372. ISSN 1759-5916

Kereri, J O and Adamtey, S (2019) RFID use in residential/commercial construction industry. Journal of Engineering, Design and Technology, 17(3), pp. 591-612. ISSN 1726-0531

Keskin, B (2021) A building information modeling (BIM)-centric digital ecosystem for smart airport life cycle management. PhD thesis, Syracuse University, USA.

Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364

Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 0969-9988

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khalef, R and El-Adaway, I H (2023) Identifying design-build decision-making factors and providing future research guidelines: Social network and association rule analysis. Journal of Construction Engineering and Management, 149(1): 04022151, ISSN 0733-9364

Khalef, R and El-Adaway, I H (2024) Performance of project delivery methods for us airport projects: A holistic quantitative risk-based assessment through perceptions of associated industry experts. Journal of Construction Engineering and Management, 150(10): 04024141, ISSN 0733-9364

Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.

Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304

Khalife, S; Pourrahimian, E; Didluck, T and Hamzeh, F (2024) Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework. Architectural Engineering and Design Management, 20(6), pp. 1357-1380. ISSN 1745-2007

Khalil, A (2018) Developing a strategy for the implementation of sustainable construction practices in Libya. PhD thesis, University of Salford, UK.

Khalil, A; Rathnasinghe, A P and Kulatunga, U (2021) Challenges to the implementation of sustainable construction practices in Libya. Construction Economics and Building, 21(3), pp. 243-261. ISSN 2204-9029

Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364

Khamseh, A and Marei, P (2020) Designing a model developed to assess the capabilities of technological innovation in Iranian construction of power plant equipment industries. Journal of Engineering, Design and Technology, 18(5), pp. 1241-1249. ISSN 1726-0531

Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems for buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029

Khan, I H and Munawer, T (2024) A systematic review of economic sustainability of vertical greenery systems in buildings. Construction Economics and Building, 24(1-2), pp. 119-143. ISSN 2204-9029

Khan, M I; Khan, S; Khan, U and Haleem, A (2023) Modeling the big data challenges in context of smart cities: an integrated fuzzy ISM-DEMATEL approach. International Journal of Building Pathology and Adaptation, 41(2), pp. 422-453. ISSN 23984708

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Khanapure, V U and Shastri, S S (2024) A sustainable-lean implementation methodology: A catalyst for sustainability enhancement of high-rise residential projects. Engineering, Construction and Architectural Management, 31(7), pp. 2585-2603. ISSN 0969-9988

Khandelwal, M and Khanapuri, V (2015) Infrastructure debt fund policy framework in India: issues and challenges. Journal of Financial Management of Property and Construction, 20(1), pp. 4-23. ISSN 1366-4387

Khanh, H D; Minh, N V and Tu, N T (2026) Measuring the overall impact of barriers to BIM adoption in prefabricated construction using a fuzzy synthetic evaluation approach. Construction Economics and Building, 26(1), ISSN 2204-9029

Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599

Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; a case of construction industry. Engineering, Construction and Architectural Management, 30(6), pp. 2564-2581. ISSN 0969-9988

Khatleli, N (2016) The impediments to efficient megaproject implementation in South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Khoa, V. D.; Chinda, T. and Nguyen, N. H. (2026) Knowledge management process to enhance construction competitiveness in the long term: System dynamics modelling approach. International Journal of Construction Management, 26(9), pp. 1960-1977. ISSN 1562-3599

Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.

Khodabuccus, R A (2016) Commercialising zero carbon housing design: towards an economic and socio-technically informed approach. EngD thesis, University of Surrey, UK.

Khodadadyan, A (2021) Living and future tools for risk assessment: an examination of the possibilities for fusion. PhD thesis, University of Liverpool, UK.

Khoshfetrat, R; Sarvari, H; Chan, D W M and Rakhshanifar, M (2022) Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey. International Journal of Construction Management, 22(12), pp. 2375-2384. ISSN 1562-3599

Khosravi, M; Mirsaeedie, L and Emami, A (2019) The application of open building principles in popular residential buildings in Iran. Journal of Construction in Developing Countries, 24(1), pp. 125-140. ISSN 1823-6499

Khosrowshahi, F and Alani, M (2003) Event and effect model of building maintenance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.

Khuc, T Q; Nguyen, V T and Do, S T (2026) Barriers to the adoption of blockchain technology in the construction industry: A total interpretive structural modeling (t ISM) and demat el approach. Construction Innovation, 26(1), pp. 260-285. ISSN 1471-4175

Khural, R A; Ertz, M and Cerchione, R (2024) Moving toward sustainability and circularity in hill road construction: A study of barriers, practices and performance. Engineering, Construction and Architectural Management, 31(4), pp. 1608-1641. ISSN 0969-9988

Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.

Kibert, C J and Fard, M M (2012) Differentiating among low-energy, low-carbon and net-zero-energy building strategies for policy formulation. Building Research & Information, 40(5), pp. 625-637. ISSN 0961-3218

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.

Kiet, T T (2024) Problematic issues emerging during BIM implementation process in construction organizations. Built Environment Project and Asset Management, 14(6), pp. 892-913. ISSN 2044-124X

Kifokeris, D; Bahnariu, B and Koch, C (2022) A mapping of Swedish lean construction variants in practice: Review and survey. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Kifokeris, D and Xenidis, Y (2017) Constructability: Outline of past, present, and future research. Journal of Construction Engineering and Management, 143(8): 04017035, ISSN 0733-9364

Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364

Kim, C (1996) An evaluation of the impact of integration and computerization on construction projects. PhD thesis, Worcester Polytechnic Institute, USA.

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation. PhD thesis, University of Texas at Austin, USA.

Kim, E (2000) A study on the effective implementation of earned value management methodology. DSc thesis, George Washington University, USA.

Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.

Kim, J I (2014) Methodology for the application of BIM-based decision support methods to evaluate sustainability metrics for master plans of a large-scale development. DEng thesis, Stanford University, USA.

Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level. PhD thesis, University of Texas at Austin, USA.

Kim, S Y and Nguyen, V T (2022) Supply chain management in construction: Critical study of barriers to implementation. International Journal of Construction Management, 22(16), pp. 3148-3157. ISSN 1562-3599

Kim, Y W and Ballard, G (2002) Earned value method and customer earned value. Journal of Construction Research, 3(1), pp. 55-66. ISSN 1609-9451

Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(4), pp. 203-208. ISSN 0961-3218

Kineber, A F; Ali, A H; Elshaboury, N; Oke, A E and Arashpour, M (2024) A multi-criteria evaluation and stationary analysis of value management implementation barriers for sustainable residential building projects. International Journal of Construction Management, 24(2), pp. 199-212. ISSN 1562-3599

Kineber, A F; Oke, A E; Ali, A H; Dosumu, O; Fakunle, K and Olanrewaju, O I (2025) Critical application areas of radio frequency identification (RFID) technology for sustainable construction in developing countries: The case of Nigeria. Journal of Engineering, Design and Technology, 23(3), pp. 895-916. ISSN 1726-0531

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Buniya, M K (2021) Impact of value management on building projects success: Structural equation modeling approach. Journal of Construction Engineering and Management, 147(4): 04021011, ISSN 0733-9364

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2023) Value management implementation barriers for sustainable building: A bibliometric analysis and partial least square structural equation modeling. Construction Innovation, 23(1), pp. 38-73. ISSN 1471-4175

Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2024) Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(5), pp. 1380-1400. ISSN 1471-4175

Kirkham, R J; Alisa, M; Silva, A P d; Grindley, T and Brøndsted, J (2004) Rethinking whole life cycle cost based design decision-making. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988

Kishk, M (2002) Towards effective consideration of non-financial factors in the design and management of construction assets. Journal of Financial Management of Property and Construction, 7(3), pp. 163-174. ISSN 1366-4387

Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kishk, M and Al-Hajj, A (2000) Fuzzy modelling of life cycle costs of alternatives with different lives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kishk, M; Al-Hajj, A and Pollock, R (2001) Inclusion of non-financial factors in life-cycle decision-making: A fuzzy approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kishk, M; Al-Hajj, A and Pollock, R (2003) Effective measurement and visualization of whole-life costs of building elements. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2003) Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(2), pp. 89-98. ISSN 1366-4387

Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599

Kissi, E; Aigbavboa, C and Kuoribo, E (2023) Emerging technologies in the construction industry: Challenges and strategies in Ghana. Construction Innovation, 23(2), pp. 383-405. ISSN 1471-4175

Kissi, E; Boateng, E B; Adjei-Kumi, T and Badu, E (2017) Principal component analysis of challenges facing the implementation of value engineering in public projects in developing countries. International Journal of Construction Management, 17(2), pp. 142-150. ISSN 1562-3599

Kit Miyamoto, H; Gilani, A S J and Wada, A (2011) Damage mitigation for school buildings in seismically vulnerable regions. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 8-29. ISSN 1759-5916

Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(2), pp. 99-110. ISSN 1366-4387

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.

Kjellmark, G; Hjelseth, E; Peñaloza, G A and Riemer-Sørensen, S (2026) Toward construction 5.0: Bridging AI and people through continuous learning. Journal of Construction Engineering and Management, 152(1): 04025227, ISSN 0733-9364

Kjerulf, L and Haugbølle, K (2021) Circular prequalification and bidding practices at contractor firms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kliewer, J E (1994) Development of performance based test procedures for asphalt mixtures. PhD thesis, Oregon State University, USA.

Klocko, Barbara A (2009) Superintendents as sensemakers in the design of sustainable schools. PhD thesis, Oakland University, USA.

Klotz, L (2008) Process transparency for sustainable building delivery. PhD thesis, Pennsylvania State University, USA.

Knight, T and Boyd, D (2009) Researching property development in interesting times. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Knos, C T (2001) Investigating the effects of insurance industry standards on public building inspection departments in Florida, Georgia, and South Carolina. DPA thesis, University of Georgia, USA.

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988

Koc, K and Okudan, O (2021) Assessment of life cycle risks of deconstruction in urban regeneration projects. Journal of Construction Engineering and Management, 147(10): 04021137, ISSN 0733-9364

Koch, C; Gottlieb, S C; Rönn, M and Braide, A (2021) The quandaries of design developer competitions. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Koch, C and Larsen, A (2018) Performance of retrofit with ICT of social housing: Proving technology optimists wrong? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Koch, C and Simonsen, R (2002) Seeping in? Embankment of product innovations in urban renewal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Koch, C and Simonsen, R (2006) Operations strategy and innovation? A contractor implementing lean. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, M; Emilsson, K; Lee, J and Johansson, H (2024) Structural barriers to sufficiency: the contribution of research on elites. Buildings & Cities, 5(1), pp. 268-282. ISSN 2632-6655

Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kokkonen, A and Alin, P (2016) Practitioners deconstructing and reconstructing practices when responding to the implementation of BIM. Construction Management and Economics, 34(7-8), pp. 578-591. ISSN 01446193

Kolar, Duro (2017) Improving the link between project management and strategy to optimise project success. PhD thesis, RMIT University, Australia.

Kolawole, O M (2023) A model for improving ethics in construction materials and products supply chain using blockchain. PhD thesis, London South Bank University, UK.

Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.

Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988

Komolafe, M O; Oyewole, M O and Kolawole, J T (2016) Extent of incorporation of green features in office properties in Lagos, Nigeria. Smart and Sustainable Built Environment, 5(3), pp. 232-260. ISSN 2046-6099

Kong, C W; li, H and Love, P E D (2001) An e-commerce system for construction material procurement. Construction Innovation, 1(1), pp. 43-54. ISSN 1471-4175

Kongsmobath, B (2021) Enterprise risk management and board decision making: context of Laos construction and tourism industry. PhD thesis, University of the West of Scotland, UK.

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.

Koo, H J and O’Connor, J T (2022) Building information modeling as a tool for prevention ofdesign defects. Construction Innovation, 22(4), pp. 870-890. ISSN 1471-4175

Koopman, K L (2023) Implementation of technological innovations within the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(4), pp. 315-321. ISSN 01446193

Kordestani Ghalenoeei, N; Saghatforoush, E; Athari Nikooravan, H and Preece, C (2021) Evaluating solutions to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: A case study of road infrastructure projects. International Journal of Construction Management, 21(2), pp. 140-152. ISSN 1562-3599

Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099

Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.

Korpela J, M R (2013) BIM in facility management and maintenance: The case of Kaisa Library of Helsinki University. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Koskela, L and Vrijhoef, R (2001) Is the current theory of construction a hindrance to innovation? Building Research & Information, 29(3), pp. 197-207. ISSN 0961-3218

Koskela, L J (2000) An exploration towards a production theory and its application to construction. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Kosovac, B (2007) A framework for managing information from heterogeneous, distributed, and autonomous sources in the architecture, engineering, construction, and facilities management domain. PhD thesis, University of British Columbia, Canada.

Kothapally, P R; Gbadamosi, A Q; Delgado, J M D and Mahamadu, A M (2023) An implementation strategy for the application of digital twin for construction progress monitoring using wearable technologies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Kreider, R G (2013) An ontology of the uses of building information modeling. PhD thesis, Pennsylvania State University, USA.

Kridan, A B and Goulding, J S (2005) Change management and human resource management as potential success areas for knowledge management implementation within the Libyan banking sector. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kridan, A B and Goulding, J S (2006) Assessing the role of knowledge management processes in implementing a knowledge management system: An application of the capability maturity model to the Libyan banking sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.

Ku, K and Taiebat, M (2011) BIM experiences and expectations: The constructors' perspective. International Journal of Construction Education and Research, 7(3), pp. 175-197. ISSN 1557-8771

Kugonza, S (2010) Influence of formal and informal institutions on outsourcing of public construction projects in Uganda. PhD thesis, University of Birmingham, UK.

Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531

Kula, B and Ergen, E (2021) Implementation of a BIM-FM platform at an international airport project: Case study. Journal of Construction Engineering and Management, 147(4): 05021002, ISSN 0733-9364

Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.

Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.

Kulchartchai, O and Hadikusumo, B H (2010) Exploratory study of obstacles in safety culture development in the construction industry: A grounded theory approach. Journal of Construction in Developing Countries, 15(1), pp. 45-66. ISSN 1823-6499

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.

Kululanga, G and Kuotcha, W (2010) Measuring project risk management process for construction contractors with statement indicators linked to numerical scores. Engineering, Construction and Architectural Management, 17(4), pp. 336-351. ISSN 0969-9988

Kululanga, G K and Kuotcha, W S (2008) Measuring organisational learning through project reviews. Engineering, Construction and Architectural Management, 15(6), pp. 580-595. ISSN 0969-9988

Kum, Y T; Yap, J B H; Lew, Y L and Lee, W P (2024) Transforming construction health and safety management during COVID-19 pandemic using innovative technologies: PLS-SEM approach. Engineering, Construction and Architectural Management, 31(7), pp. 2770-2808. ISSN 0969-9988

Kumar, B and Hayne, G (2017) Implementation of level 2 Building Information Modelling strategy for asset procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(5), pp. 190-206. ISSN 17514304

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kumara, W H C D; Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(3), pp. 302-316. ISSN 2044-124X

Kumarasiri, B and Dissanayake, P (2021) Barriers to implementing waste-to-energy projects in Sri Lanka: A pestel analysis. Built Environment Project and Asset Management, 11(4), pp. 544-558. ISSN 2044-124X

Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988

Kurwi, S (2019) Integrating BIM and GIS for design collaboration in railway projects. PhD thesis, Loughborough University, UK.

Kurwi, S; Demian, P; Hassan, T M and Blay, K B (2022) A process model for collaboration at the design stage of rail project delivery. Journal of Construction Engineering and Management, 148(10): 04022105, ISSN 0733-9364

Kussl, S and Wald, A (2025) The role of construction clients in digital innovation: Insights from scenario analysis. Construction Management and Economics, 43(5), pp. 381-404. ISSN 0144-6193

Kussl, S; Wald, A and Flak, L S (2025) Change must come from within: Study of digital transformation in construction client organizations. Journal of Construction Engineering and Management, 151(3): 05024017, ISSN 0733-9364

Kwan, A Y and Ofori, G (2001) Chinese culture and successful implementation of partnering in Singapore's construction industry. Construction Management and Economics, 19(6), pp. 619-632. ISSN 01446193

Kwawu, W and Elmualim, A (2011) Sustainability in facilities management: A review of drivers and policy issues. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Kwofie, T E; Aigbavboa, C O and Mpambela, J S (2018) Improving continuing professional development compliance among construction professionals through integrated strategies in South Africa. Journal of Engineering, Design and Technology, 16(4), pp. 637-653. ISSN 1726-0531

Kwok, T W and Chang, S (2025) Comprehensive evaluation of digital technology's effects on the supply chain of prefabricated construction. Engineering, Construction and Architectural Management, 32(8), pp. 5350-5370. ISSN 0969-9988

Kwok, C; Young, R J and Kirkham, R J (2010) Risk and asset management in privatization/private finance of public utiliities: A risk investigation of water infrastructure projects in China. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988

Kürüm Varolgüneş, F and Şeker, İ H (2026) Sustainable urban resettlement in earthquake zones: Evaluating housing and design strategies post-2023 kahramanmaras earthquake. International Journal of Disaster Resilience in the Built Environment, 17(1), pp. 55-79. ISSN 1759-5908

La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.

La Fleur, L (2019) Energy renovation of multi-family buildings in Sweden an evaluation of life cycle costs, indoor environment and primary energy use, and a comparison with constructing a new building. PhD thesis, Linköping University, Sweden.

Laan, A; Leuven, A v; Kolkman, S and Voordijk, H (2002) It in construction: Aligning it and business strategies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Labaka, L; Hernantes, J and Sarriegi, J M (2015) A framework to improve the resilience of critical infrastructures. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 409-423. ISSN 1759-5916

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364

Ladinski, V (2017) Designing for adaptability: The Gateshead Civic Centre. International Journal of Building Pathology and Adaptation, 35(4), pp. 380-396.

Laepple, E S (2005) Exploring project collaboration systems in the building industry. PhD thesis, Texas A&M University, USA.

Laganakou, G (2020) What feasible macro-scale interventions could stimulate a sustainable growth in the UK housing retrofit industry? An examination of the potential impact from supply-chain innovations on low energy retrofit of pre-1919 housing. PhD thesis, University of Northampton, UK.

Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Lagos, C I; Herrera, R F and Alarcón, L F (2019) Assessing the impacts of an IT LPS support system on schedule accomplishment in construction projects. Journal of Construction Engineering and Management, 145(10): 04019055, ISSN 0733-9364

Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029

Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Critical factors that influence lean premise design implementation: A case of Hong Kong high-rise buildings. Architectural Engineering and Design Management, 20(6), pp. 1612-1628. ISSN 1745-2007

Lam, H-C R (2003) An investigation into the implementation of safety management systems by Hong Kong construction contractors. PhD thesis, University of Hong Kong, Hong Kong.

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Lama, Supreet (2023) Improving design briefing with BIM-based concept generation aiming to enhance building project performance. PhD thesis, University of West London, UK.

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Lamson-Hall, P and Martin, R (2022) The Ethiopia urban expansion initiative and knowledge exchange. Buildings & Cities, 3(1), pp. 772-791. ISSN 2632-6655

Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.

Landgren, M; Skovmand Jakobsen, S; Wohlenberg, B and Jensen, L M B (2019) Integrated design processes–a mapping of guidelines with Danish conventional 'silo' design practice as the reference point. Architectural Engineering and Design Management, 15(4), pp. 233-248. ISSN 1745-2007

Langford, D; Rowlinson, S and Sawacha, E (2000) Safety behaviour and safety management: Its influence on the attitudes of workers in the UK construction industry. Engineering, Construction and Architectural Management, 7(2), pp. 133-140. ISSN 0969-9988

Langford, D A; Abukhder, J; Murray, M; Hardcastle, C and Vernea, E (2004) Rethinking construction: What about the SMEs? Journal of Construction Procurement, 10(1),

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988

Langston, C and Crowley, C (2021) Evaluation of transportation infrastructure: A case study of Gold Coast Light Rail stage 1&2. Construction Economics and Building, 21(4), pp. 1-20. ISSN 2204-9029

Languell, J L (2001) Development of a prototype assessment tool to evaluate the potential to successfully implement deconstruction as a regional waste reduction strategy. PhD thesis, University of Florida, USA.

Lansley, P (2001) Building research and the quality-of-life. Building Research & Information, 29(1), pp. 62-74. ISSN 0961-3218

Laovisutthichai, V. and Lu, W. (2026) Design for excellence (dfx) in architecture, engineering, and construction: Definition, necessity, and knowledge management-based framework. Architectural Engineering and Design Management, 22(1), pp. 188-205. ISSN 1745-2007

Laovisutthichai, V and Lu, W (2023) Design for manufacture and assembly (dfma) in architectural design meetings: From a case study to knowledge-to-action framework. Smart and Sustainable Built Environment, 12(5), pp. 1117-1134. ISSN 2046-6099

Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007

Laovisutthichai, V; Lu, W and Low, S P (2025) Design for excellence (DfX) for high-rise modular buildings: from DfX considerations to module design guidelines using the case of Hong Kong. Architectural Engineering and Design Management, 21(3), pp. 430-449. ISSN 1745-2007

Larsson, J; Eriksson, P E; Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1-2), pp. 83-96. ISSN 01446193

Larsson, N K (1999) Development of a building performance rating and labelling system in Canada. Building Research & Information, 27(4-5), pp. 332-341. ISSN 0961-3218

Laryea, S and Watermeyer, R B (2018) Comparison of two infrastructure project implementation models in a developing country. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 3-17. ISSN 17514304

Lassandro, P and Cosola, T (2018) Climate change mitigation: Resilience indicators for roof solutions. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 4-17. ISSN 1759-5916

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988

Laufer, A (1985) On site performance improvement programs. Journal of Construction Engineering and Management, 111(1), pp. 82-97. ISSN 0733-9364

Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364

Lavikka, R; Chauhan, K; Peltokorpi, A and Seppänen, O (2021) Value creation and capture in systemic innovation implementation: Case of mechanical, electrical and plumbing prefabrication in the Finnish construction sector. Construction Innovation, 21(4), pp. 837-856. ISSN 1471-4175

Lavikka, R; Kallio, J; Casey, T and Airaksinen, M (2018) Digital disruption of the AEC industry: Technology-oriented scenarios for possible future development paths. Construction Management and Economics, 36(11), pp. 635-650. ISSN 01446193

Lavikka, R; Seppänen, O; Peltokorpi, A and Lehtovaara, J (2020) Fostering process innovations in construction through industry–university consortium. Construction Innovation, 20(4), pp. 569-586. ISSN 1471-4175

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.

Lawani, K; Hare, B and Cameron, I (2019) Evaluating wind technicians' performance on safety-critical rescue steps. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 17-24. ISSN 17514304

Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531

Lawani, K; Thomson, C; Hare, B and Duplicki, A (2024) Unpacking the perceptions of high-density living and zoning laws: A case of Philadelphia area, USA. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Lawther, P M (2000) Predictive cost modelling: Investigation utilising a qualitatively biased research methodology. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Le, D A; Dang, C N; Le-Hoai, L and Hoang, V Q (2025) Influences of critical success factors on nonprofit outcomes of oda education construction projects: A case of Vietnam. Journal of Engineering, Design and Technology, 23(5), pp. 1423-1446. ISSN 1726-0531

Le, Ngoc Quyet (2021) Building information modelling (BIM) adoption and implementation: Interaction between BIM specialists and non-BIM specialists in Vietnam. PhD thesis, University of Technology Sydney, Australia.

Lebea, M J; Agumba, J N and Adebowale, O J (2024) Critical success factors in the maintenance strategies of public healthcare facilities. International Journal of Building Pathology and Adaptation, 42(7), pp. 55-75. ISSN 23984708

Lebunu Hewage, U W A; Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 296-311. ISSN 2044-124X

Lee, A (2002) The development of a project process evaluation (PPE) framework that aims to measure the effectiveness of implementing a new design and construction project process. PhD thesis, University of Salford, UK.

Lee, D; Khan, N and Park, C (2023) Rigorous analysis of safety rules for vision intelligence-based monitoring at construction jobsites. International Journal of Construction Management, 23(10), pp. 1768-1778. ISSN 1562-3599

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lee, J K (2011) Building environment rule and analysis (BERA) language and its application for evaluating building circulation and spatial program. PhD thesis, Georgia Institute of Technology, USA.

Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lee, Jaeho (2007) A methodology for developing bridge condition rating models based on limited inspection records. PhD thesis, Griffith University, Australia.

Lee, S (2014) Re-examination of the enterprise resource planning success model in cross industry sectors: New statistical findings. PhD thesis, George Washington University, USA.

Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364

Lee, S and Yu, J (2016) Comparative study of BIM acceptance between Korea and the United States. Journal of Construction Engineering and Management, 142(3): 05015016, ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2004) Effective practice utilization using performance prediction software. Journal of Construction Engineering and Management, 130(4), pp. 576-585. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193

Lee, S-H (2001) Discriminant function analysis for categorization of best practices. PhD thesis, University of Texas at Austin, USA.

Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.

Lees, E (2016) The polluter pays principle and the remediation of the land. International Journal of Law in the Built Environment, 8(1), pp. 2-20. ISSN 1756-1450

Lees, H and Austin, J (2011) The case for behaviour-based safety in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 3-8. ISSN 17514312

Leghissa, G (2019) Collaboration between construction firms and the supply chain for the implementation of innovation strategies. PhD thesis, Loughborough University, UK.

Leghissa, G; Sage, D and Dainty, A (2016) Collaboration between housebuilding firms and suppliers for the implementation of innovation strategies: A strategy-as-practice approach. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Legnér, M; Leijonhufvud, G and Tunefalk, M (2020) Energy policy and conservation planning in Sweden: A longitudinal evaluation. International Journal of Building Pathology and Adaptation, 38(4), pp. 555-572. ISSN 23984708

Lehtovaara, J; Seppänen, O; Peltokorpi, A; Kujansuu, P and Grönvall, M (2021) How Takt production contributes to construction production flow: A theoretical model. Construction Management and Economics, 39(1), pp. 73-95. ISSN 01446193

Lehtovaara, Joonas (2023) Takt production and decentralized decision-making: Improving construction production flow with novel planning & control approaches. DScTech thesis, Aalto University, Finland.

Lei, Haoran (2024) Life cycle assessment in circular economy for built environment. PhD thesis, RMIT University, Australia.

Lei, Z; Chen, Q; Altaf, M S and Cao, K (2024) Defining information requirements for off-site construction management: An industry case study from Canada. Journal of Construction Engineering and Management, 150(12): 05024014, ISSN 0733-9364

Leicht, R M; Hunter, S T; Saluja, C and Messner, J I (2010) Implementing observational research methods to study team performance in construction management. Journal of Construction Engineering and Management, 136(1), pp. 76-86. ISSN 0733-9364

Leon, M; Ahiaga-Dagbui, D; Fleming, C and Laing, R (2017) Exploring visual asset management collaboration: Learning from the oil and gas sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Leon, M and Laing, R (2022) A concept design stages protocol to support collaborative processes in architecture, engineering and construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 777-799. ISSN 1726-0531

Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.

Lerche, J; Enevoldsen, P and Seppänen, O (2022) Application of takt and kanban to modular wind turbine construction. Journal of Construction Engineering and Management, 148(2), ISSN 0733-9364

Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364

Leshinsky, R (2012) Use of planning agreements to support sustainability and environmental preservation: A case study from Victoria, Australia. International Journal of Law in the Built Environment, 4(2), pp. 157-172. ISSN 1756-1450

Leung, M Y; Bowen, P; Liang, Q and Famakin, I (2015) Development of a job-stress model for construction professionals in south Africa and Hong Kong. Journal of Construction Engineering and Management, 141(2): 04014077, ISSN 0733-9364

Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364

Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193

Leung, M Y; Wei, X and Wang, C (2023) Demystifying critical success factors for applying value management in construction projects along the belt and road regions: Focus group study. Journal of Construction Engineering and Management, 149(8): 04023066, ISSN 0733-9364

Leuven, A v and Voordijk, H (2001) Enterprise resource planning in construction: An evaluation of recent implementations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Levitt, R E (2007) CEM research for the next 50 years: Maximizing economic, environmental, and societal value of the built environment. Journal of Construction Engineering and Management, 133(9), pp. 619-628. ISSN 0733-9364

Lewis, A (2013) A framework for improving building operations decisions for energy efficiency. PhD thesis, University of Reading, UK.

Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.

Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(1), pp. 7-23. ISSN 1466433X

Li, J.; Sun, J.; Cao, J. and Mao, L. (2026) Evolutionary dynamics of multiagent on-chain adoption strategies in blockchain-enabled smart construction. Journal of Construction Engineering and Management, 152(8): 04026113, ISSN 0733-9364

Li, Q; Zhang, Q; Shen, Y and Zhang, X (2025) Uncovering the dynamic decision-making behaviours of multiple stakeholders in the community public infrastructure. Journal of Engineering, Design and Technology, 23(5), pp. 1501-1518. ISSN 1726-0531

Li, T; Zhai, H; Wu, W; Deng, J and Wang, F (2026) How AI adoption shapes construction workers' extra-role safety behavior: The mediating roles of responsibility and relational energy. Journal of Construction Engineering and Management, 152(1): 04025219, ISSN 0733-9364

Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, B and Yao, R (2012) Building energy efficiency for sustainable development in China: Challenges and opportunities. Building Research & Information, 40(4), pp. 417-431. ISSN 0961-3218

Li, F; Phoon, K K; Du, X and Zhang, M (2013) Improved AHP method and its application in risk identification. Journal of Construction Engineering and Management, 139(3), pp. 312-320. ISSN 0733-9364

Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(2), pp. 101-106. ISSN 0961-3218

Li, H; Guo, H L; Li, Y and Skitmore, M (2012) From IKEA model to the lean construction concept: A solution to implementation. International Journal of Construction Management, 12(4), pp. 47-63. ISSN 1562-3599

Li, H; Kong, C W; Pang, Y C; Shi, W Z and Yu, L (2003) Internet-based geographical information systems system for e-commerce application in construction material procurement. Journal of Construction Engineering and Management, 129(6), pp. 689-697. ISSN 0733-9364

Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.

Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.

Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988

Li, J; Zhang, J; Liu, C and Luo, X (2025) What hinders the implementation of carbon emission reduction in the construction industry: Evidence from integrated multi-criteria decision-making in China. Engineering, Construction and Architectural Management, 32(3), pp. 1670-1690. ISSN 0969-9988

Li, J J (2023) A socio-technical framework to guide implementation and value realisation of distributed ledger technologies (DLT) in the construction sector. PhD thesis, Northumbria University, UK.

Li, K; Salleh, H B; Wang, R and Yang, Y (2025) How do different policy instruments influence circular economy implementation in the construction sector? Building Research & Information, 53(3), pp. 359-374. ISSN 0961-3218

Li, K; Griffin, M A and Xia, M (2025) How do workforce adaptability and reskilling initiatives drive innovations: The case of western Australian construction industry. Construction Management and Economics, 43(9), pp. 746-763. ISSN 0144-6193

Li, N and Becerik-Gerber, B (2011) Life-cycle approach for implementing RFID technology in construction: Learning from academic and industry use cases. Journal of Construction Engineering and Management, 137(12), pp. 1089-1098. ISSN 0733-9364

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry. PhD thesis, University of Sheffield, UK.

Li, S D and Xu, Z D (2022) System configuration design of BIM object-oriented database for civil engineering. Journal of Construction Engineering and Management, 148(12): 04022130, ISSN 0733-9364

Li, T; Li, Z and Cai, J (2024) Antecedents and consequence of intra-organizational diffusion of prefabricated construction technology: A contingency theory perspective. Engineering, Construction and Architectural Management, 31(7), pp. 2932-2951. ISSN 0969-9988

Li, T H Y; Ng, S T and Wong, K K W (2009) A study on the social impact assessment of infrastructure projects in China. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Li, X; Jin, X; Li, H; Gong, L and Zhou, D (2025) Exploring the impact of policy interventions on project performance through a psm-did approach: Evidence from the Hong Kong construction industry. Engineering, Construction and Architectural Management, 32(2), pp. 1163-1185. ISSN 0969-9988

Li, Y; Cao, L; Han, Y and Wei, J (2020) Development of a conceptual benchmarking framework for healthcare facilities management: Case study of Shanghai municipal hospitals. Journal of Construction Engineering and Management, 146(1): 05019016, ISSN 0733-9364

Li, Y and Ning, Y (2022) Mitigating opportunistic behaviors in consulting projects: Evidence from the outsourced architectural and engineering design. Journal of Construction Engineering and Management, 148(7): 04022044, ISSN 0733-9364

Liang, C (2016) Development of a multifunctional building information modelling (BIM) maturity model. PhD thesis, University of Hong Kong, Hong Kong.

Liang, J (1998) System integration and database management for computer-aided design of tall building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liang, J S (2023) A knowledge with ontology representation for product life cycle to support eco-design activities. Journal of Engineering, Design and Technology, 21(4), pp. 991-1026. ISSN 1726-0531

Liang, S (2013) Legal aspects of privately financed infrastructure projects (PFIPs) in China: the case for international standards. PhD thesis, University of Leeds, UK.

Liang, X; Gidado, K and Painting, N (2004) The identification of key obstacles that hinder foreign private finance investments in highway projects in China. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Liao, L (2018) Building information modeling-based process transformation to improve productivity in the Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Liao, L and Teo, E A L (2019) Managing critical drivers for building information modelling implementation in the Singapore construction industry: An organizational change perspective. International Journal of Construction Management, 19(3), pp. 240-256. ISSN 1562-3599

Liao, L; Teo Ai Lin, E and Low, S P (2020) Assessing building information modeling implementation readiness in building projects in Singapore: A fuzzy synthetic evaluation approach. Engineering, Construction and Architectural Management, 27(3), pp. 700-724. ISSN 0969-9988

Liao, P-C (2008) Influence factors of engineering productivity and their impact on project performance. PhD thesis, University of Texas at Austin, USA.

Liao, X; Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 227-244. ISSN 0969-9988

Liaros, S (2020) Implementing a new human settlement theory: Strategic planning for a network of regenerative villages. Smart and Sustainable Built Environment, 9(3), pp. 258-271. ISSN 2046-6099

Liaros, S (2022) A network of circular economy villages: Design guidelines for 21st century garden cities. Built Environment Project and Asset Management, 12(3), pp. 349-364. ISSN 2044-124X

Liguori, D; Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2025) A guideline for BIM and lean integrated construction practice. Smart and Sustainable Built Environment, 14(4), pp. 1264-1291. ISSN 2046-6099

Lim, J.; Fauzan, F. and Oey, E. (2026) Evaluating green building certification criteria for small health care centre (Puskemas) in Jakarta area: From GREENSHIP to Puske-GREENSHIP framework. Smart and Sustainable Built Environment, 15(3), pp. 1047-1067. ISSN 2046-6099

Lim, M L W; Wong, S Y and Ding, C S (2024) Challenges of industrial revolution 4.0: Quantity surveying students' perspectives. Engineering, Construction and Architectural Management, 31(6), pp. 2496-2512. ISSN 0969-9988

Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Lima, Rosimeire Midori Suzuki Rosa (2012) Evaluation system of integrated construction and demolition waste management at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.

Lin, G (2009) Measuring the performance of value management studies in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lin, G; Shen, G Q; Sun, M and Kelly, J (2011) Identification of key performance indicators for measuring the performance of value management studies in construction. Journal of Construction Engineering and Management, 137(9), pp. 698-706. ISSN 0733-9364

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Lin, S S and Zheng, X J (2025) A decision support approach for safety risk analysis and management in large-scale shield cutter head hoisting operations. Journal of Construction Engineering and Management, 151(11): 04025169, ISSN 0733-9364

Lindblad, H (2016) Translating building information modelling: A study of the BIM implementation process at a large Swedish client organisation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lindblad, H (2019) Black boxing BIM: The public client's strategy in BIM implementation. Construction Management and Economics, 37(1), pp. 1-12. ISSN 01446193

Lindblad, H (2019) BIM in translation exploring client organisations as drivers for change in construction. PhD thesis, KTH Royal Institute of Technology, Sweden.

Lindblad, H and Guerrero, J R (2020) Client's role in promoting BIM implementation and innovation in construction. Construction Management and Economics, 38(5), pp. 468-482. ISSN 01446193

Lindblad, H and Gustavsson, T K (2018) Project managers as involuntary policy implementers? The case of implementing BIM. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Lindblad, H and Karrbom Gustavsson, T (2017) Receptiveness for change: The case of a public client. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Lindblad, H and Karrbom Gustavsson, T (2021) Public clients ability to drive industry change: The case of implementing BIM. Construction Management and Economics, 39(1), pp. 21-35. ISSN 01446193

Linderoth, H C J (2015) When big visions meet the pragmatic practice: Follow the institutional logic or personal benefits? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Linderoth, H C J (2017) From visions to practice: The role of sensemaking, institutional logic and pragmatic practice. Construction Management and Economics, 35(6), pp. 324-337. ISSN 0144-6193

Lindgren, J (2018) Diffusion of systemic innovations in the construction sector. PhD thesis, Halmstad University, Sweden.

Lindkvist, C and Elmualim, A (2010) An examination of actors that impact technology introduction to FM. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lines, B (2014) Action research approach to implementation of APDMS within owner organizations strategic management and overcoming resistance to change in the AEC industry. PhD thesis, Arizona State University, USA.

