Items with Index Term: finishes

Number of items: 51.

Abd-Elnaby, A-E H A and Reffat, R M (2024) Enhancing BIM-BEM integration: Solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(3), pp. 596-623. ISSN 1745-2007

Aktas, C B (2011) Impact of product lifetime on life cycle assessment results. PhD thesis, University of Pittsburgh, USA.

Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.

Amoah, C; Kajimo-Shakantu, K and Schalkwyk, T (2021) Meeting the expectations of the social housing recipients in South Africa: A myth or reality? International Journal of Building Pathology and Adaptation, 39(2), pp. 218-234. ISSN 23984708

Amuda Yusuf, G and Mohamed, S F (2014) Perceived benefits of adopting standard: based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(2), pp. 104-119. ISSN 2204-9029

Arayamparambil, S. R.; Jha, K. N. and Singh, A. (2026) Development of a quality assessment scoring framework for residential buildings. International Journal of Building Pathology and Adaptation, 44(4), pp. 833-848. ISSN 2398-4708

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market. PhD thesis, University of Strathclyde, UK.

Castelblanco, G; Mangano, G; Zenezini, G and De Marco, A (2025) Once concessioned, twice shy? Asymmetries of "reconcession" in national PPP programs. Construction Management and Economics, 43(6), pp. 405-427. ISSN 0144-6193

Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Conejos, S; Ubando, A and Lin Chew, M Y (2022) Design for maintainability tool for nano-façade coating applications on high-rise façades in the tropics. Built Environment Project and Asset Management, 12(1), pp. 70-95. ISSN 2044-124X

Driza, P J N and Park, N K (2014) Occupant satisfaction in LEED-certified higher education buildings. Smart and Sustainable Built Environment, 3(3), pp. 223-236. ISSN 2046-6099

Edwards, B and Eckblad, J (1984) Motivating the British construction industry. Construction Management and Economics, 2(2), pp. 145-156. ISSN 01446193

Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364

Flanagan, R; Kendell, A; Norman, G and Robinson, G D (1987) Life cycle costing and risk management. Construction Management and Economics, 5(4), ISSN 01446193

Folorunso, C O (2021) Analysis of effectiveness of wooden floor finishes in some residential buildings in Lagos, Nigeria. International Journal of Building Pathology and Adaptation, 39(5), pp. 756-765. ISSN 23984708

Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364

Forsythe, P (2006) Consumer-perceived appearance tolerances in construction quality management. Engineering, Construction and Architectural Management, 13(3), pp. 307-318. ISSN 0969-9988

Glass, J and Pepper, C (2005) Perceptions of precast concrete cladding in the UK market. Architectural Engineering and Design Management, 1(4), pp. 233-246. ISSN 1745-2007

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Hasan, S and Sacks, R (2023) Integrating BIM and multiple construction monitoring technologies for acquisition of project status information. Journal of Construction Engineering and Management, 149(7): 04023051, ISSN 0733-9364

Isiofia, L A; Nna, E; Uzuegbunam, F O and Ibem, E O (2024) The association of physical development density, prevalence and types of microbes in colonized façade finishes in enugu metropolis, Nigeria. International Journal of Building Pathology and Adaptation, 42(6), pp. 1147-1168. ISSN 2398-4708

Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.

Kishk, M; Laing, R and Edge, M (2006) An extended whole-life application for the selection of hospital finishes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kishk, M; Laing, R and Pollock, R (2004) A novel approach for selecting finishes: System algorithm and methodology. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kishk, M; Laing, R; Scott, J and Edge, M (2007) A generic finishes database for healthcare facilities. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364

Mahmoud, A S; Sanni-Anibire, M O; Hassanain, M A and Ahmed, W (2019) Key performance indicators for the evaluation of academic and research laboratory facilities. International Journal of Building Pathology and Adaptation, 37(2), pp. 208-230. ISSN 23984708

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Newsham, G R; Birt, B J; Arsenault, C; Thompson, A J L; Veitch, J A; Mancini, S; Galasiu, A D; Gover, B N; MacDonald, I A and Burns, G J (2013) Do green buildings have better indoor environments? New evidence. Building Research & Information, 41(4), pp. 415-434. ISSN 0961-3218

Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.

Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193

Ogbu, C P (2017) Building quality condition and maintenance cost: The case of public low income housing in Abia State, Nigeria. Journal of Construction Business and Management, 1(2), pp. 24-34. ISSN 2521-0165

Olajide, J F; Ajayi, O O; Kudirat Ibilola, Z and Adenuga, O A (2021) Climatic conditions and the resilience of buildings along Lagos coastline. Built Environment Project and Asset Management, 11(4), pp. 738-749. ISSN 2044-124X

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ramos, N M M and De Freitas, V P (2009) Experimental determination of the hygroscopic inertia of building materials. Building Research & Information, 37(3), pp. 293-299. ISSN 0961-3218

Rauf, A; Shafiq, M T; Khalfan, M M A and Ulhaq, I (2024) Sustainable water management in construction: Life-cycle embodied water assessment of residential buildings. Built Environment Project and Asset Management, 14(5), pp. 682-696. ISSN 2044-124X

Sachchithananthan, M and Thayaparan, M (2025) A framework to select suitable sustainable materials for high-rise buildings in Sri Lanka. International Journal of Construction Management, 25(9), pp. 1072-1086. ISSN 1562-3599

Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364

Sameh, R; Ismaeel, W S E and Othman, F (2021) Sustainable building renovation and indoor environmental quality. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.

Sward, A (2006) Relations as a key resource. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Uzuegbunam, F O; Isiofia, L A and Ibem, E O (2024) Assessment of susceptibility of buildings with different façade finishes to microbial decay in the hot-humid tropical environment of enugu, southeast Nigeria. International Journal of Building Pathology and Adaptation, 42(6), pp. 1106-1125. ISSN 2398-4708

Ventura, M; S. Dias, I; Flores-Colen, I and Silva, A (2023) Pathology and proactive maintenance of floor finishes. International Journal of Building Pathology and Adaptation, 41(3), pp. 588-605. ISSN 23984708

Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Victoria, M F (2017) Developing decision support models for early stage embodied carbon management in buildings. PhD thesis, Northumbria University, UK.

Victoria, M F and Perera, S (2018) Managing embodied carbon in buildings: A Pareto approach. Built Environment Project and Asset Management, 8(5), pp. 504-514. ISSN 2044-124X

Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X

Woodhead, R M (1999) The influence of paradigms and perspectives on the decision to build undertaken by large experienced clients of the UK construction industry. PhD thesis, University of Leeds, UK.

This list was generated on Sat Aug 22 01:41:44 2026 UTC.