Items with Index Term: genetic algorithm
Abdallah, M A A; El-Rayes, K and Liu, L (2016) Minimizing upgrade cost to achieve LEED certification for existing buildings. Journal of Construction Engineering and Management, 142(2): 04015073, ISSN 0733-9364
Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.
Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364
Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364
Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 0969-9988
Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599
Agarwal, S; Kant, R and Shankar, R (2022) Humanitarian supply chain management: Modeling the pre and post-disaster relief operations. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 421-439. ISSN 1759-5916
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599
Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364
Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.
Ahmed Gouda, M and Marzouk, M (2024) A BIM-based semantic approach for fund-allocation of building components. Architectural Engineering and Design Management, 20(3), pp. 471-493. ISSN 1745-2007
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364
Al-Hadidi, S; Sweis, G; Abu-Khader, W; Abu-Rumman, G and Sweis, R (2024) Managing future urbanization growth patterns using genetic algorithm modeling. Engineering, Construction and Architectural Management, 31(7), pp. 2648-2668. ISSN 0969-9988
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364
Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(2), pp. 121-132. ISSN 0969-9988
Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364
Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364
Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X
Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175
Allam, A S; Bassioni, H; Ayoub, M and Kamel, W (2023) Investigating the performance of genetic algorithm and particle swarm for optimizing daylighting and energy performance of offices in alexandria, Egypt. Smart and Sustainable Built Environment, 12(3), pp. 682-700. ISSN 2046-6099
Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364
Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms. PhD thesis, Illinois Institute of Technology, USA.
Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364
Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364
Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.
Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175
Ballesteros-Pérez, P; Phua, F T T and Mora-Melià, D (2019) Human resource allocation to multiple projects based on members' expertise, group heterogeneity, and social cohesion. Journal of Construction Engineering and Management, 145(2): 04018134, ISSN 0733-9364
Bee-Hua, G (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector. Construction Management and Economics, 18(2), pp. 209-217. ISSN 01446193
Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364
Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364
Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.
Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.
Cao, J; Said, H; Savov, A and Hall, D (2024) Graph-based evolutionary search for optimal hybrid modularization of building construction projects. Journal of Construction Engineering and Management, 150(8): 04024098, ISSN 0733-9364
Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007
Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, K; You, B; Zhang, Y and Chen, Z (2025) Automatic lift path planning of prefabricated building components using semantic BIM, improved A* and GA. Engineering, Construction and Architectural Management, 32(6), pp. 4100-4124. ISSN 0969-9988
Chen, X; Feng, J; Zhao, Y and Lu, T (2025) Feasibility of a program delay claims scheme: Synergistic effect and risk-cost optimization. Journal of Construction Engineering and Management, 151(10): 04025151, ISSN 0733-9364
Cheng, M Y and Ko, C H (2003) Object-oriented evolutionary fuzzy neural inference system for construction management. Journal of Construction Engineering and Management, 129(4), pp. 461-469. ISSN 0733-9364
Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364
Choi, J; Hong, D H; Lee, S H; Lee, H Y; Hong, T; Lee, D E and Park, H S (2023) Multi-objective green design model for prestressed concrete slabs in long-span buildings. Architectural Engineering and Design Management, 19(5), pp. 531-549. ISSN 1745-2007
Choi, S; Kim, D Y; Han, S H and Kwak, Y H (2014) Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning. Journal of Construction Engineering and Management, 140(1): 04013026, ISSN 0733-9364
Clement, D; Aliabadi, A A; MacKey, J; Thé, J and Gharabaghi, B (2021) Dust emissions management model for construction sites. Journal of Construction Engineering and Management, 147(8): 04021092, ISSN 0733-9364
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531
Deng, L. and Zu, F. (2026) Promoting public housing development on private land: The case of Hong Kong. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988
Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis. PhD thesis, University of Alberta, Canada.
