Items with Index Term: housing project

Number of items: 177.

Abdullah, A K and Alshibani, A (2022) Multi-criteria decision-making framework for selecting sustainable private partners for housing projects. Journal of Financial Management of Property and Construction, 27(1), pp. 112-140. ISSN 1366-4387

Abdullah, M R and Egbu, C (2010) Selection criteria framework for choosing industrialized building systems for housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Abdullah, M R and Egbu, C (2011) The application of analytical hierarchy process (AHP) as a decision tool in choosing the type of industrialised building system (IBS) for housing projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey. PhD thesis, Heriot-Watt University, UK.

Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599

Adabre, M A and Chan, A P C (2020) Towards a sustainability assessment model for affordable housing projects: The perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(9), pp. 2523-2551. ISSN 0969-9988

Adesiyan, B (2016) Exploring leadership strategies to maximize profitability in the Nigerian housing sector. DBA thesis, Walden University, USA.

Adetooto, J; Windapo, A; Pomponi, F; Companie, F; Alade, K and Mtya, A (2024) Strategies to promote the acceptance of sandbag building technology for sustainable and affordable housing delivery: The South African case. Journal of Engineering, Design and Technology, 22(5), pp. 1505-1522. ISSN 1726-0531

Ahmed, I and Charlesworth, E R (2015) An evaluation framework for assessing resilience of post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 300-312. ISSN 1759-5916

Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.

Al-Khaiat, H and Fereig, S M (1996) The role of precast concrete systems in Kuwaiti housing projects. Building Research & Information, 24(6), pp. 374-378. ISSN 0961-3218

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(2), pp. 151-161. ISSN 1466433X

Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions. PhD thesis, Nottingham Trent University, UK.

Ali, A H; Elyamany, A; Ibrahim, A H; Kineber, A F and Daoud, A O (2024) Modelling the relationship between modular construction adoption and critical success factors for residential projects in developing countries. International Journal of Construction Management, 24(12), pp. 1314-1325. ISSN 1562-3599

Alketbi, S R (2020) Effective implementation of value engineering in the housing construction programmes of the UAE. PhD thesis, University of Wolverhampton, UK.

Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.

Arijeloye, B T (2025) Impact of project risk allocation on PPP housing project delivery in Nigeria: Partial least square structural equation modeling approach. Journal of Engineering, Design and Technology, 23(3), pp. 812-829. ISSN 1726-0531

Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.

Atkinson, A (1997) The management of construction failures and defects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.

Bajere, P A (1996) Maintenance conditions and occupant behavior in government-provided housing in Lagos, Nigeria. DIT thesis, University of Northern Iowa, USA.

Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364

Barros de Oliveira, N R (2013) A theory of coordination voids in dynamic inter-organisational relationships: a study of social housing projects in England. PhD thesis, London School of Economics and Political Science, UK.

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175

Bos-de Vos, M; Wamelink, J W F H and Volker, L (2016) Trade-offs in the value capture of architectural firms: The significance of professional value. Construction Management and Economics, 34(1), pp. 21-34. ISSN 01446193

Boutilier, R G and Zdziarski, M (2017) Managing stakeholder networks for a social license to build. Construction Management and Economics, 35(8-9), pp. 498-513. ISSN 01446193

Brissi, S G (2021) Principles for the adoption of offsite construction in design and construction companies. PhD thesis, Purdue University, USA.

Bruen, J; Spillane, J P and Brooks, T (2021) Community orientated post-disaster sustainable housing recovery, rebuilding and community renewal: Sri Lanka case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing. PhD thesis, Heriot-Watt University, UK.