Lines, B C; Perrenoud, A; Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(2), pp. 140-160. ISSN 1557-8771

Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364

Ling, F Y Y (2003) Managing the implementation of construction innovations. Construction Management and Economics, 21(6), pp. 635-649. ISSN 01446193

Ling, F Y Y; Hartmann, A; Kumaraswamy, M and Dulaimi, M (2007) Influences on innovation benefits during implementation: Client's perspective. Journal of Construction Engineering and Management, 133(4), pp. 306-315. ISSN 0733-9364

Lingard, H; Graham, P and Smithers, G (2000) Employee perceptions of the solid waste management system operating in a large Australian contracting organization: Implications for company policy implementation. Construction Management and Economics, 18(4), pp. 383-393. ISSN 01446193

Lingard, H and Oswald, D (2020) Safety at the front line: Social negotiation of work and safety at the principal contractor-subcontractor interface. Journal of Construction Engineering and Management, 146(4): 04020024, ISSN 0733-9364

Lingard, H; Pink, S; Harley, J and Edirisinghe, R (2015) Looking and learning: Using participatory video to improve health and safety in the construction industry. Construction Management and Economics, 33(9), pp. 740-751. ISSN 01446193

Lingard, H and Sublet, A (2002) The impact of job and organizational demands on marital or relationship satisfaction and conflict among Australian civil engineers. Construction Management and Economics, 20(6), pp. 507-521. ISSN 01446193

Lingard, H and Wakefield, R (2013) A voluntary approach to designing for safer construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 249-259. ISSN 17514312

Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193

Linh, T N Q; Hanh, T T T and Shaw, R (2021) COVID-19 initial preparedness and response in Vietnam during the first six months of the pandemic and the lessons for Sendai framework implementation. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 143-155. ISSN 1759-5916

Lisø, K R; Aandahl, G; Eriksen, S and Alfsen, K H (2003) Preparing for climate change impacts in norway's built environment. Building Research & Information, 31(3-4), pp. 200-209. ISSN 0961-3218

Littke, H (2016) Becoming biophilic: Challenges and opportunities for biophilic urbanism in urban planning policy. Smart and Sustainable Built Environment, 5(1), pp. 15-24. ISSN 2046-6099

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, Y; Junjia, Y; Wang, H and Alias, A H (2026) Bridging robotics implementation and operational efficiency via agile management: Evidence from commercial residential projects. Journal of Construction Engineering and Management, 152(4): 04026019, ISSN 0733-9364

Liu, Y.; Schmidt, S.; Li, H. and Cao, Y. (2026) A study on the moisture risk assessment path for exterior wall of existing residential building in Shanghai based on hygrothermal simulation analysis. Architectural Engineering and Design Management, 22(2), pp. 340-364. ISSN 1745-2007

Liu, A; Hodgson, G and Lord, W (2010) Innovation in construction education: The role of culture in e-learning. Architectural Engineering and Design Management, 6(2), pp. 91-102. ISSN 1745-2007

Liu, A M M (2003) The quest for quality in public housing projects: A behaviour-to-outcome paradigm. Construction Management and Economics, 21(2), pp. 147-158. ISSN 01446193

Liu, A M M; Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(3), pp. 160-169. ISSN 1745-2007

Liu, B; Xue, B; Meng, J; Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: An empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), pp. 2797-2833. ISSN 0969-9988

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G and Zou, Y (2024) Understanding social interaction and physiological patterns in nonlean and Last Planner system-based project teams: A comparative study using immersive virtual reality. Journal of Construction Engineering and Management, 150(10): 04024131, ISSN 0733-9364

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364

Liu, G; Ma, Z; Li, J; Li, S; Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(6): 04024051, ISSN 0733-9364

Liu, G W (2003) A framework for implementing value management in China's construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, J; Guo, Y; Martek, I; Chen, C and Tian, J (2022) A phase-oriented evaluation framework for China's PPP projects. Engineering, Construction and Architectural Management, 29(9), pp. 3737-3753. ISSN 0969-9988

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, J; Yan, X and Gao, W (2024) A dualistic perspective of opportunity and risk: The impact of head-mounted augmented reality on construction onsite hazard identification of workers. Journal of Construction Engineering and Management, 150(11): 04024160, ISSN 0733-9364

Liu, Lan (2020) Design guidance and development of construction stormwater technologies. PhD thesis, Auburn University, USA.

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, N (2010) Analysing functionalities of project extranets in construction: a provision and requirement approach. PhD thesis, University of Salford, UK.

Liu, N; Ruan, L; Jin, R; Chen, Y; Deng, X and Yang, T (2019) Investigation of individual perceptions towards BIM implementation-a Chongqing case study. Engineering, Construction and Architectural Management, 26(7), pp. 1455-1475. ISSN 0969-9988

Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.

Liu, R (2012) BIM-based life cycle information management: Integrating knowledge of facility management into design. PhD thesis, University of Florida, USA.

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.

Liu, R; Du, J; Issa, R R A and Giel, B (2017) BIM cloud score: Building information model and modeling performance benchmarking. Journal of Construction Engineering and Management, 143(4): 04016109, ISSN 0733-9364

Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988

Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X

Liu, T; Chong, H Y; Zhang, W; Lee, C Y and Tang, X (2022) Effects of contractual and relational governances on BIM collaboration and implementation for project performance improvement. Journal of Construction Engineering and Management, 148(6): 04022029, ISSN 0733-9364

Liu, T; Mao, Y and Lu, S (2023) Fostering participants' collaborative innovation performance in megaprojects: The effects of perceived partners' non-mediated power. Journal of Construction Engineering and Management, 149(1): 04022141, ISSN 0733-9364

Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175

Liu, W; Chan, A P C; Chan, M W; Darko, A and Oppong, G D (2025) Key performance indicators for hospital planning and construction: A systematic review and meta-analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3375-3406. ISSN 0969-9988

Liu, X (2025) From circular to sustainable: The implementation of circular economy in transport infrastructure projects in China and the Netherlands. PhD thesis, Delft University of Technology, Netherlands.

Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.

Liu, Z (2012) Know-how signalling and transfer systems to support integrated supply chains. PhD thesis, University of Manchester, UK.

Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988

Liyanage, C L and Egbu, C O (2004) Development of a performance management framework for facilities management in the control of infections: An outline of methodology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ljung, E and Tallgren, M V (2024) Can interoperability between disciplines be improved by adding phasing information using standardised coding? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Lnenicka, M.; Kysela, T. and Horák, O. (2026) Building security and resilience: A guide to implementing effective cybersecurity and data protection measures in smart cities. Smart and Sustainable Built Environment, 15(2), pp. 908-937. ISSN 2046-6099

Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.

Locicero, Ryan Charles Robert (2015) Mainstreaming green infrastructure: The nexus of infrastructure and education using the green space based learning (gsbl) approach for bioretention plant selection. PhD thesis, University of South Florida, USA.

Loforte Ribeiro, F (2009) Enhancing knowledge management in construction firms. Construction Innovation, 9(3), pp. 268-284. ISSN 1471-4175

London, B C K and Gajendran, T (2010) Diffusing cultural awareness and maturity in lean managed organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

London, K; Singh, V; Taylor, C; Gu, N and Brankovic, L (2008) Building information modelling project decision support framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

London, Kerry (2004) Construction supply chain procurement modelling. PhD thesis, University of Melbourne, Australia.

Long, G (2010) A detailed investigation of the applicability and utility of simulation and gaming in the teaching of civil engineering students. PhD thesis, University of Nottingham, UK.

Long, J (2004) Computer-integrated information modelling for design of building structures. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Loosemore, M and Alkilani, S (2022) The collaborative challenges of social procurement. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Loosemore, M; Alkilani, S Z and Mathenge, R (2019) Barriers to employment faced by disadvantaged groups targeted by new social procurement policies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Loosemore, M; Denny-Smith, G; Barraket, J; Keast, R; Chamberlain, D; Muir, K; Powell, A; Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(7), pp. 1908-1928. ISSN 0969-9988

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(2), pp. 189-198. ISSN 0969-9988

Loosemore, M; Keast, R and Alkilani, S (2023) The drivers of social procurement policy adoption in the construction industry: An Australian perspective. Building Research & Information, 51(5), pp. 555-567. ISSN 0961-3218

Loosemore, M; Keast, R and Barraket, J (2023) How are social procurement actors shaping a new field of professional practice in the Australian construction industry? Engineering, Construction and Architectural Management, 30(9), pp. 4192-4209. ISSN 0969-9988

Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(4), pp. 183-200. ISSN 01446193

Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.

Lou, E C W (2012) E-readiness in construction: readiness of UK construction organisations. PhD thesis, University of Salford, UK.

Loudoun, R and Townsend, K (2017) Implementing health promotion programs in the Australian construction industry: Levers and agents for change. Engineering, Construction and Architectural Management, 24(2), pp. 260-274. ISSN 0969-9988

Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.

Love, P; Edwards, D J; Standing, C and Irani, Z (2009) Beyond the Red Queen syndrome: CRM technology and building material suppliers. Engineering, Construction and Architectural Management, 16(5), pp. 459-474. ISSN 0969-9988

Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.

Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364

Love, P E D; Edwards, D J and Sohal, A (2004) Total quality management in Australian contracting organisations: Pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(3), pp. 189-198. ISSN 0969-9988

Love, P E D; Mistry, D and Davis, P R (2010) Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), pp. 947-956. ISSN 0733-9364

Low, S P and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), pp. 91-111. ISSN 1823-6499

Low, S P; Liu, J Y; Ng, S H M and Liu, X (2013) Enterprise risk management and the performance of local contractors in Singapore. International Journal of Construction Management, 13(2), pp. 27-41. ISSN 1562-3599

Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(8), pp. 815-829. ISSN 01446193

Lowe, R (2009) Policy and strategy challenges for climate change and building stocks. Building Research & Information, 37(2), pp. 206-212. ISSN 0961-3218

Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175

Lu, Z.; Jin, X.; Osei-Kyei, R. and Senaratne, S. (2026) A conceptual framework for realising ESG-centred project value in modern methods of construction. Construction Innovation, pp. 1-19. ISSN 1471-4175

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, W (2015) Collaboration in BIM-enabled projects: a socio-technical perspective. PhD thesis, University of Hong Kong, Hong Kong.

Lu, W; Chen, K; Zetkulic, A and Liang, C (2021) Measuring building information modeling maturity: A Hong Kong case study. International Journal of Construction Management, 21(3), pp. 299-311. ISSN 1562-3599

Lu, W; Guo, W and Zhu, Q (2020) Effect of justice on contractor's relational behavior: Moderating role of owner's asset specificity. Journal of Construction Engineering and Management, 146(4): 04020020, ISSN 0733-9364

Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007

Lu, Y; Liu, J and Yu, W (2024) Social risk analysis for mega construction projects based on structural equation model and bayesian network: A risk evolution perspective. Engineering, Construction and Architectural Management, 31(7), pp. 2604-2629. ISSN 0969-9988

Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599

Lu W, Z D R S (2013) BIM collaboration: A conceptual model and its characteristics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Lucas, A N and Löschke, S K (2025) Towards circular renovation: A comparative review of circular economy integration in sustainable building rating systems. Building Research & Information, 53(3), pp. 375-396. ISSN 0961-3218

Lucas, J and Gajjar, D (2022) Influence of virtual reality on student learning in undergraduate construction education. International Journal of Construction Education and Research, 18(4), pp. 374-387. ISSN 1557-8771

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.

Lukhele, T; Botha, B and Mbanga, S (2021) Exploring project complexity relations to scope changes in construction projects: A case study of NEC projects in South Africa. Construction Economics and Building, 21(2), pp. 18-33. ISSN 2204-9029

Lundberg, M; Engström, S and Lidelöw, H (2019) Diffusion of innovation in a contractor company: The impact of the social system structure on the implementation process. Construction Innovation, 19(4), pp. 629-652. ISSN 1471-4175

Lundgren, R.; Kyrö, R.; Toivonen, S. and Tähtinen, L. (2025) Reimagining circularity: Actions for optimising the use of existing buildings. Buildings & Cities, 6(1), pp. 674-694. ISSN 2632-6655

Lundgren, M S (2016) Energy and architectural consequences of Swedish building code. Smart and Sustainable Built Environment, 5(2), pp. 125-142. ISSN 2046-6099

Luo, Q; Sun, C; Dan, Y; Zhao, T and Zhang, G (2026) Unraveling safety risk coupling in prefabricated steel construction via data mining. Journal of Construction Engineering and Management, 152(3): 04025281, ISSN 0733-9364

Luo, Huyuan (2013) Towards green universities: A decision support framework for green roof and living wall implementation. PhD thesis, Queensland University of Technology, Australia.

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the P.R. Of China. PhD thesis, University of Manchester, UK.

Luo, L Z; Mao, C; Shen, L Y and Li, Z D (2015) Risk factors affecting practitioners' attitudes toward the implementation of an industrialized building system a case study from China. Engineering, Construction and Architectural Management, 22(6), pp. 622-643. ISSN 0969-9988

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lutz, J D; Chang, L M and Napier, T R (1990) Evaluation of new building technology. Journal of Construction Engineering and Management, 116(2), pp. 281-299. ISSN 0733-9364

Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364

Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364

Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lützkendorf, T and Lorenz, D (2006) Using an integrated performance approach in building assessment tools. Building Research & Information, 34(4), pp. 334-356. ISSN 0961-3218

M.E. Sepasgozar, S (2020) Digital technology utilisation decisions for facilitating the implementation of industry 4.0 technologies. Construction Innovation, 21(3), pp. 476-489. ISSN 1471-4175

Ma, C P and Winch, G (2000) It implementation performance and organisational characteristics in Taiwanese contractors. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ma, C-P (2001) IT performance and organisational characteristics in construction firms: the case of Taiwanese contractors. PhD thesis, University College London, UK.

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364

Ma, J; Jiang, X; Zheng, D; Liao, X; Lu, J and Zhao, Y (2024) Transwallnet: High-performance semantic segmentation of large-scale and multifeatured point clouds of building gables. Journal of Construction Engineering and Management, 150(8): 04024092, ISSN 0733-9364

Ma, L; Lovreglio, R; Yi, W; Yiu, T W and Shan, M (2023) Barriers and strategies for building information modelling implementation: A comparative study between New Zealand and China. International Journal of Construction Management, 23(12), pp. 2067-2076. ISSN 1562-3599

Ma, P (2023) A sociomateriality view of boundary spanning in BIM-enabled early facilities management involvement. PhD thesis, University of Hong Kong, Hong Kong.

Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988

Ma, Q; Li, S; Teo, P X and Ling, F Y Y (2023) Barriers to adopting integrated project delivery practices. Engineering, Construction and Architectural Management, 30(9), pp. 4171-4191. ISSN 0969-9988

Ma, S; Li, Z; Li, L; Zhang, S and Zheng, R (2024) Deciphering the key characteristics of on-site industrialized construction: Inspiration from China. Journal of Construction Engineering and Management, 150(4): 05024003, ISSN 0733-9364

Ma, X; Chan, A P C; Li, Y; Zhang, B and Xiong, F (2020) Critical strategies for enhancing BIM implementation in AEC projects: Perspectives from Chinese practitioners. Journal of Construction Engineering and Management, 146(2): 05019019, ISSN 0733-9364

Ma, X; Darko, A; Chan, A P C; Wang, R and Zhang, B (2022) An empirical analysis of barriers to building information modelling (BIM) implementation in construction projects: Evidence from the Chinese context. International Journal of Construction Management, 22(16), pp. 3119-3127. ISSN 1562-3599

Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.

Ma, Z; Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(1), pp. 291-307. ISSN 0969-9988

MacAskill, K and Guthrie, P (2016) Disaster risk reduction and empowering local government: a case comparison between Sri Lanka and New Zealand. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 318-329. ISSN 1759-5916

Macdonald, R N (2013) A strategy for materials price risk mitigation. PhD thesis, University of Alabama, USA.

Macit, S (2014) Computer representation of building codes for automated compliance checking. PhD thesis, Izmir Institute of Technology, Turkey.

Macmillan, S (2006) Added value of good design. Building Research & Information, 34(3), pp. 257-271. ISSN 0961-3218

Madihi, M H; Shirzadi Javid, A A and Nasirzadeh, F (2025) Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks. Engineering, Construction and Architectural Management, 32(3), pp. 2022-2043. ISSN 0969-9988

Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988

Madushika, W H S; Perera, B A K S; Ekanayake, B J and Shen, G Q P (2020) Key performance indicators of value management in the Sri Lankan construction industry. International Journal of Construction Management, 20(2), pp. 157-168. ISSN 1562-3599

Madziva, T J (2018) The effect of partnering, infrastructure gaps and currency weakness on the cost of an infrastructure-building nonmarket strategy in emerging markets. PhD thesis, University of Pretoria, South Africa.

Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.

Magent, C S; Korkmaz, S; Klotz, L E and Riley, D R (2009) A design process evaluation method for sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 62-74. ISSN 1745-2007

Maghrebi, M; Sammut, C and Waller, S T (2015) Feasibility study of automatically performing the concrete delivery dispatching through machine learning techniques. Engineering, Construction and Architectural Management, 22(5), pp. 573-590. ISSN 0969-9988

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.

Mahagedara, U I K (2021) Implementation of sustainable supply chain management in UK SMEs in construction industry. PhD thesis, University of the West of Scotland, UK.

Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364

Mahamadu, A M; Mahdjoubi, L and Booth, C A (2014) Determinants of building information modelling (BIM) acceptance for supplier integration: A conceptual model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mahat, N; Tah, J H M and Vidalakis, C (2019) Sustainable construction and residential building developers in Malaysia: Factors affecting the adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175

Mahmood, S; Ahmed, S M; Panthi, K and Kureshi, N I (2014) Determining the cost of poor quality and its impact on productivity and profitability. Built Environment Project and Asset Management, 4(3), pp. 296-311. ISSN 2044-124X

Mahmood, W Y W and Mohammed, A H (2008) A conceptual framework for the development of quality culture in the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, Bello Zailani (2025) Equity-driven workforce development initiatives through long-term strategic partnerships for the construction and maintenance of green stormwater infrastructure. DEng thesis, Morgan State University (Maryland), USA.

Maina, W and van Graan, A (2017) Identifying path-breaking transitions for kenya's marginalised communities in water and sanitation provision. Journal of Engineering, Design and Technology, 15(5), pp. 689-699.

Maisarah, F; Abduh, M; Wirahadikusumah, R and Cakravastia, A (2025) Development of the conceptual business model of a third-party logistics provider for Indonesian small contractors. International Journal of Construction Management, 25(2), pp. 194-203. ISSN 1562-3599

Maiti, S and Choi, J H (2021) Investigation and implementation of conflict management strategies to minimize conflicts in the construction industry. International Journal of Construction Management, 21(4), pp. 337-352. ISSN 1562-3599

Majava, J; Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation, 19(1), pp. 34-47. ISSN 1471-4175

Majzoub, Omar (2025) A precursor to computation in architecture – an alternative to the current concept design process. PhD thesis, University of New South Wales, Australia.

Makabate, C T; Musonda, I; Okoro, C S and Chileshe, N (2022) Scientometric analysis of BIM adoption by SMEs in the architecture, construction and engineering sector. Engineering, Construction and Architectural Management, 29(1), pp. 179-203. ISSN 0969-9988

Makarfi, U and Udeaja, C (2019) To formulate a conceptual model for innovation: Reframing theoretical constructs of BIM adoption within SME organisations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Makarfi, U U (2022) Digital prototype framework for understanding building information modelling adoption: Nigerian small and medium architectural firms. PhD thesis, University of Salford, UK.

Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.

Maldonado-Fortunet, F (2002) Sustainable development criteria for the evaluation of highway projects. PhD thesis, Georgia Institute of Technology, USA.

Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193

Malla, V; K.V, P and Delhi, V S K (2026) Analysing inhibitors to BIM implementation: A social network theoretical perspective. Construction Innovation, 26(1), pp. 198-218. ISSN 1471-4175

Mallaburn, P; Azhari, R; Fawcett, T and Topouzi, M (2021) Australian non-domestic buildings policy as an international exemplar. Buildings & Cities, 2(1), pp. 318-335. ISSN 2632-6655

Mallisetti, V; Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects: the Indian case. Journal of Financial Management of Property and Construction, 27(2), pp. 179-198. ISSN 1366-4387

Mambwe, M; Mwanaumo, E M; Phiri, F and Chabota, K (2020) The construction subcontracting policy framework for developing local contractors capacities in Zambia. Journal of Construction Business and Management, 4(1), pp. 60-70. ISSN 2521-0165

Mamphey, S A (2024) A framework for the implementation of international construction ethics standards in Sub-Sahara Africa: The case of Ghana. PhD thesis, Nottingham Trent University, UK.

Mamun, M T (2021) Development of a governance framework for delivery of collaborative and security-minded BIM projects. PhD thesis, University of Salford, UK.

Manase, D (2008) An exploratory study of GIS based analysis of health and safety related information. PhD thesis, University of Wolverhampton, UK.

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Mangvwat, J. S.; Spillane, J. P. and Bradley, J. G. (2026) Integrating social value into public procurement: A strategic framework for sustainable construction in Nigerian tertiary institutions. International Journal of Building Pathology and Adaptation, 44(5), pp. 1145-1166. ISSN 2398-4708

Mangvwat, J S and Spillane, J P (2021) Social sustainability in procurement of construction projects: A literature review from a Nigerian perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mangvwat, J S; Spillane, J P and Bradley, J G (2023) Instrumentality of procurement laws to implement social sustainability in Nigeria. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mani, S; Ahmadi Eftekhari, N; Hosseini, M R and Bakhshi, J (2024) Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects. Construction Innovation, 24(2), pp. 425-445. ISSN 1471-4175

Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(3), pp. 230-245. ISSN 0969-9988

Mannakkara, S and Wilkinson, S (2015) Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 126-139. ISSN 1759-5916

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A training guide for the reinforcement of continuous professional development of engineers and project managers on performance and productivity improvement practices in construction. International Journal of Construction Management, 24(13), pp. 1475-1484. ISSN 1562-3599

Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X

Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 0969-9988

Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364

Mansoor, A; Liu, S; Bouferguene, A and Al-Hussein, M (2024) Crane signalman hand-signal classification framework using sensor-based smart construction glove and machine-learning algorithms. Journal of Construction Engineering and Management, 150(8): 04024094, ISSN 0733-9364

Mansoori, S; Harkonen, J and Haapasalo, H (2023) Productization and product structure enabling BIM implementation in construction. Engineering, Construction and Architectural Management, 30(5), pp. 2155-2184. ISSN 0969-9988

Mansour, H; Aminudin, E and Mansour, T (2023) Implementing industry 4.0 in the construction industry- strategic readiness perspective. International Journal of Construction Management, 23(9), pp. 1457-1470. ISSN 1562-3599

Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.

Manzoor, B; Antwi-Afari, M F; Alotaibi, K S; Edwards, D J and Posillico, J J (2025) Critical success factors for implementing digital twin technology in construction projects: A systematic and bibliometric approach. Journal of Construction Engineering and Management, 151(12): 03125008, ISSN 0733-9364

Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.

Maqsood, T; Walker, D H T and Finegan, A D (2007) Facilitating knowledge pull to deliver innovation through knowledge management: A case study. Engineering, Construction and Architectural Management, 14(1), pp. 94-109. ISSN 0969-9988

Maqsoom, A; Hammad, M; Umer, M; Salman, A and Ashraf, H (2024) From intentions to actions: unveiling the socio-psychological drivers of solar home system adoption in developing nations. Architectural Engineering and Design Management, 20(5), pp. 1019-1036. ISSN 1745-2007

Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 0969-9988

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marchant, David (2015) Capturing and integrating the design brief in building information models. PhD thesis, University of New South Wales, Australia.

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(2), pp. 186-198. ISSN 2044-124X

Marinelli, M (2022) A dfx-based approach for incorporating sustainability in infrastructure project planning. Built Environment Project and Asset Management, 12(1), pp. 20-37. ISSN 2044-124X

Marinelli, M; Petroutsatou, K; Fragkakis, N and Lambropoulos, S (2018) Rethinking new public infrastructure value for money in recession times: The Greek case. International Journal of Construction Management, 18(4), pp. 331-342. ISSN 1562-3599

Marinelli, M and Salopek, M (2020) Joint risk management and collaborative ethos: Exploratory research in the UK construction sector. Journal of Engineering, Design and Technology, 18(2), pp. 343-361. ISSN 1726-0531

Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Marique, Y (2013) Cooperation and competition in complex construction projects: Implementation of EU procurement rules in England and Belgium. International Journal of Law in the Built Environment, 5(1), pp. 53-70. ISSN 17561469

Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599

Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework. PhD thesis, University of Johannesburg, South Africa.

Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007

Marques Neto, José da Costa (2009) Study on municipal management of construction and demolition wastes in the turvo grande watershed (urghi-15). PhD thesis, Universidade de São Paulo, Brazil.

Marsh, D; Bryde, D and Graham, A (2014) Perceptions of the value and viability of implementing lean construction with business information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Martin, H; Watson, C and Brooks, T (2025) Synergizing BIM and riba in architectural practice-technology workflow efficiencies, challenges, and insights. Architectural Engineering and Design Management, 21(1), pp. 35-59. ISSN 1745-2007

Martinez-Avila, C and Olander, S (2024) Stakeholder participation in the implementation of urban property development projects. Construction Management and Economics, 42(10), pp. 926-941. ISSN 01446193

Martínez Avíla, C (2018) Stakeholder participation in property development. PhD thesis, Lund University, Sweden.

Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE. PhD thesis, Heriot-Watt University, UK.

Marx, H J (2011) Key performance indicators measuring contractor satisfaction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Marzouk, M; Elsaay, H and Othman, A A E (2022) Analysing BIM implementation in the Egyptian construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4177-4190. ISSN 0969-9988

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

Masood, R; Roy, K; Gonzalez, V A; Lim, J B P and Nasir, A R (2025) Modeling relational performance of the supply chains for prefabricated housebuilding in New Zealand. Smart and Sustainable Built Environment, 14(1), pp. 276-302. ISSN 2046-6099

Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.

Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.

Mathur, Sandeep (2024) Managing data science initiatives as exploratory projects : A new approach to program management. PhD thesis, University of Technology Sydney, Australia.

Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.

Matsuoka, Y; Takeuchi, Y and Shaw, R (2013) Implementation of Hyogo framework for action in Makati City, Philippines. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 23-42. ISSN 1759-5916

Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maurya, K K and Biswas, A (2021) Performance assessment of governance in Indian smart city development. Smart and Sustainable Built Environment, 10(4), pp. 653-680. ISSN 2046-6099

Mawed, M (2024) Revolutionizing performance measures and criteria for the facilities management industry in the UAE. Built Environment Project and Asset Management, 14(4), pp. 644-662. ISSN 2044-124X

Mayara Regina, M and Tavares, S F (2021) Materials passport's review: Challenges and opportunities toward a circular economy building sector. Built Environment Project and Asset Management, 11(4), pp. 767-782. ISSN 2044-124X

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

Mayouf, M; Gerges, M and Cox, S (2019) 5D BIM: an investigation into the integration of quantity surveyors within the BIM process. Journal of Engineering, Design and Technology, 17(3), pp. 537-553. ISSN 1726-0531

Mazen, A M (2023) The extent to which the national and organisational culture contributes to delays of Libyan construction projects. PhD thesis, Bournemouth University, UK.

Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364

Mbabu, Alex (2025) Digital twins in lean strategic facility management in the UK healthcare sector: A proposed framework to enabling lean strategic facility management in healthcare operations in the UK. PhD thesis, University of Salford, UK.

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(1), pp. 39-54. ISSN 1466433X

Mbadugha, L C; Ozumba, A O U and Shakantu, W (2021) Prospects for integrated design process (IDP) in implementing construction waste prevention (CWP) practices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

McAdam, B (2010) Building information modelling: the UK legal context. International Journal of Law in the Built Environment, 2(3), pp. 246-259. ISSN 1756-1450

McAndrew, S T (2009) Collaborative technologies for mobile workers and virtual project teams. EngD thesis, Loughborough University, UK.

McCabe, S and Boyd, D (2004) Quality management 25 years on: What can we learn about initiatives in construction? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

McCarney, M; Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: A conceptual model. Construction Innovation, 23(3), pp. 587-605. ISSN 1471-4175

McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.

McCausland, K (2021) The design, development and evaluation of GIS applications as decision support tools for ecologically aware infrastructure design. EngD thesis, University of Reading, UK.

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

McCutcheon, R (1979) Modern construction technology in low-income housing policy: The case of industrialised building. PhD thesis, University of Sussex, UK.

McDermott, P and Quinn, B (1995) Latham causes conflict: Institutional development in the UK construction industry. Journal of Construction Procurement, 1(2), pp. 150-164. ISSN 1358-9180

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193

McDonnell, A and Sinnott, D (2010) Barriers and enablers to energy efficient retrofitting of dwellings in Ireland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

McGill, G; Sharpe, T; Robertson, L; Gupta, R and Mawditt, I (2017) Meta-analysis of indoor temperatures in new-build housing. Building Research & Information, 45(1-2), pp. 19-39. ISSN 0961-3218

McGilligan, C; Wilde, P and Goodhew, S (2008) An assessment of the potential returns of energy certificates for the UK household sector. Journal of Financial Management of Property and Construction, 13(3), pp. 187-199. ISSN 1366-4387

McIntosh, J F (1984) The application of the relational data model to computer-aided building design. ArchD thesis, University of Michigan, USA.

McLean, W P (2004) Inspector discretion and industry compliance in the street-level implementation of building codes. PhD thesis, University of New Orleans, USA.

McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.

McMahon, M (2013) Designed from the inside out: developing capacity for social sustainability in design through collaboration. PhD thesis, Loughborough University, UK.

McMillan, L (2023) Artificial intelligence–enabled self-healing infrastructure systems. PhD thesis, University College London, UK.

McNamara, A J and Sepasgozar, S M E (2020) Developing a theoretical framework for intelligent contract acceptance. Construction Innovation, 20(3), pp. 421-445. ISSN 1471-4175

McNamara, A J; Shirowzhan, S and M.E. Sepasgozar, S (2024) Investigating the determents of intelligent construction contract adoption: A refinement of the technology readiness index to inform an integrated technology acceptance model. Construction Innovation, 24(3), pp. 702-724. ISSN 1471-4175

McPeek, K T (2009) Collaborative design pedagogy: A naturalistic inquiry of architectural education. PhD thesis, Texas A&M University, USA.

Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.

Medda, F R and Cocconcelli, L (2018) Municipal bonds as a means of accelerating local infrastructure investment. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 220-227. ISSN 17514304

Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.

Meglin, R (2022) Economic and environmental assessment of a regional construction and building materials industry in Switzerland: An applied combination of material-flow analysis, life-cycle assessment and input-output analysis. DSc thesis, ETH Zürich, Switzerland.

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364

Meijon Morêda Neto, H; Bastos Costa, D and Coelho Ravazzano, T (2019) Recommendations for target value design implementation for real estate development in Brazil. Architectural Engineering and Design Management, 15(1), pp. 48-65. ISSN 1745-2007

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Mell, Ian Caleb (2010) Green infrastructure: Concepts, perceptions and its use in spatial planning. PhD thesis, University of Newcastle upon Tyne, UK.

Mello, Simone Gueresi de (2023) Urban transformation in pieces: Financing, regulation, and implementation tricks of social interest housing in the consortium urban operations of the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Memari, S; Kocaturk, T; Lozanovska, M; Andrews, F and Tucker, R (2023) Future proofing for hospital building design: From research to practice. Architectural Engineering and Design Management, 19(6), pp. 681-700. ISSN 1745-2007

Men, Y (2023) Investigation into sustainable solutions for improving small and medium sized museums in China. PhD thesis, De Montfort University, UK.

Menadue, Vanessa Rachel (2014) Green commercial office buildings: Environmental performance and user perceptions. PhD thesis, University of Adelaide, Australia.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menezes-Firmino, M J; Alencar, L H and Olbina, S (2025) Framework for implementing an agile-BIM in Brazilian public organizations based on the value-focused thinking method. Engineering, Construction and Architectural Management, 32(12), pp. 8021-8055. ISSN 0969-9988

Meng, Q; Zhang, Y; Li, Z; Shi, W; Wang, J; Sun, Y; Xu, L and Wang, X (2020) A review of integrated applications of BIM and related technologies in whole building life cycle. Engineering, Construction and Architectural Management, 27(8), pp. 1647-1677. ISSN 0969-9988

Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Mengistu, D G; Ashene, D A and Halabo, H A (2024) Technology and innovation development in Ethiopian construction industry: the challenges and improvement mechanisms. Journal of Engineering, Design and Technology, 22(6), pp. 1936-1957. ISSN 1726-0531

Menoka, B (2014) Stakeholder engagement and sustainability-related project performance in construction. PhD thesis, Liverpool John Moores University, UK.

Mensah, S; Nani, G and Ayarkwa, J (2022) Contractors' adaptation to environmentally sustainable construction: A micro-level implementation framework. Smart and Sustainable Built Environment, 11(4), pp. 832-851. ISSN 2046-6099

Mesa Jiménez, J J (2021) Artificial intelligence for optimisation and demand side response in built environment. PhD thesis, Brunel University, UK.

Messah, Y; Wirahadikusumah, R and Abduh, M (2023) Structural equation model (SEM) of the factors affecting sustainable procurement for construction work. International Journal of Construction Management, 23(13), pp. 2221-2229. ISSN 1562-3599

Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.

Metham, M; Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(3), pp. 501-513. ISSN 1562-3599

Mezher, T; Abdul-Malak, M A; Arnaout, S and Bassil, Z (2004) Public project programming system (3PS): A decision support system for public sector investment. Construction Innovation, 4(2), pp. 99-111. ISSN 1471-4175

Mhundwa, R and Simon, M (2021) Electrical energy prediction using a surface fitting model for an on-farm direct expansion bulk milk cooler (DXBMC) in South Africa. Journal of Engineering, Design and Technology, 19(3), pp. 778-794. ISSN 1726-0531

Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099

Michielsens, E (2016) Contextualising diversity management: challenging the effectiveness of the business case. PhD thesis, University of Westminster, UK.

Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.

Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364

Mikulić, D; Lovrinčević, Ž and Keček, D (2021) Valorization of economic effects from the programme of energy renovation of public buildings in Croatia. Building Research & Information, 49(5), pp. 561-573. ISSN 0961-3218

Miller, A; Radcliffe, D and Isokangas, E (2009) A perception-influence model for the management of technology implementation in construction. Construction Innovation, 9(2), pp. 168-183. ISSN 1471-4175

Miller, C; Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: Co-operation at a cost. Journal of Construction Procurement, 9(2), pp. 17-28. ISSN 1358-9180

Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451

Miller, C J M; Packham, G A and Williams, T (1999) Re-defining sub-contracting: Reducing transaction costs? In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Milner, Philip E (2025) A phenomenological study of lean labor method adoption in commercial construction projects. DBA thesis, California Southern University, USA.

Min, V; Panuwatwanich, K and Matsumoto, K (2025) Evaluating key attributes for enhancing contractors' performance in construction waste management: A multi-criteria decision analysis using the best worst method. International Journal of Construction Management, 25(16), pp. 1968-1981. ISSN 1562-3599

Min, W and Pheng, L S (2005) EOQ with a price discount versus JIT purchasing: an alternative analysis in the ready-mixed concrete industry. Journal of Construction Research, 6(1), pp. 47-69. ISSN 1609-9451

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(5): 04024025, ISSN 0733-9364

Mincks, W R (2016) Career success for construction project managers: A qualitative study of construction project managers coping with stress to complete successful projects. PhD thesis, University of Idaho, USA.

Minh Van, N and Ha, K D (2024) A corporate social responsibility implementation index for architectural design firms in Vietnam. Architectural Engineering and Design Management, 20(1), pp. 65-78. ISSN 1745-2007

Mireku, E. K.; Kissi, E.; Ikuabe, M.; Arkoh-Clayman, E. and Musah, L. (2026) Encumbrances of integrating sustainability concepts and practices in rural community buildings: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(5), pp. 1232-1245. ISSN 2398-4708

Mirmoghtadaee, M; Abdi, M H and Eslamlou, M S (2025) Managing uncertainties in fault avoidance zone of urban areas: A case study of karaj, Iran. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 275-288. ISSN 1759-5908

Mirzaei, M (2018) Cost-effectiveness of outsourcing public architectural/engineering projects in government agencies. PhD thesis, New York University Tandon School of Engineering, USA.

Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.

Mis, N B; Joseph, R; Proverbs, D and Lamond, J (2015) Grass-root preparedness against potential flood risk among residential and commercial property holders. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 44-56. ISSN 1759-5916

Mishra, A; Hasan, A and Jha, K N (2024) A holistic evaluation of BIM implementation barriers in the Indian construction industry: Pre- and post-adoption perspectives. International Journal of Construction Education and Research, 20(3), pp. 358-380. ISSN 15578771

Mitropoulos, P (1996) Technology adoption decisions in construction organizations. PhD thesis, Stanford University, USA.

Mitropoulos, P and Namboodiri, M (2011) New method for measuring the safety risk of construction activities: Task demand assessment. Journal of Construction Engineering and Management, 137(1), pp. 30-38. ISSN 0733-9364

Miyatake, Y and Kangari, R (1993) Experiencing computer integrated construction. Journal of Construction Engineering and Management, 119(2), pp. 307-322. ISSN 0733-9364

Mlitwa, N B W and Birch, D (2011) The role of intrusion detection systems in electronic information security: From the activity theory perspective. Journal of Engineering, Design and Technology, 9(3), pp. 296-312. ISSN 1726-0531

Mmereki, D and Brouwer, D (2022) Application of innovative materials and methods in green buildings and associated occupational exposure and health of construction workers: A systematic literature review. Journal of Construction Engineering and Management, 148(8): 04022068, ISSN 0733-9364

Moatazed-Keivani, R; Ghanbari-Parsa, A R and Kagaya, S (1999) ISO 9000 standards: Perceptions and experiences in the UK construction industry. Construction Management and Economics, 17(1), pp. 107-119. ISSN 01446193

Moghaddaszadeh Kermani, M (2016) Criticality-based strategic decision-making model for maintenance and asset management. PhD thesis, University of Manchester, UK.

Moghayedi, A. and Awuzie, B. (2026) Unlocking sustainability futures: A framework for digital product passports and material banks in a circular built environment. Construction Innovation, 26(9), pp. 135-166. ISSN 1471-4175

Mohamad, M I (1999) The application of concurrent engineering philosophy to the construction industry. PhD thesis, Loughborough University, UK.

Mohamad, M I; Nekooie, M A and Al-Harthy, A B S (2012) Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures. Journal of Construction in Developing Countries, 17(2), pp. 23-44. ISSN 1823-6499

Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.

Mohamed, A H (2016) Lean construction as an innovative approach for minimising risks in mega-Construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Mohamed, M and Tran, D Q (2023) Content analysis of e-inspection implementation for highway infrastructure construction projects. Engineering, Construction and Architectural Management, 30(7), pp. 2621-2644. ISSN 0969-9988

Mohamed, S (2003) Scorecard approach to benchmarking organizational safety culture in construction. Journal of Construction Engineering and Management, 129(1), pp. 80-88. ISSN 0733-9364

Mohamed, S (2003) Adaptation of the balanced scorecard to measure organizational safety culture. Journal of Construction Research, 4(1), pp. 45-57. ISSN 1609-9451

Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(3), pp. 266-281. ISSN 0969-9988

Mohamed, Yamen (2023) Adopting modern methods of construction in low-income housing projects in Egypt. PhD thesis, London South Bank University, UK.

