Items with Index Term: formwork
Abd El-Razek, M E and Basha, I M (2001) Constructability improvement of bridges using stepping formwork. Journal of Construction Engineering and Management, 127(3), pp. 206-213. ISSN 0733-9364
Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175
Abreu, M M and Lordsleem, A C (2019) Aluminum formwork system: Loss and productivity. Built Environment Project and Asset Management, 9(5), pp. 616-627. ISSN 2044-124X
Abu Dabous, S; Zadeh, T and Ibrahim, F (2024) A failure mode, effects and criticality analysis-based method for formwork assessment and selection in building construction. International Journal of Building Pathology and Adaptation, 42(5), pp. 1019-1040. ISSN 2398-4708
Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.
Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Al Asali, M W (2020) Craft-inclusive construction: design strategies for thin-tile vaulting. PhD thesis, University of Cambridge, UK.
Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988
Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175
Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988
Amarasinghe, Sam (2025) Performance optimizing for precast concrete construction. PhD thesis, Queensland University of Technology, Australia.
André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.
Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175
Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007
Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364
Ataei, S and Jafari, A (2026) Comparative environmental impact assessment of 3D concrete printing and precast techniques in bridge construction: A case study analysis. Journal of Construction Engineering and Management, 152(1): 05025018, ISSN 0733-9364
Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364
Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process. PhD thesis, Pennsylvania State University, USA.
Boakye Danquah, C; Acheampong, A and Adjei-Kumi, T (2022) Level of awareness of formwork design in the Ghanaian construction industry; enabling future technology application. Journal of Engineering, Design and Technology, 20(4), pp. 1015-1039. ISSN 1726-0531
Bradley, R A; Gohnert, M and Bulovic, I (2018) Construction considerations for low-cost earth brick shells. Journal of Construction in Developing Countries, 23(1), pp. 43-60. ISSN 1823-6499
Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364
Chellappa, V and Salve, U R (2025) Exploring causes of falls and preventive measures in vertical formwork operations in Indian construction. Built Environment Project and Asset Management, 15(6), pp. 1089-1105. ISSN 2044-124X
Christian, J and Mir, S U (1987) Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), pp. 603-610. ISSN 0733-9364
Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771
Dakhli, Z and Lafhaj, Z (2017) Experimental and numerical prototyping of a complex cement column formwork for construction. Architectural Engineering and Design Management, 13(2), pp. 147-165. ISSN 1745-2007
Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364
Dunlop, P and Smith, S (2000) Stochastic modelling of concrete operations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dunlop, P G and Smith, S D (2002) Simulation analysis of the UK concrete delivery and placement process: A tool for planners. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
El Sayed, A Y; Darwish, M and Nassar, K (2021) Design and constructability of novel extendable arched steel truss falsework. Journal of Construction Engineering and Management, 147(3): 04020187, ISSN 0733-9364
El-Shahhat, A M (1993) Safety of concrete high-rise buildings during construction. PhD thesis, Purdue University, USA.
Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364
Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X
Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364
Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364
Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.
Gai, X (2012) Fibre reinforced polymer (FRP) stay-in-place (SIP) participating formwork for new construction. PhD thesis, University of Bath, UK.
Gallego, E; Fuentes, J M; Ramírez, A and Ayuga, F (2010) Design of tall formworks by a finite-element model. Journal of Construction Engineering and Management, 136(7), pp. 803-810. ISSN 0733-9364
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Hampson, K and Fischer, M (1997) Structural designs and construction technologies for California highway bridges. Journal of Construction Engineering and Management, 123(3), pp. 269-275. ISSN 0733-9364
Hanna, A S (1989) An interactive knowledge-based formwork selection system for buildings. PhD thesis, Pennsylvania State University, USA.
Hanna, A S; Willenbrock, J H and Sanvido, V E (1992) Knowledge acquisition and development for formwork selection system. Journal of Construction Engineering and Management, 118(1), pp. 179-198. ISSN 0733-9364
Hansen, S and Siregar, P H R (2020) Analytic hierarchy process-based decision-making framework for formwork system selection by contractors. Journal of Construction in Developing Countries, 25(2), pp. 237-255. ISSN 1823-6499
Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.
Hilf, J W (1987) Rolled concrete dams using gap-graded aggregate. Journal of Construction Engineering and Management, 113(1), pp. 27-33. ISSN 0733-9364
Ikaheimonen, J (1998) Construction loads on shores and stability of horizontal formwork. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.
Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X
Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.
