Items with Index Term: hotel

Number of items: 63.

Almås, A J and Hygen, H O (2012) Impacts of sea level rise towards 2100 on buildings in Norway. Building Research & Information, 40(3), pp. 245-259. ISSN 0961-3218

Amirkhani, S (2022) Minimum energy efficiency standard (MEES) requirements and the impact on the UK hotel buildings stock. PhD thesis, University of West London, UK.

Asgary, A and Azimi, N (2019) Choice of emergency shelter: Valuing key attributes of emergency shelters. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 130-150. ISSN 1759-5916

Asok, A (2017) Work-life balance of migrant labourers in Kerala with special reference to civil construction sector. PhD thesis, University of Kerala, India.

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Bandara, C; Dissanayake, D M P P; Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(5), pp. 515-527. ISSN 2044-124X

Bandara, S G D K; Abdeen, F N; Disaratna, V and Perera, B A K S (2022) Employee welfare and job satisfaction in the Sri Lankan hotel industry. International Journal of Construction Management, 22(15), pp. 3045-3054. ISSN 1562-3599

Barakat, T A H (2009) A hybrid model of communication and information management in mega construction projects in Dubai using a new critical success factor approach. PhD thesis, Loughborough University, UK.

Bello, N U; Jolaoso, A B and Olanrele, O O (2018) Comparative analysis of investment attributes of hotel and commercial property in South-Western Nigeria. African Journal of Built Environment Research, 2(1), pp. 1-20. ISSN 2414-0236

Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.

Blismas, N G (2001) Multi project environments of construction clients. PhD thesis, Loughborough University, UK.

Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.

Chandrasekera, T and Hebert, P (2019) Emergency preparedness in the hospitality industry in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 167-174. ISSN 1759-5916

Dehghan Pour Farashah, M; Aslani, E; Yadollahi, S and Ghaderi, Z (2023) Postoccupancy evaluation of historic buildings after their adaptive reuse into boutique hotels: An experience from yazd, Iran. International Journal of Building Pathology and Adaptation, 41(4), pp. 849-874. ISSN 23984708

Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X

Duggan, G P; Bauleo, P; Authier, M; Aloise-Young, P A; Care, J and Zimmerle, D (2023) Electricity consumption in commercial buildings during COVID-19. Buildings & Cities, 4(1), pp. 851-866. ISSN 2632-6655

Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.

Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ewart, K and Silcock, G (1987) An analysis of the cost of compliance with the fire services order, Northern Ireland, 1985. Construction Management and Economics, 5(1), pp. 3-12. ISSN 01446193

Fasna, M F F and Gunatilake, S (2020) Overcoming barriers for building energy efficiency retrofits: Insights from hotel retrofits in Sri Lanka. Built Environment Project and Asset Management, 10(2), pp. 277-295. ISSN 2044-124X

Fasna, M F F and Gunatilake, S (2020) Roles and functions of stakeholders in implementing energy retrofits in the hotel sector. International Journal of Building Pathology and Adaptation, 38(5), pp. 737-751. ISSN 23984708

Fenech, N (2006) Managing risks within international hotel construction projects. PhD thesis, University College London, UK.

Florencio, Lutemberg de Araújo (2018) Structuring of a rating system for the classification of risk of linking commercial real estate properties as guarantee for long-term credit operations. PhD thesis, Universidade de São Paulo, Brazil.

Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.

Grant, E (2013) "Pack 'em, rack 'em and stack 'em": The appropriateness of the use and reuse of shipping containers for prison accommodation. Construction Economics and Building, 13(2), pp. 35-44. ISSN 2204-9029

Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(4), pp. 369-385. ISSN 1466433X

Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry. PhD thesis, University of Strathclyde, UK.

Hein, M F and Houck, K D (2008) Construction challenges of adaptive reuse of historical buildings in Europe. International Journal of Construction Education and Research, 4(2), pp. 115-131. ISSN 1557-8771

Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.

Jiang, A; Zhu, Y; Elsafty, A and Tumeo, M (2018) Effects of global climate change on building energy consumption and its implications in Florida. International Journal of Construction Education and Research, 14(1), pp. 22-45. ISSN 1557-8771

Jupp, B C (2003) Forecasting value in building projects. PhD thesis, Loughborough University, UK.

