Items with Index Term: hoisting
Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988
Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193
Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364
Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364
Li, H; Luo, X and Skitmore, M (2020) Intelligent hoisting with car-like mobile robots. Journal of Construction Engineering and Management, 146(12): 04020136, ISSN 0733-9364
Lin, S S and Zheng, X J (2025) A decision support approach for safety risk analysis and management in large-scale shield cutter head hoisting operations. Journal of Construction Engineering and Management, 151(11): 04025169, ISSN 0733-9364
Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364
Luo, Q; Sun, C; Dan, Y; Zhao, T and Zhang, G (2026) Unraveling safety risk coupling in prefabricated steel construction via data mining. Journal of Construction Engineering and Management, 152(3): 04025281, ISSN 0733-9364
Oduori, M and Mbuya, T (2009) Wire rope selection for manual winch application. Journal of Engineering, Design and Technology, 7(2), pp. 207-222. ISSN 1726-0531
Pham, V H S and Pham, D H (2025) A cutting-edge approach to prefabricated construction site layouts using multi-objective artificial hummingbird algorithm solution. International Journal of Construction Management, 25(16), pp. 2063-2081. ISSN 1562-3599
Pham, V H S and Pham, D H (2025) Dynamic multiobjective optimization model for construction site layout in prefabricated projects. Journal of Construction Engineering and Management, 151(10): 04025150, ISSN 0733-9364
Sawhney, A and Mund, A (2001) Intellicranes: An integrated crane type and model selection system. Construction Management and Economics, 19(2), pp. 227-237. ISSN 01446193
Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364
Tamate, S; Suemasa, N and Katada, T (2005) Analyses of instability in mobile cranes due to ground penetration by outriggers. Journal of Construction Engineering and Management, 131(6), pp. 689-704. ISSN 0733-9364
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Wang, G; Liu, M; Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(2), pp. 940-960. ISSN 0969-9988
Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364
Yao, F.; Tong, W.; Ji, Y.; Zhang, Y. and Li, H. X. (2026) Monitoring hoisting workers' negative emotions in prefabricated construction using galvanic skin response measurements. Journal of Construction Engineering and Management, 152(9): 04026150, ISSN 0733-9364
Zhang, J and Jiang, S (2026) Unsafe behaviors in workers at heights: A spacetime-based coupling analysis method and its safety implications. Journal of Construction Engineering and Management, 152(1): 04025233, ISSN 0733-9364
Zhou, R.; Li, H.; Hu, W.; Meng, T.; Lu, H.; Wu, Y.; Chen, Y.; Cao, D. and Wang, F. Y. (2026) Integrated dual-crane positioning and lifting planning in extreme conditions: A critical states and spatial constraint optimization approach. Journal of Construction Engineering and Management, 152(6): 04026072, ISSN 0733-9364
Up a level