Mohammadi, Masoud (2023) Development of bridge information model (brim) for digital twinning and management using tls technology. PhD thesis, Western Sydney University, Australia.

Mohammed, A W (2016) Agent-based modeling of abc methods for decisionmaking in highway bridge projects including uncertainty and several stakeholders. PhD thesis, Western Michigan University, USA.

Mohammed, S (2022) Effect of political corruption on project failure. A multilevel inquiry on the effects of corruption on public sector construction project failure in emerging and advanced market economies. DBA thesis, Northcentral University, USA.

Mohandes, S R; Singh, A K; Fazeli, A; Banihashemi, S; Arashpour, M; Cheung, C; Ejohwomu, O and Zayed, T (2025) Determining the stationary digital twins implementation barriers for sustainable construction projects. Smart and Sustainable Built Environment, 14(5), pp. 1538-1563. ISSN 2046-6099

Mohd Ishak, S S; Esa, M and Ismail, M H (2017) Social capital, social network and diffusion of BIM practices. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Mohd Nor, M F I (2019) The development of a pedagogical framework for the integration of building information modelling in the architecture degree programme in Malaysia. PhD thesis, University of Strathclyde, UK.

Mohd Zin, I N (2014) Knowledge sharing approaches in Malaysian construction organisations for improved performance. PhD thesis, University of Salford, UK.

Mohyin, N A; Dainty, A R J and Carrillo, P M (2009) Managing knowledge workers commitment in small construction professional firms. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Moir, S and Carter, K (2012) Diagrammatic representations of sustainability: A review and synthesis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Mojela, T. W.; Laryea, S.; Zungu, Z. and Kwasafo, O. K. (2026) Client and contractor experiences in framework construction agreements in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 154-168. ISSN 1751-4304

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Molad, C and Edward Back, W (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(2), pp. 93-104. ISSN 0969-9988

Molin Valdés, H; Amaratunga, D and Haigh, R (2013) Making cities resilient: From awareness to implementation. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 5-8. ISSN 1759-5916

Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.

Mollo, L G; Emuze, F and Smallwood, J (2023) A proposed training-within-industry-informed human failure reduction framework for South African construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 104-112. ISSN 17514304

Momade, M H; Durdyev, S; Van Tam, N; Shahid, S; Mbachu, J and Momade, Y (2024) Factors influencing adoption of construction technologies in Vietnam's residential construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1002-1018. ISSN 2398-4708

Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.

Monahan, J (2013) Housing and carbon reduction: can mainstream 'eco-housing' deliver on its low carbon promises? PhD thesis, University of East Anglia, UK.

Moncaster, A M and Simmons, P (2015) Policies and outcomes for UK sustainable schools. Building Research & Information, 43(4), pp. 452-464. ISSN 0961-3218

Moodley, K; Preece, C and Kyprianou, R (2001) An examination of knowledge management implementation within civil engineering consulting organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2023) Proximity activity intensity identification system in hot and humid weather conditions: Development and implementation. Journal of Construction Engineering and Management, 149(12): 04023122, ISSN 0733-9364

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Moore, D R and Fisher, T (2017) Challenges of motivating postgraduate built environment online teaching and learning practice workgroups to adopt innovation. International Journal of Construction Education and Research, 13(3), pp. 225-47. ISSN 1557-8771

Moore, S A; Gelfand, S and Whitsett, D (2015) Epistemological conflict: Modern and non-modern frameworks for sustainability. Building Research & Information, 43(6), pp. 659-674. ISSN 0961-3218

Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.

Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Morais, Marcelo de (2016) Method for implementing BIM and target costing in social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.

Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Morgado, J; Flores-Colen, I; De Brito, J and Silva, A (2017) Maintenance planning of pitched roofs in current buildings. Journal of Construction Engineering and Management, 143(7): 05017010, ISSN 0733-9364

Morgan, B (2017) Organizing for technology in practice: implementing Building Information Modeling in a design firm. PhD thesis, University College London, UK.

Morgan, R E and Morgan, N A (1991) An appraisal of the marketing development in engineering consultancy firms. Construction Management and Economics, 9(4), pp. 355-368. ISSN 01446193

Morland, K V (2020) Multi-level learning of a quality management routine: a UK housebuilder case study. PhD thesis, University of Sheffield, UK.

Morrison, S; Callaghan, N; Tong, M and Thomson, C (2022) Quantity surveyors incorporating circularity at early project design stage: A literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Moses, T; Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology, 18(6), pp. 1867-1888. ISSN 1726-0531

Moskowitz, J M and McCranie, J B (2026) Investigating the impact of army safety and occupational health management system implementation on safety performance indices: Case study of a U.S. Army corps of engineers district. International Journal of Construction Management, 26(5), pp. 840-856. ISSN 1562-3599

Motawa, I; Kaka, A and Hong Wong, C (2008) Development of transparent payment systems. Journal of Financial Management of Property and Construction, 13(2), pp. 143-156. ISSN 1366-4387

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Motawa, I A; Price, A D F and Sher, W (1998) The introduction and management of innovative construction processes and products. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Motawa, I A; Price, A D F and Sher, W (1999) Implementing construction innovations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Moteleb, M (2010) Risk based decision making tools for sewer infrastructure management. PhD thesis, University of Cincinnati, USA.

Motjolopane, B P and van Zyl, R (2009) A review of rectenna models for electromagnetic energy harvesting. Journal of Engineering, Design and Technology, 7(3), pp. 282-292. ISSN 1726-0531

Motlagh, K C (1992) Algorithms for computerised surface modelling and highway alignment design. PhD thesis, University of Strathclyde, UK.

Moua, B and Russell, J S (2001) Comparison of two maintainability programs. Journal of Construction Engineering and Management, 127(3), pp. 239-244. ISSN 0733-9364

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.

Mousaei, A; Taghaddos, H; Nekouvaght Tak, A; Behzadipour, S and Hermann, U (2021) Optimized mobile crane path planning in discretized polar space. Journal of Construction Engineering and Management, 147(5): 04021036, ISSN 0733-9364

Mousakhani, E; Yavarkhani, M and Sohrabi, S (2017) Selecting an appropriate alternative for a major infrastructure project with regard to value engineering approach. Journal of Engineering, Design and Technology, 15(3), pp. 395-416.

Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364

Moyo, T.; Raliile, M.; Edwards, D. J. and Chigara, B. (2026) Construct validation for technical sustainability as the fourth pillar for achieving sustainable construction: A case for Zimbabwe. Construction Innovation, 26(9), pp. 233-263. ISSN 1471-4175

Moyo, T and Chigara, B (2023) Barriers to lean construction implementation in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 733-757. ISSN 1726-0531

Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), pp. 1-17. ISSN 1823-6499

Mtunzi, B and Meyer, E L (2015) Design and implementation of a directly cooled PV/T. Journal of Engineering, Design and Technology, 13(3), pp. 369-379.

Mugabi, J and Marin, P (2008) PPP in urban water: Lessons from Yerevan, Armenia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 171-178. ISSN 17514312

Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry. PhD thesis, Heriot-Watt University, UK.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Muianga, Elisa Atália Daniel (2018) Evolutionary model for IPD implementation in construction projects with little diffusion of collaborative practices. PhD thesis, Universidade Estadual de Campinas, Brazil.

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Muller, M (2012) Polycentric governance: Water management in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 193-200. ISSN 17514312

Muller, M (2018) Lessons from transforming a South African special-purpose vehicle into a project implementation agency. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 189-196. ISSN 17514304

Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Munaro, M R; Freitas, M D C D; Tavares, S F and Bragança, L (2021) Circular business models: Current state and framework to achieve sustainable buildings. Journal of Construction Engineering and Management, 147(12): 04021164, ISSN 0733-9364

Munaro, M R and Tavares, S F (2025) Design for adaptability and disassembly: Guidelines for building deconstruction. Construction Innovation, 25(2), pp. 665-687. ISSN 1471-4175

Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.

Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.

Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2021) BIM business value for asset owners: Key issues and challenges. International Journal of Building Pathology and Adaptation, 39(1), pp. 135-151. ISSN 23984708

Munir, M; Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(6), pp. 1171-1191. ISSN 0969-9988

Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.

Murguia, D; Soetanto, R; Szczygiel, M; Goodier, C I and Kavuri, A (2026) Construction 4.0 implementation for performance improvement: An innovation management perspective. Construction Innovation, 26(3), pp. 843-870. ISSN 1471-4175

Murguia, D (2021) A model of systemic BIM adoption. PhD thesis, Loughborough University, UK.

Murguia, D; Demian, P and Soetanto, R (2017) A systemic BIM innovation model in the construction supply chain. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Murguia, D; Demian, P and Soetanto, R (2021) Systemic BIM adoption: A multilevel perspective. Journal of Construction Engineering and Management, 147(4): 04021014, ISSN 0733-9364

Murguia, D; Rathnayake, A; Jansen Van Vuuren, T and Middleton, C (2024) Measuring construction productivity across projects: Multilevel three-dimensional framework. Journal of Construction Engineering and Management, 150(11): 04024151, ISSN 0733-9364

Murguia, D; Vasquez, C; Demian, P and Soetanto, R (2023) BIM adoption among contractors: A longitudinal study in Peru. Journal of Construction Engineering and Management, 149(1): 04022140, ISSN 0733-9364

Murphy, M and Eadie, R (2019) Socially responsible procurement: A service innovation for generating employment in construction. Built Environment Project and Asset Management, 9(1), pp. 138-152. ISSN 2044-124X

Murphy, M E (2014) Implementing innovation: A stakeholder competency-based approach for BIM. Construction Innovation, 14(4), pp. 433-452. ISSN 1471-4175

Murphy, M E; Perera, S and Heaney, G (2015) Innovation management model: A tool for sustained implementation of product innovation into construction projects. Construction Management and Economics, 33(3), pp. 209-232. ISSN 01446193

Murtaza, I; Rashid, M U and Asad, M (2024) Construction safety challenges and opportunities at design stage for building industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 3-15. ISSN 17514304

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.

Musa, S (2019) A framework of intra-organisational knowledge sharing practices in implementing BIM within the Malaysian construction industry. PhD thesis, University of Salford, UK.

Mushi, F V; Nguluma, H and Kihila, J (2022) A critical review of African green building research. Building Research & Information, 50(6), pp. 610-627. ISSN 0961-3218

Musonda, I and Smallwood, J (2008) Health and safety (H&S) awareness and implementation in botswana's construction industry. Journal of Engineering, Design and Technology, 6(1), pp. 81-90. ISSN 1726-0531

Mustaffa, N K; Abdul Kudus, S; Abdul Aziz, M F H and Anak Joseph, V R (2022) Strategies and way forward of low carbon construction in Malaysia. Building Research & Information, 50(6), pp. 628-645. ISSN 0961-3218

Mustaffa, N K; Isa, C M M; Ekundayo, D and Joseph, V R A (2022) Barriers and strategies for improving carbon emissions management approaches in Malaysian construction. Construction Economics and Building, 22(3), pp. 99-123. ISSN 2204-9029

Mustapa, F D (2014) Managing immigrant construction workers in peninsular Malaysia: The economic perspective. PhD thesis, Loughborough University, UK.

Mustapa, M (2013) Facilities management knowledge in private finance initiative (PFI) healthcare projects. PhD thesis, Loughborough University, UK.

Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America. PhD thesis, Indiana State University, USA.

Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.

Muya, M; Mulenga, M N; Bwalya, D C; Edum-Fotwe, F T and Price, A D F (2003) Construction skills requirement issues in Zambia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Muya, M; Price, A D F and Thorpe, A (1999) Implementation of information technology in materials logistics in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Muzondo, F T (2020) The limitations of the South African procurement policies and practices in relation to contractor selection criteria: The importance of technical qualifications and experience of established construction companies. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Muzorewa, Maxwell (2024) Project management strategies used in hospitality construction projects to improve performance. DBA thesis, Walden University, USA.

Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety. DPhil thesis, University of Johannesburg, South Africa.

Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.

Mwelu, N; Davis, P R; Ke, Y; Watundu, S and Jefferies, M (2021) Success factors for implementing Uganda's public road construction projects. International Journal of Construction Management, 21(6), pp. 598-614. ISSN 1562-3599

Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499

Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599

Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.

Mzyece, D; Ndekugri, I E; Ankrah, N and Hammond, F (2012) The principal contractor’s role under construction (design and management) regulations 2007: Areas for further research based on a qualitative inquiry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Müller, B (2016) Policy gaps: Future challenges for research. Building Research & Information, 44(3), pp. 338-341. ISSN 0961-3218

N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X

Naanaa, H.; Bril El Haouzi, H.; Derigent, W. and Lezoche, M. (2026) A semantic search system for efficient information retrieval in the construction domain. Smart and Sustainable Built Environment, 15(5), pp. 1781-1807. ISSN 2046-6099

Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.

Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Nahmens, I and Mullens, M (2009) The impact of product choice on lean homebuilding. Construction Innovation, 9(1), pp. 84-100. ISSN 1471-4175

Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates: lessons learned. Construction Innovation, 13(2), pp. 186-201. ISSN 1471-4175

Naim, A A A A (2018) An investigation of building information modelling implementation in KSA. PhD thesis, University of Wolverhampton, UK.

Naizghi, M S (2021) Factors affecting implementation of earned value management (EVM) in construction projects. PhD thesis, Wayne State University, USA.

Najafi, M.; Rahimian, F.; Zaki Abdelaziz, Y.; Poppe, J. and Rodriguez Trejo, S. (2026) User-side regime dynamics and design-use misalignments in circular construction transitions. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988

Najafzadeh, M; Abbasianjahromi, H and Tabari, P (2025) Integrating sustainable development and ethical engineering in industry 4.0 applications for AEC contract management. Engineering, Construction and Architectural Management, 32(13), pp. 445-476. ISSN 0969-9988

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation. PhD thesis, University of Strathclyde, UK.

Nam, C H and Tatum, C B (1992) Strategies for technology push: Lessons from construction innovations. Journal of Construction Engineering and Management, 118(3), pp. 507-524. ISSN 0733-9364

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.

Nanayakkara, L (2004) The motivation of masons in the Sri Lankan construction industry. PhD thesis, University of Reading, UK.

Nanayakkara, L (2005) An empirically grounded framework for human resource management in the Sri Lankan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Nanayakkara, L (2012) Site layout: how it is perceived to affect productivity in public sector construction projects in Sri Lanka. PhD thesis, Oxford Brookes University, UK.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nasri, E; Pegels, G; Mostofinejad, D and Chini, A (2010) International transfer of CAD/CAM construction technologies: Case study of a German-Iranian partnership. International Journal of Construction Management, 10(2), pp. 71-92. ISSN 1562-3599

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Navandar, Y V; Bari, C and Gaikwad, P G (2022) Failure factors–a comparative study of private and government construction firms. Engineering, Construction and Architectural Management, 29(6), pp. 2495-2513. ISSN 0969-9988

Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: A systems thinking approach. Engineering, Construction and Architectural Management, 29(3), pp. 1427-1448. ISSN 0969-9988

Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Navon, R; Kelly, P W and Johnston, D W (1993) Human factors in introducing on-site construction automation. Journal of Construction Engineering and Management, 119(4), pp. 801-812. ISSN 0733-9364

Navon, R; Rubinovitz, Y and Coffler, M (1996) Fully automated rebar CAD/CAM system: Economic evaluation and field implementation. Journal of Construction Engineering and Management, 122(2), pp. 101-108. ISSN 0733-9364

Nawfal, S and Ali, F (2018) The acceleration of 3D graphics transformations based on cuda. Journal of Engineering, Design and Technology, 16(6), pp. 925-937. ISSN 1726-0531

Nawi, M N M (2012) Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects. PhD thesis, University of Salford, UK.

Nazeer, F S; Kamardeen, I and Hasan, A (2024) Research needs for enhancing pre-occupancy evaluation of buildings. Built Environment Project and Asset Management, 14(4), pp. 529-546. ISSN 2044-124X

Nazeer, F S; Kamardeen, I and Hasan, A (2025) Establishment of an end-user engaged building design framework. Built Environment Project and Asset Management, 15(1), pp. 106-124. ISSN 2044-124X

Ndekugri, I; Ankrah, N A and Adaku, E (2022) The design coordination role at the pre-construction stage of construction projects. Building Research & Information, 50(4), pp. 452-466. ISSN 0961-3218

Ndekugri, I; Ankrah, N A and Adaku, E (2023) Performance barriers for coordination of health and safety during the preconstruction phase of construction projects. Journal of Construction Engineering and Management, 149(7): 04023045, ISSN 0733-9364

Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193

Ndukwe, Chigozie Victor (2023) Impact of globalisation on the construction supply chain: Challenges and responses in Victoria. PhD thesis, University of Melbourne, Australia.

Neeraj, S; Mannakkara, S and Wilkinson, S (2020) Build back better concepts for resilient recovery: A case study of India's 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 280-294. ISSN 1759-5916

Negahban, S (2008) Utilization of enterprise resource planning tools by small to medium size construction organizations: A decision-making model. PhD thesis, University of Maryland, College Park, USA.

Negreiros, Iara (2018) Urban retrofitting an approach to support decision-making. PhD thesis, Universidade de São Paulo, Brazil.

Nelson, T N T; Poleacovschi, C; Appelgate, M; Drake, R; Swalwell, K; Jackson, C; Svec, J and Cetin, K (2024) Making social justice central to construction engineering: Testing interventions for educating reflexive engineers. Journal of Construction Engineering and Management, 150(10): 04024122, ISSN 0733-9364

Nesan, L J (1997) A generic model for effective implementation of empowerment in construction contractor organisations. PhD thesis, University of Wolverhampton, UK.

Nesensohn C, B D J and Fearon D J, O E G (2013) Combining lean construction with maturity models. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Newaz, M T; Davis, P R; Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(3), pp. 462-478. ISSN 0969-9988

Newton, S (1983) Analysis of construction economics: a cost simulation model. PhD thesis, University of Strathclyde, UK.

Newton, S; Shirazi, A and Christensen, P (2023) Defining and demonstrating a smart technology configuration to improve energy performance and occupant comfort in existing buildings: A conceptual framework. International Journal of Building Pathology and Adaptation, 41(1), pp. 182-200. ISSN 23984708

Ng, M S; Graser, K and Hall, D M (2023) Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study. Architectural Engineering and Design Management, 19(1), pp. 39-55. ISSN 1745-2007

Ng, S T; Chen, S E; McGeorge, D; Lam, K C and Evans, S (2001) Current state of IT usage by Australian subcontractors. Construction Innovation, 1(1), pp. 3-13. ISSN 1471-4175

Ng, S T; Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(3), pp. 264-282. ISSN 0969-9988

Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029

Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.

Nganpet, N G and Biermann, E (2016) Image compression system for a 3U CubeSat. Journal of Engineering, Design and Technology, 14(3), pp. 446-460.

Ngoma, S; Mundia, M and Kaliba, C (2014) Benefits, constraints and risks in infrastructure development via public-private partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), pp. 15-33. ISSN 1823-6499

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(3), pp. 142-147. ISSN 0961-3218

Ngowtanasuwan, G and Hadikusumo, B H W (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation, 17(4), pp. 457-474. ISSN 1471-4175

Nguyen, M V; Ha, K D and Nguyen, K V (2026) Linking corporate social responsibility and project performance: Role of collaboration and trust. International Journal of Construction Management, 26(6), pp. 960-973. ISSN 1562-3599

Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029

Nguyen, V. T. and Khuc, T. Q. (2026) How structural modelling of R-principles reveals their interactions and guides circular economy implementation in Vietnam. Engineering, Construction and Architectural Management, pp. 1-30. ISSN 0969-9988

Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, D C; Nguyen, T Q; Jin, R; Jeon, C H and Shim, C S (2022) BIM-based mixed-reality application for bridge inspection and maintenance. Construction Innovation, 22(3), pp. 487-503. ISSN 1471-4175

Nguyen, H T and Hadikusumo, B H W (2018) Human resource related factors and engineering, procurement, and construction (EPC) project success. Journal of Financial Management of Property and Construction, 23(1), pp. 24-39. ISSN 1366-4387

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Nguyen, Hai N (2010) The impact of leadership behaviours and organisational culture on knowledge management practices in small and medium enterprises. PhD thesis, Griffith University, Australia.

Nguyen, Loi (2018) Management innovation: Case study of balanced scorecard implementation in Vietnam. PhD thesis, University of Minnesota, USA.

Nguyen, M V (2024) Barriers to corporate social responsibility performance in construction organizations. Engineering, Construction and Architectural Management, 31(4), pp. 1473-1496. ISSN 0969-9988

Nguyen, M V (2024) Investigating the relationship between corporate social responsibility implementation and contractor competitiveness. Engineering, Construction and Architectural Management, 31(10), pp. 3895-3920. ISSN 0969-9988

Nguyen, M V (2025) Assessment of corporate social responsibility performance for Vietnamese construction organizations. Journal of Engineering, Design and Technology, 23(2), pp. 477-500. ISSN 1726-0531

Nguyen, N T H and Dang, H T (2020) Adaptation of "participatory method" in design "for/with/by" the poor community in Tam Thanh, Quang Nam, Vietnam. Smart and Sustainable Built Environment, 9(3), pp. 272-282. ISSN 2046-6099

Nguyen, P A; Bokel, R and Dobbelsteen, A (2019) Improving energy efficiency in Vietnamese tube houses: A survey of sustainable challenges and potentials. Smart and Sustainable Built Environment, 8(5), pp. 366-390. ISSN 2046-6099

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, Q A (2023) Application of Ji Koutei Kanketsu (JKK) for design risk management in highway construction projects. PhD thesis, University of Huddersfield, UK.

Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Nguyen, L H; Chileshe, N and Hallo, L (2023) Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, 23(14), pp. 2438-2451. ISSN 1562-3599

Nguyen, T; Tran, Q P; Chileshe, N; Thao Huynh, T Y and Hallo, L (2024) Risk prioritization using analytic process network for metro rail implementation projects in developing countries: A typical case study of Vietnam. International Journal of Construction Management, 24(10), pp. 1077-1089. ISSN 1562-3599

Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599

Nguyen, T A; Do, S T; Nguyen, V T; Khuc, T Q and Quach, Q T (2024) Essential strategies for embracing building information modeling (BIM) in public investment projects: A case study in Vietnam. International Journal of Construction Management, 24(15), pp. 1708-1718. ISSN 1562-3599

Nguyen, T A; Le, N M U; Nguyen, S H and Ngo, N V (2024) Determining the Frequency of Component with Building Information Modelling-Level of Development in Facility Management: A Case Study in Vietnam. Journal of Construction in Developing Countries, 29(2), pp. 157-180. ISSN 1823-6499

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Nguyen, T T N; Anh Nguyen, T; Tien Do, S and Nguyen, V T (2023) Assessing stakeholder behavioural intentions of BIM uses in Vietnam's construction projects. International Journal of Construction Management, 23(13), pp. 2279-2287. ISSN 1562-3599

Nguyen, T T N; Nguyen, T A; Do, S T and Nguyen, V T (2024) Developing a structural model of stakeholders' behavior toward BIM adoption in construction enterprises. International Journal of Construction Management, 24(10), pp. 1038-1053. ISSN 1562-3599

Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X

Nickdoost, N; Choi, J; Abdelrazig, Y A and Sobanjo, J (2022) A project life-cycle approach to managing procrastination in construction projects: State-of-the-art review. Journal of Construction Engineering and Management, 148(5): 03122001, ISSN 0733-9364

Nicolini, D; Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(1), pp. 37-47. ISSN 01446193

Nielsen, S B; Hoffmann, B; Quitzau, M B and Elle, M (2009) Mobilizing the courage to implement sustainable design solutions: Danish experiences. Architectural Engineering and Design Management, 5(1-2), pp. 53-61. ISSN 1745-2007

Nielsen, Y; Kumas, N and Ciftci, C (2006) ICT use in Turkish construction sector: Existing laws and regulations. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364

Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.

Nikou, T and Klotz, L (2014) Application of multi-attribute utility theory for sustainable energy decisions in commercial buildings: A case study. Smart and Sustainable Built Environment, 3(3), pp. 207-222. ISSN 2046-6099

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2001) Constructability implementation: A survey in the Malaysian construction industry. Construction Management and Economics, 19(8), pp. 819-829. ISSN 01446193

Nima, M A; Abdul-Kadir, M R; Jaafar, M S and Alghulami, R G (2004) Constructability concepts in Kuala Selangor cable-stayed bridge in Malaysia. Journal of Construction Engineering and Management, 130(3), pp. 315-321. ISSN 0733-9364

Nirupama, N; Popper, T and Quirke, A (2015) Role of social resilience in mitigating disasters. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 363-377. ISSN 1759-5916

Nishida, Y and Hua, Y (2011) Motivating stakeholders to deliver change: Tokyo's cap-and-trade program. Building Research & Information, 39(5), pp. 518-533. ISSN 0961-3218

Nitithamyong, P (2003) Analysis of success and failure factors in application of web-based project management systems in construction. PhD thesis, Purdue University, USA.

Nitithamyong, P and Skibniewski, M J (2006) Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), pp. 80-87. ISSN 0733-9364

Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(1), pp. 14-42. ISSN 1471-4175

Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Niu, Y; Anumba, C and Lu, W (2019) Taxonomy and deployment framework for emerging pervasive technologies in construction projects. Journal of Construction Engineering and Management, 145(5): 04019028, ISSN 0733-9364

Niu, Y; Li, H; Luo, X and Deng, X (2024) Coopetition configuration and performance of international joint ventures for high-speed rail projects. Engineering, Construction and Architectural Management, 31(9), pp. 3748-3772. ISSN 0969-9988

Niveditha, M. and Palanisamy, T. (2026) Upcycling iron-rich industrial waste into a carbon-sequestering composite binder through optimized carbonation curing for structural applications. International Journal of Construction Management, 26(8), pp. 1471-1489. ISSN 1562-3599

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.

Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.

Norton, M and Lane, A (2012) 'New water architecture': An integrated water management model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 159-171. ISSN 17514312

Noruwa, B; Merschbrock, C; Arewa, A O and Agyekum-Mensah, G (2018) Institutional foundations of construction ICT: A view from the West midlands of England. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Ntshwene, K; Essah, E A and Dixon, T J (2014) Investigating the level of awareness of building assessment tools in the construction industry of Botswana. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadike, A N and Wilkinson, S (2022) An evidence-based framework validation for building code improvement in New Zealand. Engineering, Construction and Architectural Management, 29(8), pp. 3072-3090. ISSN 0969-9988

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Nwaogu, J M and Chan, A P C (2021) Evaluation of multi-level intervention strategies for a psychologically healthy construction workplace in Nigeria. Journal of Engineering, Design and Technology, 19(2), pp. 509-536. ISSN 1726-0531

Nwaogu, O (2017) A systems approach to the development of an energy benchmarking process model for commercial buildings. DEng thesis, Morgan State University, USA.

Nyagormey, J J; Baiden, B K; Nani, G and Adinyira, E (2020) Review on criteria for evaluating unsolicited public-private partnership PPP proposals from 2004 to 2018. International Journal of Construction Management, 22(12), pp. 2243-2257. ISSN 1562-3599

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.

Nyakala, S; Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), pp. 46-54. ISSN 2521-0165

Nyateka, N (2017) An evaluation of the role and effectiveness of simulation-based learning in the occupational health training of construction apprentices. PhD thesis, Loughborough University, UK.

Nyein, T S and Hadikusumo, B H W (2021) Factors influencing the adoption of public-private partnership in low-cost housing development in Myanmar. Journal of Financial Management of Property and Construction, 26(3), pp. 337-365. ISSN 1366-4387

Nyqvist, R; Peltokorpi, A; Lavikka, R and Ainamo, A (2025) Artificial intelligence driven platforms in the construction industry: Implications for companies' business models. Construction Innovation, 25(7), pp. 409-443. ISSN 1471-4175

Nørkjaer Gade, P; Nørkjaer Gade, A; Otrel-Cass, K and Svidt, K (2019) A holistic analysis of a BIM-mediated building design process using activity theory. Construction Management and Economics, 37(6), pp. 336-350. ISSN 01446193

O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364

O'Connor, J T and Koo, H J (2021) Proactive design quality assessment tool for building projects. Journal of Construction Engineering and Management, 147(2): 04020174, ISSN 0733-9364

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

O'Connor, J T and Mock, B D (2019) Construction, commissioning, and startup execution: Problematic activities on capital projects. Journal of Construction Engineering and Management, 145(4): 04019009, ISSN 0733-9364

O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364

O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364

O'Grady, W (2013) A knowledge management system to optimise comfort throughout the building life-cycle. PhD thesis, University College Cork, Ireland.

O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.

Oberlender, G D (1984) Development of construction research. Journal of Construction Engineering and Management, 110(4), pp. 486-490. ISSN 0733-9364

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Obi, L I; Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(2), pp. 135-153. ISSN 1366-4387

Obi, L I; Arif, M; Lamb, S M and Ashayeri, I (2025) Establishing interrelationships and dependencies of critical success factors for implementing offsite construction in the UK. Smart and Sustainable Built Environment, 14(3), pp. 810-834. ISSN 2046-6099

Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.

Obiozo R, S R (2013) The role of 'greening' and an ecosystem approach to enhancing construction ergonomics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 0969-9988

Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.

Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria. PhD thesis, Loughborough University, UK.

Odiba, E; Demian, P and Ruikar, K (2021) Development of a conceptual framework for effective quality management practices in construction organisations. Journal of Construction Business and Management, 5(1), pp. 1-16. ISSN 2521-0165

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Oduro, S; Pittri, H; Baah, B; Simons, B; Gyamfi, J; Botchway, B and Afful, A E (2025) Strategies for the implementation of net zero energy buildings in the Ghanaian construction industry. Built Environment Project and Asset Management, 15(5), pp. 1004-1019. ISSN 2044-124X

Oduyemi, O; Okoroh, M and Dean, A (2014) Barriers to life cycle costing usage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ofori, G (1991) Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options. Construction Management and Economics, 9(1), pp. 19-38. ISSN 01446193

Ofori, G (2001) Indicators for measuring construction industry development in developing countries. Building Research & Information, 29(1), pp. 40-50. ISSN 0961-3218

Ofori, G (2002) Singapore's construction: Moving toward a knowledge-based industry. Building Research & Information, 30(6), pp. 401-412. ISSN 0961-3218

Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: Practices, procedures and performance. Construction Management and Economics, 21(2), pp. 113-125. ISSN 01446193

Ofori, G (2006) Revaluing construction in developing countries: A research agenda. Journal of Construction in Developing Countries, 11(1), pp. 1-16. ISSN 1823-6499

Ofori, G; Briffett, C; Gang, G and Ranasinghe, M (2000) Impact of ISO 14000 on construction enterprises in Singapore. Construction Management and Economics, 18(8), pp. 935-947. ISSN 01446193

Ofori, G and Gang, G U (2001) ISO 9000 certification of Singapore construction enterprises: Its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(2), pp. 145-157. ISSN 0969-9988

Ofori-Boadu, A N; Owusu-Manu, D G; Edwards, D J and Asiseh, F (2021) A conceptual model of subcontractor development practices for LEED projects. Engineering, Construction and Architectural Management, 28(4), pp. 1196-1213. ISSN 0969-9988

Ofori-Boadu, A N; Shofoluwe, M A; Owusu-Manu, D-G; Holt, G D and Edwards, D (2015) Analysis of US commercial buildings' energy efficiency programs. Built Environment Project and Asset Management, 5(4), pp. 349-362. ISSN 2044-124X

Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.

Ogbeifun, E (2011) Training artisans on-site. Construction Economics and Building, 11(3), pp. 83-91. ISSN 2204-9029

Ogbu, C P (2018) Survival practices of indigenous construction firms in Nigeria. International Journal of Construction Management, 18(1), pp. 78-91. ISSN 1562-3599

Ogunbayo, B F; Ohis Aigbavboa, C; Thwala, W D and Akinradewo, O I (2022) Assessing maintenance budget elements for building maintenance management in Nigerian built environment: A Delphi study. Built Environment Project and Asset Management, 12(4), pp. 649-666. ISSN 2044-124X

Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175

Ogunbiyi, O E (2014) Implementation of the lean approach in sustainable construction: a conceptual framework. PhD thesis, University of Central Lancashire, UK.

Ogunlana, S O; Li, H and Sukhera, F A (2003) System dynamics approach to exploring performance enhancement in a construction organization. Journal of Construction Engineering and Management, 129(5), pp. 528-536. ISSN 0733-9364

Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.

Ogunmakinde, O E (2025) Achieving zero waste: Circular economy strategies in Australian higher education. Construction Economics and Building, 25(2), pp. 1-23. ISSN 2204-9029

Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.

Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.

Ogwueleka, A C and Ikediashi, D I (2021) Exploring the effects of positive organizational behaviour models on occupational eustress amongst construction employees. Journal of Construction Business and Management, 5(1), pp. 38-46. ISSN 2521-0165

Ohland, M W (1996) Engineering by design: A methodology for designing creative engineering activities. PhD thesis, University of Florida, USA.

Ohueri, C C; Bamgbade, J A; Chuin, A L S; Hing, M W N and Enegbuma, W I (2022) Best practices in building information modelling process implementation in green building design: Architects' insights. Journal of Construction in Developing Countries, 27(1), pp. 79-93. ISSN 1823-6499

Ohueri, C C; Enegbuma, W I and Habil, H (2020) MyCREST embedded framework for enhancing the adoption of green office building development in Sarawak. Built Environment Project and Asset Management, 10(2), pp. 215-230. ISSN 2044-124X

Ohueri, C C; Enegbuma, W I; Wong, N H; Kuok, K K and Kenley, R (2018) Labour productivity motivation framework for Iskandar Malaysia. Built Environment Project and Asset Management, 8(3), pp. 293-304. ISSN 2044-124X

Ohueri, C C; Masrom, M A N; Habil, H and Ambashe, M S (2025) IoT-based digital twin best practices for reducing operational carbon in building retrofitting: A mixed-method approach. Engineering, Construction and Architectural Management, 32(3), pp. 2044-2065. ISSN 0969-9988

Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.

Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364

Ojiako, U; Maseko, L; Root, D; Venkatachalam, S; Marshall, A; AlRaeesi, E and Chipulu, M (2025) Design phase collaborative risk management factors: A case study of a green rating system in South Africa. Engineering, Construction and Architectural Management, 32(9), pp. 6268-6301. ISSN 0969-9988

Ojo, E M (2016) Assessment of green supply-chain management in South African and Nigerian construction firms. DPhil thesis, University of Johannesburg, South Africa.

Ojo, L D; Ogunsemi, D R; Elyamany, A and Oke, A E (2025) Profound barriers to value management adoption on construction projects in a developing nation. Journal of Engineering, Design and Technology, 23(1), pp. 264-286. ISSN 1726-0531

Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387

Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531

Okanlawon, T T; Oyewobi, L O and Jimoh, R A (2023) Evaluation of the drivers to the implementation of blockchain technology in the construction supply chain management in Nigeria. Journal of Financial Management of Property and Construction, 28(3), pp. 459-476. ISSN 1366-4387

Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988

Oke, A E; Aliu, J; Agbaje, D H; Ebekozien, A; Aghimien, D O; Leo-Olagbaye, F and Clinton, C (2025) Exploring constraints in integrating indoor environmental quality (IEQ) into building designs: A case of Nigerian quantity surveying firms. Construction Innovation, 25(6), pp. 1657-1679. ISSN 1471-4175

Oke, A E; Aliu, J; Ehiosun, L U; Kineber, A F and Stephen, S S (2025) Adoption of distributed ledger technology for construction projects: A study of the challenges in a developing country. Journal of Engineering, Design and Technology, 23(5), pp. 1364-1383. ISSN 1726-0531

Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988

Oke, A E and Aliu, J (2025) Strategies for the implementation of environmental economic practices for sustainable construction in a developing economy. International Journal of Construction Management, 25(5), pp. 542-551. ISSN 1562-3599

Oke, A E; Aliu, J; Fadamiro, P; Akanni, P; Jamir Singh, P S and Shaharudin Samsurijan, M (2025) Unpacking the strategies to promote the implementation of automation techniques in the construction industry. Construction Innovation, 25(2), pp. 381-399. ISSN 1471-4175

Oke, A E; Aliu, J; Fadamiro, P; Jamir Singh, P S; Samsurijan, M S and Yahaya, M (2024) Robotics and automation for sustainable construction: Microscoping the barriers to implementation. Smart and Sustainable Built Environment, 13(3), pp. 625-643. ISSN 2046-6099

Oke, A E; Aliu, J; Fadamiro, P; Leo-Olagbaye, F; Jamir Singh, P S and Samsurijan, M S (2023) Evaluating the drivers for the implementation of automation techniques in the Nigerian construction sector. Built Environment Project and Asset Management, 13(6), pp. 913-928. ISSN 2044-124X

Oke, A E; Aliu, J; Ifedolapo Babalola, H; Jamir Singh, P S; Tunji-Olayeni, P and Ukaha Onyeukwu, S (2025) From building blocks to digital networks: Analyzing critical drivers for social media adoption in the construction sector. International Journal of Construction Management, 25(9), pp. 1047-1057. ISSN 1562-3599

Oke, A E; Aliu, J; Jamir Singh, P S; Onajite, S A; Shaharudin Samsurijan, M and Azura Ramli, R (2024) Appraisal of awareness and usage of digital technologies for sustainable wellbeing among construction workers in a developing economy. International Journal of Construction Management, 24(5), pp. 521-529. ISSN 1562-3599

Oke, A E; Aliu, J; Mwanaumo, E M; Odia, O A; Kahanji, C and Tengan, C (2024) From awareness to action: a study of the effectiveness of environmental economic practices for sustainable construction in Nigeria. Smart and Sustainable Built Environment, 13(5), pp. 1194-1212. ISSN 2046-6099

Oke, A E; Aliu, J and Onajite, S A (2024) Barriers to the adoption of digital technologies for sustainable construction in a developing economy. Architectural Engineering and Design Management, 20(3), pp. 431-447. ISSN 1745-2007

Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099

Oke, A E; Farouk Kineber, A; Abdel-Tawab, M; Abubakar, A S; Albukhari, I and Kingsley, C (2023) Barriers to the implementation of cloud computing for sustainable construction in a developing economy. International Journal of Building Pathology and Adaptation, 41(5), pp. 988-1013. ISSN 23984708

Oke, A E; Kineber, A F; Akindele, O and Ekundayo, D (2024) Determining the stationary barriers to the implementation of radio frequency identification (RFID) technology in an emerging construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1894-1912. ISSN 1726-0531

Oke, A E; Kineber, A F; Albukhari, I and Dada, A J (2024) Modeling the robotics implementation barriers for construction projects in developing countries. International Journal of Building Pathology and Adaptation, 42(3), pp. 386-409. ISSN 23984708

Okika, M C; Vermeulen, A and Pretorius, J H C (2025) A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 42-66. ISSN 1366-4387

Okorafor, C and Osuizugbo, I C (2025) Occupant health and safety risk and opportunity in the delivery of building energy retrofits. International Journal of Building Pathology and Adaptation, 43(8), pp. 140-155. ISSN 2398-4708

Okorafor, C; Emuze, F; Das, D; Awuzie, B O and Haupt, T (2020) An artefact for improving the delivery of building energy retrofit project in South Africa. Built Environment Project and Asset Management, 10(4), pp. 619-635. ISSN 2044-124X

Okoro, C S; Nnaji, C and Adediran, A (2023) Determinants of immersive technology acceptance in the construction industry: Management perspective. Engineering, Construction and Architectural Management, 30(7), pp. 2645-2668. ISSN 0969-9988

Okoroh, M I and Torrance, V B (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17(3), pp. 315-327. ISSN 01446193

Okoye, P U; Okolie, K C and Odesola, I A (2022) Risks of implementing sustainable construction practices in the Nigerian building industry. Construction Economics and Building, 22(1), pp. 21-46. ISSN 2204-9029

Okpala, I; Nnaji, C; Awolusi, I and Akanmu, A (2021) Developing a success model for assessing the impact of wearable sensing devices in the construction industry. Journal of Construction Engineering and Management, 147(7): 04021060, ISSN 0733-9364

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.