Karatseyeva, T and Akhmedova, A (2023) Modern tendency of development of architectural typology on the example of micro-apartment for almaty city. Engineering, Construction and Architectural Management, 30(10), pp. 4846-4866. ISSN 0969-9988

Kazanci, O; Ulubeyli, S and Dogan, E (2025) A fuzzy model for financial performance measurement of real estate investment trusts: Comparison of investment areas. Engineering, Construction and Architectural Management, 32(4), pp. 2533-2552. ISSN 0969-9988

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Lamberti, G; Boghetti, R; Fantozzi, F; Leccese, F and Salvadori, G (2025) Analysing the potential of open hotel review databases for IEQ assessment: A text mining approach. Building Research & Information, 53(1-2), pp. 261-279. ISSN 0961-3218

Li, H; Guo, H L; Skitmore, M; Huang, T; Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(3), pp. 233-245. ISSN 01446193

Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry. PhD thesis, University of Sheffield, UK.

Liow, K H (1999) Corporate real estate in financial statements: Evidence from Singapore hotel corporations. Journal of Financial Management of Property and Construction, 4(2), pp. 63-80. ISSN 1366-4387

Louw, M P (2016) The adaptive reuse of industrial structures: Revisiting the Thesen Islands power station project in South Africa. Journal of Engineering, Design and Technology, 14(4), pp. 920-940.

Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance. PhD thesis, Indian Institute of Technology Delhi, India.

Mesquita, Maria Julia de Moraes (2007) Subsidy for quality plans of buildings in the hospitality sector. PhD thesis, Universidade de São Paulo, Brazil.

Nguyen, L D; Tran, D Q and Chandrawinata, M P (2016) Predicting safety risk of working at heights using Bayesian networks. Journal of Construction Engineering and Management, 142(9): 04016041, ISSN 0733-9364

Oswald, D; Sherratt, F and Smith, S D (2017) An investigation into a health & safety rewards system on a large construction project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

O’Riain, E; Spillane, J and Sherratt, F (2018) Healthy, happy workers? The consequences of commuting between Northern Ireland and Great Britain. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component. PhD thesis, University of Florida, USA.

Rahim, A A and Samad, N A A (2010) Accessible built environment for the elderly and disabled in Malaysia: Hotels as case studies. Journal of Construction in Developing Countries, 15(2), pp. 1-21. ISSN 1823-6499

Rajagopalan, K S (1988) Supports for traveling cranes: Case history. Journal of Construction Engineering and Management, 114(1), pp. 114-120. ISSN 0733-9364

Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099

Rooke, C N; Rooke, J A; Koskela, L and Tzortzopoulos, P (2010) Using the physical properties of artefacts to manage through-life knowledge flows in the built environment: An initial exploration. Construction Management and Economics, 28(6), pp. 601-613. ISSN 1466433X

Sanvido, V E and Paulson, B C (1991) Site analysis using controller-function charts. Journal of Construction Engineering and Management, 117(2), pp. 226-241. ISSN 0733-9364

Sharma, R K (2018) Factors affecting financial leveraging for BSE listed real estate development companies in India. Journal of Financial Management of Property and Construction, 23(3), pp. 274-294. ISSN 1366-4387

Sheth, A; Price, A D F; Glass, J and Achour, N (2008) Reviewing the sustainability of existing healthcare facilities. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sijakovic, M; Peric, A and Ayuso Ollero, P (2021) Towards resilient design of the building asset: The BREEAM-based evaluation of the z hotel holborn, London. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 85-100. ISSN 1759-5916

Thompson, N J (2003) Relationship marketing and client trust towards contractors within the large private building sector of the UK construction industry. PhD thesis, Oxford Brookes University, UK.

Widyarta, Mohammad (2025) Edifices as conduit: Indonesian and foreign agencies in the production of post-independence buildings. PhD thesis, University of New South Wales, Australia.

Xie, L.; Yu, Z. and Zhao, X. (2025) Assessing construction safety risks in large urban complex projects: An interval ordinal priority approach. Engineering, Construction and Architectural Management, 33(5), pp. 3996-4018. ISSN 0969-9988

Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599

Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X

Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(6), pp. 543-556. ISSN 0961-3218

Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

This list was generated on Sat Aug 22 02:12:16 2026 UTC.