Items with Index Term: failure mode and effects analysis

Number of items: 15.

Alvand, A; Mirhosseini, S M; Ehsanifar, M; Zeighami, E and Mohammadi, A (2023) Identification and assessment of risk in construction projects using the integrated FMEA-swara-waspas model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), pp. 392-404. ISSN 1562-3599

Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531

Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531

Hassan, A; Purnomo, M R A and Anugerah, A R (2020) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology, 18(2), pp. 378-388. ISSN 1726-0531

Hobart, C; Thomson, D; Dainty, A; Fernie, S and Drewniak, D (2015) Closing the energy performance gap in zero carbon homes – pro-active identification, prioritisation and mitigation of causes using fmea. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Khalilzadeh, M; Balafshan, R and Hafezalkotob, A (2020) Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects. Journal of Engineering, Design and Technology, 18(6), pp. 1997-2016. ISSN 1726-0531

Layzell, J and Ledbetter, S (1998) FMEA applied to cladding systems: reducing the risk of failure. Building Research & Information, 26(6), pp. 351-357. ISSN 0961-3218

Liang, R; Xue, Z and Chong, H Y (2023) Risk evaluation of logistics park projects' lifecycle during the COVID-19 pandemic: Failure mode and effects analysis. Journal of Construction Engineering and Management, 149(1): 04022153, ISSN 0733-9364

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Marenjak, S; El-Haram, M A and Horner, M R W (2003) Generic approach to minimize whole life costs in the building industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Nabizadeh, M; Khalilzadeh, M; Ebrahimnejad, S and Ershadi, M J (2021) Developing a fuzzy goal programming model for health, safety and environment risks based on hybrid fuzzy FMEA-vikor method. Journal of Engineering, Design and Technology, 19(2), pp. 317-338. ISSN 1726-0531

Nzekwe-Excel, C (2010) Development of an integrated framework for satisfaction assessment of construction project teams. PhD thesis, University of Wolverhampton, UK.

Wang, Y; Deng, X and Mao, H (2023) The optimization of personnel localization management on international construction projects: Cases study from China enterprises. Engineering, Construction and Architectural Management, 30(8), pp. 3259-3291. ISSN 0969-9988

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zohrehvandi, S; Vanhoucke, M; Khalilzadeh, M; Amiri, M and Shadrokh, S (2023) A fuzzy project buffer management algorithm: A case study in the construction of a renewable project. International Journal of Construction Management, 23(12), pp. 2134-2143. ISSN 1562-3599

This list was generated on Sat Aug 22 01:38:36 2026 UTC.