Items with Index Term: highway construction

Number of items: 398.

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Abdelrahman, M; Zayed, T and Elyamany, A (2008) Best-value model based on project specific characteristics. Journal of Construction Engineering and Management, 134(3), pp. 179-188. ISSN 0733-9364

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Abdul-Aziz, A R and How, Y M (2012) To-be-reclaimed land swap for new highway: The Jelutong expressway case. International Journal of Construction Management, 12(4), pp. 1-16. ISSN 1562-3599

Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abhayantha, K I L; Perera, B A K S; Perera, H A H P and Palliyaguru, R S (2025) Management of environmental risks in highway construction projects in Sri Lanka. Construction Innovation, 25(3), pp. 867-892. ISSN 1471-4175

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988

Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364

Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364

Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.

Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364

Akoh, S R (2018) Risk management framework for highway construction projects in Nigeria. PhD thesis, Heriot-Watt University, UK.

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al-Kaisy, A and Nassar, K (2005) Nighttime construction issues revisited. Journal of Construction Research, 6(1), pp. 139-156. ISSN 1609-9451

Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364

Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599

Al-Shabbani, Z; Taherpour, F and Dadi, G B (2026) Development and short-term evaluation of a pretask safety briefing tool for highway construction and maintenance crews. Journal of Construction Engineering and Management, 152(5): 04026048, ISSN 0733-9364

Al-Shabbani, Z (2019) Improving safety performance of highway maintenance crews through pre-task safety toolbox talks. PhD thesis, University of Kentucky, USA.

AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599

Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.

Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364

Alencar, C T (2000) Highway concessions in Brazil: An analysis towards the feasibility of the securitization. Journal of Financial Management of Property and Construction, 5(3), pp. 159-169. ISSN 1366-4387

Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499

Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364

Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499

Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.

Alshboul, O.; Al-Shboul, K.; Shehadeh, A. and Tatari, O. (2026) Advancing equipment management for construction: Introducing a new model for cost, time and quality optimization. Construction Innovation, 26(4), pp. 1191-1217. ISSN 1471-4175

Altalhoni, A; Liu, H; Abudayyeh, O; Kwigizile, V; Huang, W C and Kirkpatrick, K (2025) Robust forecasting models for highway construction cost indices during pandemic-era inflation. Journal of Construction Engineering and Management, 151(8): 04025101, ISSN 0733-9364

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Amadi, A (2019) A cross-sectional snapshot of the insider view of highway infrastructure delivery in the developing world. International Journal of Construction Management, 19(6), pp. 472-491. ISSN 1562-3599

Amadi, A (2023) The statistical sensitivity of highway project cost to geo-heterogeneity in the tropics. International Journal of Building Pathology and Adaptation, 41(4), pp. 875-902. ISSN 23984708

Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.

Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), pp. 349-371. ISSN 1366-4387

Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(3), pp. 269-285. ISSN 1366-4387

Amadi, A I and Higham, A (2018) The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. Journal of Financial Management of Property and Construction, 23(1), pp. 57-72. ISSN 1366-4387

Amadi, A I and Higham, A (2019) Putting context to numbers: A geotechnical risk trajectory to cost overrun extremism. Construction Management and Economics, 37(4), pp. 217-237. ISSN 01446193

Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364

Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Antillon, E I; Molenaar, K R and Javernick-Will, A (2017) Evaluating the effect of contract timing on lifecycle-design innovation in public-private partnerships: Comparative case study of highway projects. Journal of Construction Engineering and Management, 143(4): 05016023, ISSN 0733-9364

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Antoniou, F and Aretoulis, G (2019) A multi-criteria decision-making support system for choice of method of compensation for highway construction contractors in Greece. International Journal of Construction Management, 19(6), pp. 492-508. ISSN 1562-3599

Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599

Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364

Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 0969-9988

Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions. PhD thesis, North Carolina State University, USA.

Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364

Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Ashuri, B; Lu, J and Kashani, H (2011) A real options framework to evaluate investments in toll road projects delivered under the two-phase development strategy. Built Environment Project and Asset Management, 1(1), pp. 14-31. ISSN 2044-124X

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bartley, T; McMahon, C and Denton, S (2016) Information flows in highway project delivery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Beliveau, Y J; Snyder, D A and Vorster, M C (1991) Dbe programs-new model. Journal of Construction Engineering and Management, 117(1), pp. 176-192. ISSN 0733-9364

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Bhatt, N and Sarkar, D (2020) Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. International Journal of Construction Management, 20(6), pp. 653-665. ISSN 1562-3599

Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.

Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364

Bowlby, W and Cohn, L F (1983) Prediction of highway construction noise levels. Journal of Construction Engineering and Management, 109(2), pp. 163-180. ISSN 0733-9364

Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Cass, D and Mukherjee, A (2011) Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: Case study for pavement operations. Journal of Construction Engineering and Management, 137(11), pp. 1015-1025. ISSN 0733-9364

Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.

Cheng, G and Wilmot, C G (2009) Louisiana highway construction cost trend after hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(7), pp. 594-600. ISSN 0733-9364

Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364

Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.

Chou, C C; Caldas, C H; O'Connor, J T; Sroka, A W and Goldman, G K (2009) Identification of decision drivers for the strategy of incorporating utility relocations into highway construction contracts. Journal of Construction Engineering and Management, 135(9), pp. 812-818. ISSN 0733-9364

Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364

Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.

Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Public assessment for environmental management plan implementation: Comparative study of performance indicators of road and highway construction projects. Journal of Construction Engineering and Management, 150(7): 05024006, ISSN 0733-9364

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Performance indicators for public evaluation of environmental management plan implementation in highway construction projects. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 425-449. ISSN 1759-5916

Damirchilo, F (2021) Use of machine learning and data science on infrastructure transportation and construction projects. PhD thesis, Arizona State University, USA.

Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X

De Cicco, S (2004) Design and development of an information management system for highway construction specifications. PhD thesis, University of Wisconsin - Madison, USA.

Deep, A; Nayyer, M I and Annamalai, T R (2025) When sauce for the goose is not sauce for the gander—the divergent impact of transparency law in infrastructure procurement: Evidence from EPC and PPP road projects in India. Construction Management and Economics, 43(11), pp. 922-937. ISSN 0144-6193

Deep, S; Bhoola, V; Vidhani, J and Hampannaver, P R (2022) Evaluating the impact of constraints on project success: Empirical study of highway projects. Built Environment Project and Asset Management, 12(4), pp. 684-700. ISSN 2044-124X

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.

Diab, M F; Varma, A and Panthi, K (2017) Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of Construction Engineering and Management, 143(8): 04017041, ISSN 0733-9364

Do, Q; Moriyani, M A; Le, C and Le, T (2023) Cost-weighted tf-idf: A novel approach for measuring highway project similarity based on pay items' cost composition and term frequency. Journal of Construction Engineering and Management, 149(8): 04023069, ISSN 0733-9364

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Do, Q; Le, T; Trinh, M T and Le, C (2025) Multiobjective project clustering optimization for enhancing highway contract bundling decisions. Journal of Construction Engineering and Management, 151(11): 04025166, ISSN 0733-9364

Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Dunston, P S; Savage, B M and Mannering, F L (2000) Weekend closure for construction of asphalt overlay on urban highway. Journal of Construction Engineering and Management, 126(4), pp. 313-315. ISSN 0733-9364

Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364

Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

El Kassis, R (2023) The use of augmented reality for communication in uncontrolled construction environment. PhD thesis, Arizona State University, USA.

El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.

El-Abbasy, M S; Zayed, T; Ahmed, M; Alzraiee, H and Abouhamad, M (2013) Contractor selection model for highway projects using integrated simulation and analytic network process. Journal of Construction Engineering and Management, 139(7), pp. 755-767. ISSN 0733-9364

El-Assaly, A E E-D (1997) Development of a statistical/mechanistic model to predict the consumption of nonrenewable materials in highway construction programs. PhD thesis, University of Florida, USA.

