Items with Index Term: fuzzy logic

Number of items: 172.

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis. PhD thesis, University of Alberta, Canada.

Abdelgawad, M A M and Fayek, A R (2010) Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management, 136(9), pp. 1028-1036. ISSN 0733-9364

Abdelgawad, M A M and Fayek, A R (2012) Comprehensive hybrid framework for risk analysis in the construction industry using combined failure mode and effect analysis, fault trees, event trees, and fuzzy logic. Journal of Construction Engineering and Management, 138(5), pp. 642-651. ISSN 0733-9364

Abdul Majid, M Z (1997) Non-excusable delays in construction. PhD thesis, Loughborough University, UK.

Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988

Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988

Ahmed, S; Romdhane, L; El-Sayegh, S M and Manjikian, S (2025) Risk assessment for 3D printing in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 67-87. ISSN 1366-4387

Akomea-Frimpong, I; Dzagli, J R A D; Eluerkeh, K; Bonsu, F B; Opoku-Brafi, S; Gyimah, S; Asuming, N A S; Atibila, D W and Kukah, A S (2025) A systematic review of artificial intelligence in managing climate risks of PPP infrastructure projects. Engineering, Construction and Architectural Management, 32(4), pp. 2430-2454. ISSN 0969-9988

Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Humaidi, H M (2016) Construction projects bid or not bid approach using the fuzzy technique for order preference by similarity FTOPSIS method. Journal of Construction Engineering and Management, 142(12): 04016068, ISSN 0733-9364

Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. PhD thesis, Ohio State University, USA.

Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099

AlKheder, S; AlKandari, D and AlYatama, S (2022) Sustainable assessment criteria for airport runway material selection: A fuzzy analytical hierarchy approach. Engineering, Construction and Architectural Management, 29(8), pp. 3091-3113. ISSN 0969-9988

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.

Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364

Ali, S; Zayed, T and Hegab, M (2007) Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems. Journal of Construction Engineering and Management, 133(10), pp. 743-748. ISSN 0733-9364

Alipour-Bashary, M; Ravanshadnia, M; Abbasianjahromi, H and Asnaashari, E (2022) Building demolition risk assessment by applying a hybrid fuzzy FTA and fuzzy critic-TOPSIS framework. International Journal of Building Pathology and Adaptation, 40(1), pp. 134-159. ISSN 23984708

Ameyaw, E. E.; Agyekum-Mensah, G.; Kumar, B. and Edwards, D. J. (2026) Understanding barriers to the adoption of blockchain-enabled smart contracts in construction projects: Perspectives of construction practitioners. Smart and Sustainable Built Environment, 15(2), pp. 597-621. ISSN 2046-6099

Amiri, O; Rahimi, M; Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: A hybrid approach. International Journal of Building Pathology and Adaptation, 42(3), pp. 369-385. ISSN 23984708

Andrić, J M; Wang, J; Zou, P X W; Zhang, J and Zhong, R (2019) Fuzzy logic-based method for risk assessment of belt and road infrastructure projects. Journal of Construction Engineering and Management, 145(12): 4019082, ISSN 0733-9364

Anjomshoa, E (2025) The application of building information modeling (BIM) system in the smartification of green and sustainable buildings. Engineering, Construction and Architectural Management, 32(8), pp. 5194-5227. ISSN 0969-9988

Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007

Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.

Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.

Bansal, S; Biswas, S and Singh, S K (2018) Fuzzy TOPSIS based holistic assessment of regions: Context of India. Smart and Sustainable Built Environment, 7(2), pp. 166-181. ISSN 2046-6099

Butchers, A M (2004) Learning off the job: engineers and professional education. PhD thesis, University of Sheffield, UK.

Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(6), pp. 2463-2480. ISSN 0969-9988

Chakhrit, A and Chennoufi, M (2023) Failure mode, effects and criticality analysis improvement by using new criticality assessment and prioritization based approach. Journal of Engineering, Design and Technology, 21(5), pp. 1545-1567. ISSN 1726-0531

Chan, A P C; Chan, D W M and Yeung, J F Y (2009) Overview of the application of "fuzzy techniques" in construction management research. Journal of Construction Engineering and Management, 135(11), pp. 1241-1252. ISSN 0733-9364

Chan, A P C; Yang, Y; Wong, F K W; Chan, D W M and Lam, E W M (2015) Wearing comfort of two construction work uniforms. Construction Innovation, 15(4), pp. 473-492. ISSN 1471-4175

Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.

Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364

Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Cheng, M Y and Ko, C H (2003) Object-oriented evolutionary fuzzy neural inference system for construction management. Journal of Construction Engineering and Management, 129(4), pp. 461-469. ISSN 0733-9364

Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531

Diker, F and Erkan, İ (2022) Fuzzy logic method in the design of elementary school classrooms. Architectural Engineering and Design Management, 18(5), pp. 739-758. ISSN 1745-2007

Ehsanifar, M and Hemesy, M (2021) A new hybrid multi-criteria decision-making model to prioritize risks in the construction process under fuzzy environment (case study: The Valiasr Street Underpass Project). International Journal of Construction Management, 21(5), pp. 508-523. ISSN 1562-3599

El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387

Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X

Espada, R; Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 375-411. ISSN 1759-5916

Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.

Fayek, A R (2020) Fuzzy logic and fuzzy hybrid techniques for construction engineering and management. Journal of Construction Engineering and Management, 146(7): 04020064, ISSN 0733-9364

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988

Fujino, T (1994) The development of a method for investigating construction site accidents using fuzzy fault tree analysis. PhD thesis, Ohio State University, USA.

Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916

Gebretekle, Y T and Fayek, A R (2023) Fuzzy agent-based modeling of competency and performance measures in construction. Journal of Construction Engineering and Management, 149(12): 04023133, ISSN 0733-9364

Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364

Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364

Gunduz, M; Naji, K and Maki, O (2025) A framework for evaluating campus facility management performance in light of project critical success factors using a multidimensional fuzzy logic approach. Engineering, Construction and Architectural Management, 32(3), pp. 1715-1738. ISSN 0969-9988

Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988

Hassan, A; Purnomo, M R A and Anugerah, A R (2020) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology, 18(2), pp. 378-388. ISSN 1726-0531

Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988

Hellas, M S; Chaib, R and Verzea, I (2020) Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA). Journal of Engineering, Design and Technology, 18(1), pp. 40-54. ISSN 1726-0531

Imriyas, K; Pheng, L S and Teo, E A L (2007) A fuzzy knowledge-based system for premium rating of workers' compensation insurance for building projects. Construction Management and Economics, 25(11), pp. 1177-1195. ISSN 01446193

Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364

Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364

Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.

Jahangiri, K; Borgheipour, H; Gendeshmin, S B; Matin, A and Monazami Tehrani, G (2020) Site selection criteria for temporary sheltering in urban environment. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 58-70. ISSN 1759-5916

Jamalizadeh, A.; Kargar, V.; Haghighi, A.; Jahangiri, M.; Alimohammadlou, M. and Kamalinia, M. (2026) Identification and prioritization of preventive measures for crane overturning to enhance safety in asymmetric tandem lifting: Fuzzy logic approach. Journal of Construction Engineering and Management, 152(8): 04026126, ISSN 0733-9364

Jin, X H (2011) Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques. Journal of Construction Engineering and Management, 137(11), pp. 1003-1014. ISSN 0733-9364

Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.

Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364

Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.

Kiani, M; Bagheri, M; Ebrahimi, A and Alimohammadlou, M (2022) A model for prioritizing outsourceable activities in universities through an integrated fuzzy-MCDM method. International Journal of Construction Management, 22(5), pp. 784-800. ISSN 1562-3599

Kim, S Y; Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: Case study of international development projects. Engineering, Construction and Architectural Management, 28(4), pp. 1114-1133. ISSN 0969-9988

Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364

Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364

Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364

Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.

Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193

Li, H; Su, L; L.V, L and Xia, Q (2021) Detecting unbalanced bidding to achieve economic sustainability using fuzzy logic approach. Construction Innovation, 21(2), pp. 164-181. ISSN 1471-4175

Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531

Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364

Liu, D; Hu, C; Guo, S and Yu, J (2022) Z -number-based quantitative expression of activity information in uncertain project scheduling. Journal of Construction Engineering and Management, 148(9): 04022098, ISSN 0733-9364

Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364

Mahmoud, H M (1998) Applying a fuzzy logic expert system in the selection of bridge deck joints. PhD thesis, University of Central Florida, USA.

Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X

Manoliadis, O G; Pantouvakis, J P and Christodoulou, S (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(4), pp. 373-384. ISSN 1466433X

Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599

Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364

Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364

Milligan, C E (1992) Integrated construction coordination change response system. PhD thesis, Texas A&M University, USA.

Moghaddaszadeh Kermani, M (2016) Criticality-based strategic decision-making model for maintenance and asset management. PhD thesis, University of Manchester, UK.