Chai, C S; Yusof, A M and Habil, H (2015) Delay mitigation in the Malaysian housing industry: A structural equation modelling approach. Journal of Construction in Developing Countries, 20(1), pp. 65-83. ISSN 1823-6499

Chen, J C P; Tsaih, L S J and Li, Y F (2020) Exploring views on communal amenities and well-being in housing for seniors in Taiwan. Building Research & Information, 48(3), pp. 239-253. ISSN 0961-3218

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193

Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: The case of Tanzania. Built Environment Project and Asset Management, 11(1), pp. 71-87. ISSN 2044-124X

Chileshe, N; Njau, C W; Kibichii, B K; Macharia, L N and Kavishe, N (2022) Critical success factors for public-private partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), pp. 1606-1617. ISSN 1562-3599

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Cole, R J and Mitchell, L (1999) Customizing and using GBTool: Two case-study projects. Building Research & Information, 27(4-5), pp. 257-275. ISSN 0961-3218

Conteh, Augustine (2023) Values of real assets: Focus on infrastructure and housing in Australia. PhD thesis, Griffith University, Australia.

Dahanayake, B; Ramachandra, T and Thurairajah, N (2016) Assessment on rework costs probability of housing projects in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Damoah, I S; Ayakwah, A; Aryee, K J and Twum, P (2020) The rise of PPPs in public sector affordable housing project delivery in Ghana: Challenges and policy direction. International Journal of Construction Management, 20(6), pp. 690-703. ISSN 1562-3599

Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.

De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach. PhD thesis, Aston University, UK.

De Toldi, T and Pestre, T (2023) The relevance of cut-stone to strategies for low-carbon buildings. Buildings & Cities, 4(1), pp. 229-257. ISSN 2632-6655

Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988

Ding, G and Forsythe, P (2016) A comparative study of floor construction on sloping sites: An analysis of cumulative energy demand and greenhouse gas emissions. Construction Economics and Building, 16(1), pp. 33-49. ISSN 2204-9029

El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.

El-Anwar, O; El-Rayes, K and Elnashai, A S (2010) Maximizing the sustainability of integrated housing recovery efforts. Journal of Construction Engineering and Management, 136(7), pp. 794-802. ISSN 0733-9364

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

Elgrari, O (2011) The role of technology transfer in improving manpower capability in private house building companies in Libya. PhD thesis, University of Salford, UK.

Elgrari, O and Ingirige, B (2011) Privatisation and manpower capability development: Cases from the Libyan house building sector. Engineering, Construction and Architectural Management, 18(5), pp. 497-515. ISSN 0969-9988

Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.

Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya. PhD thesis, Heriot-Watt University, UK.

Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(1), pp. 31-34. ISSN 0961-3218

Eriksson, P E (2025) How clients choose procurement strategies and organizational control systems in the Swedish housing sector. Journal of Financial Management of Property and Construction, 30(1), pp. 22-41. ISSN 1366-4387

Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(6), pp. 514-526. ISSN 0969-9988

Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK. PhD thesis, Heriot-Watt University, UK.

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.

Forsythe, P J (2012) Profiling customer perceived service quality expectations in made-to-order housing construction in Australia. Engineering, Construction and Architectural Management, 19(6), pp. 587-609. ISSN 0969-9988

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.

Frimpong S, D A (2013) A phenomenological study of private homebuilders' perceptions on the employment of professional services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

García de Soto, D B; Streule, T; Klippel, M; Bartlomé, O and Adey, B T (2020) Improving the planning and design phases of construction projects by using a case-based digital building system. International Journal of Construction Management, 20(8), pp. 900-911. ISSN 1562-3599

Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175

Gerth, R; Boqvist, A; Bjelkemyr, M and Lindberg, B (2013) Design for construction: Utilizing production experiences in development. Construction Management and Economics, 31(2), pp. 135-150. ISSN 1466433X

Ghomi, S G; Wedawatta, G; Ginige, K and Ingirige, B (2021) Living-transforming disaster relief shelter: A conceptual approach for sustainable post-disaster housing. Built Environment Project and Asset Management, 11(4), pp. 687-704. ISSN 2044-124X

Glad, W (2012) Housing renovation and energy systems: The need for social learning. Building Research & Information, 40(3), pp. 274-289. ISSN 0961-3218

Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599

Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988

Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Haller, M and Stehn, L (2011) Evaluation of efficiency in housing construction design. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Heravi, G and Jafari, A (2014) Cost of quality evaluation in mass-housing projects in developing countries. Journal of Construction Engineering and Management, 140(5): 04014004, ISSN 0733-9364

Hope, A (2011) Greener homes for the future?: sustainability in PFI local authority social housing. PhD thesis, Northumbria University, UK.

Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.

Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364

Ibarra, G (2016) The meaning of 'social' in Mexican social housing: A study of housing developments in Mazatlán, Mexico. PhD thesis, University of Sheffield, UK.

Ibem, E O; Onyemaechi, P C and Ayo-Vaughan, E A (2018) Project selection and transparency factors in housing public-private partnerships in Nigeria. Construction Economics and Building, 18(2), pp. 15-40. ISSN 2204-9029

Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.

Inzulza Contardo, J; Boano, C and Wirsching, C (2018) Gentrification in (re)construction: Talca's neighbourhoods post 2010 earthquake. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 170-183. ISSN 1759-5916

Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(4), pp. 334-345. ISSN 0969-9988

Juan, Y K; Lin, I C and Tsai, J X (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(3), pp. 515-534. ISSN 0969-9988

Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364

Kavishe, N and An, M (2016) Challenges for implementing public private partnership in housing projects in dar es salaam city, Tanzania. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kavishe, N and Chileshe, N (2017) Joint venture housing projects in dar es salaam city: An analysis of challenges and effectiveness. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kavishe, N and Chileshe, N (2018) Motivational factors for adoption of public-private partnerships (PPPs) in housing projects in Tanzania: A qualitative study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Kavishe, N and Chileshe, N (2019) Readiness assessment of public-private partnerships implementation within Tanzanian housing projects: Challenges, strategies and approaches. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Kavishe, N and Chileshe, N (2020) Driving forces for adopting public-private partnerships in Tanzanian housing projects. International Journal of Construction Management, 20(8), pp. 912-927. ISSN 1562-3599

Kavishe, N and Chileshe, N (2022) Development and validation of public-private partnerships framework for delivering housing projects in developing countries: A case of Tanzania. International Journal of Construction Management, 22(5), pp. 873-890. ISSN 1562-3599

Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988

Kavishe, N; Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(4), pp. 354-369. ISSN 1562-3599

Kavishe, N W (2018) Improving the delivery of PPP housing projects in developing countries. PhD thesis, University of Birmingham, UK.

Khalid, M S (2010) Abandoned housing development: the Malaysian experience. PhD thesis, Heriot-Watt University, UK.

Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988

Knauseder, I; Josephson, P E and Styhre, A (2007) Learning approaches for housing, service and infrastructure project organizations. Construction Management and Economics, 25(8), pp. 857-867. ISSN 1466433X

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988

Krishnamurthy, A D and Mahesh, G (2024) Stimulation of construction industry output through enhanced efficiency of Indian residential real estate sector. Built Environment Project and Asset Management, 14(4), pp. 562-589. ISSN 2044-124X

Lau, J L and Hashim, A H (2020) Mediation analysis of the relationship between environmental concern and intention to adopt green concepts. Smart and Sustainable Built Environment, 9(4), pp. 539-556. ISSN 2046-6099

Lee, P. H. and Han, Q. (2026) User-centric sustainable design in mass-customized housing using kano model and quality function deployment. Architectural Engineering and Design Management, 22(2), pp. 308-324. ISSN 1745-2007

Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364

Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364

Lindén, S and Josephson, P E (2013) In-housing or out-sourcing on-site materials handling in housing? Journal of Engineering, Design and Technology, 11(1), pp. 90-106. ISSN 1726-0531

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(2), pp. 103-113. ISSN 1466433X

Loehlein, G (2000) Role of the reichsforschungsgesellschaft fuer wirtschaftlichkeit im bau - und wohnungswesen e.v in supporting non-traditional construction methods in German public housing in the late 1920s. PhD thesis, Cardiff University, UK.

Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance. PhD thesis, Indian Institute of Technology Delhi, India.

Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.

Masood, R; Roy, K; Gonzalez, V A; Lim, J B P and Nasir, A R (2025) Modeling relational performance of the supply chains for prefabricated housebuilding in New Zealand. Smart and Sustainable Built Environment, 14(1), pp. 276-302. ISSN 2046-6099

Mohamed, Yamen (2023) Adopting modern methods of construction in low-income housing projects in Egypt. PhD thesis, London South Bank University, UK.

Molaei, P; Hashempour, P and Tang, L M (2022) Semi-open spaces of apartments considering COVID-19 pandemic: General expectations of balcony design in the post-pandemic world. Architectural Engineering and Design Management, 18(5), pp. 705-722. ISSN 1745-2007

Muhammad, Z and Johar, F (2019) Critical success factors of public-private partnership projects: A comparative analysis of the housing sector between Malaysia and Nigeria. International Journal of Construction Management, 19(3), pp. 257-269. ISSN 1562-3599

Nadim, W (2016) Live-work and adaptable housing in Egypt: A zero commuting concept, lessons learnt from informal developments. Smart and Sustainable Built Environment, 5(3), pp. 289-302. ISSN 2046-6099

Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.

Nyein, T S and Hadikusumo, B H W (2021) Factors influencing the adoption of public-private partnership in low-cost housing development in Myanmar. Journal of Financial Management of Property and Construction, 26(3), pp. 337-365. ISSN 1366-4387

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Obi, L I; Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(2), pp. 135-153. ISSN 1366-4387

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Ogunkah, I (2015) Rethinking low-cost green building material selection process in the design of low-impact green housing developments. PhD thesis, University of Westminster, UK.

Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.

Onat, N (1998) An approach to the determination of adaptable spatial design concept in housing production by using prefabricated building elements. PhD thesis, Dokuz Eylul Universitesi, Turkey.

Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.

Othman, A A E (2007) Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in abu dhabi, united arab emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159. ISSN 1745-2007

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.

Peters, T and Masoudinejad, S (2022) Balconies as adaptable spaces in apartment housing. Buildings & Cities, 3(1), pp. 265-278. ISSN 2632-6655

Poon, C S; Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(2), pp. 88-98. ISSN 0969-9988

Pullen, S; Arman, M; Zillante, G; Zuo, J; Chileshe, N and Wilson, L (2010) Developing an assessment framework for affordable and sustainable housing. Construction Economics and Building, 10(1-2), pp. 48-64. ISSN 2204-9029

Raed, H (1999) Empowerment via progressive participation: Jordanian experience of the low income housing production. PhD thesis, University College London, UK.

Rogage, K; Clear, A; Alwan, Z; Lawrence, T and Kelly, G (2020) Assessing building performance in residential buildings using BIM and sensor data. International Journal of Building Pathology and Adaptation, 38(1), pp. 176-191. ISSN 23984708

Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364

Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.

Saleh, Nour M M (2025) Post-disaster management in housing reconstruction. DEng thesis, Technische Universitaet Berlin, Germany.

Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.

Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499

Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364

Sazalli, S A H; Greenwood, D; Morton, D and Agnew, B (2012) Industrialized building system in Malaysian housing: An emerging innovation system explanation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Schofield, L N (2011) The role of stakeholders in building self-sustaining capacity in housing development projects in marginalised communities: case of Odi and Kaduna South communities in Nigeria. PhD thesis, University of Salford, UK.

Sebastian, R (2010) Integrated design and engineering using building information modelling: A pilot project of small-scale housing development in the Netherlands. Architectural Engineering and Design Management, 6(2), pp. 103-110. ISSN 1745-2007

Sharma, M (2014) Architectural design quality in local authority private finance initiative sheltered housing projects: the development of an evaluation tool. PhD thesis, Northumbria University, UK.

Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(1), pp. 1-12. ISSN 1562-3599

Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531

Tauber, G (2015) Architects and rural post-disaster housing: Lessons from south India. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 206-224. ISSN 1759-5916

Teo, M and Loosemore, M (2006) Community protest groups' perceptions of environmental risks using social contagion theory. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Thomas, Douglas N (2015) The increase of timber use in residential construction in Australia: Towards a sustainable residential development model. PhD thesis, University of Technology Sydney, Australia.

Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175

Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988

Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: A case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(5), pp. 1789-1806. ISSN 0969-9988

Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599

Tummers-Mueller, L C (2017) Learning from co-housing initiatives: Between Passivhaus engineers and active inhabitants. PhD thesis, Delft University of Technology, Netherlands.

Van Oorschot, J A W H; Halman, J I M and Hofman, E (2020) Getting innovations adopted in the housing sector. Construction Innovation, 20(2), pp. 285-318. ISSN 1471-4175

Wang, H (2015) The interplay of formal and informal institutions for procurement innovation: a social network approach. PhD thesis, University of Hong Kong, Hong Kong.

Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175

Wong, F K W and Kong, L S P (1998) Marketization of state-owned housing in China: Comfortable housing project in Beijing. Journal of Financial Management of Property and Construction, 3(1), pp. 27-42. ISSN 1366-4387

Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: A case study of "old" and "new" public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(2), pp. 107-124. ISSN 1745-2007

Wu, H; Qian, Q K; Straub, A and Visscher, H (2021) Stakeholder perceptions of transaction costs in prefabricated housing projects in China. Journal of Construction Engineering and Management, 147(1): 04020145, ISSN 0733-9364

Wu, H; Qian, Q K; Straub, A and Visscher, H J (2022) Factors influencing transaction costs of prefabricated housing projects in China: Developers' perspective. Engineering, Construction and Architectural Management, 29(1), pp. 476-501. ISSN 0969-9988

Wu, Z; Yang, K; Wu, Z; Xue, H; Li, S and Antwi-Afari, M F (2024) Investigating the mechanism of developers' willingness to adopt prefabricated housing using an integrated DEMATEL-SD framework. Engineering, Construction and Architectural Management, 31(6), pp. 2392-2414. ISSN 0969-9988

Wågø, S and Berker, T (2014) Architecture as a strategy for reduced energy consumption? An in-depth analysis of residential practices' influence on the energy performance of passive houses. Smart and Sustainable Built Environment, 3(3), pp. 192-206. ISSN 2046-6099

Yee, Tiew Si (2024) Developing a building contract administration framework for graduate architects managing housing projects. PhD thesis, University of Malaya, Malaysia.

Zamalik, M N and Nawi, M N M (2024) Managing soil and geotechnical aspects in housing developments: Analysis of case studies. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Zea Escamilla, E (2015) Development of simplified life cycle assessment methodology for construction materials and buildings outside of the European context through the use of geographic information systems. DSc thesis, ETH Zürich, Switzerland.

Zheng, W; Shen, G; Wang, H and Lombardi, P (2015) Critical issues in spatial distribution of public housing estates and their implications on urban renewal in Hong Kong. Smart and Sustainable Built Environment, 4(2), pp. 172-187. ISSN 2046-6099

Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.

de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218

van Oorschot, John (2020) On the adoption of innovation in the housing sector. PhD thesis, University of Twente, Netherlands.

Çepni, M. S.; Kutluca, A. K.; Salihoğlu, T.; Atmaca, A. and Mintemur, S. (2026) Changing land-use metrics in mass housing: Türkiye case study. Buildings & Cities, 7(1), pp. 541-558. ISSN 2632-6655

This list was generated on Sat Aug 22 02:22:00 2026 UTC.