Items with Index Term: frame structure
Adel Ahmadian, A (2020) Computational design for cooperative robotic assembly of nonstandard timber frame buildings. DSc thesis, ETH Zürich, Switzerland.
Al-Muyeed, A and Afrin, R (2005) Effect of masonry infill for reducing the sway of RC frame using finite element modeling. Journal of Construction Research, 6(2), pp. 293-306. ISSN 1609-9451
Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007
Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.
Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.
Castriotto, Caio Magalhães (2023) Reciprocal link a new connection system for reciprocal frame structures developed by algorithmic modeling and digital fabrication. PhD thesis, Universidade Estadual de Campinas, Brazil.
Densley Tingley, D (2013) Design for deconstruction: an appraisal. PhD thesis, University of Sheffield, UK.
García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.
Lachance, E; Lehoux, N and Blanchet, P (2023) A simulation model to analyze different automation scenarios in a mixed-assembly manufacturing line: Timber-frame prefabrication industry. Journal of Construction Engineering and Management, 149(10): 04023091, ISSN 0733-9364
Li, S; Lin, J; Lin, W; Zheng, J; Tu, Y and Zheng, J (2026) A new energy-saving block and invisible multiribbed frame structure. Construction Innovation, 26(2), pp. 313-327. ISSN 1471-4175
Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization. PhD thesis, University of Alberta, Canada.
Olbina, S and Glick, S (2023) Using integrated hands-on and virtual reality (VR) or augmented reality (AR) approaches in construction management education. International Journal of Construction Education and Research, 19(3), pp. 341-360. ISSN 1557-8771
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.
Xu, Z; Liang, Y; Lu, H; Kong, W and Wu, G (2023) An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentation. Engineering, Construction and Architectural Management, 30(10), pp. 5302-5332. ISSN 0969-9988
Up a level