El-Diraby, T E and Kashif, K F (2005) Distributed ontology architecture for knowledge management in highway construction. Journal of Construction Engineering and Management, 131(5), pp. 591-603. ISSN 0733-9364

El-Diraby, T E and Wang, B (2005) Society portal: Integrating urban highway construction projects into the knowledge city. Journal of Construction Engineering and Management, 131(11), pp. 1196-1211. ISSN 0733-9364

El-Gafy, M and Abdelhamid, T S (2015) Impact of I/D contracts used for expediting Michigan's road construction. Journal of Construction Engineering and Management, 141(7): 5015005, ISSN 0733-9364

El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Kholy, A M (2021) Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. International Journal of Construction Management, 21(7), pp. 694-712. ISSN 1562-3599

El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

Elghamrawy, T; El-Rayes, K; Liu, L and Odeh, I (2012) Performance of temporary rumble strips at the edge of highway construction zones. Journal of Construction Engineering and Management, 138(8), pp. 923-930. ISSN 0733-9364

Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones. PhD thesis, University of Florida, USA.

Ellis, R A (1980) An analysis of the impact of public participation activities in water and transportation projects. PhD thesis, Ohio State University, USA.

Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.

Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364

Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.

Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry. PhD thesis, University of Florida, USA.

Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364

Esmaeili, B (2012) Identifying and quantifying construction safety risks at the attribute level. PhD thesis, University of Colorado at Boulder, USA.

Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(6), pp. 528-541. ISSN 1466433X

Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.

Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Feng, Z; Chao, Q; Tan, C and Yang, Y (2023) Using bargaining model with loss aversion and a risk of breakdown to determine compensation for buyback of early terminating BOT highway projects. Journal of Construction Engineering and Management, 149(5): 04023024, ISSN 0733-9364

Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364

Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Forcael, E (2010) Buffering strategies for managing transportation construction projects. PhD thesis, University of Florida, USA.

Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Gabrielli, M F (2009) Structural analysis of auction models. PhD thesis, Pennsylvania State University, USA.

Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364

Gamez, E A (2009) Risk assessment for international development projects: Owner's perspective. PhD thesis, Northeastern University, USA.

Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364

Ghoddousi, P; Nasirzadeh, F and Hashemi, H (2018) Evaluating highway construction projects' sustainability using a multicriteria group decision-making model based on bootstrap simulation. Journal of Construction Engineering and Management, 144(9): 04018092, ISSN 0733-9364

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalized document management system to update highway operation and management systems using building information modeling. Journal of Construction Engineering and Management, 152(7): 04026090, ISSN 0733-9364

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364

Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.

Goodrum, P M; Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(2), pp. 116-135. ISSN 0969-9988

Graversen, H (2022) Interchanges: Construction of the U.S. Interstate highway system and artistic practice, 1956-1984. PhD thesis, University of Chicago, USA.

Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988

Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.

Gutub, S (2019) Framework for the implementation process of public-private partnerships (P3s) in highway projects. PhD thesis, University of Washington, USA.

Haar, B W (1983) Collusion in the highway construction industry: Economic evidence as an investigative tool. PhD thesis, University of Nebraska - Lincoln, USA.

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.

Hallowell, M; Esmaeili, B and Chinowsky, P (2011) Safety risk interactions among highway construction work tasks. Construction Management and Economics, 29(4), pp. 417-429. ISSN 1466433X

Han, F and Bogus, S M (2021) Resilience criteria for project delivery processes: An exploratory analysis for highway project development. Journal of Construction Engineering and Management, 147(11): 04021140, ISSN 0733-9364

Hancher, D E (1998) Innovations in highway construction: Twelfth Peurifoy lecture, 1997. Journal of Construction Engineering and Management, 124(5), pp. 343-346. ISSN 0733-9364

Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete. PhD thesis, Pennsylvania State University, USA.

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.