Okwilagwe, O (2017) Collaboration processes in partnership working: local regeneration in Nigeria. PhD thesis, Bournemouth University, UK.

Oladejo, J (2020) An investigation in the factors affecting the implementation of health and safety management practices by contractors in Nigeria. PhD thesis, University of the West of England, Bristol, UK.

Oladimeji, O and Haddad, A N (2025) Corruption and factors influencing the viability of micro, small and medium scale construction firms (msmcfs). Journal of Financial Management of Property and Construction, 30(3), pp. 477-499. ISSN 1366-4387

Oladinrin, O T and Ojo, L D (2022) Characterisation of the drivers of environmental management system implementation. Engineering, Construction and Architectural Management, 29(10), pp. 3868-3892. ISSN 0969-9988

Oladinrin, T O and Ho, C M F (2015) Barriers to effective implementation of ethical codes in construction organizations: An empirical investigation. International Journal of Construction Management, 15(2), pp. 117-125. ISSN 1562-3599

Oladiran, O J; Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), pp. 17-27. ISSN 2521-0165

Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), pp. 553-561. ISSN 1466433X

Olanipekun, Ayokunle Olubunmi (2017) Motivating project owners to increase their commitment towards improving the delivery performance of green building projects. PhD thesis, Queensland University of Technology, Australia.

Olanrewaju, O I; Babarinde, S A; Chileshe, N and Sandanayake, M (2021) Drivers for implementation of building information modeling (BIM) within the Nigerian construction industry. Journal of Financial Management of Property and Construction, 26(3), pp. 366-386. ISSN 1366-4387

Olanrewaju, O I; Chileshe, N; Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 2931-2958. ISSN 0969-9988

Olatunbosun, S; Odediran, S; Ekundayo, D and Aigbavboa, C (2024) Factors inhibiting energy access in the delivery of construction projects in Lagos metropolis, Nigeria. International Journal of Construction Management, 24(11), pp. 1215-1224. ISSN 1562-3599

Olatunde, N A and Odeyinka, H A (2021) Extent of stakeholder management practices in building projects procured by private corporate organisations in Nigeria. Built Environment Project and Asset Management, 11(5), pp. 819-834. ISSN 2044-124X

Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be? Built Environment Project and Asset Management, 5(3), pp. 304-317. ISSN 2044-124X

Olatunji, S O; Olawumi, T O and Aje, I O (2017) Rethinking partnering among quantity-surveying firms in Nigeria. Journal of Construction Engineering and Management, 143(11): 05017018, ISSN 0733-9364

Olawale, O; Oyedele, L; Owolabi, H; Gbadamosi, A Q and Kusimo, H (2022) Project reputation in construction: A process-based perspective of construction practitioners in the UK. International Journal of Construction Management, 22(12), pp. 2267-2278. ISSN 1562-3599

Olawumi, T O and Chan, D W M (2019) An empirical survey of the perceived benefits of executing BIM and sustainability practices in the built environment. Construction Innovation, 19(3), pp. 321-342. ISSN 1471-4175

Olawumi, T O and Chan, D W M (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(6), pp. 1257-1281. ISSN 0969-9988

Olawumi, T O and Chan, D W M (2021) Green-building information modelling (green-BIM) assessment framework for evaluating sustainability performance of building projects: A case of Nigeria. Architectural Engineering and Design Management, 17(5-6), pp. 458-477. ISSN 1745-2007

Olawumi, T O and Chan, D W M (2022) Developing project evaluation models for smart sustainable practices implementation in construction projects: A comparative study between Nigeria and Hong Kong. Engineering, Construction and Architectural Management, 29(3), pp. 1522-1552. ISSN 0969-9988

Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304

Olayinka, R A (2015) A knowledge management framework for reducing the cost of poor quality on construction projects. PhD thesis, University of Wolverhampton, UK.

Olazabal, M and Broto, V C (2022) Institutionalisation of urban climate adaptation: Three municipal experiences in Spain. Buildings & Cities, 3(1), pp. 570-588. ISSN 2632-6655

Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193

Oliva, C A; Granja, A D and Picchi, F A (2024) Target value design: Guidelines for implementation in the real estate market in Brazil. Architectural Engineering and Design Management, 20(6), pp. 1323-1334. ISSN 1745-2007

Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oliveira, Iberê Pinheiro de (2023) Criteria for building certification and assessment: An integrated approach to degradation and performance. PhD thesis, Universidade de Brasília, Brazil.

Oliver, M (2013) Evaluation of the planning and implementation of NHS Local Improvement Finance Trust (LIFT) in East London. PhD thesis, University of East London, UK.

Olivera, E L; Booth, C; Agyekum, K; Al-Tarazi, D and Pittri, H (2024) A phenomenological inquiry of Building Information Modelling macro-adoption in Uruguay. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 137-149. ISSN 17514304

Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387

Ollár, A (2024) Spatial design for circularity in residential buildings: Exploring the case of the kitchen. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ollár, A (2024) Circular building adaptability in multi-residential buildings: The status quo and a conceptual design framework. International Journal of Building Pathology and Adaptation, 42(7), pp. 1-17. ISSN 23984708

Olopade, J O (2020) Qualitative comparative analysis of causal pathways to successful construction cross-functional teams. PhD thesis, University of Florida, USA.

Olowa, T; Witt, E and Lill, I (2023) Building information modelling (BIM)–enabled construction education: Teaching project cash flow concepts. International Journal of Construction Management, 23(9), pp. 1494-1505. ISSN 1562-3599

Olubukola, C I and Mewomo, M C (2022) Enhancing digital transformation in construction health and safety: A systematic review of the current state of the art. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Olugboyega, O.; Marvellous, O.; Ajayi, A. O. and Ogunniyi, O. O. (2026) Work process attachment forms and styles influencing organizational BIM transformation. Construction Economics and Building, 26(2), ISSN 2204-9029

Olugboyega, O (2024) Differential relationships in the BIM implementation process in a developing country: The role of essential BIM implementation strategies. Engineering, Construction and Architectural Management, 31(8), pp. 3283-3307. ISSN 0969-9988

Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), pp. 1-14. ISSN 2521-0165

Olugboyega, O; Binga, B; Oseghale, G E and Aigbavboa, C (2023) Effect of anti-corruption systems' logic on corruption manifestations in project planning and execution in Nigeria. Construction Economics and Building, 23(3-4), pp. 186-207. ISSN 2204-9029

Olugboyega, O; Ilesanmi, K E; Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: Perspectives from digital competence model. Construction Innovation, 24(4), pp. 912-932. ISSN 1471-4175

Olugboyega, O; Oseghale, G E and Aigbavboa, C (2023) Multiple holistic case study of project-level building information modelling (BIM) adoption in Nigeria. Construction Innovation, 23(3), pp. 567-586. ISSN 1471-4175

Olugboyega, O and Windapo, A (2023) Modelling the indicators of a reduction in BIM adoption barriers in a developing country. International Journal of Construction Management, 23(9), pp. 1581-1591. ISSN 1562-3599

Olugboyega, O and Windapo, A O (2022) Structural equation model of the barriers to preliminary and sustained BIM adoption in a developing country. Construction Innovation, 22(4), pp. 849-869. ISSN 1471-4175

Olukayode, Olukemi Temitope (2020) Sustainable construction compliance: Recommending a transformational leader for sustainability policies supervision in the United States construction industry. DBA thesis, Northcentral University, USA.

Olusola, J. and Phung, Q. (2026) A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1284-1298. ISSN 1562-3599

Oluwayemi, O (2021) Retrofitting Sustainable Drainage Systems (SUDS) in public buildings in the UK: a cost benefit analysis model. PhD thesis, Birmingham City University, UK.

Omar, I and Makhlomo, S (2003) Energy alternatives for water pumping in rural areas: Using a case study approach. Journal of Engineering, Design and Technology, 1(1), pp. 1-14. ISSN 1726-0531

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Omar Attallah, S; Senouci, A; Kandil, A and al-Derham, H (2013) Utilization of life-cycle analysis to evaluate sustainability rating systems for construction projects with a case study on qatar sustainability assessment system (qsas). Smart and Sustainable Built Environment, 2(3), pp. 272-287. ISSN 2046-6099

Omobhude, O C (2019) Inclusive policy making process for sustainable development: Empirical cases of oil and infrastructure sectors in Nigeria. PhD thesis, National Yang Ming Chiao Tung University, Taiwan R.O.C..

Omoregie, I. I. and Aigbavboa, C. O. (2026) Exploring strategies for strengthening stakeholder communication to advance sustainable construction practices in the Nigerian built environment. Engineering, Construction and Architectural Management, 33(15), pp. 414-431. ISSN 0969-9988

Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.

Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Onososen, A; Musonda, I; Molusiwa, R and Dzuwa, C (2023) Addressing collaborative challenges in human-robot teams through the development of an immersive virtual environment. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.

Onyali, A (2017) Correlates of project success in the Nigerian real estate construction sector. PhD thesis, Walden University, USA.

Onyido, T B C; Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(1), pp. 30-45. ISSN 1471-4175

Ophiyandri, T (2013) Project risk management for community-based post-disaster housing reconstruction. PhD thesis, University of Salford, UK.

Ophiyandri, T; Amaratunga, D and Keraminiyage, K (2016) Advantages and limitations of community-based post-disaster housing reconstruction projects. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 420-431. ISSN 1759-5916

Opoku, A and Fortune, C (2011) The implementation of sustainable practices through leadership in construction organizations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Opoku, A and Mills, S A (2019) Exploring the use of standardised design in addressing the shortage of primary school places in the UK. Journal of Engineering, Design and Technology, 17(2), pp. 383-401. ISSN 1726-0531

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.

Ortiz, S S (2025) Strengthening construction supply chains: An exploration of decision-making frameworks for resilience in the face of black swan event. PhD thesis, Purdue University, Indiana, USA.

Ortlepp, R; Gruhler, K and Schiller, G (2018) Materials in Germany's domestic building stock: Calculation model and uncertainties. Building Research & Information, 46(2), pp. 164-178. ISSN 0961-3218

Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387

Osei-Kyei, R. and Chan, A. P. C. (2017) Implementing public–private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599

Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007

Osei-Kyei, R and Chan, A P C (2017) Implementing public-private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(6), pp. 1222-1245. ISSN 0969-9988

Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007

Osei-Kyei, R; Chan, A P C and Dansoh, A (2020) Project selection index for unsolicited public-private partnership proposals. International Journal of Construction Management, 20(6), pp. 555-566. ISSN 1562-3599

Osei-Kyei, R; Chan, A P C; Dansoh, A; Ofori-Kuragu, J K and Owusu, E K (2018) Motivations for adopting unsolicited proposals for public-private partnership project implementation: A survey of international experts. Journal of Financial Management of Property and Construction, 23(2), pp. 221-238. ISSN 1366-4387

Osei-Tutu, S; Ayarkwa, J; Nani, G; Osei-Asibey, D and Abu, I M A (2025) Stakeholders' role towards circular economy implementation: A scientometric review. Construction Innovation, 25(6), pp. 1633-1656. ISSN 1471-4175

Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects. PhD thesis, Luleå University of Technology, Sweden.

Osipova, E and Eriksson, P E (2009) The effects of procurement procedures on joint risk management. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Osman, I I (2002) Performance measures for contracting companies: a study of the Arab Contractors Company. PhD thesis, Loughborough University, UK.

Osuizugbo, I. C.; Oyeyipo, O. O.; Ojelabi, R. A. and Oshodi, O. S. (2021) Factors inhibiting corporate social responsibility initiatives among construction companies. Construction Economics and Building, 21(1), pp. 83-99. ISSN 2204-9029

Osuizugbo, I C; Oyeyipo, O O and Olojo, A D (2025) Drivers of corporate social responsibility initiatives among construction companies in Nigeria. International Journal of Building Pathology and Adaptation, 43(6), pp. 1595-1611. ISSN 2398-4708

Osuizugbo, I C (2024) Factors impeding the implementation of buildability assessment in building construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1825-1846. ISSN 1726-0531

Osuizugbo, I C and Nnodu, C V (2023) Barriers to environmental impact assessment implementation for construction projects in Nigeria. Built Environment Project and Asset Management, 13(5), pp. 719-737. ISSN 2044-124X

Osuizugbo, I C; Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(3), pp. 879-900. ISSN 1726-0531

Osuizugbo, I C; Okolie, K C and Oyeyipo, O O (2023) Factors influencing buildability assessment implementation in the Nigerian construction industry. Construction Innovation, 23(5), pp. 917-938. ISSN 1471-4175

Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Yohanna, H S and Edike, U E (2025) Implementation of work-life balance strategies among construction companies in Lagos, Nigeria: Construction workers' perspectives. Journal of Engineering, Design and Technology, 23(3), pp. 998-1016. ISSN 1726-0531

Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.

Otasowie, K and Oke, A (2022) An assessment of exhibited drivers of mentoring in construction professional firms: A case of Nigerian quantity surveying firms. Journal of Construction in Developing Countries, 27(2), pp. 63-86. ISSN 1823-6499

Otasowie, O K and Oke, A E (2024) Drivers of mentoring practices in construction related firms: Nigerian quantity surveying firms' perspective. Engineering, Construction and Architectural Management, 31(3), pp. 997-1015. ISSN 0969-9988

Otchere-Darko, E; Atuah, L; Opoku, R and Koranteng, C (2025) Redefining green roof systems with climbers: Simulation of a conceptual model for thermal-radiative performance and plant vitality. International Journal of Building Pathology and Adaptation, 43(3), pp. 528-547. ISSN 2398-4708

Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, A A E and ElKady, M M (2023) A knowledge management based framework for enhancing the learning culture in architectural design firms in developing countries. Journal of Engineering, Design and Technology, 21(1), pp. 23-57. ISSN 1726-0531

Othman, A A E and Youssef, L Y W (2021) A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. ISSN 1726-0531

Othman, N A (2010) An exploratory study into the implementation of safety management systems of Malaysian contractors in processing plants. PhD thesis, Loughborough University, UK.

Oti, A H (2014) Building information modelling for sustainability appraisal of conceptual design of steel-framed buildings. PhD thesis, University of Nottingham, UK.

Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.

Ottou, J A; Baiden, B K; Nani, G and Martin Morgan, T (2021) Benefits of implementing six sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), pp. 214-230. ISSN 2044-124X

Ouma, L A; Castronovo, F; Rupinder, K and Leicht, R (2026) Assessment instrument for lean journeys in integrated project delivery: Lean learning health assessment (llha). Engineering, Construction and Architectural Management, 33(15), pp. 47-71. ISSN 0969-9988

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.

Owusu-Manu, D G; Adjei, T K; Sackey, D M; Edwards, D J and Hosseini, R M (2021) Mainstreaming sustainable development goals in Ghana’s energy sector within the framework of public–private partnerships: Challenges, opportunities and strategies. Journal of Engineering, Design and Technology, 19(3), pp. 605-624. ISSN 1726-0531

Owusu-Manu, D G; Debrah, C; Oduro-Ofori, E; Edwards, D J and Antwi-Afari, P (2021) Attributable indicators for measuring the level of greenness of cities in developing countries: lessons from Ghana. Journal of Engineering, Design and Technology, 19(3), pp. 625-646. ISSN 1726-0531

Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599

Oyefusi, O N; Enegbuma, W I and Brown, A (2025) From systematic literature review to performance criteria evaluation: advancing green supply chain management in construction. International Journal of Construction Management, 25(3), pp. 249-264. ISSN 1562-3599

Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Oyemomi, B; Hare, B and Tong, M (2016) Exploring human resource incentivisation for public sector construction project delivery in Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Oyemomi, B; Hare, B and Tong, M (2018) Exploring public-private partnership challenges and the effects on the construction workforce: A Scotland study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Oyewobi, L O; Windapo, A O and James, R O B (2015) An empirical analysis of construction organisations' competitive strategies and performance. Built Environment Project and Asset Management, 5(4), pp. 417-431. ISSN 2044-124X

Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X

Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.

Özkut, D (2004) Reducing risk in 'preservation project management': Re-definition of the 'assessment phase'. PhD thesis, Izmir Institute of Technology, Turkey.

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

O’Neill, T; Hartigan, K and Spillane, J P (2024) Factors inhibiting higher education institutions from addressing industry driven change in Irish construction management programs. International Journal of Construction Education and Research, 20(1), pp. 65-82. ISSN 15578771

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599

Pagani, A; Christie, D; Bourdon, V; Wall Gago, C; Joost, S; Licina, D; Lerch, M; Rozenblat, C; Guessous, I and Viganò, P (2023) Housing, street and health: A new systemic research framework. Buildings & Cities, 4(1), pp. 629-649. ISSN 2632-6655

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Pala, M (2018) Implementing inter-organisational information systems for the integration of construction supply chains. PhD thesis, Loughborough University, UK.

Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2016) Implementing commercial information exchange: A construction supply chain case study. Construction Management and Economics, 34(12), pp. 898-918. ISSN 01446193

Palagi, S (2020) Achieving risk reduction and livability: Connecting relocation decision making to outcomes at relocation communities. PhD thesis, University of Colorado at Boulder, USA.

Pali, P (2020) Potential for climate change mitigation through low carbon investment in Indian roads and railways: an assessment of obstacles and opportunities for the Asian Development Bank. PhD thesis, University of Manchester, UK.

Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916

Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.

Palos, S; Kiviniemi, A and Kuusisto, J (2014) Future perspectives on product data management in building information modeling. Construction Innovation, 14(1), pp. 52-68. ISSN 1471-4175

Pamulu, Muhammad Sapri (2010) Strategic management practices in the construction industry: A study of Indonesian enterprises. PhD thesis, Queensland University of Technology, Australia.

Pan, Q (2007) System identification of constructed civil engineering structures and uncertainty. PhD thesis, Drexel University, USA.

Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Panagiotakopoulos, P D (2005) A systems and cybernetics approach to corporate sustainability in construction. PhD thesis, Heriot-Watt University, UK.

Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364

Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Pancholi, J and Devkar, D G (2023) Analyzing the influence of organizational culture in projects using Last Planner System. Construction Economics and Building, 23(3-4), pp. 143-169. ISSN 2204-9029

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Pandithawatta, T P W S I; Zainudeen, N and Perera, C S R (2020) An integrated approach of lean-green construction: Sri Lankan perspective. Built Environment Project and Asset Management, 10(2), pp. 200-214. ISSN 2044-124X

Panquet, Q; Bourgault, M; Pellerin, R; Danjou, C and Perrier, N (2024) A process-improvement method for implementing earned value-based project management in organizations. Journal of Construction Engineering and Management, 150(12): 04024170, ISSN 0733-9364

Panta, M (2018) Approaches to the resilience and the potential for adaptation through community-driven construction projects in the global South. PhD thesis, University of Brighton, UK.

Panuwatwanich, Kriengsak (2008) Modelling the innovation diffusion process in Australian architectural and engineering design organisations. PhD thesis, Griffith University, Australia.

Papadonikolaki, E (2016) Alignment of partnering with construction it: Exploration and synthesis of network strategies to integrate BIM-enabled supply chains. PhD thesis, Delft University of Technology, Netherlands.

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: Empirical explorations. Architectural Engineering and Design Management, 12(6), pp. 476-494. ISSN 1745-2007

Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Papageorgiou, G and Demetriou, G (2020) Investigating learning and diffusion strategies for sustainable mobility. Smart and Sustainable Built Environment, 9(1), pp. 1-16. ISSN 2046-6099

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Pappas, M P (2004) An assessment of implementation requirements for the Tier II construction workforce strategy. PhD thesis, University of Texas at Austin, USA.

Parameswaran, A and Ranadewa, K A T O (2024) Learning-to-learn sand cone model integrated lean learning framework for construction industry. Smart and Sustainable Built Environment, 13(4), pp. 856-882. ISSN 2046-6099

Parami Dewi, Anak Agung Diah (2013) Framework for implementing design build project delivery system in road infrastructure in Indonesia. PhD thesis, Queensland University of Technology, Australia.

Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988

Pardalis, G. and Sula, M. (2026) One-stop shops as leverage points for renovation sufficiency. Buildings & Cities, 7(1), pp. 614-632. ISSN 2632-6655

Parfitt, M K; Syal, M G; Khalvati, M and Bhatia, S (1993) Computer-integrated design drawings and construction project plans. Journal of Construction Engineering and Management, 119(4), pp. 729-742. ISSN 0733-9364

Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599

Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599

Park, J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. PhD thesis, Purdue University, USA.

Park, J; Cai, H; Dunston, P S and Ghasemkhani, H (2017) Database-supported and web-based visualization for daily 4D BIM. Journal of Construction Engineering and Management, 143(10): 04017078, ISSN 0733-9364

Park, T; Mahamadu, A M; Agyekum, K; Adade-Boateng, A O; Manu, P; Adinyira, E and Adukpo, S (2025) An inquiry into the health and safety management practices of construction firms in South Korea. Journal of Engineering, Design and Technology, 23(2), pp. 345-367. ISSN 1726-0531

Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.

Parkinson, T and de Dear, R (2016) Thermal pleasure in built environments: Spatial alliesthesia from contact heating. Building Research & Information, 44(3), pp. 248-262. ISSN 0961-3218

Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements. PhD thesis, KTH Royal Institute of Technology, Sweden.

Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029

Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988

Patel, D A and Jha, K N (2016) An estimate of fatal accidents in Indian construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Patel, K and Ruparathna, R (2023) Life cycle sustainability assessment of road infrastructure: A building information modeling-(BIM) based approach. International Journal of Construction Management, 23(11), pp. 1837-1846. ISSN 1562-3599

Patel, S and Hastak, M (2013) A framework to construct post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 95-114. ISSN 1759-5916

Pathak, C (2021) Electric vehicle infrastructure decision support system. PhD thesis, University of Washington, USA.

Patil, K R; Bhandari, S; Agrawal, A; Ayer, S K; Perry, L A and Hallowell, M R (2023) Analysis of youtube comments to inform the design of virtual reality training simulations to target emotional arousal. Journal of Construction Engineering and Management, 149(9): 04023077, ISSN 0733-9364

Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(5), pp. 491-507. ISSN 2044-124X

Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.

Paulson, B C (1985) Automation and robotics for construction. Journal of Construction Engineering and Management, 111(3), pp. 190-207. ISSN 0733-9364

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.

Pavard, A.; de Paula, N. and Poirier, E. (2026) Organizational competencies for BIM adoption: A cross-field analysis in the built asset industry. Construction Innovation, 26(4), pp. 1118-1140. ISSN 1471-4175

Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Peansupap, V (2004) An exploratory approach to the diffusion of ICT in a project environment. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175

Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3), pp. 321-332. ISSN 01446193

Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988

Peiroavar, M S and Davoudzadeh, T (2026) A stakeholder perspective on the challenges of sustainable material management in construction projects in developing countries: The case of Iran. International Journal of Construction Management, 26(3), pp. 496-510. ISSN 1562-3599

Pekeriçli, M K (2010) A lifecycle information management solution for built environment facilities. PhD thesis, University of Reading, UK.

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Penland, J L (2002) Implementation of web-based team collaboration tools in the architectural, engineering and construction industry. PhD thesis, University of Kansas, USA.

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Pereira, E S S (2017) A framework for assessing the safety performance of industrial projects using safety-related measures. PhD thesis, University of Alberta, Canada.

Pereira, Lucas Melchiori (2019) The organizational influence on design quality of built environment. PhD thesis, Universidade de São Paulo, Brazil.

Perera, A A D A J (1989) Cost effective designs. PhD thesis, Loughborough University, UK.

Perera, C S R; Francis, V and Shang, G (2023) Acceptance and adoption of construction 4.0 related technology: A review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Perera, S; Adeniyi, O; Babatunde, S O and Ginige, K (2018) Mapping built environment professionals' educational needs to international policy frameworks for disaster risk reduction: community stakeholder perspective. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 368-384. ISSN 1759-5916

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Perez Jimenez, P A (2019) An investigation into health and safety management by SMEs and the risk of corporate manslaughter prosecution. PhD thesis, University of Wolverhampton, UK.

Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.

Perry, J G (1985) The development of contract strategies for construction projects. PhD thesis, University of Manchester, UK.

Persson, M H (2006) Lessons learned in knowledge management: The case of construction. PhD thesis, Lund University, Sweden.

Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.

Petlíková, K (2021) Application of biological algorithms in standardization of construction work. PhD thesis, Czech Technical University, Czech Republic.

Petrescu, D; Petcou, C and Baibarac, C (2016) Co-producing commons-based resilience: Lessons from R-Urban. Building Research & Information, 44(7), pp. 717-736. ISSN 0961-3218

Pham, Thanh Tung (2021) The transfer of training among Australian construction workers participating in occupational health and safety training. PhD thesis, RMIT University, Australia.

Phan, P T C and Zhou, Z (2024) Implementation of design for construction safety (DfS) in the Vietnam context: awareness, attitude and practices. Journal of Engineering, Design and Technology, 22(6), pp. 1958-1979. ISSN 1726-0531

Phelan, R S; Radjy, F; Haas, C and Hendrickson, C (1990) Computer-aided concrete-placement optimization. Journal of Construction Engineering and Management, 116(1), pp. 172-187. ISSN 0733-9364

Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.

Pheng, L S and Hou, C W (2008) Middle management's influence on the effectiveness of ISO 9000 quality management systems in architectural firms. Architectural Engineering and Design Management, 4(3-4), pp. 189-205. ISSN 1745-2007

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Pheng, L S and May, C F (1997) Quality management systems: A study of authority and empowerment. Building Research & Information, 25(3), pp. 158-169. ISSN 0961-3218

Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and ohsas 18001 for construction. Journal of Construction Engineering and Management, 129(3), pp. 338-347. ISSN 0733-9364

Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364

Phillips, K C (2010) Monumental change: The St. Louis gateway arch and the integration of craft trades. PhD thesis, Howard University, USA.

Phillips-Alonge, O K (2017) The influence of partnering on the occurrence and cost of construction conflicts and disputes. PhD thesis, Northcentral University, USA.

Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599

Phraknoi, N (2022) Supply chain finance adoption: three is a crowd in entangled relationships. PhD thesis, Lancaster University, UK.

Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(6), pp. 615-624. ISSN 1466433X

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099

Pienaar, E J A (1988) A study to identify and evaluate the level of strategic management in the construction industry. DBA thesis, University of Pretoria, South Africa.

Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531

Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988

Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.

Pikas, E; Sacks, R and Hazzan, O (2013) Building information modeling education for construction engineering and management II: Procedures and implementation case study. Journal of Construction Engineering and Management, 139(11): 5013002, ISSN 0733-9364

Pim-Wusu, M.; Gyamfi, T. A.; Thwala, W. D. and Aigbavboa, C. O. (2026) Influence of education and training on sustainable construction adaptive capacity in the construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029

Pim-Wusu, M; Aigbavboa, C and Thwala, W D (2023) Adaptability capacity framework for sustainable practices in the Ghanaian construction industry. Built Environment Project and Asset Management, 13(1), pp. 89-104. ISSN 2044-124X

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities. Unpublished PhD thesis, Universidade Estadual de Campinas, Brazil.

Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities: Focus on the city of Campinas – SP. PhD thesis, Universidade Estadual de Campinas, Brazil.

Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards. PhD thesis, North Carolina State University, USA.

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.

Pirzadeh, P; Zhang, R P and Lingard, H (2016) Safety climate as a multi-level and dynamic concept: Exploring the variance at different levels over time. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Pirzadeh, Payam (2018) A social network perspective on design for construction safety. PhD thesis, RMIT University, Australia.

Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771

Pitigala Liyana Arachchi, I S; Siriwardana, C; Amaratunga, D and Haigh, R (2022) Evaluation of societal trust on multi-hazard early warning (MHEW) mechanism: Sri Lankan context. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 533-553. ISSN 1759-5916

Pittri, H; Agyekum, K; Kukah, A S; Asamoah, E; Gasue, R and Botchway, B (2026) Adoption strategies for health and safety technologies in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029

Pittri, H; Oduro, S; Atibila, D W; Kwasafo, O K; Abdallah, A and Anteh, E D (2025) Examining the critical barriers to nzebs' implementation in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 23(6), pp. 1898-1918. ISSN 1726-0531

Pittri, H; Agyekum, K; Ayebeng Botchway, E; Opoku, A and Bimpli, I (2024) Design for deconstruction (dfd) implementation among design professionals: Empirical evidence from Ghana. International Journal of Construction Management, 24(13), pp. 1387-1397. ISSN 1562-3599

Pittri, H; Agyekum, K; Botchway, E A; Alencastro, J; Oladinrin, O T and Dompey, A M A (2024) Drivers for design for deconstruction (DfD) implementation among design professionals. Smart and Sustainable Built Environment, 13(5), pp. 1134-1154. ISSN 2046-6099

Platten, A and Gorse, C (2010) Supply chain development for major public sector projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Plemmons, J K (1995) Materials management process measures and benchmarking in the industrial construction industry. PhD thesis, Clemson University, USA.

Poirier, E; Staub-French, S and Forgues, D (2015) Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting SME. Construction Innovation, 15(1), pp. 42-65. ISSN 1471-4175

Polat, F and Demirkesen, S (2025) Measuring the impact of lean implementation on BIM and project success: Case of construction firms. Engineering, Construction and Architectural Management, 32(9), pp. 5839-5862. ISSN 0969-9988

Poon, C S; Yu, A T W; See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(8), pp. 799-805. ISSN 01446193

Poon, C S; Yu, A T W; Wong, A and Yip, R (2013) Quantifying the impact of construction waste charging scheme on construction waste management in Hong Kong. Journal of Construction Engineering and Management, 139(5), pp. 466-479. ISSN 0733-9364

Poorisat, T.; Aigwi, I. E.; Doan, D. T. and GhaffarianHoseini, A. (2026) Integrating energy efficiency, water efficiency and indoor environmental quality towards advancing sustainable building designs and practices in New Zealand: Stakeholders' perspectives. Construction Innovation, 26(9), pp. 79-114. ISSN 1471-4175

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364

Porter, D S (2018) Spatial abilities of construction and related professionals. PhD thesis, Colorado State University, USA.

Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Potts, M (2017) A participatory study into the creation of a new infrastructure delivery system in the regulated UK water sector. PhD thesis, University of Salford, UK.

Pourezzat, A A; Nejati, M and Mollaee, A (2010) Dataflow model for managing urban disasters: The experience of Bam earthquake. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 84-102. ISSN 1759-5916

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304

Powderham, A J and Tamaro, G J (1995) Mansion House London: Risk assessment and protection. Journal of Construction Engineering and Management, 121(3), pp. 266-272. ISSN 0733-9364

Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029

Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Andric, J; Manu, P and Mzyece, D (2021) An investigation into macro BIM maturity and its impacts: A comparison of qatar and the United Kingdom. Architectural Engineering and Design Management, 17(5-6), pp. 496-515. ISSN 1745-2007

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Booth, C and Aigbavboa, C (2023) Virtual reality utility and usefulness in the furniture, fixture and equipment sector: A validation of interactive and distributed immersion. Smart and Sustainable Built Environment, 12(4), pp. 787-819. ISSN 2046-6099

Prakash, A and Ambekar, S (2026) Barriers to the implementation of enterprise risk management in Indian construction firms. Construction Innovation, 26(2), pp. 440-463. ISSN 1471-4175

Prakash, A (2019) Smart cities mission in India: Some definitions and considerations. Smart and Sustainable Built Environment, 8(4), pp. 322-337. ISSN 2046-6099

Prasanna, M and Vinodh, S (2013) Lean six sigma in SMEs: An exploration through literature review. Journal of Engineering, Design and Technology, 11(3), pp. 224-250. ISSN 1726-0531

Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.

Praticò, F G (2017) Metrics for management of asphalt plant sustainability. Journal of Construction Engineering and Management, 143(4): 04016116, ISSN 0733-9364

Prayoonhong, C (1995) An integrated information model for the building process. DArch thesis, University of Michigan, USA.

Preece, C; Moodley, K and Hyde, J (2000) Knowledge management strategies to improve construction business development processes: A preliminary case study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Preece, C and Stocking, S (1999) Safety communications management in construction contracting. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Preece, C N and Khalil, I I M (2000) Preliminary research into internal marketing as a strategic business philosophy in construction contracting. Journal of Construction Research, 1(1), pp. 9-17. ISSN 1609-9451

Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.

Pribadi, K S; Martek, I and Chan, T K (2023) Inequality and vulnerability of informal employment during the pandemic. Construction Economics and Building, 23(3-4), pp. 25-44. ISSN 2204-9029

Price, A D F (2003) The strategy process within large construction orgnisations. Engineering, Construction and Architectural Management, 10(4), pp. 283-296. ISSN 0969-9988

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(3), pp. 237-251. ISSN 01446193

Prieto, A J (2021) Fuzzy systems in the digital management of heritage timber buildings in South Chile. Building Research & Information, 49(8), pp. 878-892. ISSN 0961-3218

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Prieto, A J; Vásquez, V; Silva, A; Horn, A; Alejandre, F J and Macías-Bernal, J M (2019) Protection value and functional service life of heritage timber buildings. Building Research & Information, 47(5), pp. 567-584. ISSN 0961-3218

Prince, J R (2004) Evaluating the impact of onsite design on project performance. PhD thesis, Clemson University, USA.

Pritchard, C (2005) Skin cancer prevention in the house building industry. PhD thesis, Nottingham Trent University, UK.

Priyadarshani, K; Karunasena, G and Jayasuriya, S (2013) Construction safety assessment framework for developing countries: A case study of Sri Lanka. Journal of Construction in Developing Countries, 18(1), pp. 33-51. ISSN 1823-6499

Puddicombe, M S (1997) Designers and contractors: Impediments to integration. Journal of Construction Engineering and Management, 123(3), pp. 245-252. ISSN 0733-9364

Pulhez, Magaly Marques (2014) The management arrangement: State, engineering companies and architects in the daily management of the housing policy in São Paulo. PhD thesis, Universidade de São Paulo, Brazil.

Puybaraud, M-C (2001) A model of the role of management in construction fire safety failure scenarios. PhD thesis, Heriot-Watt University, UK.

Qi, L; Wong, P S P and Holdsworth, S (2024) Towards understanding the impact of the perceptions about construction innovation on advanced technology adoption. International Journal of Construction Management, 24(14), pp. 1521-1529. ISSN 1562-3599

Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.

Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218

Qiao, S; Wang, Q; Guo, Z and Guo, J (2021) Collaborative innovation activities and BIM application on innovation capability in construction supply chain: Mediating role of explicit and tacit knowledge sharing. Journal of Construction Engineering and Management, 147(12): 04021168, ISSN 0733-9364

Quaigrain, R A and Issa, M H (2023) Comparative analysis of leading and lagging indicators of construction disability management performance: An exploratory study. International Journal of Construction Management, 23(7), pp. 1205-1213. ISSN 1562-3599

Quaigrain, R A; Owusu-Manu, D G; Edwards, D J; Hammond, M; Hammond, M and Martek, I (2024) Occupational health and safety orientation in the oil and gas industry of Ghana: Analysis of knowledge and attitudinal influences on compliance. Journal of Engineering, Design and Technology, 22(3), pp. 795-812. ISSN 1726-0531

Quaigrain, R A; Winter, J and Issa, M H (2014) A critical review of the literature on disability management in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. PhD thesis, University of Notre Dame, USA.

Qureshi, A H; Alaloul, W S; Wing, W K; Saad, S; Alzubi, K M and Musarat, M A (2024) Factors affecting the implementation of automated progress monitoring of rebar using vision-based technologies. Construction Innovation, 24(3), pp. 770-789. ISSN 1471-4175

Rachid, Ali Hassan (2021) Development of a framework to support embedding BIM within undergraduate architectural programmes in Lebanon. PhD thesis, University of Salford, UK.

Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.

Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.

Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364

Rafaat, R; Osman, H; Georgy, M and Elsaid, M (2020) Preferred risk allocation in egypt's water sector PPPs. International Journal of Construction Management, 20(6), pp. 585-597. ISSN 1562-3599

Rafieyan, A; Sarvari, H; Beer, M and Chan, D W M (2024) Determining the effective factors leading to incidence of human error accidents in industrial parks construction projects: Results of a fuzzy Delphi survey. International Journal of Construction Management, 24(7), pp. 748-760. ISSN 1562-3599

Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364

Rahat, R; Pradhananga, P and ElZomor, M (2024) Evaluation of safe-to-fail flood solution alternatives and integration of safe-to-fail concept in AEC education to develop resilient coastal cities. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 244-258. ISSN 1759-5916

Raheem, A A (2014) Developing a framework for a reciprocal safety implementation system (RSIS) in the pakistani construction industry. PhD thesis, University of Florida, USA.