Do, Q; Le, T; Trinh, M T and Le, C (2025) Multiobjective project clustering optimization for enhancing highway contract bundling decisions. Journal of Construction Engineering and Management, 151(11): 04025166, ISSN 0733-9364
Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management, 132(10), pp. 1092-1098. ISSN 0733-9364
Du, Q; Qi, X; Zou, P X W and Zhang, Y (2024) Bi-objective optimization framework for prefabricated construction service combination selection using genetic simulated annealing algorithm. Engineering, Construction and Architectural Management, 31(10), pp. 3921-3945. ISSN 0969-9988
Easa, S M and Hossain, K M A (2008) New mathematical optimization model for construction site layout. Journal of Construction Engineering and Management, 134(8), pp. 653-662. ISSN 0733-9364
East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364
Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599
El Meouche, R; Abunemeh, M; Hijaze, I; Mebarki, A and Shahrour, I (2018) Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2): 04017099, ISSN 0733-9364
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193
Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. PhD thesis, University of Waterloo, Canada.
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988
Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364
Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364
Elshaboury, N; Attia, T and Marzouk, M (2020) Application of evolutionary optimization algorithms for rehabilitation of water distribution networks. Journal of Construction Engineering and Management, 146(7): 04020069, ISSN 0733-9364
Elshaboury, N and Marzouk, M (2021) Optimizing construction and demolition waste transportation for sustainable construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2411-2425. ISSN 0969-9988
Elsheikh, A; Motawa, I and Diab, E (2023) Multi-objective genetic algorithm optimization model for energy efficiency of residential building envelope under different climatic conditions in Egypt. International Journal of Construction Management, 23(7), pp. 1244-1253. ISSN 1562-3599
Ertekin, A O (2013) Probabilistic life cycle cost optimization of bridges. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364
Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988
Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531
Farouk, A M; Rahman, R A and Romali, N S (2023) Economic analysis of rehabilitation approaches for water distribution networks: Comparative study between Egypt and Malaysia. Journal of Engineering, Design and Technology, 21(1), pp. 130-149. ISSN 1726-0531
Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(1), pp. 40-60. ISSN 0969-9988
Fattahi Tabasi, S; Rafizadeh, H R; Andaji Garmaroudi, A and Banihashemi, S (2024) Optimizing urban layouts through computational generative design: density distribution and shape optimization. Architectural Engineering and Design Management, 20(5), pp. 1164-1184. ISSN 1745-2007
Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988
Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Feng, K; Xiong, W; Wang, S; Wu, C and Xue, Y (2017) Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9): 04017067, ISSN 0733-9364
Frimpong, E and Twumasi, E (2022) Prediction of unregulated energy usage in office buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 269-282. ISSN 23984708
Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: Novel hybrid approach. Journal of Engineering, Design and Technology, 18(6), pp. 1519-1541. ISSN 1726-0531
Garip, S B; Güzelci, O Z; Garip, E and Kocabay, S (2024) A genetic algorithm-based design model to provide reduced risk areas for housing interiors. Construction Innovation, 24(1), pp. 49-66. ISSN 1471-4175
Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364
Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175
Ghanbari, M; Olaikhan, A A J and Skitmore, M (2025) Enhancing project portfolio selection for construction holding firms: A multi-objective optimization framework with risk analysis. Engineering, Construction and Architectural Management, 32(8), pp. 5534-5557. ISSN 0969-9988
Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364
Ghodoosi, F; Abu-Samra, S; Zeynalian, M and Zayed, T (2018) Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms. Journal of Construction Engineering and Management, 144(2): 04017116, ISSN 0733-9364
Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.
Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364
Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hamilton-MacLaren, F (2013) Alternative, more sustainable, wall construction techniques than brick and block, for new housing in England and Wales. PhD thesis, Loughborough University, UK.
Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364
Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.
Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
He, W; Li, W; Xu, S; Wang, W and An, X (2021) Time, cost, and energy consumption analysis on construction optimization in high-rise buildings. Journal of Construction Engineering and Management, 147(10): 04021128, ISSN 0733-9364
He, W; Shi, Y and Kong, D (2019) Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM. Journal of Engineering, Design and Technology, 17(5), pp. 929-942. ISSN 1726-0531
Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364
Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364
Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Heidari, A; Imani, D M and Khalilzadeh, M (2021) A hub location model in the sustainable supply chain considering customer segmentation. Journal of Engineering, Design and Technology, 19(6), pp. 1387-1420. ISSN 1726-0531
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Hellas, M S; Chaib, R and Verzea, I (2020) Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA). Journal of Engineering, Design and Technology, 18(1), pp. 40-54. ISSN 1726-0531
Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988
Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531
Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Islam, M M and Mohamed, S (2009) Bid-winning potential optimization for concession schemes with imprecise investment parameters. Journal of Construction Engineering and Management, 135(8), pp. 690-700. ISSN 0733-9364
Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599
Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364
Jalilzadehazhari, E; Johansson, J and Mahapatra, K (2019) Applying a decision-making framework for resolving conflicts when selecting windows and blinds. Architectural Engineering and Design Management, 15(5), pp. 382-401. ISSN 1745-2007
Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2019) Developing a decision-making framework for resolving conflicts when selecting windows and blinds. Architectural Engineering and Design Management, 15(5), pp. 357-381. ISSN 1745-2007
Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.
Jawad, D J (2003) Life cycle cost optimization for infrastructure facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364
Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364
Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.
Kar, S; Kothari, C and Jha, K N (2021) Developing an optimum material procurement schedule by integrating construction program and budget using NSGA-II. Journal of Construction Engineering and Management, 147(4): 04021017, ISSN 0733-9364
Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364
Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.
Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364
Khalafallah, A and El-Rayes, K (2008) Minimizing construction-related security risks during airport expansion projects. Journal of Construction Engineering and Management, 134(1), pp. 40-48. ISSN 0733-9364
Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.
Khorshid, E; Alfadli, A and Falah, A (2018) Application of constraint infeasibility detection methods in engineering design problems. Journal of Engineering, Design and Technology, 16(2), pp. 285-312. ISSN 1726-0531
Kim, J; Ham, Y; Chung, Y and Chi, S (2019) Systematic camera placement framework for operation-level visual monitoring on construction jobsites. Journal of Construction Engineering and Management, 145(4): 04019019, ISSN 0733-9364
Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X
Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364
Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364
Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.
Kim, T; Lee, D; Cha, M; Lim, H; Lee, M; Cho, H and Kang, K I (2020) Simulation-based lift planning model for the lift transfer operation system. Journal of Construction Engineering and Management, 146(9): 04020098, ISSN 0733-9364
Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364
Kong, F and Dou, D (2020) RCPSP with combined precedence relations and resource calendars. Journal of Construction Engineering and Management, 146(12): 04020133, ISSN 0733-9364
Koo, K J and Park, S C (2012) GA-based fuel-efficient transfer path selection model for delivering construction materials. Journal of Construction Engineering and Management, 138(6), pp. 725-732. ISSN 0733-9364
Kumar, A; Jain, S and Yadav, D (2020) A novel simulation-annealing enabled ranking and scaling statistical simulation constrained optimization algorithm for internet-of-things (IoT). Smart and Sustainable Built Environment, 9(4), pp. 675-693. ISSN 2046-6099
Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.
Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.
