Items with Index Term: ground condition
Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.
Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193
Agyekum, K; Blay, K and Opoku, A (2019) Mechanisms for preventing rising damp in new building infrastructure. International Journal of Building Pathology and Adaptation, 37(1), pp. 87-107. ISSN 23984708
Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.
Amadi, A (2023) The statistical sensitivity of highway project cost to geo-heterogeneity in the tropics. International Journal of Building Pathology and Adaptation, 41(4), pp. 875-902. ISSN 23984708
Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amavasai, A (2023) Beyond the deterministic approach: On the feasibility of data assimilation methods in geotechnics. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ashton, P and Gidado, K (2003) The development of a project and site investigation risk evaluation model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chileshe, N; Boadua, A and Yirenkyi, F (2011) Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey findings. Journal of Construction in Developing Countries, 16(2), pp. 115-149. ISSN 1823-6499
Chileshe, N and Boadua Yirenkyi-Fianko, A (2012) An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3), pp. 306-329. ISSN 1726-0531
El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599
Ezzeldine, O Y (1995) Design of tunnels constructed using pressurized shield methods. PhD thesis, University of Alberta, Canada.
Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304
Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.
Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.
Kerr, W C; Tamaro, G J and Hahn, D M (1992) Exchange place station subsurface reconstruction and improvements. Journal of Construction Engineering and Management, 118(1), pp. 166-178. ISSN 0733-9364
Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387
McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.
Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988
Rankin, J (2023) Reinforcement learning for trench excavation. PhD thesis, Loughborough University, UK.
Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988
Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007
Up a level