Items with Index Term: high-rise construction
Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193
Kaming, P F; Olomolaiye, P O; Holt, G D; Kometa, S T and Harris, F C (1996) Project managers' perception of production problems: an Indonesian case study. Building Research & Information, 24(5), pp. 302-310. ISSN 0961-3218
Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364
Maleki, B; Casanovas-Rubio, M D M and Fuente Antequera, A D L (2022) Sustainability assessment in residential high-rise building design: State of the art. Architectural Engineering and Design Management, 18(6), pp. 927-940. ISSN 1745-2007
O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364
Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218
Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.
Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193
Russell, A D; Tran, N and Staub-French, S (2014) Searching for value: Construction strategy exploration and linear planning. Construction Management and Economics, 32(6), pp. 520-547. ISSN 01446193
Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988
Salam, M A; Sarkar, S; Blackwood, D J and Staines, H J (1999) High-rise building construction in Bangladesh: Experience of questionnaire development and on-site data collection. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Salam, M A; Staines, H J; Blackwood, D J and Sarkar, S (2001) Analysis of the relationships between causes of delay in construction projects in Bangladesh. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Santoso, D S; Ogunlana, S O and Minato, T (2003) Assessment of risks in high rise building construction in Jakarta. Engineering, Construction and Architectural Management, 10(1), pp. 43-55. ISSN 0969-9988
Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599
Tripathi, P and Mittal, Y K (2025) Risk assessment and ranking methodology for occupational hazards in construction: A case of Indian high-rise projects. Smart and Sustainable Built Environment, 14(6), pp. 1927-1949. ISSN 2046-6099
Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Zhou, H.; Xu, M. and Yang, Q. (2026) Quantitative safety risk coupling assessment method based on complex network theory: A case study in super-high-rise building construction. Journal of Construction Engineering and Management, 152(7): 04026095, ISSN 0733-9364
Up a level