Lam, K C; Ning, X and Lam, M C K (2009) Conjoining MMAS to GA to solve construction site layout planning problem. Journal of Construction Engineering and Management, 135(10), pp. 1049-1057. ISSN 0733-9364
Lam, K C; Song Hu, T I E; Ng, T; Yuen, R K K; Lo, S M and Wong, C T C (2001) Using an adaptive genetic algorithm to improve construction finance decisions. Engineering, Construction and Architectural Management, 8(1), pp. 31-45. ISSN 0969-9988
Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193
Le Gia, T T; Dang, H A; Dinh, V B; Tong, M Q; Nguyen, T K; Nguyen, H H and Nguyen, D Q (2022) A simulation-based multi-objective genetic optimization framework for efficient building design in early stages: Application for Vietnam's hot and humid climates. International Journal of Building Pathology and Adaptation, 40(3), pp. 305-326. ISSN 23984708
Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364
Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Lee, Jinwoo (2015) Joint optimization of pavement management and reconstruction policies for segment and system problems. PhD thesis, University of California, USA.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364
Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Li, H; Cao, J N and Love, P E D (1999) Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, 125(5), pp. 347-353. ISSN 0733-9364
Li, H; Guo, H L; Kong, S C W and Chen, Z (2012) Optimization of curved roof surface design using GA. Journal of Engineering, Design and Technology, 10(3), pp. 345-359. ISSN 1726-0531
Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364
Li, H; Love, P E D and Ogunlana, S (1998) Genetic algorithm compared to nonlinear optimization for labour and equipment assignment. Building Research & Information, 26(6), pp. 322-329. ISSN 0961-3218
Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liang, Houhao (2024) Unmanned ground vehicle-driven indoor monitoring: Enhancing routine data acquisition and on-site deployment. PhD thesis, National University of Singapore, Singapore.
Liang, L Y; Thompson, R G and Young, D M (2004) Optimising the design of sewer networks using genetic algorithms and tabu search. Engineering, Construction and Architectural Management, 11(2), pp. 101-112. ISSN 0969-9988
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X
Liu, J; Li, Y; Li, Y; Zibo, C; Lian, X and Zhang, Y (2023) Location optimization of emergency medical facilities for public health emergencies in megacities based on genetic algorithm. Engineering, Construction and Architectural Management, 30(8), pp. 3330-3356. ISSN 0969-9988
Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.
Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364
Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364
Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X
Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599
Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364
Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364
Mahmoudi Motahar, M and Hosseini Nourzad, S H (2022) A hybrid method for optimizing selective disassembly sequence planning in adaptive reuse of buildings. Engineering, Construction and Architectural Management, 29(1), pp. 307-332. ISSN 0969-9988
Manocha, N (2018) Infrastructure investments under deep uncertainty. PhD thesis, National University of Singapore, Singapore.
Mao, W; Ran, K; Wang, T K; Yu, A; Lv, H and Chen, J H (2025) An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. Engineering, Construction and Architectural Management, 32(5), pp. 3259-3284. ISSN 0969-9988
Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.
Marasini, R and Dawood, N (2002) Integration of genetic algorithms and simulation for stockyard layout planning. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.
Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193
Marzouk, M and Moselhi, O (2004) Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), pp. 105-113. ISSN 0733-9364
Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid genetic algorithm and linear programming for bulldozer emissions and fuel-consumption management using continuously variable transmission. Journal of Construction Engineering and Management, 144(7): 04018053, ISSN 0733-9364
Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.
Mawdesley, M J; Al-jibouri, S H and Yang, H (2002) Genetic algorithms for construction site layout in project planning. Journal of Construction Engineering and Management, 128(5), pp. 418-426. ISSN 0733-9364
Mehran Mahmoudi, M; Seyed Hossein Hosseini, N and Rahimi, F (2024) Integrating complete disassembly planning with deconstructability assessment to facilitate designing deconstructable buildings. Architectural Engineering and Design Management, 20(1), pp. 150-167. ISSN 1745-2007
Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.
Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364
Mohseni, H; Setunge, S; Zhang, G and Wakefield, R (2017) Markov process for deterioration modeling and asset management of community buildings. Journal of Construction Engineering and Management, 143(6): 04017003, ISSN 0733-9364
Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364
Moussa, A; Ezzeldin, M and El-Dakhakhni, W (2025) Machine learning and optimization strategies for infrastructure projects risk management. Construction Management and Economics, 43(8), pp. 557-582. ISSN 0144-6193
Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.
Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364
Noor, K; Siddiqui, M A and Syed, A I (2025) Optimization of specific energy consumption in cnc turning of a hardened alloy steel roll at low cutting speeds. Journal of Engineering, Design and Technology, 23(2), pp. 368-385. ISSN 1726-0531
Noorian Talouki, R; Hosseini Shirvani, M and Motameni, H (2022) A hybrid meta-heuristic scheduler algorithm for optimization of workflow scheduling in cloud heterogeneous computing environment. Journal of Engineering, Design and Technology, 20(6), pp. 1581-1605. ISSN 1726-0531
Nouh Meshref, A; Elkasaby, E and Wageh, O (2026) Innovative strategic multicriteria decision-making selection model of infrastructures projects delivery systems using multiobjective optimization, case of Egypt. Construction Innovation, 26(2), pp. 353-368. ISSN 1471-4175
Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.
Orabi, W and El-Rayes, K (2012) Optimizing the rehabilitation efforts of aging transportation networks. Journal of Construction Engineering and Management, 138(4), pp. 529-539. ISSN 0733-9364
Orabi, W; El-Rayes, K; Senouci, A B and Al-Derham, H (2009) Optimizing postdisaster reconstruction planning for damaged transportation networks. Journal of Construction Engineering and Management, 135(10), pp. 1039-1048. ISSN 0733-9364
Ottaviani, F M; De Marco, M; Audisio, A; Wong, J and Belack, C (2024) A brief review of artificial intelligence techniques for conceptual cost estimation in construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Padala, S P S (2025) A BIM-integrated multi objective optimization model for sustainable building construction management. Construction Innovation, 25(6), pp. 1727-1751. ISSN 1471-4175
Padala, S P S and M Skanda, P (2025) BIM-based multi-objective optimization framework for volumetric analysis of building projects. Journal of Engineering, Design and Technology, 23(5), pp. 1326-1347. ISSN 1726-0531
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Panwar, A; Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1924-1945. ISSN 0969-9988
Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364
Peng, J and Liu, X J (2024) Labor resource allocation under extremely short construction period based on the inverse optimization method. Engineering, Construction and Architectural Management, 31(3), pp. 1254-1271. ISSN 0969-9988
Pereira, E; Hermann, U; Han, S and Abourizk, S (2018) Case-based reasoning approach for assessing safety performance using safety-related measures. Journal of Construction Engineering and Management, 144(9): 04018088, ISSN 0733-9364
Pham, V H S; Trang, N T N and Dat, C Q (2024) Optimization of production schedules of multi-plants for dispatching ready-mix concrete trucks by integrating grey wolf optimizer and dragonfly algorithm. Engineering, Construction and Architectural Management, 31(11), pp. 4602-4624. ISSN 0969-9988
Piratla, K R and Ariaratnam, S T (2013) Design innovation leads to sustainable water distribution systems. Construction Innovation, 13(3), pp. 302-319. ISSN 1471-4175
Polson, D R (2020) Assessment of applications of optimisation to building design and energy modelling. PhD thesis, University of London, University College London, UK.
Purnomo, M R A; Anugerah, A R; Aulia, S F and Azzam, A (2021) A novel optimisation model in the collaborative supply chain with production time capacity consideration. Journal of Engineering, Design and Technology, 19(3), pp. 647-658. ISSN 1726-0531
Qi, X; Du, Q; Zou, P X W and Huang, N (2024) Developing a weighted synergy network-based model for selecting prefabricated construction services. Engineering, Construction and Architectural Management, 31(6), pp. 2306-2326. ISSN 0969-9988
Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364
Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364
Rakesh Kumar, G (2025) Seismic vulnerability assessment of buildings using rapid visual screening for hybrid UMNN-RFO approach. International Journal of Construction Management, 25(10), pp. 1177-1185. ISSN 1562-3599
Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364
Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099
Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364
Raval, P and Sarkar, D (2025) Evaluation and optimization of key performance indicators affecting adoption of the building information modeling and blockchain technology in Indian construction sector through fuzzy TOPSIS and genetic algorithm. International Journal of Construction Management, 25(9), pp. 981-995. ISSN 1562-3599
Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364
Rezaei, Mohammad (2019) Characterizing controlled low-strength materials (CLSM) for narrow-trench reinstatement. PhD thesis, University of Alberta, Canada.
