Items with Index Term: fuzzy topsis
Al-Humaidi, H M (2016) Construction projects bid or not bid approach using the fuzzy technique for order preference by similarity FTOPSIS method. Journal of Construction Engineering and Management, 142(12): 04016068, ISSN 0733-9364
Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099
Bansal, S; Biswas, S and Singh, S K (2018) Fuzzy TOPSIS based holistic assessment of regions: Context of India. Smart and Sustainable Built Environment, 7(2), pp. 166-181. ISSN 2046-6099
De Silva, S H; Ranadewa, K A T O and Rathnasinghe, A P (2025) Barriers and strategies for implementing lean six sigma in small- and medium sized enterprises (SMEs) in construction industry: A fuzzy TOPSIS analysis. Construction Innovation, 25(2), pp. 510-551. ISSN 1471-4175
Gogate, N G; Shelake, A G and Band, P (2024) Selection of most significant risk factors for Indian tunnel projects: An integrated fuzzy-based MCDM approach. International Journal of Construction Management, 24(2), pp. 161-176. ISSN 1562-3599
Jia, J (2017) Multi-criteria evaluation in support of the decision-making process in highway construction projects. PhD thesis, Florida International University, USA.
Kiani, M; Bagheri, M; Ebrahimi, A and Alimohammadlou, M (2022) A model for prioritizing outsourceable activities in universities through an integrated fuzzy-MCDM method. International Journal of Construction Management, 22(5), pp. 784-800. ISSN 1562-3599
Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988
Liang, R; Li, R; Yan, X; Xue, Z and Wei, X (2023) Evaluating and selecting the supplier in prefabricated megaprojects using extended fuzzy TOPSIS under hesitant environment: A case study from China. Engineering, Construction and Architectural Management, 30(5), pp. 1902-1931. ISSN 0969-9988
Mohandes, S R; Kaddoura, K; Singh, A K; Elsayed, M Y; Banihashemi, S; Antwi-Afari, M F; Olawumi, T O and Zayed, T (2025) Application of a hybrid fuzzy-based algorithm to investigate the environmental impact of sewer overflow. Smart and Sustainable Built Environment, 14(6), pp. 1950-1990. ISSN 2046-6099
Mohandes, S R; Durdyev, S; Sadeghi, H; Mahdiyar, A; Hosseini, M R; Banihashemi, S and Martek, I (2023) Towards enhancement in reliability and safety of construction projects: Developing a hybrid multi-dimensional fuzzy-based approach. Engineering, Construction and Architectural Management, 30(6), pp. 2255-2279. ISSN 0969-9988
Mostafavi, A and Karamouz, M (2010) Selecting appropriate project delivery system: Fuzzy approach with risk analysis. Journal of Construction Engineering and Management, 136(8), pp. 923-930. ISSN 0733-9364
Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988
Okudan, O and Çevikbaş, M (2022) Alternative dispute resolution selection framework to settle disputes in public-private partnership projects. Journal of Construction Engineering and Management, 148(9): 04022086, ISSN 0733-9364
Olabanji, O M and Mpofu, K (2020) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology, 18(2), pp. 451-479. ISSN 1726-0531
Ranganath, N; Sarkar, D; Patel, P and Patel, S (2022) Application of fuzzy TOPSIS method for risk evaluation in development and implementation of solar park in India. International Journal of Construction Management, 22(14), pp. 2764-2774. ISSN 1562-3599
Raval, P; Sarkar, D and Solanki, A (2026) A comparative analysis of the application of fuzzy ANP and fuzzy TOPSIS methods for integrated building information modelling (BIM) and blockchain adoption in the construction sector. International Journal of Construction Management, 26(4), pp. 694-717. ISSN 1562-3599
Raval, P and Sarkar, D (2025) Evaluation and optimization of key performance indicators affecting adoption of the building information modeling and blockchain technology in Indian construction sector through fuzzy TOPSIS and genetic algorithm. International Journal of Construction Management, 25(9), pp. 981-995. ISSN 1562-3599
Reddy, A S; Kumar, P R and Raj, P A (2022) Entropy-based fuzzy TOPSIS framework for selection of a sustainable building material. International Journal of Construction Management, 22(7), pp. 1194-1205. ISSN 1562-3599
Shafei, H; Rahman, R A and Lee, Y S (2024) Effectiveness evaluation of Construction 4.0 technologies in improving built environment resilience. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 530-550. ISSN 1759-5916
Shafei, H; Rahman, R A and Lee, Y S (2025) Evaluating Construction 4.0 technologies in enhancing safety and health: case study of a national strategic plan. Journal of Engineering, Design and Technology, 23(4), pp. 1211-1242. ISSN 1726-0531
Shafei, H; Rahman, R A; Lee, Y S and Che Ibrahim, C K I (2025) Implications of construction 4.0 technologies to enhancing well-being: A fuzzy TOPSIS evaluation. Construction Innovation, 25(1), pp. 131-165. ISSN 1471-4175
Soltaninejad, M; Noorzai, E and Faraji, A (2025) Enhancing the level of confidence in the safe fire evacuation operation employing a combination of BIM and fuzzy TOPSIS method. Smart and Sustainable Built Environment, 14(1), pp. 163-189. ISSN 2046-6099
Tabatabaee, S; Ashour, M; Sadeghi, H; Hoseini, S A; Mohandes, S R; Mahdiyar, A; Ismail, S and Hosseini, M R (2024) Towards the adoption of most suitable green walls within sustainable buildings using interval type-2 fuzzy best-worst method and TOPSIS technique. Engineering, Construction and Architectural Management, 31(3), pp. 1145-1164. ISSN 0969-9988
Torfi, F and Rashidi, A (2011) Selection of project managers in construction firms using analytic hierarchy process and fuzzy TOPSIS: A case study. Journal of Construction in Developing Countries, 16(1), pp. 69-89. ISSN 1823-6499
Tu, H and Jin, S (2024) A group decision-making model for architectural programming in megaprojects. Engineering, Construction and Architectural Management, 31(13), pp. 342-368. ISSN 0969-9988
Valizadeh, M.; Azizi, M.; Hosseini, M. R. and Mahoor, P. (2026) A hybrid analysis of reverse logistics barriers in Iranian construction. Smart and Sustainable Built Environment, 15(3), pp. 1225-1254. ISSN 2046-6099
Up a level