Jarkas, A M (2010) Buildability factors influencing micro-level formwork labour productivity of slab panels in building floors. Architectural Engineering and Design Management, 6(3), pp. 161-174. ISSN 1745-2007
Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of walls. International Journal of Construction Management, 10(4), pp. 101-117. ISSN 1562-3599
Jarkas, A M (2010) Buildability factors influencing formwork labour productivity of isolated foundations. Journal of Engineering, Design and Technology, 8(3), pp. 274-295. ISSN 1726-0531
Jarkas, A M (2011) Buildability factors that influence micro-level formwork labour productivity of beams in building floors. Journal of Construction in Developing Countries, 16(1), pp. 1-18. ISSN 1823-6499
Jarkas, A M (2016) Effect of buildability on labor productivity: A practical quantification approach. Journal of Construction Engineering and Management, 142(2): 06015002, ISSN 0733-9364
Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity? Engineering, Construction and Architectural Management, 24(3), pp. 537-552. ISSN 0969-9988
Jarkas, A M and Horner, R M W (2011) Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management and Economics, 29(5), pp. 483-493. ISSN 1466433X
Jin, Z; Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(6): 05024005, ISSN 0733-9364
John, S T; Mohan, A; Philip, M S; Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(5), pp. 1991-2010. ISSN 0969-9988
Johnston, D W; Kahn, K P and Phillips, J B (1989) Formwork pressures in tall and thick concrete walls. Journal of Construction Engineering and Management, 115(3), pp. 444-461. ISSN 0733-9364
Kajewski, S L (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210. ISSN 0733-9364
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Karshenas, S (1997) Strength variability of conventional slab formwork systems. Journal of Construction Engineering and Management, 123(3), pp. 324-330. ISSN 0733-9364
Kavaarpuo, Godwin (2022) Transaction costs and entrepreneurial discovery in house building innovations: A study of developers' behaviour in Ghana. PhD thesis, University of Melbourne, Australia.
Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988
Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364
Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364
Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193
Li, Y.; Tai, S. and Tai, Z. (2024) Development of ANP-based greenness evaluation model of construction technologies in China. Journal of Engineering, Design and Technology, 24(2), pp. 602-630. ISSN 1726-0531
Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.
Liu, X L; Chen, W F and Bowman, M D (1986) Shore-slab interaction in concrete buildings. Journal of Construction Engineering and Management, 112(2), pp. 227-244. ISSN 0733-9364
Mahamulkar, S; Lad, V H; Patel, K A; Patel, D A and Jha, K N (2022) Development of a framework for selection of a tunnel lining formwork system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364
Mandala, R S K and Nayaka, R R (2025) A state of art review on time, cost and sustainable benefits of modern construction techniques for affordable housing. Construction Innovation, 25(2), pp. 363-380. ISSN 1471-4175
Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364
Mararo, I. M.; Babafemi, A. J. and Aigbavboa, C. (2026) Towards understanding the perceptions of 3D construction printing in Kenya. International Journal of Construction Management, 26(7), pp. 1320-1340. ISSN 1562-3599
Maurya, T; Kalita, J D and Kar, S (2026) Assessing safety scores of multimodal activities to integrate safety into construction planning. Journal of Construction Engineering and Management, 152(5): 04026039, ISSN 0733-9364
Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2023) Proximity activity intensity identification system in hot and humid weather conditions: Development and implementation. Journal of Construction Engineering and Management, 149(12): 04023122, ISSN 0733-9364
Moohialdin, Ammar (2020) A real-time worker activity intensity identification system for construction workers under hot and humid weather conditions. PhD thesis, Queensland University of Technology, Australia.
Moon, S; Yang, B and Choi, E (2018) Safety guideline for safe concrete placement utilizing the information on the structural behavior of formwork. Journal of Construction Engineering and Management, 144(12): 04018108, ISSN 0733-9364
Moselhi, O and Khan, Z (2010) Analysis of labour productivity of formwork operations in building construction. Construction Innovation, 10(3), pp. 286-303. ISSN 1471-4175
Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193
Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
Niskanen, T and Lauttalammi, J (1989) Accident risks during handling of materials at building construction sites. Construction Management and Economics, 7(4), pp. 283-301. ISSN 01446193
Noorzai, E; Gharouni Jafari, K and Moslemi Naeni, L (2022) Lessons learned on selecting the best mass housing method based on performance evaluation criteria in Iran. International Journal of Construction Education and Research, 18(2), pp. 123-141. ISSN 1557-8771
Nursyamsi, N; Tarigan, J; Aswin, M; Abu Bakar, B H and Hardjasaputra, H (2024) Structural behaviour of the strengthened reinforced concrete beams using ultra high-performance fibre reinforced concrete layer. Construction Innovation, 24(3), pp. 725-746. ISSN 1471-4175
O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Okoye, P U (2018) Occupational health and safety risk levels of building construction trades in Nigeria. Construction Economics and Building, 18(2), pp. 92-109. ISSN 2204-9029
Oti-Sarpong, K (2019) Examining international technology transfer on construction projects in developing countries through a social construction of technology lens. PhD thesis, University of Hong Kong, Hong Kong.
Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499
Peng, J L; Yen, T; Lin, Y; Wu, K L and Chen, W F (1997) Performance of scaffold frame shoring under pattern loads and load paths. Journal of Construction Engineering and Management, 123(2), pp. 138-145. ISSN 0733-9364
Phelan, R S; Radjy, F; Haas, C and Hendrickson, C (1990) Computer-aided concrete-placement optimization. Journal of Construction Engineering and Management, 116(1), pp. 172-187. ISSN 0733-9364
Poon, C S; Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(2), pp. 88-98. ISSN 0969-9988
Poon, C S; Yu, A T W; Wong, S W and Cheung, E (2004) Management of construction waste in public housing projects in Hong Kong. Construction Management and Economics, 22(7), pp. 675-689. ISSN 01446193
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.
Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks. PhD thesis, University of California, San Diego, USA.
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: A comparative investigation. Building Research & Information, 27(2), pp. 109-119. ISSN 0961-3218
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193
Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988
Ringwald, R C (1985) Formwork design. Journal of Construction Engineering and Management, 111(4), pp. 391-403. ISSN 0733-9364
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Safa, M; Reinsma, S; Haas, C T; Goodrum, P M and Caldas, C H (2018) A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(1), pp. 53-64. ISSN 1562-3599
Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salguero-Caparrós, F; Pardo-Ferreira, M D C; Herrera-Pérez, V and Rubio-Romero, J C (2026) Monitoring and improving safety and health in construction activities for concrete structures. Journal of Construction Engineering and Management, 152(5): 05026004, ISSN 0733-9364
Sayed, Ahmed Yehia Abdel Aziz El (2025) Design of novel formwork system and development of numerical model for comparison between formwork systems. PhD thesis, The American University in Cairo, Egypt.
Senarath, J R and Fernando, N G (2017) Developing labour productivity norms for aluminium system formwork in Sri Lanka. Built Environment Project and Asset Management, 7(2), pp. 199-211. ISSN 2044-124X
Sepasgozar, S M E; Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(2), pp. 158-176. ISSN 0969-9988
Shapira, A (1995) Formwork design for high elevated slab construction. Construction Management and Economics, 13(3), pp. 243-252. ISSN 01446193
Shapira, A (1995) Rational design of shoring-tower-based formwork. Journal of Construction Engineering and Management, 121(3), pp. 255-260. ISSN 0733-9364
Shapira, A (1999) Contemporary trends in formwork standards: a case study. Journal of Construction Engineering and Management, 125(2), pp. 69-75. ISSN 0733-9364
Shapira, A (2004) Work inputs and related economic aspects of multitier shoring towers. Journal of Construction Engineering and Management, 130(1), pp. 134-142. ISSN 0733-9364
Shapira, A and Goldfinger, D (2000) Work-input model for assembly and disassembly of high shoring towers. Construction Management and Economics, 18(4), pp. 467-477. ISSN 01446193
Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364
Shapira, A; Shahar, Y and Raz, Y (2001) Design and construction of high multitier shoring towers: Case study. Journal of Construction Engineering and Management, 127(2), pp. 108-115. ISSN 0733-9364
Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029
Sirca, G F (2019) Analysis of full-scale in-service civil engineering structures. PhD thesis, Ohio State University, USA.
Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sohoni, P and Jha, K N (2022) Evaluating the factors for shore selection in multi-storey building construction. International Journal of Construction Management, 22(10), pp. 1983-1992. ISSN 1562-3599
Sonmez, R and Rowings, J E (1998) Construction labor productivity modeling with neural networks. Journal of Construction Engineering and Management, 124(6), pp. 498-504. ISSN 0733-9364
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193
Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193
Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(2), pp. 113-121. ISSN 1562-3599
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Turkan, Y; Bosché, F; Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(2), pp. 145-167. ISSN 1471-4175
Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364
Williamson, D; Orr, J and Fulford, D (2017) Biogas dome construction using pneumatics. Journal of Construction in Developing Countries, 22(2), pp. 35-53. ISSN 1823-6499
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.
Yuan, X (2016) A cyber-physical systems (CPS) approach to temporary structures monitoring. PhD thesis, Pennsylvania State University, USA.
Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007
Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988
Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364
Up a level