Rezaei Nasab, S S; Tayefi Nasrabadi, A; Asadi, S and Haj Seiyed Taghia, S A (2022) Investigating the probability of designing net-zero energy buildings with consideration of electric vehicles and renewable energy. Engineering, Construction and Architectural Management, 29(10), pp. 4061-4087. ISSN 0969-9988
Rodionova, A (2022) Robust and reliable building renovation strategies for environmental and economic performance. DSc thesis, ETH Zürich, Switzerland.
Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988
Salem, O; Shahin, A and Khalifa, Y (2007) Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. Journal of Construction Engineering and Management, 133(12), pp. 982-992. ISSN 0733-9364
Samarasinghalage, T and Yang, R (2024) Evolutionary-based multi-objective optimization of BIPV envelope design: BIPV curtain wall. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364
Saraei, M H; Sharifi, A and Adeli, M (2023) Optimization of spatial distribution of hospitals for better earthquake recovery using GIS and imperialist competition algorithm (case study: Gorgan, Iran). International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 285-300. ISSN 1759-5916
Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599
Sarma, K C (2001) Fuzzy discrete multicriteria cost optimization of steel structures using genetic algorithm. PhD thesis, Ohio State University, USA.
Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Shafaat, A; Marbouti, F and Mahfouz, T (2023) Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), pp. 2348-2357. ISSN 1562-3599
Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.
Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364
Shams, A. and Marzouk, M. (2026) Leveraging BIM and time-cost-safety trade-off analysis for optimized decisions in construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5180-5209. ISSN 0969-9988
Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364
Sharma, K and Trivedi, M K (2022) Latin hypercube sampling-based nsga-iii optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects. International Journal of Construction Management, 22(16), pp. 3158-3168. ISSN 1562-3599
Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988
Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.
Shen, K; Li, X; Cao, X and Zhang, Z (2022) Prefabricated construction process optimization based on rework risk. Journal of Construction Engineering and Management, 148(6): 04022031, ISSN 0733-9364
Shi, M; Wang, J; Li, Q; Cui, B; Guan, S and Zeng, T (2022) Accelerated earth-rockfill dam compaction by collaborative operation of unmanned roller fleet. Journal of Construction Engineering and Management, 148(7): 04022046, ISSN 0733-9364
Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364
Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364
Singh Rajput, T and Thomas, A (2023) Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ann) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management, 23(13), pp. 2320-2332. ISSN 1562-3599
Siringoringo, W S; Connor, A M; Clements, N and Alexander, N (2008) Minimum cost polygon overlay with rectangular shape stock panels. International Journal of Construction Education and Research, 4(3), pp. 153-176. ISSN 1557-8771
Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.
Sohani, H; Seyed Hossein Hosseini, N and Saghatforoush, E (2024) The optimized form of building made from the reused elements. Architectural Engineering and Design Management, 20(2), pp. 191-213. ISSN 1745-2007
Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Soltani, A R (2004) A multi-objective intelligent transportation system in construction sites. PhD thesis, University of Salford, UK.
Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, P V H and Hieu, H T (2023) Logistics model for precast concrete components using novel hybrid ant lion optimizer (ALO) algorithm. International Journal of Construction Management, 23(9), pp. 1560-1570. ISSN 1562-3599
Son, P V H and Khoi, L N Q (2024) Application of slime mold algorithm to optimize time, cost and quality in construction projects. International Journal of Construction Management, 24(13), pp. 1375-1386. ISSN 1562-3599
Sorooshnia, E; Rashidi, M; Rahnamayiezekavat, P; Rezaei, F and Samali, B (2023) Optimum external shading system for counterbalancing glare probability and daylight illuminance in sydney's residential buildings. Engineering, Construction and Architectural Management, 30(1), pp. 296-320. ISSN 0969-9988
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.
Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.
Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364
Tam, C M and Tong, T K L (2003) GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Construction Management and Economics, 21(3), pp. 257-266. ISSN 01446193
Tam, C M; Tong, T K L and Chan, W K W (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), pp. 315-320. ISSN 0733-9364
Tam, C M; Tong, T K L; Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(2), pp. 207-215. ISSN 01446193
Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193
Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2005) A GA-based borrowing strategy for construction smes in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193
Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X
Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. PhD thesis, University of Surrey, UK.
Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.
Thakur, N; Awasthi, Y K; Hooda, M and Siddiqui, A S (2019) Adaptive whale optimization for intelligent multi-constraints power quality improvement under deregulated environment. Journal of Engineering, Design and Technology, 17(3), pp. 490-514. ISSN 1726-0531
Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364
Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.
Tong, T K L and Tam, C M (2003) Fuzzy optimisation of labour allocation by genetic algorithms. Engineering, Construction and Architectural Management, 10(2), pp. 146-155. ISSN 0969-9988
Tong, T K L; Tam, C M and Chan, A P C (2001) Genetic algorithm optimization in building portfolio management. Construction Management and Economics, 19(6), pp. 601-609. ISSN 01446193
Tu, J; Liu, Y; Zhou, M and Li, R (2021) Prediction and analysis of compressive strength of recycled aggregate thermal insulation concrete based on GA-bp optimization network. Journal of Engineering, Design and Technology, 19(2), pp. 412-422. ISSN 1726-0531
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.
Wang, Y.; Zhao, W.; Cui, W. and Zhou, G. (2026) Comparison of five meta-heuristic algorithms in layout optimization of multiple tower cranes. Engineering, Construction and Architectural Management, 33(7), pp. 5849-5873. ISSN 0969-9988
Wang, J (2004) Hybrid genetic algorithms for reliability assessment of structural system. PhD thesis, City University of New York, USA.
Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364
Wang, J; Huang, W and Chen, Y (2025) Solving stochastic time-cost trade-off problems via modified double-loop procedure with adaptive domain decomposition method. Journal of Construction Engineering and Management, 151(2): 04024199, ISSN 0733-9364
Wang, J; Xiahou, X; Lin, Y; Liu, Y; Han, Z and Song, Y (2025) A novel approach for pipeline generation using a mixed GA and tree strategy. Journal of Construction Engineering and Management, 151(9): 04025122, ISSN 0733-9364
Wang, M (2014) Sensitivity analysis and evolutionary optimization for building design. PhD thesis, Loughborough University, UK.
Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988
Wang, X; Li, J; Wang, R; Zhang, J and Ma, G (2025) Automated evaluation and optimization of subgrade construction based on intelligent compaction. Journal of Construction Engineering and Management, 151(9): 04025127, ISSN 0733-9364
Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364
Wong, C K; Fung, I W H and Tam, C M (2010) Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning. Journal of Construction Engineering and Management, 136(10), pp. 1116-1128. ISSN 0733-9364
Wu, Z and Ma, G (2023) Automatic generation of BIM-based construction schedule: Combining an ontology constraint rule and a genetic algorithm. Engineering, Construction and Architectural Management, 30(10), pp. 5253-5279. ISSN 0969-9988
Xiang, P; Yang, S; Yuan, Y and Li, R (2025) Integrated measurement of public safety risks in international construction projects in the belt and road initiative. Engineering, Construction and Architectural Management, 32(7), pp. 4673-4699. ISSN 0969-9988
Xiao, Peichun (2018) Development of colletive intelligence for building energy efficiency. PhD thesis, University of New South Wales, Australia.
