Items with Index Term: hardware
Abbasianjahromi, H; Shadhy, V P and Beykian, A (2021) Developing a smart helmet based on the internet of things to manage hearing problems in the construction projects. Journal of Construction in Developing Countries, 26(2), pp. 231-250. ISSN 1823-6499
Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364
Almarri, K; Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(1), pp. 85-104. ISSN 1471-4175
Almutiri, Y R (2016) Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia. PhD thesis, University of Salford, UK.
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599
Augugliaro, F (2015) Physical interaction, aerial construction, and coordinated flight for flying machines. DSc thesis, ETH Zürich, Switzerland.
Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499
Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387
Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.
Babalola, A; Cheung, C M; Yunusa-Kaltungo, A; Manu, P and Bartolo, P (2024) A conceptual framework and tools characteristics for developing an immersive technology-based occupational health training mechanism. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Barnes, W C (1993) Microcomputers in management of construction operations. Journal of Construction Engineering and Management, 119(2), pp. 403-412. ISSN 0733-9364
Bassanino, M N (1999) The perception of computer generated architectural images. PhD thesis, University of Liverpool, UK.
Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.
Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality. PhD thesis, University of Michigan, USA.
Bell, L C and McCullouch, B G (1983) Microcomputer spreadsheet applications. Journal of Construction Engineering and Management, 109(2), pp. 214-223. ISSN 0733-9364
Bellamy, T; Williams, A; Sher, W; Sherratt, S and Gameson, R (2005) Design communication: Issues confronting both co-located and virtual teams. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Birgonul, Z (2021) A receptive-responsive tool for customizing occupant's thermal comfort and maximizing energy efficiency by blending BIM data with real-time information. Smart and Sustainable Built Environment, 10(3), pp. 504-535. ISSN 2046-6099
Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.
Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.
Cao, W (2019) Data interpretation for infrastructure system diagnosis and prognosis based on model falsification. PhD thesis, National University of Singapore, Singapore.
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, K T W; Pelosi, A and Yang, N (2024) Effects of digital readiness on digital competence of AEC companies: A dual-stage PLS-SEM-ANN analysis. Building Research & Information, 52(8), pp. 905-922. ISSN 0961-3218
Clark, G G (1993) Rule-based integrated building management systems. PhD thesis, Brunel University, UK.
Coutinho, Maria Lucia Granja (2016) Managerial roles in project-oriented businesses. PhD thesis, Universidade de São Paulo, Brazil.
Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364
Darby, S (2010) Smart metering: What potential for householder engagement? Building Research & Information, 38(5), pp. 442-457. ISSN 0961-3218
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
Distefano, M J and O'Brien, W J (2009) Comparative analysis of infrastructure assessment methodologies at the small unit level. Journal of Construction Engineering and Management, 135(2), pp. 96-107. ISSN 0733-9364
Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.
Domingo, L (2023) Influence of method and media interventions in creative remote design team collaboration. PhD thesis, Stanford University, USA.
Egbu, C O; Gaskell, C and Howes, J (2002) The improvement of teamworking through the exploitation of IT: Lessons from the construction, manufacturing and finance sectors. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ekemode, B G (2024) Factors influencing building information modelling adoption for residential property development. International Journal of Construction Management, 24(9), pp. 986-996. ISSN 1562-3599
El-Medany, W M (2014) A cost-effective programmable soc for network security using xilinx spartan 3an fpga. Journal of Engineering, Design and Technology, 12(2), pp. 280-291. ISSN 1726-0531
El-Medany, W M; Al-Omary, A; Al-Hakim, R and Nusaif, M (2014) Low cost real-time tracking system prototype using gm862 cellular quad band module. Journal of Engineering, Design and Technology, 12(3), pp. 389-407.
El-Omari, S and Moselhi, O (2009) Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(5), pp. 490-503. ISSN 0969-9988
Everett, J G and Slocum, A H (1993) Cranium: Device for improving crane productivity and safety. Journal of Construction Engineering and Management, 119(1), pp. 23-39. ISSN 0733-9364
Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.
Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management. PhD thesis, University of Alberta, Canada.
Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.
Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(3), pp. 739-762. ISSN 1726-0531
Goedert, J D; Foster, E T; Jewell, J and Bartek, J (2009) Automated tool tracking on the construction site. International Journal of Construction Education and Research, 5(1), pp. 12-23. ISSN 1557-8771
Gotthelf, H; Ozbek, M E and Guggemos, A (2013) Potential efficiency gains from early involvement of steel fabricators and erectors: Lessons learned from the nrel research support facility project. International Journal of Construction Education and Research, 9(2), pp. 147-160. ISSN 1557-8771
Hajirasouli, A; Banihashemi, S; Sanders, P and Rahimian, F (2024) BIM-enabled virtual reality (VR)-based pedagogical framework in architectural design studios. Smart and Sustainable Built Environment, 13(6), pp. 1490-1510. ISSN 2046-6099
Haliburton, J T (2016) Building information modeling and small architectural practice: An analysis of factors affecting BIM adoption. PhD thesis, Texas A&M University, USA.