Hashem M. Mehany, M S and Guggemos, A (2015) Risk management for asphalt road construction and maintenance under performance-based contracts. International Journal of Construction Education and Research, 11(4), pp. 292-315. ISSN 1557-8771

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364

Herbsman, Z (1983) Long-range forecasting highway construction costs. Journal of Construction Engineering and Management, 109(4), pp. 423-434. ISSN 0733-9364

Herbsman, Z J (1995) A+B bidding method: hidden success story for highway construction. Journal of Construction Engineering and Management, 121(4), pp. 430-437. ISSN 0733-9364

Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Holt, G D and Edwards, D J (2013) Analysis of United Kingdom off-highway construction machinery market and its consumers using new-sales data. Journal of Construction Engineering and Management, 139(5), pp. 529-537. ISSN 0733-9364

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193

Hou, W and Wang, L (2022) Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand. Engineering, Construction and Architectural Management, 29(5), pp. 2047-2072. ISSN 0969-9988

Huang, N; Du, Q; Zou, P X W and Huang, Y (2023) Analysis of key factors influencing green highway project development focusing on network interaction and project success: Evidence from China. Engineering, Construction and Architectural Management, 30(8), pp. 3203-3223. ISSN 0969-9988

Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364

Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jaraiedi, M; Plummer, R W and Aber, M S (1995) Incentive/disincentive guidelines for highway construction contracts. Journal of Construction Engineering and Management, 121(1), pp. 112-120. ISSN 0733-9364

Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364

Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.

Jia, J (2017) Multi-criteria evaluation in support of the decision-making process in highway construction projects. PhD thesis, Florida International University, USA.

Jiang, Y; Chen, H and Li, S (2009) Computation of user costs at freeway work zones using weigh-in-motion traffic data. International Journal of Construction Education and Research, 5(3), pp. 197-219. ISSN 1557-8771

Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771

Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988

Johnson, L R (1969) A competitive strategy model for highway construction proposals. PhD thesis, Oklahoma State University, USA.

Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.

Kalainesan, S (2007) Best management practices for highway construction site sedimentation basins. PhD thesis, University of Pittsburgh, USA.

Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. DSc thesis, University of Massachusetts Lowell, USA.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988

Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.

Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364

Kim, B; Lee, H; Park, H and Kim, H (2013) Estimation of greenhouse gas emissions from land-use changes due to road construction in the republic of Korea. Journal of Construction Engineering and Management, 139(3), pp. 339-346. ISSN 0733-9364

Kim, K and Cho, Y K (2021) Automatic recognition of workers' motions in highway construction by using motion sensors and long short-term memory networks. Journal of Construction Engineering and Management, 147(3): 04020184, ISSN 0733-9364

Kim, Y A; Ryoo, B Y; Kim, Y S and Huh, W C (2013) Major accident factors for effective safety management of highway construction projects. Journal of Construction Engineering and Management, 139(6), pp. 628-640. ISSN 0733-9364

Kishore, V; Abraham, D M and Sinfield, J V (2011) Portfolio cash assessment using fuzzy systems theory. Journal of Construction Engineering and Management, 137(5), pp. 333-343. ISSN 0733-9364

Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X

Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction. PhD thesis, University of Florida, USA.

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364

Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364

Le, T (2009) Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors. PhD thesis, University of Texas at Austin, USA.

Le, T; Caldas, C H; Gibson, G E and Thole, M (2009) Assessing scope and managing risk in the highway project development process. Journal of Construction Engineering and Management, 135(9), pp. 900-910. ISSN 0733-9364

Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364

Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364

Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364

Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364

Lee, E B and Thomas, D K (2007) State-of-practice technologies on accelerated urban highway rehabilitation: I-15 California experience. Journal of Construction Engineering and Management, 133(2), pp. 105-113. ISSN 0733-9364

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials. PhD thesis, University of Wisconsin - Madison, USA.

Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.

Lee, T S (1990) Detection of collusion in highway construction contract bidding. PhD thesis, University of Wisconsin - Madison, USA.