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Xu, J; Meng, J; Zeng, Z; Wu, S and Shen, M (2013) Resource sharing-based multiobjective multistage construction equipment allocation under fuzzy environment. Journal of Construction Engineering and Management, 139(2), pp. 161-173. ISSN 0733-9364
Yang, F (2008) Collaborative optimisation in building design with a Pareto-based genetic algorithm. PhD thesis, Loughborough University, UK.
Yang, F and Bouchlaghem, D (2010) Genetic algorithm-based multiobjective optimization for building design. Architectural Engineering and Design Management, 6(1), pp. 68-82. ISSN 1745-2007
Yang, I T; Hsieh, Y M and Kung, L O (2012) Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning. Journal of Construction Engineering and Management, 138(2), pp. 215-226. ISSN 0733-9364
Yang, J; Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(9): 04024118, ISSN 0733-9364
Yao, Z; Chen, Z and Lee, Y (2025) A construction site layout planning study for dust reduction. Journal of Construction Engineering and Management, 151(6): 04025066, ISSN 0733-9364
Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.
Yi, W; Wang, H; Zhen, L; Song, Y and Xiao, B (2026) Strategic planning of modular construction hubs: A bilevel framework integrating governmental and industrial perspectives. Journal of Construction Engineering and Management, 152(5): 04026034, ISSN 0733-9364
Yin, J; Li, J; Yang, A and Cai, S (2024) Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Engineering, Construction and Architectural Management, 31(3), pp. 1348-1369. ISSN 0969-9988
Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988
Yu, Y (2021) Road network maintenance and repair considering day-to-day traffic dynamics and transient congestion. PhD thesis, Imperial College London, UK.
Yılmaz, M and Dede, T (2026) Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem. Engineering, Construction and Architectural Management, 33(1), pp. 380-412. ISSN 0969-9988
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175
Zeng, Z (2007) Coordinated rescheduling of precast production. PhD thesis, National University of Singapore, Singapore.
Zhang, J.; Wang, Y.; Wang, R. D.; Li, X.; Zhang, Z. and Yang, Z. (2026) A multitower crane layout planning framework for modular integrated construction considering material relay handling. Journal of Construction Engineering and Management, 152(8): 04026109, ISSN 0733-9364
Zhang, J and Jiang, S (2025) Construction safety decision-making system based on improved integration of case-based reasoning and rule-based reasoning. Journal of Construction Engineering and Management, 151(9): 04025130, ISSN 0733-9364
Zhang, K (2020) Energy-saving parameterized design of buildings based on genetic algorithm. International Journal of Building Pathology and Adaptation, 38(5), pp. 785-795. ISSN 23984708
Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.
Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zhang, W (2021) Construction productivity improvement through industrialized construction methods. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zhang, Y; Luo, H; Skitmore, M; Li, Q and Zhong, B (2018) Optimal camera placement for monitoring safety in metro station construction work. Journal of Construction Engineering and Management, 145(1): 04018118, ISSN 0733-9364
Zhang, Y; Peng, Z; Lu, W and Webster, C (2025) Profit-sensitive generative design for high-rise building morphologies: Innovations in 3D form generation and cost-revenue assessment. Building Research & Information, 53(4), pp. 435-457. ISSN 0961-3218
Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364
Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364
Zheng, Z; Li, Y and Torres, J (2024) An integrated method of automated layout design and optimization for modular construction. Engineering, Construction and Architectural Management, 31(3), pp. 1016-1036. ISSN 0969-9988
Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988
Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.
Zhou, Z; Xie, Y; Zhou, L and Zhang, Z (2026) Risk factor analysis of crane accidents based on HFACS in the construction industry. Journal of Construction Engineering and Management, 152(5): 04026036, ISSN 0733-9364
Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364
Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.
li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175