Mohamed, E; Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(6), pp. 2328-2357. ISSN 0969-9988

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364

Nasirzadeh, F; Afshar, A; Khanzadi, M and Howick, S (2008) Integrating system dynamics and fuzzy logic modelling for construction risk management. Construction Management and Economics, 26(11), pp. 1197-1212. ISSN 1466433X

Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988

Nguyen, P H D (2020) Development of fuzzy hybrid approaches to project delivery method selection in highway construction. PhD thesis, University of Kansas, USA.

Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364

Nuhu, B K; Aliyu, I; Adegboye, M A; Ryu, J K; Olaniyi, O M and Lim, C G (2021) Distributed network-based structural health monitoring expert system. Building Research & Information, 49(1), pp. 144-159. ISSN 0961-3218

Nyongesa, H O; Musumba, G W and Chileshe, N (2017) Partner selection and performance evaluation framework for a construction-related virtual enterprise: A multi-agent systems approach. Architectural Engineering and Design Management, 13(5), pp. 344-364. ISSN 1745-2007

Okoroh, M I and Torrance, V B (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17(3), pp. 315-327. ISSN 01446193

Oladokun, V O; Proverbs, D G and Lamond, J (2017) Measuring flood resilience: A fuzzy logic approach. International Journal of Building Pathology and Adaptation, 35(5), pp. 470-487.

Olatunji, E O; Adebimpe, O A and Oladokun, V O (2023) A fuzzy logic approach for measuring flood resilience at community level in Nigeria. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 434-452. ISSN 1759-5916

Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364

Palsodkar, M; Yadav, G and Nagare, M R (2024) Integrating industry 4.0 and agile new product development practices to evaluate the penetration of sustainable development goals in manufacturing industries. Journal of Engineering, Design and Technology, 22(4), pp. 1351-1392. ISSN 1726-0531

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Park, T i (2009) A comprehensive asset management system for sewer infrastructures. PhD thesis, Pennsylvania State University, USA.

Patel, D A and Jha, K N (2017) Developing a process to evaluate construction project safety hazard index using the possibility approach in India. Journal of Construction Engineering and Management, 143(1): 04016081, ISSN 0733-9364

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Pitigala Liyana Arachchi, I S; Siriwardana, C; Amaratunga, D and Haigh, R (2022) Evaluation of societal trust on multi-hazard early warning (MHEW) mechanism: Sri Lankan context. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 533-553. ISSN 1759-5916

Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.

Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175

Poveda, C A and Fayek, A R (2009) Predicting and evaluating construction trades foremen performance: Fuzzy logic approach. Journal of Construction Engineering and Management, 135(9), pp. 920-929. ISSN 0733-9364

Prieto, A J (2021) Fuzzy systems in the digital management of heritage timber buildings in South Chile. Building Research & Information, 49(8), pp. 878-892. ISSN 0961-3218

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Prieto, A J; Torres-González, M and Carpio, M (2024) Virtual web-based instruments in the evaluation of functional degradation of heritage timber buildings. Building Research & Information, 52(1-2), pp. 181-193. ISSN 0961-3218

Raoufi, M and Fayek, A R (2020) Fuzzy Monte Carlo agent-based simulation of construction crew performance. Journal of Construction Engineering and Management, 146(5): 04020041, ISSN 0733-9364

Raoufi, M and Fayek, A R (2021) Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Construction Innovation, 21(3), pp. 398-416. ISSN 1471-4175

Revadigar, S P (1996) Automated analysis of building seismic records. PhD thesis, University of Houston, USA.

Rooke, J; Molloy, E M; Sinclair, M; Koskela, L; Siriwardena, M; Kagioglou, M and Siemieniuch, C (2008) Models and metaphors: Complexity theory and through-life management in the built environment. Architectural Engineering and Design Management, 4(1), pp. 47-57. ISSN 1745-2007

Roy, N C and Roy, N G (2022) Sustainable hydroelectric power project planning under socio-economic and environmental concerns using index based approach. Built Environment Project and Asset Management, 12(3), pp. 401-432. ISSN 2044-124X

Russell, A D and Fayek, A (1994) Automated corrective action selection assistant. Journal of Construction Engineering and Management, 120(1), pp. 11-33. ISSN 0733-9364

Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.

Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364

Shang, H; Anumba, C J; Bouchlaghem, D M; Miles, J C; Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(4), pp. 391-409. ISSN 0969-9988

Sharma, K and Trivedi, M K (2022) Latin hypercube sampling-based nsga-iii optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects. International Journal of Construction Management, 22(16), pp. 3158-3168. ISSN 1562-3599

Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.