Li, F; Xu, X; Zhou, J; Chen, J and Zhou, S (2026) Automatic generation of inspection knowledge for highway construction via the integration of computer vision and ontology reasoning. Engineering, Construction and Architectural Management, 33(1), pp. 73-97. ISSN 0969-9988

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364

Liang, X; Gidado, K and Painting, N (2004) The identification of key obstacles that hinder foreign private finance investments in highway projects in China. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364

Lo, W; Lin, C L and Yan, M R (2007) Contractor's opportunistic bidding behavior and equilibrium price level in the construction market. Journal of Construction Engineering and Management, 133(6), pp. 409-416. ISSN 0733-9364

Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.

Mahamid, I (2017) Effect of change orders on rework in highway projects in Palestine. Journal of Financial Management of Property and Construction, 22(1), pp. 62-76. ISSN 1366-4387

Maharjan, S; Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(5), pp. 2008-2025. ISSN 0969-9988

Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364

Mahdi, I M; Arafat, H; Ebid, A M and El-Kadi, A F (2023) Decision model to identify the optimum retaining wall type for restricted highway projects sites. International Journal of Construction Management, 23(8), pp. 1387-1394. ISSN 1562-3599

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531

Mahmud, A T; Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: A systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(1), pp. 29-56. ISSN 1366-4387

Maldonado-Fortunet, F (2002) Sustainable development criteria for the evaluation of highway projects. PhD thesis, Georgia Institute of Technology, USA.

Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X

Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175

Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364

Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.

Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364

Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364

Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.

Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387

Meharie, M G; Mengesha, W J; Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(7), pp. 2836-2853. ISSN 0969-9988

Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.

Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X

Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mirzadeh, I and Birgisson, B (2016) Evaluation of highway projects under government support mechanisms based on an option-pricing framework. Journal of Construction Engineering and Management, 142(4): 04015094, ISSN 0733-9364

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599

Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.

Mohamed, M and Tran, D Q (2021) Risk-based inspection model for hot mix asphalt pavement construction projects. Journal of Construction Engineering and Management, 147(6): 78622053, ISSN 0733-9364

Mohamed, M and Tran, D Q (2023) Content analysis of e-inspection implementation for highway infrastructure construction projects. Engineering, Construction and Architectural Management, 30(7), pp. 2621-2644. ISSN 0969-9988

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Montes Victorio, Shani A (2024) A comprehensive framework for stakeholder management in utility coordination on highway projects. PhD thesis, Iowa State University, USA.

Moon, S; Ha, C and Yang, J (2012) Structured idea creation for improving the value of construction design. Journal of Construction Engineering and Management, 138(7), pp. 841-853. ISSN 0733-9364

Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364

Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364

Nayyer, M I and Annamalai, T R (2024) Procuring authorities and project performance: A case study of PPP highway projects in India. Built Environment Project and Asset Management, 14(1), pp. 38-55. ISSN 2044-124X

Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X

Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.

Nguyen, T; Elelu, K; Le, T and Le, C (2026) Enhancing auditory safety warnings in highway construction zones with loud noise using generative artificial intelligence. Journal of Construction Engineering and Management, 152(3): 04025283, ISSN 0733-9364

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, P H D (2020) Development of fuzzy hybrid approaches to project delivery method selection in highway construction. PhD thesis, University of Kansas, USA.

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, P H D; Tran, D and Lines, B C (2020) Fuzzy set theory approach to classify highway project characteristics for delivery selection. Journal of Construction Engineering and Management, 146(5): 04020044, ISSN 0733-9364

Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193

Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364

Nguyen, Q A (2023) Application of Ji Koutei Kanketsu (JKK) for design risk management in highway construction projects. PhD thesis, University of Huddersfield, UK.

Nguyen, Thinh Tan (2025) Accident data analytics and AI-based auditory enhancement for highway construction safety. PhD thesis, Clemson University, USA.

Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. PhD thesis, University of Colorado at Boulder, USA.

Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364

Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.

Ogunrinde, O; Amirkhanian, A; Corley, M and Nnaji, C (2020) Effect of nighttime construction on quality of asphalt paving. Journal of Construction Engineering and Management, 146(9): 04020111, ISSN 0733-9364

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Ohrn, L G and Schexnayder, C (1998) Performance-related specifications for highway construction. Journal of Construction Engineering and Management, 124(1), pp. 25-30. ISSN 0733-9364

Ozcan-Deniz, G (2011) An integrated multi-agent framework for optimizing time, cost and environmental impact of construction processes. PhD thesis, Florida International University, USA.

