Items with Index Term: fast-tracking
Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988
Dehghan, R and Ruwnapura, J Y (2014) Model of trade-off between overlapping and rework of design activities. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364
El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.
Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193
Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364
Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.
Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(2), pp. 133-144. ISSN 01446193
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Lin, S and Cheung, S O (2022) Intention to settle as an indispensable element of negotiated construction dispute settlement. Journal of Construction Engineering and Management, 148(10): 04022113, ISSN 0733-9364
Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364
Pena-Mora, F and Park, M (2001) Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management, 127(6), pp. 445-456. ISSN 0733-9364
Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364
Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599
Williams, P and Williams, A (2014) Planning law reform and fast-tracking development in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Up a level