Items with Index Term: impact analysis

Number of items: 54.

Alarc N, L F and Bastias, A (2000) A computer environment to support the strategic decision-making process in construction firms. Engineering, Construction and Architectural Management, 7(1), pp. 63-75. ISSN 0969-9988

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Alkaissy, M; Arashpour, M; Zeynalian, M and Li, H (2022) Worksite accident impacts on construction and infrastructure: Nondeterministic analysis of subsectors and organization sizes. Journal of Construction Engineering and Management, 148(6): 04022023, ISSN 0733-9364

Arditi, D and Patel, B K (1989) Impact analysis of owner-directed acceleration. Journal of Construction Engineering and Management, 115(1), pp. 144-157. ISSN 0733-9364

Beitelmal, W H (2016) Towards an infrastructure asset management organizational model for developing countries. PhD thesis, University of Colorado at Boulder, USA.

Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(6), pp. 2463-2480. ISSN 0969-9988

Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.

Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.

Coskun, C; Dikmen, I and Birgonul, M T (2023) Sustainability risk assessment in mega construction projects. Built Environment Project and Asset Management, 13(5), pp. 700-718. ISSN 2044-124X

Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.

Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.

Han, S H (1999) Risk-based go/no-go decision making model for international construction projects: The cross-impact analysis approach. PhD thesis, University of Colorado at Boulder, USA.

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451

Han, S H and Diekmann, J E (2001) Making a risk-based bid decision for overseas construction projects. Construction Management and Economics, 19(8), pp. 765-776. ISSN 01446193

Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation, 20(1), pp. 43-60. ISSN 1471-4175

Hiete, M; Merz, M and Schultmann, F (2011) Scenario-based impact analysis of a power outage on healthcare facilities in Germany. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 222-244. ISSN 1759-5916

Irurah, D K and Holm, D (1999) Energy impact analysis of building construction as applied to South Africa. Construction Management and Economics, 17(3), pp. 363-374. ISSN 01446193

Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364

Jadidoleslami, S; Azizi, M; Sobhiyah, M and Zareravasan, A (2026) A cross-impact analysis of digital transformation factors in construction firms: A multilevel MICMAC analysis. Journal of Construction Engineering and Management, 152(2): 04025243, ISSN 0733-9364

Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Karim, J A; Demian, P; Baldwin, A and Anumba, C (2014) An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), pp. 505-531. ISSN 0969-9988

Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes. DEng thesis, University of California, Berkeley, USA.

Laugé, A; Hernantes, J and Sarriegi, J M (2015) Analysis of disasters impacts and the relevant role of critical infrastructures for crisis management improvement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 424-437. ISSN 1759-5916

Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), pp. 56-73. ISSN 0969-9988

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mishra, S K; Upadhyay, B and Das, B B (2026) Exploring the role of metakaolin in binary and ternary blended 3D printable mortars: Deep insights into printability. International Journal of Construction Management, 26(2), pp. 185-203. ISSN 1562-3599

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. PhD thesis, University of Maryland, College Park, USA.

Musil, T A (2011) Evaluating development and community benefits of shopping malls: A case study using input/output analysis. Journal of Financial Management of Property and Construction, 16(2), pp. 111-125. ISSN 1366-4387

Nguyen, N H; Skitmore, M and Wong, J K W (2009) Stakeholder impact analysis of infrastructure project management in developing countries: A study of perception of project managers in state-owned engineering firms in Vietnam. Construction Management and Economics, 27(11), pp. 1129-1140. ISSN 1466433X

Oh, E H; Deshmukh, A and Hastak, M (2010) Disaster impact analysis based on inter-relationship of critical infrastructure and associated industries: A winter flood disaster event. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 25-49. ISSN 1759-5916

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Olander, S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(3), pp. 277-287. ISSN 1466433X

Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.

Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364

Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Exploring the barriers for implementing waste trading practices in the construction industry in Australia. Built Environment Project and Asset Management, 11(4), pp. 559-576. ISSN 2044-124X

Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364

Rustom, R N (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(2), pp. 11-19. ISSN 2204-9029

Schmidt Iii, R; Vibaek, K S and Austin, S (2014) Evaluating the adaptability of an industrialized building using dependency structure matrices. Construction Management and Economics, 32(1-2), pp. 160-182. ISSN 01446193

Sekar, G; Sambasivan, M and Viswanathan, K (2021) Does size of construction firms matter? Impact of project-factors and organization-factors on project performance. Built Environment Project and Asset Management, 11(2), pp. 174-194. ISSN 2044-124X

Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364

Soleimani, M and Shahandashti, M (2017) Comparative process-based life-cycle assessment of bioconcrete and conventional concrete. Journal of Engineering, Design and Technology, 15(5), pp. 667-688.

Sun, J; Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), pp. 284-303. ISSN 2044-124X

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Venegas C, P and Alarcón C, L F (1997) Selecting long-term strategies for construction firms. Journal of Construction Engineering and Management, 123(4), pp. 388-398. ISSN 0733-9364

Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364

Wilkinson, P; Glockling, J; Bouchlaghem, D and Ruikar, K (2013) Using business impact analyses to enhance resilient fire engineering building design. Architectural Engineering and Design Management, 9(4), pp. 229-249. ISSN 1745-2007

Zelinka, D L (2019) Systems approaches to transdisciplinary sustainable development issues. PhD thesis, University of Colorado at Boulder, USA.