Rahimian, A; Ahmed, R R; Fazeli, A; Aghdam, E; Kumar Singh, A; Naji, M; Mohandes, S R; Fordjour Antwi-Afari, M and Zayed, T (2025) Examining the barriers to the adoption of IoT-based technologies in green buildings. Journal of Construction Engineering and Management, 151(3): 04024211, ISSN 0733-9364

Rahman, A and Sainati, T (2021) Adapting standard forms of contract to facilitate building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 110-118. ISSN 17514304

Rahman, Muzibur (2022) Constructors' decision-support framework for nzeb projects. PhD thesis, Oklahoma State University, USA.

Raidén, A B; Williams, H and Dainty, A (2008) Human resource information systems in construction: A review seven years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Rajendran, S (2007) Sustainable construction safety and health rating system. PhD thesis, Oregon State University, USA.

Rajendran, S and Gambatese, J A (2009) Development and initial validation of sustainable construction safety and health rating system. Journal of Construction Engineering and Management, 135(10), pp. 1067-1075. ISSN 0733-9364

Rajhans, K and Bhavsar, V (2023) Impending need of sustainable human resource management practices in construction industry: Evidence from India. International Journal of Construction Management, 23(13), pp. 2249-2259. ISSN 1562-3599

Rajiv, P; Logesh, R; Vinodh, S and Rajanayagam, D (2014) Financial feasibility and value engineering principles integrated quality function deployment for a manufacturing organization: A case study. Journal of Engineering, Design and Technology, 12(1), pp. 71-88. ISSN 1726-0531

Ramage, K L (2018) Scope management strategies for engineering leaders to improve project success rates. PhD thesis, Walden University, USA.

Ramalingam Rethnam, O and Thomas, A (2024) Urban building energy modelling-based framework to analyze the effectiveness of the community-wide implementation of national energy conservation codes. Smart and Sustainable Built Environment, 13(5), pp. 1213-1239. ISSN 2046-6099

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Ramanayaka, C D E; Olatunji, O A and Rotimi, J O (2023) Critical success factors of strategy-led planning of high-profile projects. International Journal of Construction Management, 23(1), pp. 75-88. ISSN 1562-3599

Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988

Ramantswana, T.; Awuzie, B.; Mompati, L. and Khafiso, T. (2026) Embedding ESG in facility management practices: A South African corporate real estate perspective. International Journal of Building Pathology and Adaptation, 44(5), pp. 1246-1266. ISSN 2398-4708

Rameezdeen, R; Chileshe, N; Hosseini, M R and Lehmann, S (2016) A qualitative examination of major barriers in implementation of reverse logistics within the South Australian construction sector. International Journal of Construction Management, 16(3), pp. 185-196. ISSN 1562-3599

Ramos, M A P (2023) Determining factors and strategies to promote construction and demolition waste management on a local scale. PhD thesis, Universidade NOVA de Lisboa, Portugal.

Ranadewa, K; Sandanayake, Y G and Siriwardena, M (2021) Enabling lean through human capacity building: An investigation of small and medium contractors. Built Environment Project and Asset Management, 11(4), pp. 594-610. ISSN 2044-124X

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(2), pp. 165-174. ISSN 01446193

Ranasinghe, Rajeshkumar (2023) Identifying factors that influence adoption, deployment and optimisation of project management methodologies within the Australian local government sector. PhD thesis, RMIT University, Australia.

Ranasinghe, U; Ruwanpura, J and Liu, X (2012) Streamlining the construction productivity improvement process with the proposed role of a construction productivity improvement officer. Journal of Construction Engineering and Management, 138(6), pp. 697-706. ISSN 0733-9364

Randall, T (2011) Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management, 137, pp. 797-805. ISSN 0733-9364

Ranganath, N; Sarkar, D; Patel, P and Patel, S (2022) Application of fuzzy TOPSIS method for risk evaluation in development and implementation of solar park in India. International Journal of Construction Management, 22(14), pp. 2764-2774. ISSN 1562-3599

Rankin, K; Suji, M; Pandey, B; Baniya, J; Hirslund, D V; Limbu, B; Rawal, N and Shneiderman, S (2026) Negotiating expertise in nepal's post-earthquake disaster reconstruction. Buildings & Cities, 7(1), pp. 1-19. ISSN 2632-6655

Rankin, J H (2000) Computer-assisted construction planning. PhD thesis, University of British Columbia, Canada.

Rankohi, S; Bourgault, M and Iordanova, I (2023) The new-normal challenges and IPD solutions: A Canadian case study. Built Environment Project and Asset Management, 13(1), pp. 20-35. ISSN 2044-124X

Rantshilo, K; Mahamadu, A M; Agyekum, K; Cheung, C; Manu, P and Yunusa-Kaltungo, A (2024) Design for safety among design professionals in the Botswanan construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 27-38. ISSN 17514304

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Raoufi, M and Fayek, A R (2021) Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Construction Innovation, 21(3), pp. 398-416. ISSN 1471-4175

Rapheal, O; Afolabi, A; Oyeyipo, O and Olugbenro, O (2024) Modelling client and construction firm barriers hindering social client relationship management system implementation in the built environment. Architectural Engineering and Design Management, 20(1), pp. 102-119. ISSN 1745-2007

Rasanjali, W A; Mendis, A P K D; Perera, B A K S and Disaratna, V (2024) Implementing enterprise resource planning for lean waste minimisation: Challenges and proposed strategies. Smart and Sustainable Built Environment, 13(2), pp. 330-353. ISSN 2046-6099

Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory. PhD thesis, Illinois Institute of Technology, USA.

Rashed, A and Mutis, I (2023) Trends of integrated project delivery implementations viewed from an emerging innovation framework. Engineering, Construction and Architectural Management, 30(3), pp. 989-1014. ISSN 0969-9988

Rashid, K B A and Morledge, R (1999) Strategies to remove or alleviate constraints affecting the processes of construction procurement in Malaysia. Journal of Construction Procurement, 5(1), pp. 27-41. ISSN 1358-9180

Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.

Rashid Alteneiji, H; Ahmed, V and Saboor, S (2021) A qualitative approach to investigate emergency preparedness state for the built environment in the UAE. Engineering, Construction and Architectural Management, 28(7), pp. 2005-2022. ISSN 0969-9988

Rashidi, A; Woon, G L; Dasandara, M; Bazghaleh, M and Pasbakhsh, P (2025) Smart personal protective equipment for intelligent construction safety monitoring. Smart and Sustainable Built Environment, 14(3), pp. 835-858. ISSN 2046-6099

Rashidian, S; Drogemuller, R and Omrani, S (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), pp. 1454-1470. ISSN 1745-2007

Rashidian, Sara (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. PhD thesis, Queensland University of Technology, Australia.

Raslan, R and Davies, M (2012) Legislating building energy performance: Putting EU policy into practice. Building Research & Information, 40(3), pp. 305-316. ISSN 0961-3218

Raslan, R M S (2010) Performance based regulations: the viability of the modelling approach as a methodology for building energy compliance demonstration. PhD thesis, University College London, UK.

Rasmussen, G M G; Jensen, P L and Gottlieb, S C (2017) Frames, agency and institutional change: The case of benchmarking in Danish construction. Construction Management and Economics, 35(6), pp. 305-323. ISSN 01446193

Ratcliffe, J S (2001) Built environment futures: A general examination of the role of future studies in built environment policy formulation, with a particular appraisal of the use of the foresight principal through scenario planning techniques in the framing, testing and imp. PhD thesis, Ulster University, UK.

Rathi, R N; Tulasi Devi, S L and Rajamalla, A P (2025) Evaluating the impact of lockdowns and interest rate cuts on construction stock price returns: A did approach. International Journal of Construction Management, 25(16), pp. 2051-2062. ISSN 1562-3599

Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175

Rathnayake, D K; Kularatne, D; Abeysinghe, S; Shehara, I; Fonseka, T; Edirisinghe Mudiyanselage, S D J; Kamalrathne, W G C T; Siriwardana, C; Alagiyawanna Mohotti Appuhamilage, C S B and Dissanayake, R (2020) Barriers and enablers of coastal disaster resilience: lessons learned from tsunami in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 275-288. ISSN 1759-5916

Raval, P and Sarkar, D (2025) Evaluation and optimization of key performance indicators affecting adoption of the building information modeling and blockchain technology in Indian construction sector through fuzzy TOPSIS and genetic algorithm. International Journal of Construction Management, 25(9), pp. 981-995. ISSN 1562-3599

Ravi, M (1998) Knowledge-based system approach to integrated design of multistorey office buildings at the preliminary stage. PhD thesis, Concordia University, Canada.

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Razak, D S A; Mills, G and Roberts, A (2016) External failure cost in construction supply chains. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Razia, B; Larkham, P and Thurairajah, N (2019) Risk assessment and risk engagement in the construction industry within conflict zones. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Razmak, J and Farhan, W (2026) A proposed digital transformation model for implementation by digital leaders. Smart and Sustainable Built Environment, 15(1), pp. 92-119. ISSN 2046-6099

Ready to deleteÓ Broin, E (2016) Modelling drivers of energy demand in the European union building sector. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Redmond, A and West, R (2012) The use of cloud enabled building information models: an expert analysis. Construction Economics and Building, 12(4), pp. 53-67. ISSN 2204-9029

Rees, J V (1986) Reforming the workplace: A study of self-regulation in occupational safety. PhD thesis, University of California, Berkeley, USA.

Reichert, J (2005) Will change management master the challenge of introducing the Eurocodes to the UK? PhD thesis, University of London, University College London, UK.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction. DEng thesis, George Washington University, USA.

Reid, S and Loosemore, M (2017) Motivations and barriers to social procurement in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Reja, V. K.; Yin, M.; Davletshina, D.; Wei, R.; Fauth, J.; Perrotta, F. and Brilakis, I. (2026) Establishing and fulfilling information requirements for computer vision-enabled digital twin-based control of roadside vegetation. Journal of Construction Engineering and Management, 152(9): 04026147, ISSN 0733-9364

Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007

Renukappa, S; Suresh, S; Abdalla, W; Shetty, N; Yabbati, N and Hiremath, R (2024) Evaluation of smart village strategies and challenges. Smart and Sustainable Built Environment, 13(6), pp. 1386-1407. ISSN 2046-6099

Renukappa, S; Suresh, S and Alosaimi, H (2021) Knowledge management-related training strategies in Kingdom of Saudi Arabia construction industry: An empirical study. International Journal of Construction Management, 21(7), pp. 713-723. ISSN 1562-3599

Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364

Reyes Veras, P; Renukappa, S and Suresh, S (2022) Awareness of big data concept in the Dominican Republic construction industry: An empirical study. Construction Innovation, 22(3), pp. 465-486. ISSN 1471-4175

Reynoso Vanderhorst, H (2022) A framework for adoption of drones in the Dominican Republic construction industry. PhD thesis, University of Wolverhampton, UK.

Reynoso Vanderhorst, H D; Heesom, D; Suresh, S; Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (uas) services in a decentralised system: Case of the Dominican Republic. Construction Innovation, 23(4), pp. 833-857. ISSN 1471-4175

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599

Rezgui, Y and Zarli, A (2006) Paving the way to the vision of digital construction: A strategic roadmap. Journal of Construction Engineering and Management, 132(7), pp. 767-776. ISSN 0733-9364

Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.

Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.

Ribeiro, F J L T (1995) Assessment of applications for the house renovations grants system: An IT support framework. PhD thesis, University of Salford, UK.

Ribeiro, F L (2001) BOT model: The Portuguese case. Journal of Construction Procurement, 7(2), pp. 72-86. ISSN 1358-9180

Ricci, D; Leiwakabessy, C; van Wieringen, S; de Koning, P and Konstantinou, T (2025) Co-creating justice in housing energy transitions through energy living labs. Buildings & Cities, 6(1), pp. 747-766. ISSN 2632-6655

Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.

Richter, S M and Bixler, R P (2022) Complexifying urban expansion: An exploratory, gradient-based approach. Buildings & Cities, 3(1), pp. 792-807. ISSN 2632-6655

Riggio, M; Alhariri, N and Hansen, E (2020) Paths of innovation and knowledge management in timber construction in North America: A focus on water control design strategies in CLT building enclosures. Architectural Engineering and Design Management, 16(1), pp. 58-83. ISSN 1745-2007

Riggs, L S and Hills, J W (1991) Implications for U.S. Construction companies in 1992 european community. Journal of Construction Engineering and Management, 117(4), pp. 773-790. ISSN 0733-9364

Riley, M J (2001) Re-engineering the construction procurement process. PhD thesis, University of Southampton, UK.

Riley, S (2022) Assessing barriers to green infrastructure for flood mitigation. PhD thesis, University of Hawai'i at Manoa, USA.

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.

Riza, R (2014) Integration of wind catchers in modern residential buildings in the uae as a means of providing thermal comfort. PhD thesis, British University in Dubai, UAE.

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Rob Danie Raijmakers, S V and Remko Cremers, A D (2023) Two paths colliding at one road: Integrating split municipal climate action agendas. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Roberts, C; Edwards, D J; Sing, M C P and Aigbavboa, C (2023) Post-occupancy evaluation: Process delineation and implementation trends in the UK higher education sector. Architectural Engineering and Design Management, 19(2), pp. 125-147. ISSN 1745-2007

Roberts, C J; Edwards, D J; Hosseini, M R; Mateo-Garcia, M and Owusu-Manu, D G (2019) Post-occupancy evaluation: A review of literature. Engineering, Construction and Architectural Management, 26(9), pp. 2084-2106. ISSN 0969-9988

Roberts, J (1987) The business roundtable construction industry cost effectiveness task force. Construction Management and Economics, 5(2), pp. 95-100. ISSN 01446193

Robertson, B (2020) On-site installation flexibility for disruption management in modular off-site construction systems. PhD thesis, University of Cambridge, UK.

Robertson, C M (2018) Migrant worker perceptions of life, work, health and safety in Kuwait: A construction industry perspective. PhD thesis, Auckland University of Technology, New Zealand.

Robin, R O A (2023) Building information modelling (BIM) performance evaluation model in the Malaysian construction industry. PhD thesis, Universiti Tun Hussein Onn, Malaysia.

Robinson, H S; Carrillo, P M; Anumba, C J and A-Ghassani, A M (2005) Review and implementation of performance management models in construction engineering organizations. Construction Innovation, 5(4), pp. 203-217. ISSN 1471-4175

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2001) Linking knowledge management strategy to business performance in construction organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2004) Developing a business case for knowledge management: The IMPaKT approach. Construction Management and Economics, 22(7), pp. 733-743. ISSN 01446193

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2005) Knowledge management practices in large construction organisations. Engineering, Construction and Architectural Management, 12(5), pp. 431-445. ISSN 0969-9988

Robinson, W; Chan, P and Lau, T (2015) How do technological niches emerge? A case analysis of servitization in construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Robinson, W G; Chan, P W and Lau, T (2016) Sensors and sensibility: Examining the role of technological features in servitizing construction towards greater sustainability. Construction Management and Economics, 34(1), pp. 4-20. ISSN 01446193

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Rockett, P and Hathway, E A (2017) Model-predictive control for non-domestic buildings: A critical review and prospects. Building Research & Information, 45(5), pp. 556-571. ISSN 0961-3218

Rodger, D; Callaghan, N and Thomson, C (2018) Are retrofitted social houses sufficiently reflecting the holistic health and wellbeing requirements of older people? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Rodger, D; Callaghan, N and Thomson, C S (2020) The loosening control of social housing: Creating a holistic retrofit system for an ageing population through the lens of governmentality. Construction Management and Economics, 38(12), pp. 1101-1121. ISSN 01446193

Rodrigo, N; Omrany, H; Chang, R and Zuo, J (2024) Leveraging digital technologies for circular economy in construction industry: A way forward. Smart and Sustainable Built Environment, 13(1), pp. 85-116. ISSN 2046-6099

Rodriguez Diaz, C R (2012) Development of a framework and a rating system tool, for sustainable infrastructure certification in developing countries, case study for Ecuador. PhD thesis, University of Florida, USA.

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364

Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.

Rokooei, S (2016) Project management education research excellence within cyber-infrastructure environment. PhD thesis, University of Nebraska - Lincoln, USA.

Rokooei, S; Shojaei, A and Ly, R (2025) Faculty development program to enhance teaching quality in construction. International Journal of Construction Management, 25(1), pp. 89-98. ISSN 1562-3599

Ronny, R and Ptak, J S (2012) Localised solutions developed to suit South African challenges. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 5-11. ISSN 17514312

Rooke, J A and Kagioglou, M (2007) Criteria for evaluating research: The unique adequacy requirement of methods. Construction Management and Economics, 25(9), pp. 979-987. ISSN 1466433X

Rooke, J A; Koskela, L and Seymour, D (2007) Producing things or production flows? Ontological assumptions in the thinking of managers and professionals in construction. Construction Management and Economics, 25(10), pp. 1077-1085. ISSN 1466433X

Roosli, R and O'Keefe, P (2013) Post-disaster housing and management in Malaysia: A literature review. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 168-181. ISSN 1759-5916

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193

Rosayuru, H D R R; Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(5), pp. 769-783. ISSN 1562-3599

Rose, Colin (2019) Systems for reuse, repurposing and upcycling of existing building components. PhD thesis, University College London, UK.

Rosenbaum, S; Toledo, M and González, V (2014) Improving environmental and production performance in construction projects using value-stream mapping: Case study. Journal of Construction Engineering and Management, 140(2): 04013045, ISSN 0733-9364

Rosenfeld, Y (1994) Innovative construction methods. Construction Management and Economics, 12(6), pp. 521-541. ISSN 01446193

Ross, N; Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: Lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(5), pp. 433-449. ISSN 1466433X

Rostami, A (2015) Risk management in small and medium enterprises in the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Rostami, A; Khodadadyan, A; Sommerville, J and Wong, I L (2015) Training provisions for risk management in SMEs in the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Rostami, A; Sommerville, J; Wong, I L and Lee, C (2015) Risk management implementation in small and medium enterprises in the UK construction industry. Engineering, Construction and Architectural Management, 22(1), pp. 91-107. ISSN 0969-9988

Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988

Rotimi, E O O; Rotimi, F E; Silva, C W C and Aigwi, I E (2024) BIM knowledge transfer in construction industry: A partial least square analysis. Journal of Engineering, Design and Technology, 22(4), pp. 1393-1411. ISSN 1726-0531

Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029

Rotimi, J O B and Wilkinson, S (2014) Improving environmental management legislation to facilitate post-disaster reconstruction. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 23-37. ISSN 1759-5916

Roumboutsos, A and Macário, R M R (2013) Public private partnerships in transport: Theory and practice. Built Environment Project and Asset Management, 3(2), pp. 160-164. ISSN 2044-124X

Rounds, J L and Chi, N Y (1985) Total quality management for construction. Journal of Construction Engineering and Management, 111(2), pp. 117-128. ISSN 0733-9364

Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.

Rousseau, D and Chen, Y (2001) Sustainability options for China's residential building sector. Building Research & Information, 29(4), pp. 293-301. ISSN 0961-3218

Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364

Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(3), pp. 227-238. ISSN 1466433X

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.

Ruge, G and McCormack, C (2017) Building and construction students' skills development for employability: reframing assessment for learning in discipline-specific contexts. Architectural Engineering and Design Management, 13(5), pp. 365-383. ISSN 1745-2007

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Ruikar, K (2006) Business process implications of e-commerce in construction organisations. EngD thesis, Loughborough University, UK.

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Keijzer, E; Volker, L and Dorée, A (2024) The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Construction Management and Economics, 42(10), pp. 902-925. ISSN 01446193

Ruiz, A; Vinke-de Kruijf, J; Santos, J; Volker, L and Dorée, A (2023) Sustainable innovation processes in the asphalt paving sector: A system innovation approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364

Russo, J G (1981) Construction marketing in the USA: A viable system for success and control. Construction Papers, 1(2), pp. 29-35. ISSN 0144-8587

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Ruwanpura, U D R E; Perera, B A K S and Ranadewa, T (2025) Lean tools used in administrative processes across sectors: a systematic review and insights for the construction industry. Construction Innovation, 25(4), pp. 1287-1314. ISSN 1471-4175

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(6), pp. 435-445. ISSN 0961-3218

Rwelamila, P D (2012) Research contribution to innovation in infrastructure development in Africa: Assessing the status. Journal of Construction in Developing Countries, 17(S1), pp. 43-56. ISSN 1823-6499

Rwelamila, P D and Phungula, M G (2009) Managing the complexity of public private partnerships initiatives: How mature are South African public institutions? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Rwelamila, P M D and Purushottam, N (2015) Green campus initiatives as projects: Can creating conducive internal university project environment a key to success? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ryall, P (2012) Implementation and the effectiveness of quality management systems within the construction industry and organisational change management in this process. PhD thesis, University of South Wales, UK.

Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304

Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193

Ríos-Fernández, J C (2022) Thermal performance assessment of cool roofs on supermarkets through case analysis in 13 cities. Engineering, Construction and Architectural Management, 29(2), pp. 739-754. ISSN 0969-9988

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Saad, N M (2016) The influence of safety culture on safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.

Saad, S; Alaloul, W S; Ammad, S and Qureshi, A H (2022) A qualitative conceptual framework to tackle skill shortages in offsite construction industry: A scientometric approach. Engineering, Construction and Architectural Management, 29(10), pp. 3917-3947. ISSN 0969-9988

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Sabet, P; Jonescu, E; Chong, H Y and Ramanyaka, C E (2025) Interacting possibilities between building information modelling and off-site manufacturing for performance improvement. Construction Economics and Building, 25(1), pp. 221-243. ISSN 2204-9029

Sabri, B K M; Ujang, N; Arif, A M M and Aripin, S (2017) Measures in curbing poor compliance to building control regulation among renovated terrace houses. International Journal of Law in the Built Environment, 9(3), pp. 256-271. ISSN 1756-1450

Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.

Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.

Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364

Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X

Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Sadrinooshabadi, S; Taheri, A; Yitmen, I and Jongeling, R (2021) Requirement management in a life cycle perspective based on ISO 19650-1 and coclass as the new classification system in Sweden. Engineering, Construction and Architectural Management, 28(9), pp. 2736-2753. ISSN 0969-9988

Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.

Saghatforoush, E; Hosseini Nourzad, S H; Zareravasan, A and Jadidoleslami, S (2023) Enablers for BIM application in architectural design: A robust exploratory factor analysis approach. International Journal of Construction Management, 23(9), pp. 1549-1559. ISSN 1562-3599

Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.

Said, H (2015) Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12): 04015045, ISSN 0733-9364

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Saidi, K (2002) Possible applications of handheld computers to quantity surveying. PhD thesis, University of Texas at Austin, USA.

Saied al Surf, M; Trigunarsyah, B and Susilawati, C (2013) Saudi Arabia's sustainable housing limitations: The experts' views. Smart and Sustainable Built Environment, 2(3), pp. 251-271. ISSN 2046-6099

Saifi, S and Anandakumar, R M (2025) Web-based visualization and rendering of aerial lidar point cloud for urban flood simulation. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 260-274. ISSN 1759-5908

Saini, M; Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(1), pp. 15-33. ISSN 1471-4175

Saka, A B and Chan, D W M (2023) BIM divide: An international comparative analysis of perceived barriers to implementation of BIM in the construction industry. Journal of Engineering, Design and Technology, 21(5), pp. 1604-1632. ISSN 1726-0531

Saka, A B; Chan, D W M and Ajayi, S O (2024) Institutional isomorphism and adoption of building information modelling (BIM) in small and medium-sized enterprises (SMEs) of the Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 179-199. ISSN 0969-9988

Sakhakarmi, S; Park, J and Cho, C (2019) Enhanced machine learning classification accuracy for scaffolding safety using increased features. Journal of Construction Engineering and Management, 145(2): 04018133, ISSN 0733-9364

Salama, M and Hana, A R (2010) Green buildings and sustainable construction in the United Arab Emirates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Salama M, A T (2013) Imposing green building regulations in Dubai. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salama M, H A R (2013) UAE green building strategic model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.

Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364

Saleem, M; Elshami, M M and Najjar, M (2017) Development, testing, and implementation strategy of a translucent concrete-based smart lane separator for increased traffic safety. Journal of Construction Engineering and Management, 143(5): 04016129, ISSN 0733-9364

Saleh, Nour M M (2025) Post-disaster management in housing reconstruction. DEng thesis, Technische Universitaet Berlin, Germany.

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364

Salih, A (2020) Project management information system introduction: Challenges and remedies in a construction context. PhD thesis, University of Liverpool, UK.

Salih, F; Eissa, R and El-Adaway, I H (2024) Data-driven analysis of progressive design build in water and wastewater infrastructure projects. Journal of Construction Engineering and Management, 150(1): 04023149, ISSN 0733-9364

Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364

Salman, A and Ahmad, W (2025) Implementation of augmented reality and mixed reality applications for smart facilities management: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 254-275. ISSN 2046-6099

Salman, A F M; Skibniewski, M J and Basha, I (2007) BOT viability model for large-scale infrastructure projects. Journal of Construction Engineering and Management, 133(1), pp. 50-63. ISSN 0733-9364

Salman, S H (1991) Planning and control in the small business: Case studies from construction industry. PhD thesis, Swansea University, UK.

Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.

Salvaraji, L.; Toha, H. R.; Mohd Aris, N.; Hanafi, N. S.; Kumareswaran, S.; Abd Razak, M. F. and Ibrahim, M. F. (2026) A community-based disaster risk management framework for chemical emergency preparedness in Johor, Malaysia. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 389-405. ISSN 1759-5908

Sam, Mahya (2023) Exploring the relationship between human-robot collaboration (HRC) and the resilience of construction work processes. PhD thesis, University of Florida, USA.

Samarakkody, A and Perera, B A K S (2023) Application of soft landings concept in Sri Lanka to narrow the building performance gap, enablers and barriers. Smart and Sustainable Built Environment, 12(1), pp. 156-180. ISSN 2046-6099

Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531

Samasoni, J C (2017) Evaluating the feasibility of implementing a risk-based inspection scheme by building consent authorities in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Samman, R A and Graham, I (2007) The six sigma project management strategy. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Sammour, F; Xu, J; Wang, X; Hu, M and Zhang, Z (2026) Responsible AI in construction safety: Systematic evaluation of large language models and prompt engineering. Journal of Construction Engineering and Management, 152(1): 04025217, ISSN 0733-9364

Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.

Sanboskani, H (2024) The implementation of integrated delivery and management in large government-owned engineering construction projects. PhD thesis, Arizona State University, USA.

Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364

Sandhaus, G (1998) Neural networks for cost estimating in project management. PhD thesis, Swansea University, UK.

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sankaran, B and O'Brien, W J (2018) Bayesian second-order factor model for maturity assessment of CIM technologies and practices at highway agencies. Journal of Construction Engineering and Management, 144(4): 04018015, ISSN 0733-9364

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sanni, A O (2016) Factors determining the success of public private partnership projects in Nigeria. Construction Economics and Building, 16(2), pp. 42-55. ISSN 2204-9029

Sanseverino, Anna (2023) Application of BIM methodology for structural inspection and maintenance eco-systems: Semi-automated monitoring procedures to implement different kinds of data into enriched cooperative systems. PhD thesis, Università degli Studi di Salerno, Italy.

Santhosh, C (2019) Impact of determinants on early internationalization: An exploratory study of Indian engineering SMEs. Journal of Engineering, Design and Technology, 17(5), pp. 1018-1034. ISSN 1726-0531

Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.

Sanvido, V E and Paulson, B C (1992) Site-level construction information system. Journal of Construction Engineering and Management, 118(4), pp. 701-715. ISSN 0733-9364

Saoud, E A B (1996) Expert systems for management training in the construction industry. PhD thesis, University of Edinburgh, UK.

Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499

Saqib, G; Hassan, M U; Zubair, M U and Choudhry, R M (2023) Investigating the acceptance of an electronic incident reporting system in the construction industry: An application of the technology acceptance model. Journal of Construction Engineering and Management, 149(5): 04023021, ISSN 0733-9364

Sarhan, J; Xia, B; Fawzia, S; Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(2), pp. 246-272. ISSN 1471-4175

Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029

Sarhan, J G; Xia, B; Fawzia, S; Karim, A; Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(1), pp. 1-23. ISSN 0969-9988

Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.

Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(1), pp. 23-35. ISSN 2204-9029

Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218

Sari, K (2019) A framework for lean implementation in infrastructure construction in the UK. PhD thesis, University of Salford, UK.

Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599

Sarkar, A; Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(1), pp. 51-58. ISSN 0961-3218

Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599

Sarosa, W (2001) Infrastructure -based community development: Theory and practice of sustainable development at the local level with a participant-observation of three pilot projects in rural villages of Java, Indonesia. PhD thesis, University of California, Berkeley, USA.

Sarpin, Norliana (2015) Developing people capabilities for the promotion of sustainability in facility management practices. PhD thesis, Queensland University of Technology, Australia.

Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175

Sarvari, H; Chan, D W M; Banaitiene, N; Norhazilan Md, N and Beer, M (2021) Barriers to development of private sector investment in water and sewage industry. Built Environment Project and Asset Management, 11(1), pp. 52-70. ISSN 2044-124X

Sarvari, H; Parsa, A; Olawumi, T O; Chan, D W M; Rashidi, A and Beer, M (2024) Perceived barriers to implementing building information modeling in Iranian small and medium-sized enterprises (SMEs): A Delphi survey of construction experts. Architectural Engineering and Design Management, 20(3), pp. 673-693. ISSN 1745-2007

Sathkumara, T M; Waidyasekara, A S and Victar, H C (2025) The feasibility of transparent solar panels for high-rise building façade in Sri Lanka. Construction Innovation, 25(4), pp. 1127-1152. ISSN 1471-4175

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Sauni, M; Luomala, H; Kolisoja, P and Vaismaa, K (2022) Framework for implementing track deterioration analytics into railway asset management. Built Environment Project and Asset Management, 12(6), pp. 871-886. ISSN 2044-124X

Savaşkan, M O and Özener, O Ö (2023) H-BIM applications for vernacular architecture: A historic rural house case study in bursa, Turkey. Engineering, Construction and Architectural Management, 30(9), pp. 3997-4017. ISSN 0969-9988

Savva, C (2023) Lessons that can be learnt using action research strategies within TfL. PhD thesis, University of Liverpool, UK.

Sayce, S; Ellison, L and Parnell, P (2007) Understanding investment drivers for UK sustainable property. Building Research & Information, 35(6), pp. 629-643. ISSN 0961-3218

Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X

Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988

Schaefer, K K (2024) Community insurance as a flood management element in California. PhD thesis, University of California, Davis, USA.

Schafer, D W (2014) A conceptual framework for resilience engineering in construction safety. PhD thesis, Michigan State University, USA.

Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.

Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.

Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Schönbeck, P; Löfsjögård, M and Ansell, A (2022) Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), pp. 2405-2412. ISSN 1562-3599

Scott, D (1997) An intelligent approach to the engineering management of housing subsidence cases. PhD thesis, Teesside University, UK.

Scully, R E M (2012) An implementation roadmap for knowledge sharing for small and micro companies (SMC) in Ireland. PhD thesis, University of Salford, UK.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988

Sear, E A; Hartland, T G; Abdel-Wahab, M S and Miller, C G (2008) Implementing customer relationship management at constructionskills. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sebastian, R (2004) Critical appraisal of design management in architecture. Journal of Construction Research, 5(2), pp. 255-266. ISSN 1609-9451

Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), pp. 176-187. ISSN 0969-9988

Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175

Sebastian, R and Van Berlo, L (2010) Tool for benchmarking BIM performance of design, engineering and construction firms in the Netherlands. Architectural Engineering and Design Management, 6(4), pp. 254-263. ISSN 1745-2007

Seboni, L and Tutesigensi, A (2014) Allocating project managers to projects in a multi-project environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499

Selberherr, J (2015) Sustainable life cycle offers through cooperation. Smart and Sustainable Built Environment, 4(1), pp. 4-24. ISSN 2046-6099

Selvam, G.; Kamalanandhini, M.; Velpandian, M.; Hariharan, R.; Mohanakrishna, S. and Thirumurugan, V. (2026) Integrated statutory waste management framework for the sustainable built environment. Engineering, Construction and Architectural Management, 33(5), pp. 4078-4097. ISSN 0969-9988

Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988

Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving LEED certification in a green building project. Built Environment Project and Asset Management, 5(2), pp. 170-183. ISSN 2044-124X

Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499

Senaratne, S and Kuruwita, S (2010) Resistance to organisational change: A case study in Sri Lankan construction organisation. International Journal of Construction Management, 10(1), pp. 61-73. ISSN 1562-3599

Senawi, A and Osmadi, A (2024) Property tax reassessment among local authorities: The implementation and its key challenges. Journal of Financial Management of Property and Construction, 29(1), pp. 152-167. ISSN 1366-4387

Seng, Hansen (2020) A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia. PhD thesis, RMIT University, Australia.

Sengupta Dasgupta, P (2013) Interventions to reduce ergonomic exposures during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.

Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364

Seo, J (1998) Graphical interface design for equipment control in unstructured environments. PhD thesis, University of Texas at Austin, USA.

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Sepasgozar, S M E; Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(2), pp. 158-176. ISSN 0969-9988

Sepasgozar, Samad (2015) Technology adoption in construction. PhD thesis, University of New South Wales, Australia.

Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.

Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.

Sergeeva, N and Radosavljevic, M (2010) Radicality of ideas: Challenging radical versus incremental changes in construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sergeeva, N and Radosavljevic, M (2012) Idea contribution in construction: In search for evidence of the interface between idea generation and its implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Setiawan, H (2015) Corporate entrepreneurship capability model for contractors. PhD thesis, Heriot-Watt University, UK.

Setiawan, H and Erdogan, B (2020) Key factors for successful corporate entrepreneurship: A study of Indonesian contractors. International Journal of Construction Management, 20(3), pp. 252-268. ISSN 1562-3599

Setiawan, H; Erdogan, B and Ogunlana, S O (2012) Corporate entrepreneurship for contracting companies: The current issue. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Seydel, J F (1991) Development and implementation of multiple criteria approaches to optimization in construction bidding. PhD thesis, Texas A&M University, USA.

Seyed-Alangi, F; Parchami-Jalal, M and Noorzai, E (2026) The challenges of risk and reward sharing in the implementation of integrated project delivery contracts in the Iranian construction industry. International Journal of Construction Education and Research, 22(1), pp. 72-95. ISSN 1557-8771

Seyman Guray, T and Kismet, B (2023) VR and ar in construction management research: Bibliometric and descriptive analyses. Smart and Sustainable Built Environment, 12(3), pp. 635-659. ISSN 2046-6099

Seyman-Guray, T and Kismet, B (2024) Drivers and barriers on implementing XR technologies in the construction industry in Turkey. International Journal of Construction Management, 24(9), pp. 959-974. ISSN 1562-3599

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sha, K (2019) Incentive strategies for construction project manager: A common agency perspective. Construction Management and Economics, 37(8), pp. 461-471. ISSN 01446193

Shaaban, S M (2004) A user-centric approach for the development and evaluation of a visual interface to online information in the construction industry. PhD thesis, University of Newcastle upon Tyne, UK.

Shabha, G; Barber, F and Laycock, P (2023) A qualitative assessment of the impact of smart homes and environmentally beneficial technologies on the UK 2050 net-zero carbon emission target. Smart and Sustainable Built Environment, 12(2), pp. 341-360. ISSN 2046-6099

Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.

Shah, M A; Kumar, S; Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(2), pp. 250-273. ISSN 1366-4387

Shah, Mohammad Aminur Rahman A R (2017) Decision support framework for sustainability assessment of flood mitigation projects. PhD thesis, Griffith University, Australia.

Shah R, W S R A (2013) Challenges and solutions for management of FRP usage in the UK rail sector. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shahruddin, S; Zairul, M and Haron, A T (2021) Redefining the territory and competency of architectural practitioners within a BIM-based environment: A systematic review. Architectural Engineering and Design Management, 17(5-6), pp. 376-410. ISSN 1745-2007

Shaked, O and Warszawski, A (1995) Knowledge-based system for construction planning of high-rise buildings. Journal of Construction Engineering and Management, 121(2), pp. 172-182. ISSN 0733-9364

Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364

Shams, A. and Marzouk, M. (2026) Leveraging BIM and time-cost-safety trade-off analysis for optimized decisions in construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5180-5209. ISSN 0969-9988

Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X

Shang, G; Low, S P and Lim, X Y V (2023) Prospects, drivers of and barriers to artificial intelligence adoption in project management. Built Environment Project and Asset Management, 13(5), pp. 629-645. ISSN 2044-124X

Shang, H; Anumba, C J; Bouchlaghem, D M; Miles, J C; Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(4), pp. 391-409. ISSN 0969-9988

Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.

Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364

Sharar, M; Agyekum, K; Manu, P; Che Ibrahim, C K I; Mahamadu, A M; Antwi-Afari, M F and Danso, F O (2024) Design for safety in construction: A study of design professionals in Kuwait. International Journal of Building Pathology and Adaptation, 42(4), pp. 596-617. ISSN 23984708

Sharma, N and Laishram, B (2025) Understanding the relevance and impact of the cost of quality in the construction industry: A systematic literature review using prisma. Construction Innovation, 25(6), pp. 1707-1726. ISSN 1471-4175

Sharma, H; Sohani, N and Yadav, A (2023) Structural modeling of lean supply chain enablers: A hybrid AHP and ISM-MICMAC based approach. Journal of Engineering, Design and Technology, 21(6), pp. 1658-1689. ISSN 1726-0531

Sharma, N and Laishram, B (2025) Unveiling the path to the cost of quality implementation in the construction industry: Multivariate analysis. Journal of Construction Engineering and Management, 151(2): 04024202, ISSN 0733-9364

Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment. PhD thesis, University of Alberta, Canada.

Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364

Sharma, V; Caldas, C H and Mulva, S P (2021) Development of metrics and an external benchmarking program for healthcare facilities. International Journal of Construction Management, 21(6), pp. 615-630. ISSN 1562-3599

Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175

Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.