Soltanmohammadlou, Nazi (2025) A sociotechnical system for earthmoving equipment safety in Australian construction sites. PhD thesis, Queensland University of Technology, Australia.

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364

Tafazzoli, M (2017) Dynamic risk analysis of construction delays using fuzzy-failure mode effects analysis. PhD thesis, University of Nevada, Las Vegas, USA.

Tah, J H M and Carr, V (2000) A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), pp. 491-500. ISSN 01446193

Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(2), pp. 107-119. ISSN 0969-9988

Tan, Y and Shen, L (2010) A fuzzy competence requirement (FCR) model for competitive bidding strategy. Construction Innovation, 10(1), pp. 75-88. ISSN 1471-4175

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tavakolan, M and Etemadinia, H (2017) Fuzzy weighted interpretive structural modeling: Improved method for identification of risk interactions in construction projects. Journal of Construction Engineering and Management, 143(11): 04017084, ISSN 0733-9364

Tetteh, M O; Chan, A P C; Darko, A; Özorhon, B and Adinyira, E (2024) Developing a multidimensional performance measurement framework for international construction joint ventures (icjvs): The perspective of Ghana-hosted icjvs' practitioners. Engineering, Construction and Architectural Management, 31(12), pp. 4754-4790. ISSN 0969-9988

Tetteh, M O; Chan, A P C; Mohandes, S R and Agyemang, D Y (2023) Diagnosing critical barriers to international construction joint ventures success in the developing country of Ghana. Construction Innovation, 23(5), pp. 1151-1185. ISSN 1471-4175

Tokede, O and Ahiaga-Dagbui, D (2016) Evaluating the whole-life cost implication of revocability and disruption in office retrofit building projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.

Toosi, H; Ghaaderi, M A and Shokrani, Z (2022) Comparative study of academic research on project management in Iran and the world with text mining approach and tf–idf method. Engineering, Construction and Architectural Management, 29(3), pp. 1553-1583. ISSN 0969-9988

Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.

Vanelslander, T; Chomat, G; Roumboutsos, A and Bonnet, G (2014) Cross-sectoral comparison of concessions in transport: Urban, road and port pre-fuzzy assessment. Built Environment Project and Asset Management, 4(1), pp. 22-39. ISSN 2044-124X

Vidyadhar, R; Sudeep, K R; Vinodh, S and Antony, J (2016) Application of fuzzy logic for leanness assessment in SMEs: A case study. Journal of Engineering, Design and Technology, 14(1), pp. 78-103.

Wang, M; Yao, G; Yang, Y; Li, R and Deng, R (2025) A decision support tool for dust prevention and control in construction. Journal of Construction Engineering and Management, 151(5): 04025037, ISSN 0733-9364

Wang, N; Horner, R M W and El-Haram, M (2004) Fuzzy logic approach to a generic elemental whole life costing model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wee, S (1993) A prototype of an expert system for pavement maintenance and rehabilitation strategy in the state of Ohio (espresso). PhD thesis, Ohio State University, USA.

Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.

Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364

Wuni, I Y (2025) Developing a multidimensional risk assessment model for sustainable construction projects. Engineering, Construction and Architectural Management, 32(6), pp. 4155-4173. ISSN 0969-9988

Yang, H (2001) A web-based collaborative decision making system for construction project teams using fuzzy logic. PhD thesis, Loughborough University, UK.

Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.

Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364

Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364

Zarghami, S A and Dumrak, J (2021) Reimaging stakeholder analysis in project management: Network theory and fuzzy logic applications. Engineering, Construction and Architectural Management, 28(9), pp. 2426-2447. ISSN 0969-9988

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Zeng, J; An, M; Chan, A H C and Lin, Y (2004) A methodology for assessing risks in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988

ng, S T; Fang, Y and Skitmore, R M (2008) Negotiation of on-site buffer stocks: A fuzzy non-structural fuzzy decision support system approach. Construction Innovation, 8(3), pp. 202-217. ISSN 1471-4175

Özkan-Özen, Y D; Akcicek, C and Ozturkoglu, Y (2025) Machine learning applications in smart logistics: Analysing barriers for future practices. Journal of Engineering, Design and Technology, 23(6), pp. 2105-2123. ISSN 1726-0531

This list was generated on Sat Aug 22 01:28:11 2026 UTC.