Han, S-H (2004) A working prototype of distributed collaborative architectural design system. PhD thesis, University of Michigan, USA.
Hansen, K L; Gann, D M and Gro K, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(2), pp. 115-126. ISSN 0969-9988
Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.
Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.
Hendrickse, C and Thurner, T W (2019) Design intervention at major technological installations: Investigating the ergonomics of the South African Large Telescope (SALT). Journal of Engineering, Design and Technology, 17(2), pp. 402-413. ISSN 1726-0531
Henriksen, T; Lo, S and Knaack, U (2016) The impact of a new mould system as part of a novel manufacturing process for complex geometry thin-walled gfrc. Architectural Engineering and Design Management, 12(3), pp. 231-249. ISSN 1745-2007
Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.
Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems. PhD thesis, University of Michigan, USA.
Irizarry, J; Gheisari, M; Zolfagharian, S and Meadati, P (2013) Human computer interaction modes for construction education applications: Experimenting with small format interactive displays. International Journal of Construction Education and Research, 9(2), pp. 83-101. ISSN 1557-8771
Jacobsen, E L; Solberg, A; Golovina, O and Teizer, J (2022) Active personalized construction safety training using run-time data collection in physical and virtual reality work environments. Construction Innovation, 22(3), pp. 531-553. ISSN 1471-4175
Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.
Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(2), pp. 158-167. ISSN 1726-0531
Johansson, M (2016) From BIM to VR – the design and development of BIMXplorer. PhD thesis, Chalmers University of Technology, Sweden.
Joy Vasantha Rani, S P and Aruna Prabha, K (2010) Stochastic logic computation based rbfnn with adaptive hidden layer structure. Journal of Engineering, Design and Technology, 8(2), pp. 206-220. ISSN 1726-0531
Kangari, R and Halpin, D W (1989) Potential robotics utilization in construction. Journal of Construction Engineering and Management, 115(1), pp. 126-143. ISSN 0733-9364
Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.
Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.
Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.
Kelly, S (2004) Making it work and making do: A study of best practice, computing and routine work in building firms. PhD thesis, Lancaster University, UK.
Khan, M; Khalid, R; Anjum, S; Tran, S V T and Park, C (2022) Fall prevention from scaffolding using computer vision and IoT-based monitoring. Journal of Construction Engineering and Management, 148(7): 04022051, ISSN 0733-9364
Kiu, M S; Lai, K W; Chia, F C and Wong, P F (2024) Blockchain integration into electronic document management (EDM) system in construction common data environment. Smart and Sustainable Built Environment, 13(1), pp. 117-132. ISSN 2046-6099
Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.
Levitt, R E; Kartam, N A and Kunz, J C (1988) Artificial intelligence techniques for generating construction project plans. Journal of Construction Engineering and Management, 114(3), pp. 329-343. ISSN 0733-9364
Li, X; Lu, W; Xue, F; Wu, L; Zhao, R; Lou, J and Xu, J (2022) Blockchain-enabled IoT-BIM platform for supply chain management in modular construction. Journal of Construction Engineering and Management, 148(2): 0002229, ISSN 0733-9364
Liang, Y and Xu, Z (2025) Intelligent inspection of appearance quality for precast concrete components based on improved YOLO model and multi-source data. Engineering, Construction and Architectural Management, 32(3), pp. 1691-1714. ISSN 0969-9988
Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.
Loyola, M (2019) A method for real-time error detection in low-cost environmental sensors data. Smart and Sustainable Built Environment, 8(4), pp. 338-350. ISSN 2046-6099
Lu, Xueqing (2021) Examining safety behaviour on construction sites using virtual reality. PhD thesis, University of New South Wales, Australia.
Lucenti Jr., M J (1999) Flexible computer support for collaboration in civil infrastructure management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Luo, Q (2017) Research on relationship resource integration of Chinese construction enterprises: Evolutionary process and balance mechanism. DM thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007
McCullouch, B G and Lueprasert, K (1994) 2D bar-code applications in construction. Journal of Construction Engineering and Management, 120(4), pp. 739-752. ISSN 0733-9364
McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364
Mishra, A; Hasan, A and Jha, K N (2024) A holistic evaluation of BIM implementation barriers in the Indian construction industry: Pre- and post-adoption perspectives. International Journal of Construction Education and Research, 20(3), pp. 358-380. ISSN 15578771
Mohagheghi-Fard, M N (2019) An online collaboration framework for small and medium sized enterprises in the United Kingdom construction sector. PhD thesis, University of Salford, UK.
Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364
Müller, P (2010) Procedural modeling of buildings. DSc thesis, ETH Zürich, Switzerland.
N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X
Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.
Nasri, E; Pegels, G; Mostofinejad, D and Chini, A (2010) International transfer of CAD/CAM construction technologies: Case study of a German-Iranian partnership. International Journal of Construction Management, 10(2), pp. 71-92. ISSN 1562-3599
Navabian, N (2020) Development of an automated structural health monitoring system based on wireless sensor network for civil structures. PhD thesis, Auckland University of Technology, New Zealand.
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Nganpet, N G and Biermann, E (2016) Image compression system for a 3U CubeSat. Journal of Engineering, Design and Technology, 14(3), pp. 446-460.
Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099
Oloke, D A; Edwards, D J and Li, B (2001) Intelligent construction plant information management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Panella, Fabio (2023) Automating inspection of tunnels with photogrammetry and deep learning. PhD thesis, University College London, UK.
Park, J; Marks, E; Cho, Y K and Suryanto, W (2016) Performance test of wireless technologies for personnel and equipment proximity sensing in work zones. Journal of Construction Engineering and Management, 142(1): 04015049, ISSN 0733-9364
Pekeriçli, M K (2010) A lifecycle information management solution for built environment facilities. PhD thesis, University of Reading, UK.
Poudel, O and Assaad, R H (2025) A real-time intelligent acoustic IoT-enabled embedded construction site monitoring and alert system: Integrating deep learning-based machine-listening algorithms, edge computing, and cloud computing. Journal of Construction Engineering and Management, 151(7): 04025075, ISSN 0733-9364
Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.
Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.
Rad, A A; Asnaashari, E; Knight, A and Hurst, A (2010) ICT utilization in administrative tasks in Iranian construction organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rashidi, A; Woon, G L; Dasandara, M; Bazghaleh, M and Pasbakhsh, P (2025) Smart personal protective equipment for intelligent construction safety monitoring. Smart and Sustainable Built Environment, 14(3), pp. 835-858. ISSN 2046-6099
Ren, R (2021) Heterogeneous data processing to support BIM interoperability and project management in the architecture, engineering, and construction (AEC) domain. PhD thesis, Purdue University, USA.
Revadigar, S P (1996) Automated analysis of building seismic records. PhD thesis, University of Houston, USA.
Riaz, Z; Parn, E A; Edwards, D J; Arslan, M; Shen, C and Pena-Mora, F (2017) BIM and sensor-based data management system for construction safety monitoring. Journal of Engineering, Design and Technology, 15(6), pp. 738-753.
Ribón, J G T M (2020) Advanced monitoring of construction safety using UAS and positioning technologies. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Salman, A and Ahmad, W (2025) Implementation of augmented reality and mixed reality applications for smart facilities management: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 254-275. ISSN 2046-6099
Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.
Seemann, Kurt Walter (1997) The socio-technical sustainability of shelter systems and hardware in remote indigenous Australian communities. PhD thesis, University of New South Wales, Australia.
Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.
Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364
Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.
Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.
Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988
Song, J (2005) Tracking the location of materials on construction projects. PhD thesis, University of Texas at Austin, USA.
Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.
Spaeth, A B and Khali, R (2018) The place of VR technologies in UK architectural practice. Architectural Engineering and Design Management, 14(6), pp. 470-487. ISSN 1745-2007
Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.
Sufianto, Heru (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach. PhD thesis, University of New South Wales, Australia.
Sweetnam, T; Fell, M; Oikonomou, E and Oreszczyn, T (2019) Domestic demand-side response with heat pumps: Controls and tariffs. Building Research & Information, 47(4), pp. 344-361. ISSN 0961-3218
Tai, S; Zhang, Y and Li, T (2021) Factors affecting BIM application in China: A social network model. Journal of Engineering, Design and Technology, 19(2), pp. 373-384. ISSN 1726-0531
Tan, A H (2015) While stands the colosseum: A ground-up exploration of ancient Roman construction techniques using virtual reality. PhD thesis, Ohio State University, USA.
Tan, T; Graser, K; Walzer, A N; Ng, M S and Hall, D (2025) Exploring the implementation of digital fabrication in construction: Combining system approaches and a revelatory case study from Switzerland. Journal of Construction Engineering and Management, 151(12): 05025016, ISSN 0733-9364
Van Roy, A F and Firdaus, A (2020) Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2), pp. 199-217. ISSN 1823-6499
Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.
Wang, L (2020) Home intelligent lighting control system based on wireless sensor. Journal of Engineering, Design and Technology, 18(5), pp. 1231-1240. ISSN 1726-0531
Ward, M J (2004) The capture and integration of construction site data. EngD thesis, Loughborough University, UK.
Watts, C J (2002) In-service training for computer-aided design in building surveying. PhD thesis, De Montfort University, UK.
Wijeratne, P U; Gunarathna, C; Yang, R J; Wu, P; Hampson, K and Shemery, A (2024) BIM enabler for facilities management: A review of 33 cases. International Journal of Construction Management, 24(3), pp. 251-260. ISSN 1562-3599
Wood, G; Davis, P and Olatunji, O A (2011) Modelling the costs of corporate implementation of building information modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 211-231. ISSN 1366-4387
Zhou, S and Gheisari, M (2018) Unmanned aerial system applications in construction: a systematic review. Construction Innovation, 18(4), pp. 453-468. ISSN 1471-4175
de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.
de Souza-Daw, T; Ross, R; Nhan, T D; Hung, L A; Trung, N D Q; Chau, L H; Phuong, H M; Ngoc, L H and Nkhoma, M (2015) Design and evaluation of a low-cost street-level image capturing vehicle for south-east Asia. Journal of Engineering, Design and Technology, 13(4), pp. 579-595.
Up a level