Shaw, C (2023) Understanding the need for a comparative framework when selecting an appropriate building technology for sustainable human settlements in South Africa. PhD thesis, University of Pretoria, South Africa.

Shaw, C; de Andrade Pereira, F; Farghaly, K; Hoare, C; Hartmann, T and O'Donnell, J (2024) Life cycle cost analysis at scale: a reference architecture-based approach. Built Environment Project and Asset Management, 14(5), pp. 713-733. ISSN 2044-124X

Sheffer, D A (2011) Innovation in modular industries: Implementing energy-efficient innovations in us buildings. PhD thesis, Stanford University, USA.

Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.

Shehu, Z (2008) The framework for effective adoption and implementation of programme management within the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175

Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988

Shen, Z; Wang, G; Ali, A; Wei, X; Zang, X and Ye, Y (2025) Study on the cooperation model of infrastructure projects in the third-party market of the belt and road. International Journal of Construction Management, 25(13), pp. 1609-1625. ISSN 1562-3599

Shen, Q (1993) A knowledge based structure for implementing Value Management in the design of office buildings. PhD thesis, University of Salford, UK.

Shen, X (2017) Location-based leading indicators in BIM for construction safety. PhD thesis, University of Alabama, USA.

Shepherd, S (2006) Evaluation of an engineering intervention to prevent silica exposures in construction. ScD thesis, University of Massachusetts Lowell, USA.

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Sherif, K F (2010) Total quality management and construction project management in Libya. PhD thesis, University of Plymouth, UK.

Sheriff, A (2011) Improvements in the effectiveness of information management in construction organisations. EngD thesis, Loughborough University, UK.

Sheriff, A; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2013) Seven lessons for effective information management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 205-211. ISSN 17514312

Sheth, A and Sarkar, D (2020) Socio-economic feasibility analysis for sustainable mass rapid transit project in Western India. Journal of Construction in Developing Countries, 25(2), pp. 129-151. ISSN 1823-6499

Sheth, A Z (2011) A refurbishment framework with an emphasis on energy consumption of existing healthcare facilities. EngD thesis, Loughborough University, UK.

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Shi, J J and Halpin, D W (2003) Enterprise resource planning for construction business management. Journal of Construction Engineering and Management, 129(2), pp. 214-221. ISSN 0733-9364

Shi, Q; Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: A Chinese case study. Construction Management and Economics, 30(6), pp. 425-440. ISSN 1466433X

Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.

Shi-Dong, L and Zhao-Dong, X (2024) Logical object structure and system implementation for BIM database in civil infrastructures. Architectural Engineering and Design Management, 20(3), pp. 448-470. ISSN 1745-2007

Shikweni, S (2018) Talent management in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Shirzad Talatappeh, S and Lakzi, A (2020) Developing a model for investigating the impact of cloud-based systems on green supply chain management. Journal of Engineering, Design and Technology, 18(4), pp. 741-760. ISSN 1726-0531

Shiue, I (2016) Future urban design strategies for health and wellbeing: Proposal of DIDID action plan and design mapping. Journal of Engineering, Design and Technology, 14(1), pp. 104-114.

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM). PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shohet, I M (2003) Building evaluation methodology for setting maintenance priorities in hospital buildings. Construction Management and Economics, 21(7), pp. 681-692. ISSN 01446193

Shohet, I M; Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(2), pp. 219-228. ISSN 01446193

Shohet, I M; Wei, H H; Skibniewski, M J; Tak, B and Revivi, M (2019) Integrated communication, control, and command of construction safety and quality. Journal of Construction Engineering and Management, 145(9): 04019051, ISSN 0733-9364

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Enablers for the adoption and use of BIM in main contractor companies in the UK. Engineering, Construction and Architectural Management, 30(4), pp. 1726-1745. ISSN 0969-9988

Shojaei, R S; Oti-Sarpong, K and Burgess, G (2023) Leading UK construction companies’ strategies to tackle BIM training and skills challenges. International Journal of Construction Education and Research, 19(4), pp. 383-404. ISSN 1557-8771

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Shokri, S; Ahn, S; Lee, S; Haas, C T and Haas, R C G (2016) Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2): 04015070, ISSN 0733-9364

Shokri-Ghasabeh, M and Chileshe, N (2014) Knowledge management: Barriers to capturing lessons learned from Australian construction contractors' perspectives. Construction Innovation, 14(1), pp. 108-134. ISSN 1471-4175

Shoniwa, Kuda John (2024) The use of integrated project delivery (IPD) to reduce construction claims in South African mining capital projects. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Shook, S R (1997) Innovation and the United States residential construction industry: An integrated model of determinants of firm innovativeness for engineered wood products. PhD thesis, University of Washington, USA.

Shooshtarian, S; Caldera, S; Maqsood, T; Ryley, T and Khalfan, M (2022) An investigation into challenges and opportunities in the Australian construction and demolition waste management system. Engineering, Construction and Architectural Management, 29(10), pp. 4313-4330. ISSN 0969-9988

Short, C A and Al-Maiyah, S (2009) Design strategy for low-energy ventilation and cooling of hospitals. Building Research & Information, 37(3), pp. 264-292. ISSN 0961-3218

Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218

Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218

Shrahily, R; Medjdoub, B; Klalib, H; Chalal, M and Alwetaishi, M (2022) Managing construction site communication using the responsibility assignment matrix (RAM) system. International Journal of Construction Management, 22(15), pp. 2966-2986. ISSN 1562-3599

Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364

Shrimant, P B (2013) Implementation of total quality management: An exploratory study of Indian construction industry. PhD thesis, Swami Ramanand Teerth Marathwada University, India.

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.

Shukor, A S A; Mohammad, M F; Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shukra, Z A and Zhou, Y (2021) Holistic green BIM: A scientometrics and mixed review. Engineering, Construction and Architectural Management, 28(9), pp. 2273-2299. ISSN 0969-9988

Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531

Sica, G (2014) Groundborne vibrations caused by railway construction and operation in buildings: Design, implementation and analysis of measurement for assessment of human exposure. PhD thesis, University of Salford, UK.

Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.

Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.

Siebelink, S; Voordijk, H J T; Endedijk, M D and Adriaanse, A M (2025) Exploring strategies for managing maturity variations among project partners: From underperformance and controlling weak links to stretching capabilities. Construction Management and Economics, 43(4), pp. 243-261. ISSN 0144-6193

Siebelink, S; Voordijk, J T and Adriaanse, A (2018) Developing and testing a tool to evaluate BIM maturity: Sectoral analysis in the Dutch construction industry. Journal of Construction Engineering and Management, 144(8): 05018007, ISSN 0733-9364

Siebelink, Sander (2021) Maturities in building information modelling: A multi-level perspective. PhD thesis, University of Twente, Netherlands.

Siemons, J C M M (1992) Occupational safety and health policy implementation: A comparison between Japan and the Netherlands. PhD thesis, University of Twente, Netherlands.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), pp. 37-55. ISSN 1823-6499

Siew, R Y J (2015) Health and safety communication strategy in a Malaysian construction company: A case study. International Journal of Construction Management, 15(4), pp. 310-320. ISSN 1562-3599

Siham, E Y (2024) Towards a 3D property valuation model: Conceptualization and BIM-CIM based data integrability. PhD thesis, Universite de Liege, Belgium.

Silva, A; Neves, L C; Gaspar, P L and de Brito, J (2016) Probabilistic transition of condition: Render facades. Building Research & Information, 44(3), pp. 301-318. ISSN 0961-3218

Silva, E N; Brasil de Brito Mello, L C and Pinto, G O (2023) Challenges for lean construction adoption in the Brazilian industry: A study in construction companies, universities and class organizations. Construction Innovation, 23(5), pp. 1130-1150. ISSN 1471-4175

Silva, Tássia Farssura Lima da (2022) BIM and risk management interface in the design phase: A multi-method approach. PhD thesis, Universidade de São Paulo, Brazil.

Silva, Vanessa Gomes da (2003) Sustainability assessment of office buildings in Brazil: Guidelines and methodological basis. PhD thesis, Universidade de São Paulo, Brazil.

Silverio, A K; Suresh, S; Renukappa, S and Heesom, D (2023) Status of BIM implementation in the Dominican Republic construction industry: an empirical study. Journal of Engineering, Design and Technology, 21(2), pp. 417-441. ISSN 1726-0531

Silverio Fernández, M A (2019) Implementation of smart devices in the construction industry. PhD thesis, University of Wolverhampton, UK.

Silverio Rodriguez, A K (2020) Implementation of building information modelling in the Dominican Republic construction industry. PhD thesis, University of Wolverhampton, UK.

Silverio-Fernandez, M A; Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry: An empirical study in the Dominican Republic. Engineering, Construction and Architectural Management, 26(8), pp. 1625-1640. ISSN 0969-9988

Silverio-Fernández, M A; Renukappa, S and Suresh, S (2021) Strategic framework for implementing smart devices in the construction industry. Construction Innovation, 21(2), pp. 218-243. ISSN 1471-4175

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(2), pp. 113-125. ISSN 0969-9988

Simmonds, D M (2015) Information technology and sustainability: An empirical study of the value of the building automation system. PhD thesis, University of South Florida, USA.

Simon, D; Bellinson, R and Smit, W (2022) Transformational climate action at the city scale: Comparative South–North perspectives. Buildings & Cities, 3(1), pp. 1000-1018. ISSN 2632-6655

Simpeh, E and Smallwood, J (2018) Field diagnosis of challenges and facilitators to the adoption of green building principles in multi-purpose office facilities. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Simpeh, E K; Smallwood, J J; Ahadzie, D K and Mensah, H (2023) Analytical taxonomy of challenges to the implementation of green building projects in South Africa. International Journal of Construction Management, 23(2), pp. 286-296. ISSN 1562-3599

Simpeh, F; Bamfo-Agyei, E and Amoah, C (2022) Barriers to the implementation of COVID-19 safety regulations: Insight from Ghanaian construction sites. Journal of Engineering, Design and Technology, 20(1), pp. 47-65. ISSN 1726-0531

Simukonda, W (2019) Occupational health and safety practices among contractors in Malawi: A generic overview. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 118-124. ISSN 17514304

Simukonda, W and Kamwela, N (2021) The management of theft and vandalism on construction jobsites in the southern region of Malawi. Journal of Construction Business and Management, 5(1), pp. 47-59. ISSN 2521-0165

Sing, M C P; Cao, N; Liu, H J and Choy, Y N (2025) Digitalization in Hong Kong building surveying: Advancements in building plan scrutiny process. Built Environment Project and Asset Management, 15(4), pp. 827-843. ISSN 2044-124X

Singh, A. K.; Mohandes, S. R.; Awuzie, B. O.; Omotayo, T.; Kumar, V. R. P. and Kidd, C. (2026) A roadmap for overcoming barriers to implementation of blockchain-enabled smart contracts in sustainable construction projects. Smart and Sustainable Built Environment, 15(2), pp. 570-596. ISSN 2046-6099

Singh, P K; Saxena, D and Kakade, V (2025) Identification of success clusters using principal component analysis for oil and gas industry. International Journal of Construction Management, 25(14), pp. 1675-1690. ISSN 1562-3599

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(2), pp. 66-80. ISSN 0969-9988

Singh, A; Kumar, V; Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(1), pp. 67-105. ISSN 1471-4175

Singh, A K and Kumar, V (2024) Establishing the relationship between the strategic factors influencing blockchain technology deployment for achieving sdg and esg objectives during infrastructure development: An ism-MICMAC approach. Smart and Sustainable Built Environment, 13(3), pp. 711-736. ISSN 2046-6099

Singh, S (2021) Stakeholder management within BIM implemented projects in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Singh, V (2014) BIM and systemic ICT innovation in AEC: Perceived needs and actor's degrees of freedom. Construction Innovation, 14(3), pp. 292-306. ISSN 1471-4175

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364

Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988

Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988

Siriwardhana, S and Moehler, R (2024) Mastering the skills of construction 4.0: A review of the literature using science mapping. Smart and Sustainable Built Environment, 13(4), pp. 989-1014. ISSN 2046-6099

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Sivam, Alpana (1999) An approach to improved housing delivery in large cities of less developed countries. PhD thesis, University of Melbourne, Australia.

Skea, J (2012) Research and evidence needs for decarbonisation in the built environment: A UK case study. Building Research & Information, 40(4), pp. 432-445. ISSN 0961-3218

Skibniewski, M J (1986) Engineering and economic analysis of robotics application potential in selected construction operations. PhD thesis, Carnegie Mellon University, USA.

Skibniewski, M J (1991) Information management system for new construction technologies. Construction Management and Economics, 9(1), pp. 39-49. ISSN 01446193

Skibniewski, M J and Ghosh, S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. Journal of Construction Engineering and Management, 135(10), pp. 965-978. ISSN 0733-9364

Slater, K R and Robinson, J B (2023) Transformational climate actions by cities. Buildings & Cities, 4(1), pp. 74-82. ISSN 2632-6655

Slater, K R; Ventura, J; Robinson, J B; Fernandez, C; Dutfield, S and King, L (2022) Assessing climate action progress of the city of Toronto. Buildings & Cities, 3(1), pp. 1059-1074. ISSN 2632-6655

Slaughter, E S (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), pp. 226-231. ISSN 0733-9364

Slaughter, E S (2000) Implementation of construction innovations. Building Research & Information, 28(1), pp. 2-17. ISSN 0961-3218

Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.

Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599

Small-Warner, K (2022) Adopting sustainable business models in small island developing states (SIDS): buildings and construction sector. PhD thesis, De Montfort University, UK.

Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Smallwood, J and Allen, C (2023) Practitioners' perceptions of the potential impact of industry 4.0 on construction health and safety. Journal of Engineering, Design and Technology, 21(2), pp. 486-501. ISSN 1726-0531

Smallwood, J J; Allen, C J and Deacon, C H (2020) The role of industry 4.0 in construction occupational health (OH). In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.

Smith, J; Mills, A and Iyer-Raniga, U (2004) Benchmarking the implementation of continuing professional development in the victorian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Smith, S D; Sherratt, F and Oswald, D C (2017) The antecedents and development of unsafety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 59-67. ISSN 17514304

Smith, W N; Smith, J and Bingham, E D (2022) Current state of practice associated with the use of building information modeling (BIM) in the custom home building industry. International Journal of Construction Education and Research, 18(3), pp. 251-269. ISSN 1557-8771

Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218

Smyth, H; Duryan, M and Kusuma, I (2019) Service design for marketing in construction: Tactical implementation in the "business development management". Built Environment Project and Asset Management, 9(1), pp. 87-99. ISSN 2044-124X

Snippert, T; Witteveen, W; Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), pp. 569-586. ISSN 01446193

Soares, Bruno Cesarino (2021) Use of building information modeling to support built environment management. PhD thesis, Universidade Federal de Minas Gerais, Brazil.

Sodangi, M (2021) Overcoming the constraints to the adoption of sustainable civil engineering practices. International Journal of Construction Management, 21(5), pp. 490-507. ISSN 1562-3599

Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: The case of saudi Arabia. Engineering, Construction and Architectural Management, 30(6), pp. 2545-2563. ISSN 0969-9988

Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.

Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.

Soetanto, R; Childs, M; Poh, P; Austin, S and Hao, J (2014) Virtual collaborative learning for building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 25-34. ISSN 17514304

Soetanto, R; Dainty, A R J; Price, A D F and Glass, J (2003) Utilizing socio-technical systems design principles to implement new ICT systems. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988

Sohal, K; Renukappa, S; Suresh, S; Georgakis, P and Stride, N (2025) The uptake of digital twins in delivering infrastructure sector projects. Smart and Sustainable Built Environment, 14(3), pp. 794-809. ISSN 2046-6099

Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.

Solanki, A; Sarkar, D and Shah, D (2024) Evaluation of factors affecting the effective implementation of internet of things and cloud computing in the construction industry through waspas and TOPSIS methods. International Journal of Construction Management, 24(2), pp. 226-239. ISSN 1562-3599

Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.

Soliman-Junior, J; Tzortzopoulos, P and Kagioglou, M (2022) Designers' perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(2), pp. 123-141. ISSN 01446193

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364

Sommerville, J and McCarney, M (2003) Cross-border holdings in the UK construction industry: The influence on micro-enterprises and entrepreneurs. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sompolgrunk, A; Banihashemi, S; Hosseini, M R; Golzad, H and Hajirasouli, A (2023) An integrated model of BIM return on investment for Australian small- and medium-sized enterprises (SMEs). Engineering, Construction and Architectural Management, 30(5), pp. 2048-2074. ISSN 0969-9988

Son, J; O'Brien, W J and Thomas, S R (2022) Recommended practices for effective management of academia-industry collaborative research teams in construction management. Journal of Construction Engineering and Management, 148(8): 04022075, ISSN 0733-9364

Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), pp. 1-18. ISSN 1823-6499

Song, D; Song, J; Yuan, H and Fan, Y (2021) An evolutionary game analysis of user-pay public-private partnership projects. Engineering, Construction and Architectural Management, 28(7), pp. 2042-2062. ISSN 0969-9988

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Song, S (2017) Construction equipment travel path visualization and productivity evaluation. PhD thesis, University of Alabama, USA.

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364

Songer, A D; Hays, B and North, C (2004) Multidimensional visualization of project control data. Construction Innovation, 4(3), pp. 173-190. ISSN 1471-4175

Songer, A D; Ibbs, C W and Napier, T R (1994) Process model for public sector design-build planning. Journal of Construction Engineering and Management, 120(4), pp. 857-874. ISSN 0733-9364

Songer, A D and Molenaar, K R (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), pp. 34-40. ISSN 0733-9364

Sonson, S J (2018) Performance measurement and management within construction firms in Saint Lucia. PhD thesis, University of Salford, UK.

Sorsa, F. T.; Mengistu, D. G. and Tadesse, S. T. (2026) Professionals' performance appraisal practice in construction companies. International Journal of Construction Education and Research, 22(2), pp. 308-330. ISSN 1557-8771

Sospeter, N G and Awuzie, B O (2024) Capital budgeting implementation by public sector construction firms in tanzania's housebuilding industry: An exploratory study. Journal of Construction in Developing Countries, 29(1), pp. 87-109. ISSN 1823-6499

Sospeter, N G; Rwelamila, P D and Gimbi, J (2020) Critical success factors for managing post-disaster reconstruction projects: The case of Angola. Construction Economics and Building, 20(3), pp. 37-55. ISSN 2204-9029

Sossah, J Y; Osei-Poku, G and Dorhetso, S N (2026) Exploring the feasibility of adopting autonomous drones for construction progress monitoring in Ghana. International Journal of Construction Management, 26(3), pp. 412-427. ISSN 1562-3599

Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

Souza, Fernando da Silva (2021) Reinsertion of construction and demolition waste into the production chain of civil construction in Rio Branco, Acre. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.

Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007

Souza, Roberto de (1997) Methodology for development and implementation of quality management systems in small and medium size building companies. PhD thesis, Universidade de São Paulo, Brazil.

Spearing, L A; Bakchan, A; Hamlet, L C; Stephens, K K; Kaminsky, J A and Faust, K M (2022) Comparing qualitative analysis techniques for construction engineering and management research: The case of arctic water infrastructure. Journal of Construction Engineering and Management, 148(7): 04022058, ISSN 0733-9364

Spence, R (2004) Risk and regulation: Can improved government action reduce the impacts of natural disasters? Building Research & Information, 32(5), pp. 391-402. ISSN 0961-3218

Spentzou, E; Cook, M J and Emmitt, S (2022) Low-energy cooling and ventilation refurbishments for buildings in a mediterranean climate. Architectural Engineering and Design Management, 18(4), pp. 473-494. ISSN 1745-2007

Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029

Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218

Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Srivastava, M (2020) Cooperative learning in design studios: A pedagogy for net-positive performance. Buildings & Cities, 1(1), pp. 594-609. ISSN 2632-6655

Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.

Ssenyange, K and Kudakwashe, C (2023) The impact of leadership styles on government construction project success: A structural equation modeling approach. Journal of Construction Business and Management, 6(2), pp. 11-26. ISSN 2521-0165

Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.

Stamatiou, D R I; Kirytopoulos, K A; Ponis, S T; Gayialis, S and Tatsiopoulos, I (2019) A process reference model for claims management in construction supply chains: The contractors' perspective. International Journal of Construction Management, 19(5), pp. 382-400. ISSN 1562-3599

Stanitsa, A; Hallett, S H and Jude, S (2024) The challenges of implementing evidence-based strategies to inform building and urban design decisions: A view from current practice. Journal of Engineering, Design and Technology, 22(4), pp. 1099-1118. ISSN 1726-0531

Stanitsas, M and Kirytopoulos, K (2022) Underlying factors for successful project management to construct sustainable built assets. Built Environment Project and Asset Management, 12(2), pp. 129-146. ISSN 2044-124X

Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029

Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.

Stein, M (2012) Decision making with implementation dependent feedback. PhD thesis, National University of Singapore, Singapore.

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Stewart, R A and Mohamed, S (2001) Utilizing the balanced scorecard for IT/IS performance evaluation in construction. Construction Innovation, 1(3), pp. 147-163. ISSN 1471-4175

Stewart, R A; Mohamed, S and Marosszeky, M (2004) An empirical investigation into the link between information technology implementation barriers and coping strategies in the Australian construction industry. Construction Innovation, 4(3), pp. 155-171. ISSN 1471-4175

Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193

Stopforth, R; Proctor-Parker, C and Davrajh, S (2019) Analysis of a low-cost anthropomorphic sensory platform for the world first minibus test. Journal of Engineering, Design and Technology, 17(2), pp. 434-455. ISSN 1726-0531

Straub, A (2002) Strategic technical management of housing stock: Lessons from Dutch housing associations. Building Research & Information, 30(5), pp. 372-381. ISSN 0961-3218

Straub, M (2014) A new framework for designing and developing cost-effective logistic chains for long items. PhD thesis, University of Gloucestershire, UK.

Sturges, J and Bates, M (2001) Data integration and construction contracting: Barriers to implementation. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.

Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364

Subchan, B R; Tayeh, B A; Widayanto, E and Wiswamitra, K A (2024) Bamboo's evolution as a sustainable material: A comprehensive exploration and practical integration as a structural element in concrete, bridge frameworks, and architectural perspectives. Architectural Engineering and Design Management, 20(6), pp. 1566-1588. ISSN 1745-2007

Subedi, J; Ghimire, R M; Neupane, R P and Amatya, S (2016) Cost difference of buildings in Kathmandu constructed with and without earthquake safer features. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 444-459. ISSN 1759-5916

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Succar, B; Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), pp. 120-142. ISSN 1745-2007

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.

Sufianto, Heru (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach. PhD thesis, University of New South Wales, Australia.

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.

Sujan, S F (2020) A holistic and systemic model of collaboration in the AED industry. PhD thesis, University of Liverpool, UK.

Sujan, Sujesh Francis (2020) A holistic and systemic model of collaboration in the AEC industry. PhD thesis, University of Liverpool, UK.

Suk, Sung Joon (2012) Analysis of project management attributes for the successful delivery of capital facility projects. PhD thesis, University of Texas at Austin, USA.

Sukmara, R B; Ariyaningsih, A and Bachtiar, R (2024) Understanding the stakeholders' interests and role toward climate change adaptation (case study of Indonesia). International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 571-590. ISSN 1759-5916

Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.

Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.

Sulaiman, N F (2002) The development of a dual phase approach to embracing a total quality culture in the Malaysian construction industry. PhD thesis, Glasgow Caledonian University, UK.

Sulaimon, I A; Alaka, H; Olu-Ajayi, R; Ahmad, M; Ajayi, S and Hye, A (2024) Effect of traffic data set on various machine-learning algorithms when forecasting air quality. Journal of Engineering, Design and Technology, 22(3), pp. 1030-1056. ISSN 1726-0531

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Sumanarathna, N; Duodu, B; Memon, S A and Rowlinson, S (2025) Exploring innovation deployment of construction contracting firms through the lens of exploratory–exploitative learning: A Hong Kong case study. Construction Innovation, 25(2), pp. 641-664. ISSN 1471-4175

Sun, Y; Wang, L; Zhao, Y and Tiong, R L K (2026) Appraising institutional quality drivers of private capital participation in public–private partnership by dynamic qualitative comparative analysis. International Journal of Construction Management, 26(6), pp. 1078-1096. ISSN 1562-3599

Sun, C; Xu, H and Jiang, S (2020) Understanding the risk factors of BIM technology implementation in the construction industry: An interpretive structural modeling (ISM) approach. Engineering, Construction and Architectural Management, 27(10), pp. 3289-3308. ISSN 0969-9988

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Sun, W (2000) Designing an object-oriented geographic information system application for integration of building construction project information. PhD thesis, University of Florida, USA.

Sunarharum, Tri Mulyani (2016) Collaborative planning for disaster resilience: The role of community engagement for flood risk management. PhD thesis, Queensland University of Technology, Australia.

Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective. PhD thesis, University of Salford, UK.

Sunding, L (2015) On problems, joint problem solving and change: A human behavioural approach in a construction sector context. PhD thesis, Lund University, Sweden.

Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175

Sundling, R; Blomsterberg, Å and Landin, A (2019) Enabling energy-efficient renovation: the case of vertical extension to buildings. Construction Innovation, 19(1), pp. 2-14. ISSN 1471-4175

Sundquist, V; Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(3), pp. 358-373. ISSN 0969-9988

Sundquist, V; Leto, A D; Gustafsson, M; Johansson, M and Roupé, M (2020) BIM in construction production: Gains and hinders for firms, projects and industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sunindijo, R Y and Zou, P X W (2012) Political skill for developing construction safety climate. Journal of Construction Engineering and Management, 138(5), pp. 605-612. ISSN 0733-9364

Sunindijo, R Y and Zou, P X W (2013) The roles of emotional intelligence, interpersonal skill, and transformational leadership on improving construction safety performance. Construction Economics and Building, 13(3), pp. 97-113. ISSN 2204-9029

Sunindijo, Riza (2012) Skills for developing safety climate in construction projects. PhD thesis, University of New South Wales, Australia.

Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Supriadi, L S R (2014) Implementing business continuity management (bcm) using a knowledge based decision support system (kbdss) for indonesian contractors. PhD thesis, National University of Singapore, Singapore.

Supriadi, L S R and Pheng, L S (2013) Business continuity management for Indonesian contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 31-42. ISSN 17514304

Suprun, E V and Stewart, R A (2015) Construction innovation diffusion in the Russian federation: Barriers, drivers and coping strategies. Construction Innovation, 15(3), pp. 278-312. ISSN 1471-4175

Suraji, A; Sulaiman, K; Mahyuddin, N and Mohamed, O (2006) Rethinking construction safety: An introduction to total safety management. Journal of Construction Research, 7(1), pp. 49-63. ISSN 1609-9451

Suresh, M and Arun Ram Nathan, R B (2020) Readiness for lean procurement in construction projects. Construction Innovation, 20(4), pp. 587-608. ISSN 1471-4175

Suresh, S; Olayinka, R; Chinyio, E and Renukappa, S (2017) Impact of knowledge management on construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 27-43. ISSN 17514304

Suresh, S; Renukappa, S; Abdul-Aziz, A R; Paloo, Y and Jallow, H (2021) Developments in the UK road transport from a smart cities perspective. Engineering, Construction and Architectural Management, 28(4), pp. 845-862. ISSN 0969-9988

Suresh, S; Renukappa, S; Stride, M; Nicola Toor, R and Khan, A (2025) Women in the UK construction industry: Are we still clinging to the "old boys club"? Engineering, Construction and Architectural Management, 32(1), pp. 214-236. ISSN 0969-9988

Sutrisna, M; Pellicer, E; Torres-Machi, C and Picornell, M (2020) Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage. International Journal of Construction Management, 20(1), pp. 1-12. ISSN 1562-3599

Sutrisna, M; Tjia, D and Wu, P (2021) Developing a predictive model of construction industry-university research collaboration. Construction Innovation, 21(4), pp. 761-781. ISSN 1471-4175

Sutterby, P; Wang, X; Li, H X and Ji, Y (2023) The impact of COVID-19 on construction supply chain management: An Australian case study. Engineering, Construction and Architectural Management, 30(8), pp. 3098-3122. ISSN 0969-9988

Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007

Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Swallow, M and Zulu, S L (2025) Investigating the implementation of immersive technologies within on-site construction safety processes. Journal of Engineering, Design and Technology, 23(1), pp. 323-343. ISSN 1726-0531

Swan, W C (2002) Construct IT: An exploratory case study of a knowledge network supported by an intermediary. PhD thesis, University of Salford, UK.

Swaris, N; Halwatura, R U and Amaratunga, D (2024) Policy coherence for resilience in Sri Lanka coherence of climate change adaptation (CCA) disaster risk reduction (DRR) and sustainable development goals (SDGs). International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 450-473. ISSN 1759-5916

Swarnadhipathi, K and Boyd, D (2007) An investigation of construction project performance in Botswana using time predictability. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Sweis, G J; Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(4), pp. 446-459. ISSN 1471-4175

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation. PhD thesis, University of Texas at Austin, USA.

Sylvie, J R; Thomas, S R; Lee, S H; Chapman, R E and Smith, R T (2013) Development and interpretation of the security rating index. Journal of Construction Engineering and Management, 139(2), pp. 185-194. ISSN 0733-9364

Sánchez, F A S; Peláez, G I C and Alís, J C (2017) Integral diagnosis of occupational health and safety management in colombian construction companies. Journal of Construction in Developing Countries, 22(2), pp. 101-116. ISSN 1823-6499

Sørensen, N L; Rasmussen, F N; Øien, T B and Frandsen, A K (2020) Holistic sustainability: Advancing interdisciplinary building design through tools and data in Denmark. Construction Economics and Building, 20(2), pp. 25-44. ISSN 2204-9029

Tabatabaee, S; Ashour, M; Mohandes, S R; Sadeghi, H; Mahdiyar, A; Hosseini, M R and Ismail, S (2022) Deterrents to the adoption of green walls: A hybrid fuzzy-based approach. Engineering, Construction and Architectural Management, 29(9), pp. 3460-3479. ISSN 0969-9988

Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tajani, F; Anelli, D; Di Liddo, F and Morano, P (2024) An innovative methodology for the assessment of the social discount rate: An application to the European states for ensuring the goals of equitable growth. Smart and Sustainable Built Environment, 13(5), pp. 1281-1309. ISSN 2046-6099

Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.

Talla, A and McIlwaine, S (2024) Industry 4.0 and the circular economy: Using design-stage digital technology to reduce construction waste. Smart and Sustainable Built Environment, 13(1), pp. 179-198. ISSN 2046-6099

Tallant, D J (1993) Privatization in a developing economy: Lessons from the Turkish cement industry. PhD thesis, Cornell University, USA.

Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193

Tam, C M; Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: The supervision plan. Construction Management and Economics, 19(4), pp. 393-403. ISSN 01446193

Tam, C M; Tam, V W Y and Zeng, S X (2002) Environmental performance evaluation (EPE) for construction. Building Research & Information, 30(5), pp. 349-361. ISSN 0961-3218

Tam, C M; Tam, V W Y and Zeng, S X (2004) Environmental performance assessment in China and Hong Kong. Building Research & Information, 32(2), pp. 110-118. ISSN 0961-3218

Tam, G C K (2018) Managing project sustainability: a study of the construction industry in Hong Kong. PhD thesis, London South Bank University, UK.

Tam, V W Y; Shen, L Y; Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(2), pp. 149-166. ISSN 1471-4175

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tam, V W Y; Zhang, X; Lee, W W Y and Shen, L Y (2011) Applications of extensive green-roof systems in contributing to sustainable development in densely populated cities: A Hong Kong study. Construction Economics and Building, 11(1), pp. 15-25. ISSN 2204-9029

Tambwe, O.; Aigbavboa, C. and Akinradewo, O. (2026) Influence of data longevity on data management in the South African construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tan, A H (2015) While stands the colosseum: A ground-up exploration of ancient Roman construction techniques using virtual reality. PhD thesis, Ohio State University, USA.

Tan, Loke Mun (1992) The development of group self build housing in Victoria. PhD thesis, University of Melbourne, Australia.

Tan, R R (1996) Information technology and perceived competitive advantage: An empirical study of engineering consulting firms in Taiwan. Construction Management and Economics, 14(3), pp. 227-240. ISSN 01446193

Tan, R R and Chang, D S (1993) The formulation of performance indicators in evaluating the implementation of automation in the construction industry. Construction Management and Economics, 11(5), pp. 398-403. ISSN 01446193

Tan, T; Mills, G; Ma, X and Papadonikolaki, E (2024) Adoption challenges of building information modelling (BIM) and off-site construction (OSC) in healthcare construction: are they fellow sufferers? Engineering, Construction and Architectural Management, 31(13), pp. 390-410. ISSN 0969-9988

Tan, T; Graser, K; Walzer, A N; Ng, M S and Hall, D (2025) Exploring the implementation of digital fabrication in construction: Combining system approaches and a revelatory case study from Switzerland. Journal of Construction Engineering and Management, 151(12): 05025016, ISSN 0733-9364

Tan, Y; Langston, C; Wu, M and Ochoa, J J (2015) Grey forecasting of construction demand in Hong Kong over the next ten years. International Journal of Construction Management, 15(3), pp. 219-228. ISSN 1562-3599

Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka. PhD thesis, University of the West of England, Bristol, UK.

Taneja, P (2013) The flexible port. PhD thesis, Delft University of Technology, Netherlands.

Tang, X.; Zhang, S.; Wang, M. and Sepasgozar, S. M. E. (2026) Understanding the construction digital technology assimilation process in AEC companies: Exploration based on grounded theory and verification of SEM. Journal of Construction Engineering and Management, 152(9): 04026143, ISSN 0733-9364

Tang, Y H and Ogunlana, S O (2003) Selecting superior performance improvement policies. Construction Management and Economics, 21(3), pp. 247-256. ISSN 01446193

Tangrungruengyoo, K (2018) The impact of environmental impact assessment on new housing development: a case study of Bangkok, Thailand. PhD thesis, King's College London, UK.

Tangwe, S and Simon, M (2019) Quantification of the viability of residential air source heat pump water heaters as potential replacement for geysers in South Africa. Journal of Engineering, Design and Technology, 17(2), pp. 456-470. ISSN 1726-0531

Tangwe, S L; Simon, M and Meyer, E L (2016) Design of a heat pump water heater performance monitoring system: To determine performance of a split type system. Journal of Engineering, Design and Technology, 14(4), pp. 739-751.

Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X

Tansey, P and Spillane, J P (2014) Government influence on the construction industry during the economic recession 2007-2013. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.

Tantiprabha, P (1990) Acquisition of strategic management concepts from construction project data: An inductive learning approach. PhD thesis, University of Texas at Austin, USA.

Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.

Tao, L; Wu, C; Chiang, Y H; Wong, F K W and Liang, S (2017) Generational perceptions of freedom-related work values: Hong Kong's implementation of a no-saturday-site-work policy in construction. Journal of Construction Engineering and Management, 143(7): 06017002, ISSN 0733-9364

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364

Taofeeq, M D; Adeleke, A Q and Lee, C K (2020) Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), pp. 1543-1569. ISSN 1726-0531

Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.

Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364

Tariq, S and Zhang, X (2022) A critical analysis of water PPP failures in Sub-Saharan Africa. Engineering, Construction and Architectural Management, 29(8), pp. 3157-3180. ISSN 0969-9988

Tarr, K R (2024) Incorporating sustainability in infrastructure design: A case study of phoenix, Arizona. PhD thesis, Arizona State University, USA.

Tasantab, J C; Gajendran, T; von Meding, J K and Maund, K (2020) Perceptions and deeply held beliefs about responsibility for flood risk adaptation in Accra Ghana. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 631-644. ISSN 1759-5916

Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.

Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits. PhD thesis, University of Maryland, College Park, USA.

Tatari, O; Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: Survey research. Construction Innovation, 7(4), pp. 310-319. ISSN 1471-4175

Tatum, C B (1983) Issues in professional construction management. Journal of Construction Engineering and Management, 109(1), pp. 112-119. ISSN 0733-9364

Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364

Tauber, G (2015) Architects and rural post-disaster housing: Lessons from south India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 206-224. ISSN 1759-5916

Tavakolan, M and Mohammadi, A (2018) Risk management workshop application: A case study of Ahwaz Urban Railway project. International Journal of Construction Management, 18(3), pp. 260-274. ISSN 1562-3599

Tavakoli, P; Yitmen, I; Sadri, H and Taheri, A (2024) Blockchain-based digital twin data provenance for predictive asset management in building facilities. Smart and Sustainable Built Environment, 13(1), pp. 4-21. ISSN 2046-6099

Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599

Tawalare, A and Laishram, B (2018) Relational contracting conceptual model for public sector construction organisations: An Indian context. Construction Economics and Building, 18(2), pp. 70-91. ISSN 2204-9029

Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364

Tayeh, B A; Hallaq, K A; Zahoor, H and Al Faqawi, A H (2019) Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry. Engineering, Construction and Architectural Management, 26(7), pp. 1424-1436. ISSN 0969-9988

Taylor, J E (2006) Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks. PhD thesis, Stanford University, USA.

Taylor, J E (2007) Antecedents of successful three-dimensional computer-aided design implementation in design and construction networks. Journal of Construction Engineering and Management, 133(12), pp. 993-1002. ISSN 0733-9364

Taylor, J E; Levitt, R and Villarroel, J A (2009) Simulating learning dynamics in project networks. Journal of Construction Engineering and Management, 135(10), pp. 1009-1015. ISSN 0733-9364

Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Taylor-Lewis, D (2012) Entrepreneurial support for black (afro-caribbean) and Asian construction businesses: Can it enhance their growth? PhD thesis, Oxford Brookes University, UK.

Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana. PhD thesis, University of Salford, UK.

Tchumtcha Wembe, P (2022) Managing stakeholders in epcm projects in Africa by Western project managers. International Journal of Construction Management, 22(12), pp. 2279-2289. ISSN 1562-3599

Tea, S; Panuwatwanich, K; Ruthankoon, R and Kaewmoracharoen, M (2022) Multiuser immersive virtual reality application for real-time remote collaboration to enhance design review process in the social distancing era. Journal of Engineering, Design and Technology, 20(1), pp. 281-298. ISSN 1726-0531

Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects' perspective. Journal of Construction in Developing Countries, 28(2), pp. 329-352. ISSN 1823-6499

Tehranchi, H (2008) Stakeholders' attitudes to systematic risk management in infrastructure projects: A comparative study of projects in Iran and Sweden. PhD thesis, University of Reading, UK.