O’Connor, J T; Hugo, F and Stamm, E M (1991) Improving highway specifications for constructibility. Journal of Construction Engineering and Management, 117(2), pp. 242-258. ISSN 0733-9364

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599

Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.

Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.

Pewdum, W; Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(6), pp. 544-557. ISSN 0969-9988

Pieper, P J (1984) The measurement of real investment in structures and the construction productivity decline (deflation). PhD thesis, Northwestern University, USA.

Pietroforte, R; Gregori, T and Falagario, M (2009) The changing input structure of the US construction industry: A longitudinal analysis. Construction Management and Economics, 27(11), pp. 1089-1098. ISSN 1466433X

Pinheiro Santos Fernandes, P G; Elias Arantes, A and Ferreira Nobre Júnior, E (2024) Optimization model for earthwork allocations considering the construction of multiple haul roads: GIS-based integrated approach. Journal of Construction Engineering and Management, 150(4): 05024001, ISSN 0733-9364

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(6), pp. 540-561. ISSN 0969-9988

Prasertrungruang, T and Hadikusumo, B H W (2009) Study of factors influencing the efficient management and downtime consequences of highway construction equipment in Thailand. Journal of Construction Engineering and Management, 135(1), pp. 2-11. ISSN 0733-9364

Praticò, F G (2007) Quality and timeliness in highway construction contracts: A new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(3), pp. 305-313. ISSN 1466433X

Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. PhD thesis, University of Florida, USA.

Qiao, Y; Fricker, J D and Labi, S (2019) Influence of project bundling on maintenance of traffic costs across highway project types. Journal of Construction Engineering and Management, 145(8): 05019010, ISSN 0733-9364

Radzi, A R; Rahman, R A; Doh, S I and Esa, M (2022) Construction readiness for highway projects: Key decision criteria. Journal of Construction Engineering and Management, 148(2): 04021196, ISSN 0733-9364

Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.

Rohman, M A (2022) Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), pp. 239-258. ISSN 1366-4387

Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988

Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304

Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Santos, P A S; Cortez, B and Carvalho, M T M (2025) Integrating GIS and BIM with MCDM for infrastructure planning: A comprehensive framework. Engineering, Construction and Architectural Management, 32(6), pp. 4197-4226. ISSN 0969-9988

Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599

Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364

Shafaat, A; Marbouti, F and Mahfouz, T (2023) Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), pp. 2348-2357. ISSN 1562-3599

Shane, J S (2006) A fundamental study of scope definition in early highway project development. PhD thesis, University of Colorado at Boulder, USA.

Shang, T; Hu, X; Ye, K and Tam, V W Y (2023) Will contractors pursue unsustainable practices following environmental recovery? A highway case in China. Engineering, Construction and Architectural Management, 30(3), pp. 1165-1182. ISSN 0969-9988

Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364

Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Shehadeh, A; Alshboul, O and Tamimi, M (2025) Quantitative analysis of climate-adaptive pavement technologies: Mitigating environmental impact and enhancing economic viability in urban infrastructure. Journal of Construction Engineering and Management, 151(6): 04025064, ISSN 0733-9364

Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.

Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599

Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.

Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K J; Jeong, H D and Gransberg, D D (2017) Multidimensional highway construction cost indexes using dynamic item basket. Journal of Construction Engineering and Management, 143(8): 04017036, ISSN 0733-9364

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules. PhD thesis, Iowa State University, USA.

Shrestha, P P (2007) Performance benchmarking of large highway projects. PhD thesis, University of Texas at Austin, USA.

Shrestha, P P; O'Connor, J T and Gibson Jr, G E (2012) Performance comparison of large design-build and design-bid-build highway projects. Journal of Construction Engineering and Management, 138(1), pp. 1-13. ISSN 0733-9364

Shrestha, S; Shan, Y and Goodrum, P M (2024) Identification of best practices in project bundling for state dots using semistructured interviews. Journal of Construction Engineering and Management, 150(7): 04024056, ISSN 0733-9364

Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364

Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193

Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.

Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.

Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364

Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364

Tezel, A and Koskela, L (2023) Off-site construction in highways projects: Management, technical, and technology perspectives from the United Kingdom. Construction Management and Economics, 41(6), pp. 475-499. ISSN 01446193

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531

Tong, R; Zhao, H; Zhang, N; Li, H; Wang, X and Yang, H (2021) Modified accident causation model for highway construction accidents (acm-hc). Engineering, Construction and Architectural Management, 28(9), pp. 2592-2609. ISSN 0969-9988

Touran, A (1991) Modeling uncertainty in operations with nonstationary cycle times. Journal of Construction Engineering and Management, 117(4), pp. 728-735. ISSN 0733-9364

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Uchehara, I; Hamma-adama, M and Moore, D (2020) Highway sustainability construction: Reducing carbon emissions using process management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364

Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.

Uddin, W (2008) Airborne laser terrain mapping for expediting highway projects: Evaluation of accuracy and cost. Journal of Construction Engineering and Management, 134(6), pp. 411-420. ISSN 0733-9364

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(2), pp. 171-182. ISSN 2044-124X

Vo, H. M. and Yang, J. B. (2026) Incorporating stakeholder perception into risk assessment model: An empirical study of highway construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5244-5274. ISSN 0969-9988

Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988

Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty. PhD thesis, University of California, Irvine, USA.

Wang, X; Li, J; Wang, R; Zhang, J and Ma, G (2025) Automated evaluation and optimization of subgrade construction based on intelligent compaction. Journal of Construction Engineering and Management, 151(9): 04025127, ISSN 0733-9364

Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Williams, R C; Hildreth, J C and Vorster, M C (2009) Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135(12), pp. 1299-1306. ISSN 0733-9364

Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193

Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175

Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364

Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364

Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364

Wu, C H; Hsieh, T Y; Cheng, W L and Lu, S T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(5), pp. 509-520. ISSN 01446193

Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.

Yang, G (2009) Evaluation method research and effect analysis of rural road construction on local development. PhD thesis, Harbin Institute of Technology, China.

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yao, H and Hao, J L (2014) Simulation model for identifying effective policy in mitigating noise emissions from highway projects. International Journal of Construction Management, 14(2), pp. 67-77. ISSN 1562-3599

Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364

Yates, J K (2013) Sustainable methods for waste minimisation in construction. Construction Innovation, 13(3), pp. 281-301. ISSN 1471-4175

Yi, J; Chen, H and Li, S (2010) Determination of contract time and incentive and disincentive values of highway construction projects. International Journal of Construction Education and Research, 6(4), pp. 285-302. ISSN 1557-8771

Yousif, O and Zakaria, R (2022) A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia. Construction Economics and Building, 22(2), pp. 102-120. ISSN 2204-9029

Zafar, I; Wuni, I Y; Shen, G Q P; Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(4), pp. 732-750. ISSN 1562-3599

Zagia, F.; Kajewski, S.; Omrani, S. and Motamedisedeh, O. (2026) Prioritizing the key causes of construction project delay in different countries: A cross-sectional analysis of different project types. International Journal of Construction Management, 26(9), pp. 1879-1904. ISSN 1562-3599

Zhang, D and Ho, C H (2024) Distribution fitting and anova test to analyze pavement sensing patterns for condition assessments. Built Environment Project and Asset Management, 14(4), pp. 663-676. ISSN 2044-124X

Zhang, J (2018) Building a sustainability assessment model for highway infrastructure projects in Yunnan, China. PhD thesis, University of Greenwich, UK.

Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364

Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364

Zhang, Y; Wang, Z; Lin, W; Minchin, R E and Xue, X (2022) Understanding the slow diffusion of alternative delivery systems using interpretive structural modelling. Construction Management and Economics, 40(6), pp. 459-476. ISSN 01446193

Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364

de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.