Tembo, M; Mwanaumo, E M u and Kahanji, C (2023) An investigation into construction tender-price inflation. Journal of Construction Business and Management, 6(1), pp. 17-32. ISSN 2521-0165

Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.

Tender, M; Couto, J P; Fuller, P; Demian, P; Chow, V; Vaughan, A; Silva, F and Santos, R (2024) Using virtual reality for occupational safety and health in a UK tunnelling megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 232-239. ISSN 17514304

Tene Nengou, C B (2019) Framework for the effective implementation of building regulations and policies: The case of Sub-Sahara African countries. PhD thesis, University of Nottingham, UK.

Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531

Tengberg, C S (2022) A design-build contractor risk assessment framework for new technical solutions in the construction industry. PhD thesis, Chalmers University of Technology, Sweden.

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2026) Mixed methods framework for implementation research in the architecture, engineering, construction and operations industry. International Journal of Construction Management, 26(2), pp. 204-218. ISSN 1562-3599

Tennant, S and Fernie, S (2014) Theory to practice: A typology of supply chain management in construction. International Journal of Construction Management, 14(1), pp. 56-66. ISSN 1562-3599

Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Teo, E A L; Ofori, G; Tjandra, I K and Kim, H (2015) The potential of building information modelling (BIM) for improving productivity in Singapore construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Tetteh, M O; Chan, A P C; Darko, A; Torku, A and Nani, G (2021) Critical barriers to international construction joint ventures success: Multiexpert views and contextual disparities. Journal of Construction Engineering and Management, 147(8): 04021081, ISSN 0733-9364

Tetteh, M O; Chan, A P C; Darko, A; Yevu, S K; Boateng, E B and Nwaogu, J M (2022) Key drivers for implementing international construction joint ventures (icjvs): Global insights for sustainable growth. Engineering, Construction and Architectural Management, 29(9), pp. 3363-3393. ISSN 0969-9988

Tetteh, M O; Chan, A P C; Mohandes, S R and Agyemang, D Y (2023) Diagnosing critical barriers to international construction joint ventures success in the developing country of Ghana. Construction Innovation, 23(5), pp. 1151-1185. ISSN 1471-4175

Tezel, B A (2011) Visual management: an exploration of the concept and its implementation in construction. PhD thesis, University of Salford, UK.

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175

Thiruvenghadam, T S and Prakash, A (2025) Emerging paradigms and practices in construction equipment management. Journal of Construction Engineering and Management, 151(5): 03125003, ISSN 0733-9364

Thneibat, M; Thneibat, M and Al-Tamimi, B (2022) Establishing the synergy between the perceptions of construction professionals and the phases of value management. Engineering, Construction and Architectural Management, 29(4), pp. 1835-1860. ISSN 0969-9988

Thomas, K (2002) The exploitation of information technology (IT) in the Irish architecture/engineering/construction (AEC) industry. PhD thesis, University College Cork, Ireland.

Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.

Thomson, C and El-Haram, M (2014) Potential and implications of sustainability action plans: Lessons from the Greater Middlehaven Regeneration Project. Built Environment Project and Asset Management, 4(1), pp. 108-122. ISSN 2044-124X

Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.

Thomson, C S and Munns, A K (2004) Successfully implementing system innovations within the construction project environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thorpe, D (2003) Online remote construction management trials in Queensland department of main roads: A participant's perspective. Construction Innovation, 3(2), pp. 65-79. ISSN 1471-4175

Thorpe, D; Ryan, N and Charles, M B (2009) Innovation and small residential builders: An Australian study. Construction Innovation, 9(2), pp. 184-200. ISSN 1471-4175

Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175

Thwala, W D (2009) Experiences and challenges of community participation in urban renewal projects: The case of Johannesburg, South Africa. Journal of Construction in Developing Countries, 14(2), pp. 37-54. ISSN 1823-6499

Tian, L; Wright, A; Painter, B and Pazhoohesh, M (2023) Factors influencing BIM use in green building construction project management in the UK and China. Building Research & Information, 51(7), pp. 853-870. ISSN 0961-3218

Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.

Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: A case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(5), pp. 1789-1806. ISSN 0969-9988

Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165

Timm, J F G; Maciel, V G and Passuello, A (2023) Green public procurement model for environmental assessment of constructive systems. International Journal of Construction Management, 23(4), pp. 718-728. ISSN 1562-3599

Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193

Tobin, N Y (2017) A framework for knowledge capture and recovery in whole life costing practice. PhD thesis, Robert Gordon University, UK.

Tobolski, M J (2010) Improving the design and performance of concrete bridges in seismic regions. PhD thesis, University of California, San Diego, USA.

Toh, Y Z; Goh, Y M and Guo, B H W (2017) Knowledge, attitude, and practice of design for safety: Multiple stakeholders in the Singapore construction industry. Journal of Construction Engineering and Management, 143(5): 04016131, ISSN 0733-9364

Toke, L K and Kalpande, S D (2022) Strategic planning to investigate the decision index of organization for effective total quality management implementation: in context of Indian small and medium enterprises. Journal of Engineering, Design and Technology, 20(3), pp. 749-776. ISSN 1726-0531

Toladun, Olawale (2025) Sustainable procurement of infrastructure projects in the Australian construction industry: The perceptions of consultants. PhD thesis, University of New South Wales, Australia.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Tolstoy, D and Axelsson, B (2018) The development of international purchasing capabilities: A comparative study of the four largest Swedish construction firms. International Journal of Construction Management, 18(2), pp. 163-176. ISSN 1562-3599

Toma, H M; El-Sayed, S; Ibrahim, A H and Badawy, M (2025) Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts. International Journal of Construction Management, 25(7), pp. 750-759. ISSN 1562-3599

Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364

Tong, K; Mills, G and Çidik, M S (2023) Value of modularisation in healthcare buildings: An exploration of the nucleus programme. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.

Tong, R; Zhang, N; Wang, X and Zhao, H (2020) Impact of safety management system on safety performance: The mediating role of safety responsibility. Engineering, Construction and Architectural Management, 27(10), pp. 3155-3170. ISSN 0969-9988

Torbica, Z M (1997) Total quality management and customer satisfaction in homebuilding. PhD thesis, University of Florida, USA.

Torbica, Z M and Stroh, R C (1999) Impact of total quality management on home-buyer satisfaction. Journal of Construction Engineering and Management, 125(3), pp. 198-203. ISSN 0733-9364

Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218

Torku, A; Chan, A P C and Yung, E H K (2021) Implementation of age-friendly initiatives in smart cities: Probing the barriers through a systematic review. Built Environment Project and Asset Management, 11(3), pp. 412-426. ISSN 2044-124X

Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364

Toussaint, C D (2019) Modes of humanities and social thought in entry level civil engineering. PhD thesis, University of Minnesota, USA.

Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.

Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531

Trach, R; Pawluk, K and Lendo-Siwicka, M (2022) The assessment of the effect of BIM and IPD on construction projects in Ukraine. International Journal of Construction Management, 22(10), pp. 1844-1851. ISSN 1562-3599

Tran, C N N; Pham, P T; Tran, T T M; Tam, V W Y and Illankoon, I M C S (2025) A practical approach to promoting sustainable development in the construction industry through the use of the LOTUS-Vietnamese green-building assessment tool. International Journal of Construction Management, 25(11), pp. 1288-1299. ISSN 1562-3599

Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Tran, D Q; Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(5), pp. 774-787. ISSN 0969-9988

Trani, M L; Cassano, M; Minotti, M and Todaro, D (2014) Construction site BIM requirements. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Trethewy, R W (2005) The effect of feedback on risk taking in the Australian construction industry. Journal of Engineering, Design and Technology, 3(2), pp. 109-115. ISSN 1726-0531

Trethewy, Ross (2002) Influences on subcontractor OHS management outcomes in construction. PhD thesis, University of New South Wales, Australia.

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193

Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.

Trill, J E (2003) The application of occupational performance standards in the construction industry: 'Factors influencing their use'. PhD thesis, University of Sussex, UK.

Troiani, E; Mahamadu, A M; Manu, P; Kissi, E; Aigbavboa, C and Oti, A (2020) Macro-maturity factors and their influence on micro-level BIM implementation within design firms in Italy. Architectural Engineering and Design Management, 16(3), pp. 209-226. ISSN 1745-2007

Troje, D (2018) Rhetorical strategies to diffuse social procurement in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Troje, D (2020) Can I get some help down here? Inter-project support for creating social value through social procurement. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Tsai, J S and Chi, C S F (2015) Learning for win-win collaboration. Journal of Construction Engineering and Management, 141(7): 4015013, ISSN 0733-9364

Tsai, S L; Ochiai, C; Deng, C Z and Tseng, M H (2022) A sustainable post-disaster housing development framework for an indigenous hao-cha community in Taiwan: Considering culture and livelihood in housing extensions. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 583-600. ISSN 1759-5916

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.

Tserng, H P; Yin, S Y L; Skibniewski, M J and Lee, M H (2010) Developing an Aris-house-based method from existing information systems to project-based enterprise resource planning for general contractor. Journal of Construction Engineering and Management, 136(2), pp. 199-209. ISSN 0733-9364

Tsionas, I; Llaguno-Munitxa, M and Stephan, A (2025) Environmental effects of urban wind energy harvesting: A review. Buildings & Cities, 6(1), pp. 1-24. ISSN 2632-6655

Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988

Tu, H and Jin, S (2024) A group decision-making model for architectural programming in megaprojects. Engineering, Construction and Architectural Management, 31(13), pp. 342-368. ISSN 0969-9988

Tucker, R C; Liyanage, C; Robinson, S J; Montebon, D R; Gotangco Gonzales, C K; Olpoc, J C; Patacsil, L B; Tantanee, S; Buranajarukorn, P; Apichayaku, O S; Weerasinghe, R N and Dissanayake, R (2025) Understanding university enterprise collaboration for disaster resilience in South-East Asia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 104-128. ISSN 1759-5908

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Tumbare, M J (2013) Sedimentation of small and medium sized dams: Discussion issues. Journal of Engineering, Design and Technology, 11(2), pp. 112-128. ISSN 1726-0531

Tunji-Olayeni, P; Kajimo-Shakantu, K and Osunrayi, E (2020) Practitioners' experiences with the drivers and practices for implementing sustainable construction in Nigeria: A qualitative assessment. Smart and Sustainable Built Environment, 9(4), pp. 443-465. ISSN 2046-6099

Turksezer, Z I; Iacovino, C; Giordano, P F and Limongelli, M P (2021) Development and implementation of indicators to assess bridge inspection practices. Journal of Construction Engineering and Management, 147(12): 04021165, ISSN 0733-9364

Tutesigensi, A and Hj Mohammad, S A (2008) A framework for introducing the private finance initiative in the Brunei darussalam construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tutesigensi, A and Pleim, V (2008) Why small and medium construction enterprises do not employ six sigma. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tyler, J and Singh, A (2011) Enhancing post-earthquake disaster resilience. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 103-117. ISSN 1759-5916

Tymvios, N and Gambatese, J A (2016) Perceptions about design for construction worker safety: Viewpoints from contractors, designers, and university facility owners. Journal of Construction Engineering and Management, 142(2): 04015078, ISSN 0733-9364

Tzortzopoulos, P (2004) The design and implementation of product development process models in construction companies. PhD thesis, University of Salford, UK.

Tzortzopoulos, P and Sexton, M (2007) An investigation on the implementation of product development process models in construction companies. Construction Management and Economics, 25(11), pp. 1153-1164. ISSN 01446193

Tzortzopoulos, P; Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: A literature synthesis. Engineering, Construction and Architectural Management, 12(5), pp. 470-486. ISSN 0969-9988

Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations. PhD thesis, Columbia University, USA.

Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2021) From green buildings to living buildings? Rating schemes and waste management practices in Australian educational buildings. Engineering, Construction and Architectural Management, 28(4), pp. 1278-1294. ISSN 0969-9988

Uddin, M N; Anwer, S; Wei, H H; Chi, H L; Ni, M and Tamanna, N (2021) Energy efficient behavioural trends in residential sectors for low-income cultural background: A case-study of slums in chittagong, Bangladesh. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Uddin, S M J; Albert, A and Karakhan, A A (2024) Leveraging YouTube to aid Construction Hazard Prevention through Design (CHPtD). Construction Management and Economics, 42(9), pp. 847-865. ISSN 01446193

Udeaja, Chika Emmanuel (2002) A decision support framework for construction material supply chain management using multi-agent systems. PhD thesis, London South Bank University, UK.

Udomdech, P (2021) Project-based innovation learning mechanisms in the built environment. PhD thesis, University College London, UK.

Udomdech, P; Papadonikolaki, E and Davies, A (2018) An alternative project-based learning model for building information modelling using teams. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ugwu, O O; Anumba, C J and Thorpe, A (2001) Ontology development for agent-based collaborative design. Engineering, Construction and Architectural Management, 8(3), pp. 211-224. ISSN 0969-9988

Uher, T E and Ritchie, J A N (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(3), pp. 304-311. ISSN 0969-9988

Ullah, F; Olatunji, O and Qayyum, S (2026) A scoping review of green internet of things in construction and smart cities: Current applications, adoption strategies and future directions. Smart and Sustainable Built Environment, 15(1), pp. 294-318. ISSN 2046-6099

Ulrich de Alencastro, J P (2019) The impact of quality management on the thermal performance of social housing in the United Kingdom. PhD thesis, University of Plymouth, UK.

Umar, A A; Zawawi, N A W A and Abdul Aziz, A R (2024) Do regional characteristics influence PPP contract governance skills requirements? Engineering, Construction and Architectural Management, 31(10), pp. 4146-4161. ISSN 0969-9988

Umar, T (2020) Key factors influencing the implementation of three-dimensional printing in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(3), pp. 104-114. ISSN 17514304

Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.

Umar, T (2022) Challenges of BIM implementation in gcc construction industry. Engineering, Construction and Architectural Management, 29(3), pp. 1139-1168. ISSN 0969-9988

Umar, T; Egbu, C; Honnurvali, M S; Saidani, M and Al-Bayati, A J (2019) Briefing: Status of occupational safety and health in GCC construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 137-141. ISSN 1751-4304

Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988

Underwood, J; Alshawi, M A; Aouad, G; Child, T and Faraj, I Z (2000) Enhancing building product libraries to enable the dynamic definition of design element specifications. Engineering, Construction and Architectural Management, 7(4), pp. 373-388. ISSN 0969-9988

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms. Engineering, Construction and Architectural Management, 10(2), pp. 128-145. ISSN 0969-9988

Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Upadhyaya, D and Malek, M S S (2024) An exploratory factor analysis approach to investigate health and safety factors in Indian construction sector. Construction Economics and Building, 24(1-2), pp. 29-49. ISSN 2204-9029

Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2015) Developing a sustainability assessment tool to aid organisational learning in construction SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(4), pp. 407-427. ISSN 0969-9988

Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.

Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Vafaie, F; Remøy, H and Gruis, V (2025) From theory to practice: Evaluating success factors of adaptive reuse through a case study. Built Environment Project and Asset Management, 15(3), pp. 432-449. ISSN 2044-124X

Vahidi, A (2025) Towards circular concrete: The implementation of circular concrete in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.

Vakola, M (1999) Business process re-engineering and organisational change: Evaluation of implementation strategies. PhD thesis, University of Salford, UK.

Valente, C P; Brandalise, F M P and Formoso, C T (2019) Model for devising visual management systems on construction sites. Journal of Construction Engineering and Management, 145(2): 04018138, ISSN 0733-9364

Valizadeh, M.; Azizi, M.; Hosseini, M. R. and Mahoor, P. (2026) A hybrid analysis of reverse logistics barriers in Iranian construction. Smart and Sustainable Built Environment, 15(3), pp. 1225-1254. ISSN 2046-6099

Valizadeh, R and Elmi, M (2010) Feasibility studies for optimum establishment of rural occupancy in mountainous regions. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 221-240. ISSN 1759-5916

Van Egmond-De Wilde De Ligny, E L C and Mohammadi, M (2011) Innovations in domotics: Fulfilling potential or hampered by prevailing technological regime? Construction Innovation, 11(4), pp. 470-492. ISSN 1471-4175

Van Roy, A F and Firdaus, A (2020) Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2), pp. 199-217. ISSN 1823-6499

Van Tam, N; Quoc Toan, N; Phong, V V and Durdyev, S (2023) Impact of BIM-related factors affecting construction project performance. International Journal of Building Pathology and Adaptation, 41(2), pp. 454-475. ISSN 23984708

Van Timmeren, A and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(1), pp. 22-37. ISSN 1471-4175

Van Zyl, I J (1986) The role of standardization in the building industry. DSc thesis, University of Pretoria, South Africa.

Van der Heijden, J J (2009) Building regulatory enforcement regimes: Comparative analysis of private sector involvement in the enforcement of public building regulations. PhD thesis, Delft University of Technology, Netherlands.

Vanegas, J A; Bravo, E B and Halpin, D W (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), pp. 336-354. ISSN 0733-9364

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Vargas, G; Lawrence, R and Stevenson, F (2017) The role of lobbies: Short-term thermal transitions. Building Research & Information, 45(7), pp. 759-782. ISSN 0961-3218

Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364

Vass, S and Karrbom Gustavsson, T (2017) Challenges when implementing BIM for industry change. Construction Management and Economics, 35(10), pp. 597-610. ISSN 0144-6193

Vassallo, J M (2007) Implementation of quality criteria in tendering and regulating infrastructure management contracts. Journal of Construction Engineering and Management, 133(8), pp. 553-561. ISSN 0733-9364

Vassigh, S; Davis, D; Behzadan, A H; Mostafavi, A; Rashid, K; Alhaffar, H; Elias, A and Gallardo, G (2020) Teaching building sciences in immersive environments: A prototype design, implementation, and assessment. International Journal of Construction Education and Research, 16(3), pp. 180-196. ISSN 1557-8771

Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007

Vaughan, J L; Leming, M L; Liu, M and Jaselskis, E (2013) Cost-benefit analysis of construction information management system implementation: Case study. Journal of Construction Engineering and Management, 139(4), pp. 445-455. ISSN 0733-9364

Vaz-Serra, P and Edwards, P (2021) Addressing the knowledge management "nightmare" for construction companies. Construction Innovation, 21(2), pp. 300-320. ISSN 1471-4175

Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193

Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects. PhD thesis, University of Maryland, College Park, USA.

Venkatesh, P and Ergan, S (2023) Classification of challenges in achieving BIM-based safety-requirement checking in vertical construction projects. Journal of Construction Engineering and Management, 149(12): 04023131, ISSN 0733-9364

Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.

Venu Jaya, S.; Swarnakar, V.; Acquaye, A.; Khalfan, M. and El Fadel, M. (2026) Unlocking 3r-driven value engineering potential in sustainable construction: An empirical analysis of drivers, challenges, benefits, tools and techniques. Journal of Engineering, Design and Technology, 24(6), ISSN 1726-0531

Venugopal, M (2011) Formal specification of industry foundation class concepts using engineering ontologies. PhD thesis, Georgia Institute of Technology, USA.

Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.

Vernikos, V K; Goodier, C I; Gibb, A G F; Robery, P C and Broyd, T W (2011) Offsite innovation in UK infrastructure: The role of the approvals process in box jacking projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.

Vidalakis, C; Abanda, F H and Oti, A H (2020) BIM adoption and implementation: focusing on SMEs. Construction Innovation, 20(1), pp. 128-147. ISSN 1471-4175

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Vieira, Luiz de Brito Prado (2020) Analysis of technologies for recycling the waste generated in concrete production in ready mixed concrete plants. PhD thesis, Universidade de São Paulo, Brazil.

Vijay, V; Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: A concept. Built Environment Project and Asset Management, 12(3), pp. 382-400. ISSN 2044-124X

Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.

Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.

Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X

Vinodh, S; Kamala, V and Jayakrishna, K (2015) Application of fuzzy axiomatic design methodology for selection of design alternatives. Journal of Engineering, Design and Technology, 13(1), pp. 2-22.

Vinodh, S and Ravikumar, R (2012) Application of probabilistic finite element analysis for crane hook design. Journal of Engineering, Design and Technology, 10(2), pp. 255-275. ISSN 1726-0531

Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.

Vinodh, S; Selvaraj, T and Praveen, T (2012) Design and development of agile product development cycle for rotary switches. Journal of Engineering, Design and Technology, 10(3), pp. 380-396. ISSN 1726-0531

Vinodh, S; Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(2), pp. 129-141. ISSN 1726-0531

Vishwanathan, S S; Fragkos, P; Fragkiadakis, K; Paroussos, L and Garg, A (2019) Energy system transitions and macroeconomic assessment of the Indian building sector. Building Research & Information, 47(1), pp. 38-55. ISSN 0961-3218

Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Vols, M; Tassenaar, P G and Jacobs, J P A M (2015) Anti-social behaviour and European protection against eviction. International Journal of Law in the Built Environment, 7(2), pp. 148-161. ISSN 1756-1450

Voordijk, H; Van Leuven, A and Laan, A (2003) Enterprise resource planning in a large construction firm: Implementation analysis. Construction Management and Economics, 21(5), pp. 511-521. ISSN 01446193

Vorobjev, O.; Uotila, U.; Joensuu, T. and Saari, A. (2026) Design for disassembly: A review of public policy proposals. Buildings & Cities, 7(1), pp. 775-790. ISSN 2632-6655

Vosman, L; Coenen, T B J; Volker, L and Visscher, K (2023) Collaboration and innovation beyond project boundaries: Exploring the potential of an ecosystem perspective in the infrastructure sector. Construction Management and Economics, 41(6), pp. 457-474. ISSN 01446193

Votano, S and Sunindijo, R Y (2014) Client safety roles in small and medium construction projects in Australia. Journal of Construction Engineering and Management, 140(9): 04014045, ISSN 0733-9364

Vásquez-Hernández, A; Alarcón, L F; Pellicer, E and Barkokebas, B (2025) Construction industrialization: A mosaic of definitions. Journal of Construction Engineering and Management, 151(3): 03124010, ISSN 0733-9364

Wadu Mesthrige, J and Kwong, H Y (2018) Criteria and barriers for the application of green building features in Hong Kong. Smart and Sustainable Built Environment, 7(3-4), pp. 251-276. ISSN 2046-6099

Wafa, M A (1986) An investigation into the factors influencing the success of decision support systems in the construction industry. PhD thesis, Clemson University, USA.

Wagner, H E (2015) Hiring goals: Are they assisting more women to enter and remain in the building trades? PhD thesis, University of Minnesota, USA.

Walter, T and Mathew, P (2021) GHG policy impacts for seattle's buildings: Targets, timing, and scope. Buildings & Cities, 2(1), pp. 283-301. ISSN 2632-6655

Walton, D (2023) Impact of big data implementation on decision-making and organizational outcomes in the real estate construction enterprises. EdD thesis, Pepperdine University, USA.

Walzer, A N; Tan, T; Graser, K and Hall, D M (2025) Bug or feature? Institutional misalignments between construction technology and venture capital. Construction Management and Economics, 43(2), pp. 130-152. ISSN 0144-6193

Wamuziri, S and Madan, S (2009) Improvement and innovation through collaborative partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 17-27. ISSN 17514312

Wang, K; Guo, F; Zhang, C; Hao, J and Wang, Z (2025) Unlocking determinants of smart construction: An integrated model of utaut2, ttf, and perceived risk for IoT acceptance in AEC industry. Engineering, Construction and Architectural Management, 32(8), pp. 5394-5428. ISSN 0969-9988

Wang, K.; Xu, X.; Mao, P.; Deng, X. and Cao, D. (2026) Digital transformation and organizational readiness: Evidence from Chinese construction SMEs with a dynamic managerial capabilities lens. Engineering, Construction and Architectural Management, 33(7), pp. 5783-5819. ISSN 0969-9988

Wang, M.; Mahdiyar, A. and Mustafa Kamal, E. (2026) Risk assessment in digital twin implementation: A general cybernetic best-worst method approach. Engineering, Construction and Architectural Management, 33(7), pp. 5522-5539. ISSN 0969-9988

Wang, M; Shaari, N; Abidin, S Z and He, Y (2025) Service design in the context of sustainable production and consumption: A case study of elderly fall-protection clothing. Journal of Engineering, Design and Technology, 23(6), pp. 1919-1939. ISSN 1726-0531

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X

Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007

Wang, C H; Wang, M W and Huang, Y C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(3), pp. 257-267. ISSN 01446193

Wang, D (2004) The Chinese construction industry from the perspective of industrial organization. PhD thesis, Northwestern University, USA.

Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007

Wang, H; Yi, W; Zhen, L and Chan, A P C (2024) Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8): 04024093, ISSN 0733-9364

Wang, J (2004) Hybrid genetic algorithms for reliability assessment of structural system. PhD thesis, City University of New York, USA.

Wang, J (2023) Direct policy search for adaptive management of flood risk. PhD thesis, Purdue University, USA.

Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y; Ashuri, B; Chen, J and Cao, J (2025) Assessing the implementation and effectiveness of China's social credit system of the construction industry: a case study of Nanjing. International Journal of Construction Management, 25(7), pp. 850-859. ISSN 1562-3599

Wang, J; Liu, J and Huang, L (2007) Study on the professional liability insurance system of the supervision engineer in China. Construction Management and Economics, 25(7), pp. 801-810. ISSN 1466433X

Wang, J; Shou, W and Wang, X (2015) A framework of total constraint management for improving work flow in liquefied natural gas construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Wang, J; Shou, W; Wang, X and Wu, P (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. Construction Management and Economics, 34(12), pp. 859-874. ISSN 01446193

Wang, J; Xu, Y; Fang, D and Liao, P C (2025) How project-based learning improves construction contract management training: Evidence from eye-tracking searching strategies for contract risk recognition performance. Journal of Construction Engineering and Management, 151(9): 04025125, ISSN 0733-9364

Wang, K; Guo, F; Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: A bibliometric literature review and a case study from China. Construction Innovation, 24(4), pp. 1085-1116. ISSN 1471-4175

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wang, M; Wang, C C; Zlatanova, S; Shen, X and Brilakis, I (2024) A streamlined laser scanning verticality check method for installation of prefabricated wall panels. Journal of Construction Engineering and Management, 150(11): 04024159, ISSN 0733-9364

Wang, Mudan (2023) Digital technology adoption for improving efficiency of prefabrication construction in China: An application of laser scanning. PhD thesis, University of New South Wales, Australia.

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, P; Wang, K; Huang, Y and Fenn, P (2024) A contingency approach for time-cost trade-off in construction projects based on machine learning techniques. Engineering, Construction and Architectural Management, 31(11), pp. 4677-4695. ISSN 0969-9988

Wang, P; Wu, P; Wang, X; Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2109-2133. ISSN 0969-9988

Wang, Q; Appolloni, A and Liu, J (2024) Does "low-carbon pilot policy" affect the carbon intensity of construction industry? Exploring the implementation mechanism and effectiveness in China. Engineering, Construction and Architectural Management, 31(8), pp. 3222-3248. ISSN 0969-9988

Wang, Q; Guo, Z; Mintah, K; Li, Q; Mei, T and Li, P (2019) Cell-based transport path obstruction detection approach for 4D BIM construction planning. Journal of Construction Engineering and Management, 145(3): 04018141, ISSN 0733-9364

Wang, S (2017) Integrated approach and analysis of reliability, robustness, resilience and infrastructure applications. PhD thesis, University of Washington, USA.

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Wang, W; Zhang, S and Pasquire, C (2018) Factors for the adoption of green building specifications in China. International Journal of Building Pathology and Adaptation, 36(3), pp. 254-267. ISSN 23984708

Wang, X (2024) Context-aware worker intent interpretation for human-robot collaboration in construction. PhD thesis, University of Wisconsin - Madison, USA.

Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.

Wang, Y; Gong, E; Zhang, Y; Yao, Y and Zhou, X (2024) Risk assessment of infrastructure reits projects based on cloud model: A case study of China. Engineering, Construction and Architectural Management, 31(11), pp. 4330-4352. ISSN 0969-9988

Wang, Z; Zhou, Y; Jin, X; Zhao, N and Sun, J (2023) Risk allocation and benefit distribution of PPP projects for construction waste recycling: A case study of China. Engineering, Construction and Architectural Management, 30(9), pp. 3927-3956. ISSN 0969-9988

Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.

Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Waqar, A. and Shafiq, N. (2026) Impact of digital twin technology implementation on the lifecycle management of structural assets. Engineering, Construction and Architectural Management, 33(7), pp. 5715-5736. ISSN 0969-9988

Warcup, R (2015) Successful paths to becoming a lean organization in the construction industry. PhD thesis, Utah State University, USA.

Ward, M J (2004) The capture and integration of construction site data. EngD thesis, Loughborough University, UK.

Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), pp. 563-577. ISSN 1466433X

Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(4), pp. 299-317. ISSN 1471-4175

Warren-Myers, G; Judge, M and Paladino, A (2018) Sustainability ratings in residential development: A worthwhile endeavour? International Journal of Building Pathology and Adaptation, 36(4), pp. 353-372. ISSN 23984708

Warren-Myers, G and McRae, E (2017) Volume home building: The provision of sustainability information for new homebuyers. Construction Economics and Building, 17(2), pp. 24-40. ISSN 2204-9029

Warszawski, A (1996) Strategic planning in construction companies. Journal of Construction Engineering and Management, 122(2), pp. 133-140. ISSN 0733-9364

Warszawski, A and Navon, R (1998) Implementation of robotics in building: Current status and future prospects. Journal of Construction Engineering and Management, 124(1), pp. 31-41. ISSN 0733-9364

Warwick, E (2015) Policy to reality: Evaluating the evidence trajectory for English eco-towns. Building Research & Information, 43(4), pp. 486-498. ISSN 0961-3218

Watanabe, R; Watanabe, T and Skitmore, M (2025) Evaluating the implementation of innovative technology in japan's bidding system: A dynamic stackelberg game theoretical analysis. Construction Management and Economics, 43(9), pp. 657-684. ISSN 0144-6193

Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364

Watson, K J and Whitley, T (2017) Applying social return on investment to the built environment. Building Research & Information, 45(8), pp. 875-891. ISSN 0961-3218

Watson, P and Chileshe, N (1998) Total quality management (TQM) and the importance of the post-modernist paradigm. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Watson, P and Davis, R (2002) The application of the European foundation for quality management excellence model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.

Watts, C J (2002) In-service training for computer-aided design in building surveying. PhD thesis, De Montfort University, UK.

Watts, G (2019) Measuring and managing the social value created by a diverse construction business. PhD thesis, Loughborough University, UK.

Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165

Weber, S L (1999) A dynamic, integrated data management system for the 21st century construction company. PhD thesis, Arizona State University, USA.

Weerasooriya, D; Perera, B A K S; Ranadewa, K A T O and Gallage, S D (2025) Scrutinizing the shift: investigating quantity surveyors' adaptability to cyber-physical systems. International Journal of Construction Management, 25(2), pp. 139-148. ISSN 1562-3599

Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531

Wei, F; Hwang, B G; Zainal, N S B and Zhu, H (2024) Trust, team effectiveness, and strategies: A comparative study between virtual and face-to-face teams. Journal of Construction Engineering and Management, 150(7): 04024065, ISSN 0733-9364

Weippert, A; Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: A case study analysis. Construction Innovation, 2(2), pp. 103-116. ISSN 1471-4175

Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193

Wen, Q (2021) Strategic international human resource management in MNEs from an emerging market: case evidence from a Chinese multinational construction enterprise. PhD thesis, University of Manchester, UK.

Wennstroem, A; Havenvid, M I; Eriksson, P E and Larsson, J (2023) Incentivising supplier innovation in mega infrastructure projects: Exploring the result of innovation bonuses. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Werna, E (2006) The construction action programme of the international labour office: A view of on-going implementation and implications for research. Journal of Construction in Developing Countries, 11(1), pp. 53-72. ISSN 1823-6499

Wesonga, R; Tutesigensi, A and Moodley, K (2024) A comparative review of energy aggregation policies for prosumerisation of green energy in the construction phase in UK and Uganda. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.

Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988

White, C; Lees, J M and MacAskill, K (2026) Bridging the information gap using targeted digital transformation: Process mapping large-scale concrete activity. Building Research & Information, 54(1), pp. 24-43. ISSN 0961-3218

White, A S (2005) Public sector tendering: Issues and analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

White III, R J (2014) Application of social impact bonds in built infrastructure sustainability projects. PhD thesis, Texas A&M University, USA.

Whiteman, D E (2002) The application of total quality management in construction field operations. PhD thesis, University of Florida, USA.

Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.

Whittaker, S and Jespersen, K (2022) Stretching or conforming? Financing urban climate change adaptation in Copenhagen. Buildings & Cities, 3(1), pp. 974-999. ISSN 2632-6655

Whyte, A and Cammarano, C (2012) Value management in infrastructure projects in western Australia: Techniques and staging. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Whyte, J (2000) Virtual reality applications in the house-building industry. PhD thesis, Loughborough University, UK.

Whyte, J and Bouchlaghem, D (2002) Implementation of VR systems: A comparison between the early adoption of CAD and current uptake of VR. Construction Innovation, 2(1), pp. 3-13. ISSN 1471-4175

Whyte, J; Bouchlaghem, D and Thorpe, T (2002) IT implementation in the construction organization. Engineering, Construction and Architectural Management, 9(5-6), p. 371. ISSN 0969-9988

Wickenberg, J (2004) Exploring the shadows of project management. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Widén, K (2006) Innovation diffusion in the construction sector. PhD thesis, Lund University, Sweden.

Wijayarathne, N; Gunawan, I and Schultmann, F (2024) Dynamic capabilities in digital transformation: A systematic review of their role in the construction industry. Journal of Construction Engineering and Management, 150(11): 03124008, ISSN 0733-9364

Wijewansha, A S; Tennakoon, G A; Waidyasekara, K and Ekanayake, B J (2021) Implementation of circular economy principles during pre-construction stage: The case of Sri Lanka. Built Environment Project and Asset Management, 11(4), pp. 750-766. ISSN 2044-124X

Wijewickreme, S P (2016) A framework for providing a lifelong social security system for the operational workforce in the construction industry in Sri Lanka. PhD thesis, University of Salford, UK.

Wijnia, Y C (2016) Processing risk in asset management: Exploring the boundaries of risk based optimization under uncertainty for an energy infrastructure asset manager. PhD thesis, Delft University of Technology, Netherlands.

Willan, C M (2019) Life in the gap: how does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willan, Catherine M (2019) Life in the gap: How does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willar, D; Estrellita Varina Yanti, W; Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(1), pp. 106-124. ISSN 2046-6099

Willar, D; Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(2), pp. 114-133. ISSN 0969-9988

Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980. PhD thesis, University of Newcastle upon Tyne, UK.

Williams, J; Fugar, F; Adinyira, E and Danso, H (2024) A framework towards health and safety knowledge transfer from the construction industry to the community in developing countries: A case study of Ghana. International Journal of Construction Management, 24(7), pp. 771-783. ISSN 1562-3599

Williams, K; Gupta, R; Hopkins, D; Gregg, M; Payne, C; Joynt, J L R; Smith, I and Bates-Brkljac, N (2013) Retrofitting England's suburbs to adapt to climate change. Building Research & Information, 41(5), pp. 517-531. ISSN 0961-3218

Williams, P (2014) Growing houses and trees: Integrating biodiversity conservation and urbanisation: An Australian case study. International Journal of Law in the Built Environment, 6(1-2), pp. 152-173. ISSN 1756-1450

Williams, P J and Williams, A M (2016) Sustainability and planning law in Australia: Achievements and challenges. International Journal of Law in the Built Environment, 8(3), pp. 226-242. ISSN 1756-1450

Williams, R E (2000) Using a new paradigm to evaluate urban infrastructure models. PhD thesis, University of Florida, USA.

Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.

Williams, T; Bernold, L and Lu, H (2007) Adoption patterns of advanced information technologies in the construction industries of the United States and Korea. Journal of Construction Engineering and Management, 133(10), pp. 780-790. ISSN 0733-9364

Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.

Willis, C J and Rankin, J H (2010) Measuring the maturity of Guyana's construction industry using the construction industry macro maturity model. Journal of Construction in Developing Countries, 15(2), pp. 87-116. ISSN 1823-6499

Wilson, A J and Walker, D H T (2004) The strategy of information and communication technology diffusion. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wilson, B; An, M and Evdorides, H (2006) The effects of building and planning regulations on construction and demolition waste management. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wilson, P M (2001) Strategic decision-making in a professional service firm. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Wilson Jr, J M and Koehn, E (2000) Safety management: Problems encountered and recommended solutions. Journal of Construction Engineering and Management, 126(1), pp. 77-79. ISSN 0733-9364

Wimalasena, B A D S (2011) A planning tool for construction waste management. PhD thesis, University of Calgary, Canada.

Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering: The case of Sri Lanka. Construction Innovation, 18(3), pp. 350-370. ISSN 1471-4175

Winarno, S; Griffith, A and Stephenson, P (2008) Earthquake risk reduction to non-engineered buildings: A study of practice in Indonesia. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Winch, G (1998) Zephyrs of creative destruction: Understanding the management of innovation in construction. Building Research & Information, 26(5), pp. 268-279. ISSN 0961-3218

Windapo, A O and Goulding, J S (2015) Understanding the gap between green building practice and legislation requirements in South Africa. Smart and Sustainable Built Environment, 4(1), pp. 67-96. ISSN 2046-6099

Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(4), pp. 585-601. ISSN 2044-124X

Wingrove, K; Heffernan, E and Daly, D (2024) Increased home energy use: unintended outcomes of energy efficiency focused policy. Building Research & Information, 52(5), pp. 577-595. ISSN 0961-3218

Winkler, C (2024) Implementing solar photovoltaic systems in buildings: A case of systemic innovation in the construction sector. Construction Innovation, 24(7), pp. 102-123. ISSN 1471-4175

Winkler, C; Perez Vico, E and Widén, K (2024) Challenges to business ecosystem alignment when implementing solar photovoltaic systems in the Swedish built environment. Building Research & Information, 52(5), pp. 497-514. ISSN 0961-3218

Wirahadikusumah, R; Abduh, M; Messah, Y and Aulia, M (2021) Introducing sustainability principles into the procurement of construction works–case of Indonesian developers. International Journal of Construction Management, 21(9), pp. 932-944. ISSN 1562-3599

Wirahadikusumah, R D and Pribadi, K S (2011) Licensing construction workforce: Indonesia's effort on improving the quality of national construction industry. Engineering, Construction and Architectural Management, 18(5), pp. 431-443. ISSN 0969-9988

Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364

Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.

Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects. PhD thesis, University of Texas at Austin, USA.

Wondimu, P A; Klakegg, O J; Lohne, J and Lædre, O (2020) Experiences with best-value procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(5): 05020001, ISSN 0733-9364

Wong, A K D; Wong, F K W and Nadeem, A (2010) Attributes of building information modelling implementations in various countries. Architectural Engineering and Design Management, 6(4), pp. 288-302. ISSN 1745-2007

Wong, A K D; Wong, F K W and Nadeem, A (2011) Government roles in implementing building information modelling systems: Comparison between Hong Kong and the United States. Construction Innovation, 11(1), pp. 61-76. ISSN 1471-4175

Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), pp. 26-49. ISSN 1471-4175

Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(3), pp. 254-273. ISSN 1471-4175

Wong, C H and Sloan, B (2004) Use of ICT for e-procurement in the UK construction industry: A survey of smes readiness. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, F (1997) Implementation of safety policy and safety system for construction companies in Hong Kong: Senior management's perspective. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wong, F K W (2000) Construction safety in Hong Kong: The development of models for the safety performance assessment of major contractors. PhD thesis, London South Bank University, UK.

Wong, F K W; Chan, A P C; Yam, M C H; Wong, E Y S; Tse, K T C; Yip, K K C and Cheung, E (2009) Findings from a research study of construction safety in Hong Kong: Accidents related to fall of person from height. Journal of Engineering, Design and Technology, 7(2), pp. 130-142. ISSN 1726-0531

Wong, F K W and Kong, L S P (1998) Marketization of state-owned housing in China: Comfortable housing project in Beijing. Journal of Financial Management of Property and Construction, 3(1), pp. 27-42. ISSN 1366-4387

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.

Wong, S S Y (2018) A review on the execution method for building information modelling projects in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 100-110. ISSN 17514304

Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, Y F (2002) The occupational health and safety in Taiwan, 1987-1999. PhD thesis, University of Wales College of Cardiff, UK.

Woo, J-H (2005) Sharing tacit design knowledge in a distributed design environment. PhD thesis, Texas A&M University, USA.

Woo, Jeyoung (2024) Engineering design quality defects: Causal factors, interactions between causal factors, and mitigation strategies. PhD thesis, University of Texas at Austin, USA.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451

Wood, G; Davis, P and Olatunji, O A (2011) Modelling the costs of corporate implementation of building information modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 211-231. ISSN 1366-4387

Wood, G and McDermott, P (2001) Building on trust: A co-operative approach to construction procurement. Journal of Construction Procurement, 7(2), pp. 4-14. ISSN 1358-9180

Woodward, A and Heesom, D (2021) Implementing HBIM on conservation heritage projects: Lessons from renovation case studies. International Journal of Building Pathology and Adaptation, 39(1), pp. 96-114. ISSN 23984708

Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. PhD thesis, Massachusetts Institute of Technology, USA.

Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364

Workineh, N; Terefe, B and Nigussie, W (2025) Nonconformity in social service space use: A case study of injibara town's plan implementation. International Journal of Construction Management, 25(14), pp. 1755-1768. ISSN 1562-3599

Worlobah, A M (2025) Investigating the implementation of building information modeling in the construction sector in Liberia. PhD thesis, National University, USA.

Wroe, B (1986) Contractors and computers, why systems succeed or fail: a grounded theory study of the development of microcomputer-based information systems in ten small companies in the construction industry. PhD thesis, Loughborough University, UK.

Wronska, M (2023) Designing and evaluating a participatory workplace nutrition intervention to improve the health and wellbeing of blue-collar (construction) workers. PhD thesis, University of Salford, UK.

Wu, Z; Zhang, S; Xue, H and Li, V (2025) Identifying the policy configurational conditions for off-site construction development: A case of China. Engineering, Construction and Architectural Management, 32(12), pp. 8524-8547. ISSN 0969-9988

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.

Wu, H; Qian, Q K; Straub, A and Visscher, H J (2022) Factors influencing transaction costs of prefabricated housing projects in China: Developers' perspective. Engineering, Construction and Architectural Management, 29(1), pp. 476-501. ISSN 0969-9988

Wu, H; Zhang, P; Li, H; Zhong, B; Guo, S; Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(6): 04024039, ISSN 0733-9364

Wu, H; Zhong, W; Zhong, B; Li, H; Guo, J and Mehmood, I (2025) Barrier identification, analysis and solutions of blockchain adoption in construction: A fuzzy DEMATEL and TOE integrated method. Engineering, Construction and Architectural Management, 32(1), pp. 409-426. ISSN 0969-9988

Wu, Hongjuan (2021) Challenges of prefabricated housing in China: Supply chain, stakeholders, and transaction costs. PhD thesis, Delft University of Technology, Netherlands.

Wu, J; Kumaraswamy, M M and Soo, G (2011) Regulative measures addressing payment problems in the construction industry: A calculative understanding of their potential outcomes based on gametric models. Journal of Construction Engineering and Management, 137(8), pp. 566-573. ISSN 0733-9364

Wu, J; Liu, H J; Sing, M C P; Humphrey, R and Zhao, J (2020) Public-private partnerships: Implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(9), pp. 2253-2269. ISSN 0969-9988

Wu, Kai (2012) The dynamics of enterprise resource planning implementation in a complex organizational and environmental context. PhD thesis, University of New South Wales, Australia.

Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364

Wu, S (2004) IT tool for construction process management, process protocol toolkit. PhD thesis, University of Salford, UK.

Wu, S; Clements-Croome, D; Fairey, V; Albany, B; Sidhu, J; Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(2), pp. 136-153. ISSN 0969-9988

Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.

Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. I: Background, framework, and initial development. Journal of Construction Engineering and Management, 144(8): 04018065, ISSN 0733-9364

Wu, Z; Yang, K; Wu, Z; Xue, H; Li, S and Antwi-Afari, M F (2024) Investigating the mechanism of developers' willingness to adopt prefabricated housing using an integrated DEMATEL-SD framework. Engineering, Construction and Architectural Management, 31(6), pp. 2392-2414. ISSN 0969-9988

Wu W, I R (2013) Impacts of BIM on talent acquisition in the construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Wuni, I Y and Shen, G Q (2020) Critical success factors for modular integrated construction projects: A review. Building Research & Information, 48(7), pp. 763-784. ISSN 0961-3218

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988

Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(5), pp. 929-948. ISSN 1562-3599

Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wuni, I Y; Shen, G Q; Osei-Kyei, R and Agyeman-Yeboah, S (2022) Modelling the critical risk factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2013-2026. ISSN 1562-3599

Wuni, I Y; Wu, Z and Shen, G Q (2023) Exploring the challenges of implementing design for excellence in industrialized construction projects in China. Building Research & Information, 51(3), pp. 301-315. ISSN 0961-3218

Xia, B and Chan, A P C (2012) Measuring complexity for building projects: A Delphi study. Engineering, Construction and Architectural Management, 19(1), pp. 7-24. ISSN 0969-9988

Xia, N; Griffin, M A; Xie, Q and Hu, X (2023) Antecedents of workplace safety behavior: Meta-analysis in the construction industry. Journal of Construction Engineering and Management, 149(4): 04023009, ISSN 0733-9364

Xia, X and Xiang, P (2023) Dynamic network analysis of stakeholder-associated social risks of megaprojects: A case study in China. Engineering, Construction and Architectural Management, 30(10), pp. 4541-4568. ISSN 0969-9988

Xiahou, X; Li, Z; Zuo, J; Wang, Z; Li, K and Li, Q (2024) Critical success factors for the implementation of urban regeneration reits in China: A tism–MICMAC based approach. Engineering, Construction and Architectural Management, 31(1), pp. 363-385. ISSN 0969-9988

Xiahou, X; Yuan, J; Xie, H; Skibniewski, M J and Li, Q (2022) Exploring driving factors of smart city development under the physical-human society-cyber (p-h-c) space model. International Journal of Construction Management, 22(14), pp. 2753-2763. ISSN 1562-3599

Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.

Xiao, H.; Proverbs, D. G.; Joseph, R. and Adedeji, T. (2026) Property flood resilience (PFR): Exploring the experiences of commercial property owners. International Journal of Building Pathology and Adaptation, 44(4), pp. 935-949. ISSN 2398-4708

Xiao, H and Hao, S (2023) Public participation in infrastructure projects: An integrative review and prospects for the future research. Engineering, Construction and Architectural Management, 30(2), pp. 456-477. ISSN 0969-9988

Xiao, H and Noble, T (2014) Bim's impact on the project manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Xiao, Y; Liu, J and Pang, Y (2019) Development of a competency model for real-estate project managers: Case study of China. International Journal of Construction Management, 19(4), pp. 317-328. ISSN 1562-3599

Xie, L L; Luo, Y; Hou, L and Yu, J (2025) Determinants for megaproject knowledge innovation management: A Bayesian network analysis. Engineering, Construction and Architectural Management, 32(9), pp. 5885-5912. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, L; Ju, T; Han, T and Hou, L (2023) A meta-network-based management framework for megaproject social responsibility behaviour in China. Engineering, Construction and Architectural Management, 30(9), pp. 4415-4434. ISSN 0969-9988

Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988

Xie, L L; Yang, Y; Hu, Y and Chan, A P C (2014) Understanding project stakeholders' perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(2), pp. 224-240. ISSN 0969-9988

Xin, X (2020) Semantic intelligence for knowledge-based compliance checking of underground utilities. PhD thesis, Purdue University, USA.

Xing, J (2024) Functional reasoning support for nuclear power plant field operators. PhD thesis, Carnegie Mellon University, USA.

Xing, M; Cao, J and Cao, D (2023) Impacts of policy mix comprehensiveness on BIM implementation: Moderating effects of environmental state and response uncertainty. Journal of Construction Engineering and Management, 149(2): 04022171, ISSN 0733-9364

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xu, D; Agyekum, K; Manu, P; Cheung, C; Che Ibrahim, C K I; Mahamadu, A M and Perez, P A (2026) Design for safety (dfs) implementation in the construction industry: A study of design professionals in Northern China. Journal of Engineering, Design and Technology, 24(1), pp. 1-23. ISSN 1726-0531

Xu, Y; Wu, H; Chi, M; Lee, C Y; Chong, H Y and Skitmore, M (2026) Blockchain-enabled value co-creation in construction projects: Evidence from a moderated mediation model in China. Building Research & Information, 54(2), pp. 198-215. ISSN 0961-3218

Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364

Xu, J and Zeng, Z (2011) Applying optimal control model to dynamic equipment allocation problem: Case study of concrete-faced rockfill dam construction project. Journal of Construction Engineering and Management, 137(7), pp. 536-550. ISSN 0733-9364

Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.

Xu, N; Liang, Y; Guo, C; Meng, B; Zhou, X; Hu, Y and Zhang, B (2025) Entity recognition in the field of coal mine construction safety based on a pre-training language model. Engineering, Construction and Architectural Management, 32(4), pp. 2590-2613. ISSN 0969-9988

Xu, S; Liu, K and Tang, L C M (2015) Incorporation of expert reasoning into the BIM-based cost estimating process. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Xu, W; Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(2), pp. 378-400. ISSN 23984708

Xu, Y and Turkan, Y (2020) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(3), pp. 785-807. ISSN 0969-9988

Xue, H; Zhang, S; Chen, J; Cong, W; Wu, G and Zhao, X (2024) Effects of organizational elements on emerging information and construction management technology implementation in building professionals: Moderating role of top management support. Journal of Construction Engineering and Management, 150(10): 04024123, ISSN 0733-9364

Xue, H; Zhang, S; Wu, Z and Zhang, L (2025) How to improve the smart construction technology usage behavior of construction enterprise employees? TOE framework based on configuration study. Engineering, Construction and Architectural Management, 32(2), pp. 785-804. ISSN 0969-9988

Xue, J; Shen, G Q; Yang, R J; Zafar, I and Ekanayake, E M A C (2020) Dynamic network analysis of stakeholder conflicts in megaprojects: Sixteen-year case of Hong Kong-Zhuhai-Macao Bridge. Journal of Construction Engineering and Management, 146(9): 04020103, ISSN 0733-9364

Yadav, H; Soni, U and Kumar, G (2023) Analysing challenges to smart waste management for a sustainable circular economy in developing countries: A fuzzy DEMATEL study. Smart and Sustainable Built Environment, 12(2), pp. 361-384. ISSN 2046-6099

Yakubu, S U-N (2017) The barriers to the implementation and enforcement of the Building Code Standards Structural Provisions for mid-rise residential buildings: the case of Nigeria. PhD thesis, University of Strathclyde, UK.

Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yan, C (2006) Risk management strategy of construction projects in China. PhD thesis, University of Bedfordshire, UK.

Yan, L; Chen, Y and Cao, T (2024) Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: A configurational analysis. Engineering, Construction and Architectural Management, 31(11), pp. 4462-4481. ISSN 0969-9988

Yang, H (2001) A web-based collaborative decision making system for construction project teams using fuzzy logic. PhD thesis, Loughborough University, UK.

Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.

Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988

Yang, K; Sunindijo, R Y; Wang, C C and Zhang, S (2024) Key leadership competencies in different management levels for digital transformation in construction organisations. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Yang, L; Li, Q and Pan, W (2024) A domain model for geometric modeling in support of the automated BIM modeling. Engineering, Construction and Architectural Management, 31(12), pp. 4897-4919. ISSN 0969-9988

Yang, R J; Gunarathna, C L; McDermott, V; Lingard, H; Zhao, H and Liu, C (2020) Opportunities for improving construction health and safety using real-time H&S management innovations: A socio-technical-economic perspective. International Journal of Construction Management, 20(5), pp. 534-554. ISSN 1562-3599

Yang, Y; Zhang, S; Oti-Sarpong, K and Chow, V (2024) A conceptual framework of building information modelling capabilities: An infrastructure owner perspective. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364

Yanita, R and Mochtar, K (2021) Legal aspect of value engineering implementation in Jakarta (Indonesia) construction projects. International Journal of Construction Management, 21(2), pp. 131-139. ISSN 1562-3599

Yankah, J E (2018) An integrated framework of marketing in construction contracting enterprises in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yap, J. B. H.; Tan, Z. Y.; Skitmore, M.; Loo, S. C. and Yong, F. Y. Y. (2026) Unmasking green procurement: What drives adoption in developing-country construction? Construction Management and Economics, 44(5), pp. 337-358. ISSN 0144-6193

Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499

Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.

Yap, J B H and Toh, H M (2020) Investigating the principal factors impacting knowledge management implementation in construction organisations. Journal of Engineering, Design and Technology, 18(1), pp. 55-69. ISSN 1726-0531

Yapa Mudiyanselage, S. D. Y. B.; Perera, B. A. K. S. and Kavirathna, A. S. (2026) Adaptability of design out waste concept to minimise waste in modular construction: A qualitative delphi study. Smart and Sustainable Built Environment, pp. 1-33. ISSN 2046-6099

Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.

Yates, J K (2014) Design and construction for sustainable industrial construction. Journal of Construction Engineering and Management, 140(4): B4014005, ISSN 0733-9364

Yatmo, Y A; Atmodiwirjo, P; Saginatari, D P and Harahap, M M Y (2021) Development of modular school design as a permanent solution for post-disaster reconstruction in Indonesia. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 101-113. ISSN 1759-5916

Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.

Ye, M (2018) The impacts of institutional distance on corporate social responsibility "glocalisation" : evidence from international construction. PhD thesis, University of Hong Kong, Hong Kong.

Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.

Ye, Y; You, H and Du, J (2024) Real-time muscle-level haptic feedback for enhanced welding learning: An semg-based approach. Journal of Construction Engineering and Management, 150(12): 04024178, ISSN 0733-9364

Yembi Renault, B; Agumba, J N and Ansary, N (2021) Regression analysis of the influence of demographic characteristics using risk management practices within South African small and medium construction enterprises. Journal of Engineering, Design and Technology, 19(6), pp. 1505-1529. ISSN 1726-0531

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. EngD thesis, Loughborough University, UK.

Yeung, H C; Ridwan, T; Tariq, S and Zayed, T (2022) Beam plus implementation in Hong Kong: Assessment of challenges and policies. International Journal of Construction Management, 22(14), pp. 2830-2844. ISSN 1562-3599

Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364

Yevu, S K; Yu, A T W; Darko, A; Nani, G and Edwards, D J (2023) Modeling the influence patterns of barriers to electronic procurement technology usage in construction projects. Engineering, Construction and Architectural Management, 30(10), pp. 5133-5159. ISSN 0969-9988

Yevu, S K; Yu, A T W; Nani, G; Darko, A and Tetteh, M O (2022) Electronic procurement systems adoption in construction procurement: A global survey on the barriers and strategies from the developed and developing economies. Journal of Construction Engineering and Management, 148(1): 04021186, ISSN 0733-9364

Yevu, S K; Yu, A T W; Tetteh, M O and Antwi-Afari, M F (2022) Analytical methods for information technology benefits in the built environment: Towards an integration model. International Journal of Construction Management, 22(8), pp. 1383-1394. ISSN 1562-3599

Yfanti, S (2015) An investigation of critical success factors for the creation of clusters within micro companies working in the construction sector. PhD thesis, Glasgow Caledonian University, UK.

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

Ying, F J; Zhao, N and Tookey, J (2022) Achieving construction innovation in best value procurement projects: New Zealand mega projects study. Construction Innovation, 22(2), pp. 388-403. ISSN 1471-4175

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yitmen, I.; Almusaed, A. and Alizadehsalehi, S. (2026) Facilitating construction 5.0 for smart, sustainable and resilient buildings: Opportunities and challenges for implementation. Smart and Sustainable Built Environment, 15(2), pp. 729-764. ISSN 2046-6099

Yiu, T W; Liu, T and Kwok, L C (2018) Explicating the role of relationship in construction claim negotiations. Journal of Construction Engineering and Management, 144(2): 04017114, ISSN 0733-9364

Yong, K T and Pheng, L S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(3), pp. 237-248. ISSN 1466433X

Yong, Y C and Mustaffa, N E (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), pp. 959-978. ISSN 1466433X

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364

Yorston, N and Chileshe, N (2014) Lessons learned from building the education revolution (BER) program by the South Australia construction firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.

Yousefi, Y; Jahangiri, M; Alidadi Shamsabadi, A and Raeesi Dehkordi, A (2019) Designing a mediator space and the study of its effect on the energy consumption of a residential building using EnergyPlus software in Savadkuh, Iran. Journal of Engineering, Design and Technology, 17(4), pp. 833-846. ISSN 1726-0531

Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(6), pp. 1081-1091. ISSN 0969-9988

Yu, H (2010) An integrated approach toward lean for production homebuilders. PhD thesis, University of Alberta, Canada.

Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364

Yu, J; Chan, A; Wang, B; Liu, Y and Wang, J (2023) A mixed-methods study of the critical success factors in the development of assembled buildings in steel structure projects in China. International Journal of Construction Management, 23(13), pp. 2288-2297. ISSN 1562-3599

Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364

Yu, K Q (2002) Computer integrated construction based on total project systems framework. PhD thesis, University of British Columbia, Canada.

Yu, W D; Lin, T C; Liu, S J and Chang, P L (2013) Is the knowledge management system truly cost effective? Case study of km-enabled engineering problem solving. Journal of Construction Engineering and Management, 139(2), pp. 216-224. ISSN 0733-9364

Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.

Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yuan, H and Yang, Y (2020) BIM adoption under government subsidy: Technology diffusion perspective. Journal of Construction Engineering and Management, 146(1): 4019089, ISSN 0733-9364

Yuan, Mei (2011) An integrated knowledge management framework for managing sustainability knowledge in the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Yuan, X (2016) A cyber-physical systems (CPS) approach to temporary structures monitoring. PhD thesis, Pennsylvania State University, USA.

Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yumarni, T and Amaratunga, D (2018) Gender mainstreaming as a strategy to achieve sustainable post-disaster reconstruction. Built Environment Project and Asset Management, 8(5), pp. 544-556. ISSN 2044-124X

Yung, P (2009) Institutional arrangements and construction safety in China: An empirical examination. Construction Management and Economics, 27(5), pp. 439-450. ISSN 1466433X

Yunus, R and Yang, J (2012) Critical sustainability factors in industrialised building systems. Construction Innovation, 12(4), pp. 447-463. ISSN 1471-4175

Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.

Yusuf, A O; Opawole, A; Musa, N A; Kadiri, D S and Ebunoluwa, E I (2024) Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1058-1083. ISSN 2398-4708

Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.

Yépez, F and Villacreses, J P (2023) Temporary sheltering areas in case of earthquakes: Engineering design, implementation and policy experiences. The case of quito: Ecuador. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 655-668. ISSN 1759-5916

Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364

Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499

Zadeh Kazemi, M (2022) Essays on sustainability reporting quality, sustainability-oriented innovation, disruptive technologies and resilience in the construction sector: The case of the UAE. PhD thesis, Brunel University, UK.

Zadok, Y (2020) Project-based learning in robotics meets junior high school. Journal of Engineering, Design and Technology, 18(5), pp. 941-958. ISSN 1726-0531

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zaeri, F; Rotimi, J O B; Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(3), pp. 324-339. ISSN 1471-4175

Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X

Zahiroddiny, S (2016) Understanding the impact of building information modelling (BIM) on construction projects' communication patterns. PhD thesis, University of Northumbria at Newcastle, UK.

Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988

Zailani, M B; Abubakar, M and Muhammad, A (2019) Assessment of barriers to risk management implementation in small construction projects in Nigeria. African Journal of Built Environment Research, 3(1), pp. 15-28. ISSN 2414-0236

Zainon, N; Skitmore, M and Mohd-Rahim, F A (2022) Critical success factors in implementing flexible IT infrastructure in the Malaysian construction industry. International Journal of Construction Management, 22(11), pp. 2166-2177. ISSN 1562-3599

Zairi, A (2013) An empirical study of quality culture in the construction industry: a Gulf Cooperation Council context. PhD thesis, University of Salford, UK.

Zairi, A (2013) An empirical study of quality culture in the construction industry: A GCC context. PhD thesis, University of Salford, UK.

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708

Zakharova, J; Afefy, H M; Hamood, A; Hampton, P; Gowayed, M A; Ragab, M and Abouali, M G (2025) Can the degree apprenticeship become the degree of difference in Egypt? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 76-82. ISSN 17514304

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zamenian, H; Choi, J; Sadeghi, S A and Naderpajouh, N (2017) Systematic approach for asset management of urban water pipeline infrastructure systems. Built Environment Project and Asset Management, 7(5), pp. 506-517. ISSN 2044-124X

Zaneldin, E; Hegazy, T and Grierson, D (2001) Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127(4), pp. 330-336. ISSN 0733-9364

Zanni, M; Ruikar, K and Soetanto, R (2020) Systematising multidisciplinary sustainable building design processes utilising BIM. Built Environment Project and Asset Management, 10(5), pp. 637-655. ISSN 2044-124X

Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.

Zanni, M A; Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), pp. 101-129. ISSN 1745-2007

Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988

Zapata-Poveda, G (2012) Detailed design ethnography: Architects embedding low carbon performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Zarghami, S A and Dumrak, J (2026) Integrating cascading effects into risk assessment of metaverse implementation in the built environment. Building Research & Information, 54(2), pp. 216-236. ISSN 0961-3218

Zarghami, S A (2024) Anatomy of interactions among risk factors influencing implementation of building information modeling (BIM): A system dynamics approach. Engineering, Construction and Architectural Management, 31(11), pp. 4398-4416. ISSN 0969-9988

Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Zeb, J (2022) A level of service framework for service-centric asset management planning. Built Environment Project and Asset Management, 12(2), pp. 147-162. ISSN 2044-124X

Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(1), pp. 69-87. ISSN 1471-4175

Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms. PhD thesis, University of Maryland, College Park, USA.

Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364

Zhai, X (2010) The role of human resource practices in enhancing employees' behaviours and organisational learning in Chinese construction organisations. PhD thesis, Loughborough University, UK.

Zhai, X; Reed, R and Mills, A (2014) Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1-2), pp. 40-52. ISSN 01446193

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6): 04025044, ISSN 0733-9364

Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364

Zhang, Y.; Guo, Y.; Li, Y. and Wang, M. (2026) ESG practices and megaproject management performance: The roles of environmental dynamism and munificence. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988

Zhang, C; Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), pp. 2951-2965. ISSN 1562-3599

Zhang, C; Zhang, W; Shi, Y; Zhao, T and Zhang, Y (2025) Digital safety navigation for tower crane climbing process from a systematic perspective: Risk identification, safety information requirements, and related intelligent platform. Journal of Construction Engineering and Management, 151(8): 04025096, ISSN 0733-9364

Zhang, D (2015) An analysis of building information modelling (BIM) implementation from a planned behavior perspective. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X

Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.

Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988

Zhang, H M; Chong, H Y; Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(6), pp. 2503-2522. ISSN 0969-9988

Zhang, J; Li, H; Xia, B; Skitmore, M; Pu, S; Deng, Q and Jin, W (2021) Development of a market-oriented efqm excellence model for analyzing the implementation of quality management in developing countries. International Journal of Construction Management, 21(9), pp. 884-909. ISSN 1562-3599

Zhang, J; Zhou, N; Hinge, A; Feng, W and Zhang, S (2016) Governance strategies to achieve zero-energy buildings in China. Building Research & Information, 44(5-6), pp. 604-618. ISSN 0961-3218

Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.

Zhang, L (2012) Ontology-based web services framework for building information modeling. PhD thesis, University of Florida, USA.

Zhang, L (2021) Artificial neural network intelligent technique and multiple nonlinear regression for prediction and optimization of the transmittance of lightpipes and implementation in BIM. PhD thesis, University of Nottingham, UK.

Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988

Zhang, L and El-Gohary, N M (2016) Discovering stakeholder values for axiology-based value analysis of building projects. Journal of Construction Engineering and Management, 142(4): 04015095, ISSN 0733-9364

Zhang, L and El-Gohary, N M (2016) Epistemology-based context-aware semantic model for sustainable construction practices. Journal of Construction Engineering and Management, 142(3): 04015084, ISSN 0733-9364

Zhang, N; Hwang, B G; Deng, X and Tay, F (2020) Collaborative contracting in the Singapore construction industry: Current status, major barriers and best solutions. Engineering, Construction and Architectural Management, 27(10), pp. 3115-3133. ISSN 0969-9988

Zhang, N; Hwang, B G; Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 919-938. ISSN 0969-9988

Zhang, P; Harris, F C; Olomolaiye, P O and Holt, G D (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, 125(2), pp. 115-122. ISSN 0733-9364

Zhang, Q; Liu, Z and Yang, S (2025) Enhancing construction workers' health and safety: Mechanisms for implementing construction 4.0 technologies in construction organizations. Engineering, Construction and Architectural Management, 32(13), pp. 68-103. ISSN 0969-9988

Zhang, Q; Oo, B L and Lim, B T H (2022) Corporate social responsibility practices by leading construction firms in China: A case study. International Journal of Construction Management, 22(8), pp. 1420-1431. ISSN 1562-3599

Zhang, Q; Oo, B L and Lim, B T H (2023) Key practices and impact factors of corporate social responsibility implementation: Evidence from construction firms. Engineering, Construction and Architectural Management, 30(5), pp. 2124-2154. ISSN 0969-9988

Zhang, Q; Oo, B L and Lim, B T H (2024) Modeling influence mechanism of factors on corporate social responsibility implementation: Evidence from Chinese construction firms. Engineering, Construction and Architectural Management, 31(1), pp. 324-362. ISSN 0969-9988

Zhang, Q W; Chong, H Y; Liao, P C and Wan, Y L (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), pp. 3031-3050. ISSN 0969-9988

Zhang, Qian (2021) Key influencing factors of corporate social responsibility implementation in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Zhang, S; Loosemore, M; Sunindijo, R Y and Gu, D (2023) An investigation of safety climate in Chinese major construction projects. International Journal of Construction Management, 23(8), pp. 1365-1375. ISSN 1562-3599

Zhang, X (2010) Competitiveness for real estate developers: a China study. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.

Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175

Zhang, X and Liu, J (2022) Incentive mechanism and value-added in PPP projects considering financial institutions' early intervention. Journal of Construction Engineering and Management, 148(4): 4022001, ISSN 0733-9364

Zhang, X; Liu, T; Rahman, A and Zhou, L (2023) Blockchain applications for construction contract management: A systematic literature review. Journal of Construction Engineering and Management, 149(1): 03122011, ISSN 0733-9364

Zhang, Y; Lei, Z; Han, S; Bouferguene, A and Al-Hussein, M (2020) Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9): 04020116, ISSN 0733-9364

Zhang, Y and Tan, W (2019) The leading small group: An institutional innovation for PPP projects in China. Built Environment Project and Asset Management, 9(2), pp. 291-301. ISSN 2044-124X

Zhang, Y; Wang, J; Ahmad, R and Li, X (2022) Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing. Engineering, Construction and Architectural Management, 29(10), pp. 3970-3996. ISSN 0969-9988

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

Zhao, S.; Guo, Y.; Wen, S.; Guo, Z.; Miao, A.; Li, D. and Guo, C. (2026) Worker health and safety in high-altitude tunnel construction: A study on oxygen supply standards and measures based on physiological indicators. International Journal of Construction Management, 26(8), pp. 1562-1583. ISSN 1562-3599

Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.

Zhao, N and Ying, F (2019) Method selection: A conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(2), pp. 214-232. ISSN 2044-124X

Zhao, X (2014) Enterprise risk management in Chinese construction firms operating overseas. PhD thesis, National University of Singapore, Singapore.

Zhao, X; Hwang, B G and Low, S P (2013) Developing fuzzy enterprise risk management maturity model for construction firms. Journal of Construction Engineering and Management, 139(9), pp. 1179-1189. ISSN 0733-9364

Zhao, X; Hwang, B G and Low, S P (2014) Investigating enterprise risk management maturity in construction firms. Journal of Construction Engineering and Management, 140(8): 05014006, ISSN 0733-9364

Zhao, X; Hwang, B G and Low, S P (2015) Enterprise risk management in international construction firms: Drivers and hindrances. Engineering, Construction and Architectural Management, 22(3), pp. 347-366. ISSN 0969-9988

Zhao, X; Hwang, B G; Pheng Low, S and Wu, P (2015) Reducing hindrances to enterprise risk management implementation in construction firms. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988

Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.

Zhao, Y (2021) Modernizing log construction system: A study on technology advancement and design strategy. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Zhao, Y (2022) An ontology-based semantic building post-occupancy evaluation framework and its application. PhD thesis, Brunel University, UK.

Zhao, Y; Hao, S; Chen, Z; Zhou, X; Zhang, L and Guo, Z (2025) Critical factors influencing the internet of things technology adoption behavior of construction companies: Evidence from China. Engineering, Construction and Architectural Management, 32(2), pp. 760-784. ISSN 0969-9988

Zheng, X; Chen, J; Xia, B; Skitmore, M and Zeng, S (2023) Understanding the megaproject social responsibility network among stakeholders: A reciprocal-exchange perspective. Journal of Construction Engineering and Management, 149(11): 04023105, ISSN 0733-9364

Zheng, X; Hu, X; Wu, C and Bai, J (2025) Does owners' leadership matter to relational behavior in mega construction projects? A role orientation perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3608-3629. ISSN 0969-9988

Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364

Zheng, Y; Debs, L; Besiktepe, D and Oh, H J (2025) Insights for key professional competencies of us entry-level construction positions: A structural topic modeling approach. Journal of Construction Engineering and Management, 151(8): 04025103, ISSN 0733-9364

Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364

Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.

Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, Y (2012) Construction knowledge mining and application of generalized fuzzy network in construction decision management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Zhou, Y; Yang, Y and Yang, J B (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(3), pp. 554-574. ISSN 0969-9988

Zhou, Z; Li, Q and Wu, W (2012) Developing a versatile subway construction incident database for safety management. Journal of Construction Engineering and Management, 138(10), pp. 1169-1180. ISSN 0733-9364

Zhu, Y (1999) Web-based construction document processing through a "malleable frame". PhD thesis, University of Florida, USA.

Zhuang, J; Wang, Y; Yan, Z and Liu, J (2026) Evolutionary game analysis on the cooperative mechanism of government subsidies and market-based risk mitigation institutions in managing ecosustainable projects' default risks. Journal of Construction Engineering and Management, 152(3): 04025270, ISSN 0733-9364

Ziadat, W (2018) A meta-analysis study of project and programme management complexity in the oil and gas sector of the Middle East and North Africa region. PhD thesis, University of Manchester, UK.

Zin, I N M and Egbu, C (2009) A literature review on the challenges associated with implementing knowledge management strategies in construction organisations. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zin, I N M and Egbu, C (2010) Readiness of organizations to implement a knowledge management strategy: A construction industry overview. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Zin, Z M I; Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(5), pp. 508-520. ISSN 2044-124X

Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.

Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zohrehvandi, S; Khalilzadeh, M; Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(2), pp. 716-738. ISSN 0969-9988

Zohrehvandi, S; Vanhoucke, M; Khalilzadeh, M; Amiri, M and Shadrokh, S (2023) A fuzzy project buffer management algorithm: A case study in the construction of a renewable project. International Journal of Construction Management, 23(12), pp. 2134-2143. ISSN 1562-3599

Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988

Zomer, T (2021) Institutional pressures and decoupling in projects: the case of BIM Level 2 and coercive isomorphism in the UK's construction sector. PhD thesis, University of Cambridge, UK.

Zomer, T; Neely, A and Parlikad, A (2020) Institutional pressures and decoupling in construction projects: An analysis of building information modelling implementation. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Zomer, T; Neely, A; Sacks, R and Parlikad, A (2020) Exploring the influence of socio-historical constructs on BIM implementation: An activity theory perspective. Construction Management and Economics, 39(1), pp. 1-20. ISSN 01446193

Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.

Zulkifli, A R; Ibrahim, C K I C and Belayutham, S (2018) Activation trigger for organisational BIM learning: Views from Malaysian construction stakeholders. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zulu, E; Mutwale, J; Zulu, S L; Musonda, I; Kavishe, N and Moobela, C (2025) Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: Evidence from Zambia. Journal of Engineering, Design and Technology, 23(2), pp. 386-405. ISSN 1726-0531

Zulu, S L; Zulu, E; Chabala, M and Chunda, N (2023) Drivers and barriers to sustainability practices in the Zambian construction industry. International Journal of Construction Management, 23(12), pp. 2116-2125. ISSN 1562-3599

Zuofa, T; Ochieng, E and Burns, A (2015) Appraising knowledge management perceptions among construction practitioners. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 89-98. ISSN 17514304

Zuofa, T; Ochieng, E G and Ode-Ichakpa, I (2023) An evaluation of determinants influencing the adoption of circular economy principles in Nigerian construction SMEs. Building Research & Information, 51(1), pp. 69-84. ISSN 0961-3218

af Hällström, A and Bosch-Sijtsema, P (2021) Creating collaboration: The use of collaborative space in large-scale infrastructure development. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

af Hällström, A and Bosch-Sijtsema, P (2021) The dark side of collaboration: The risks of strong ties in collaborative project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175

de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.

de Souza, M P; Fialho, B C; Ferreira, R C; Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: An experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(1), pp. 74-91. ISSN 1745-2007

den Otter, A F and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(3), pp. 162-173. ISSN 0969-9988

jadidoleslami, S; Saghatforoush, E and Zare Ravasan, A (2021) Constructability obstacles: An exploratory factor analysis approach. International Journal of Construction Management, 21(3), pp. 312-325. ISSN 1562-3599

li, H; yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(4), pp. 231-241. ISSN 1471-4175

ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(6), pp. 519-532. ISSN 0969-9988

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

van Nguyen, M V and Khanh, K D (2025) Exploring the relationship between corporate social responsibility and innovation performance in architectural design firms. International Journal of Construction Management, 25(12), pp. 1454-1462. ISSN 1562-3599

van Wyk, L; Kajimo-Shakantu, K and Opawole, A (2024) Adoption of innovative technologies in the South African construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 410-429. ISSN 23984708

van den Berg, M; Voordijk, H and Adriaanse, A (2021) BIM uses for deconstruction: An activity-theoretical perspective on reorganising end-of-life practices. Construction Management and Economics, 39(4), pp. 323-339. ISSN 01446193

van der Heijden, J (2024) Public governance in the context of construction 4.0: A systematic and comprehensive literature review. Smart and Sustainable Built Environment, 13(3), pp. 737-756. ISSN 2046-6099

von Malmborg, F; Rohdin, P and Wihlborg, E (2024) Climate declarations for buildings as a new policy instrument in Sweden: a multiple streams perspective. Building Research & Information, 52(4), pp. 479-496. ISSN 0961-3218

zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988

zu Ermgassen, S O S E (2022) Hard questions, concrete solutions: Mitigating the ecological impacts of the global infrastructure boom. PhD thesis, University of Kent, UK.

Çetin, Sultan (2023) Towards a circular building industry through digitalisation: Exploring how digital technologies can help narrow, slow, close, and regenerate the loops in social housing practice. PhD thesis, Delft University of Technology, Netherlands.

Öberg, V; Jockwer, R; Goto, Y and Al-Emrani, M (2025) Design for structural adaptation: Economic feasibility of an implementation for Swedish timber buildings. Building Research & Information, 53(6), pp. 759-776. ISSN 0961-3218

Özener, O Ö (2024) Context-based learning for BIM: Simulative role-playing games for strategic business implementations. Smart and Sustainable Built Environment, 13(4), pp. 908-933. ISSN 2046-6099

Ünsal Altuncan, I and Tanyer, A M (2018) Context-dependent construction conflict management performance analysis based on competency theory. Journal of Construction Engineering and Management, 144(12): 04018112, ISSN 0733-9364

Ürge-Vorsatz, D; Harvey, L D D; Mirasgedis, S and Levine, M D (2007) Mitigating CO2 emissions from energy use in the world's buildings. Building Research & Information, 35(4), pp. 379-398. ISSN 0961-3218

Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364

This list was generated on Sat Aug 22 01:49:12 2026 UTC.