Items with Index Term: fabrication
Adeleye, T; Huang, M; Huang, Z and Sun, L (2013) Predicting loss for large construction companies. Journal of Construction Engineering and Management, 139(9), pp. 1224-1236. ISSN 0733-9364
Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.
Afeez, A and Kumar, A (2013) Application of CAD and reverse engineering methodology for development of complex assemblies. Journal of Engineering, Design and Technology, 11(3), pp. 375-390. ISSN 1726-0531
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.
Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599
Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.
Al Jassmi, H; Al Ahmad, M and Ahmed, S (2021) Automatic recognition of labor activity: A machine learning approach to capture activity physiological patterns using wearable sensors. Construction Innovation, 21(4), pp. 555-575. ISSN 1471-4175
Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175
Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364
Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), pp. 21-37. ISSN 0969-9988
Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007
Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531
Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. PhD thesis, University of California, Berkeley, USA.
Ammar, M (2016) Aerial construction: Robotic fabrication of tensile structures with flying machines. DSc thesis, ETH Zürich, Switzerland.
Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218
Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7): 04022056, ISSN 0733-9364
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364
Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988
Bailey, D (2016) A performance evaluation of mainstream timber framed and traditional masonry housing in the UK. PhD thesis, University of Nottingham, UK.
Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988
Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364
Bhat, A; Gupta, V; Aulakh, S S and Elsen, R S (2023) Generative design and analysis of a double-wishbone suspension assembly: A methodology for developing constraint oriented solutions for optimum material distribution. Journal of Engineering, Design and Technology, 21(3), pp. 927-942. ISSN 1726-0531
Bigdellou, S and Chen, Q (2026) Quantification of economic influences on technology adoption and diffusion in the construction industry. International Journal of Construction Management, 26(4), pp. 621-638. ISSN 1562-3599
Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029
Bonwetsch, T (2015) Robotically assembled brickwork: Manipulating assembly processes of discrete elements. DSc thesis, ETH Zürich, Switzerland.
Booth, Peter Charles (2023) Digitally integrated material practice: Computational methods of engaging non-standardised plantation hardwood in architecture. PhD thesis, University of Technology Sydney, Australia.
Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.
Burford, N K and Smith, F W (1999) Developing a new military shelter system: A technical study in advanced materials and structures. Building Research & Information, 27(2), pp. 64-83. ISSN 0961-3218
Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.
Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Carvalho, P F M (2023) Tectonics and material transformations: Exploring concrete in architecture through digital fabrication processes. PhD thesis, Universidade do Porto, Portugal.
Castriotto, Caio Magalhães (2023) Reciprocal link a new connection system for reciprocal frame structures developed by algorithmic modeling and digital fabrication. PhD thesis, Universidade Estadual de Campinas, Brazil.
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175
Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451
Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.
Cripps, A (2004) Cardboard as a construction material: A case study. Building Research & Information, 32(3), pp. 207-219. ISSN 0961-3218
Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.
Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193
Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599
Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364
Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.
Dixit, S; Stefańska, A and Singh, P (2023) Manufacturing technology in terms of digital fabrication of contemporary biomimetic structures. International Journal of Construction Management, 23(11), pp. 1828-1836. ISSN 1562-3599
Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655
Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531
Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364
Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364
Eastman, C M and Sacks, R (2008) Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering and Management, 134(7), pp. 517-526. ISSN 0733-9364
Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364
Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364
Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.
Forde, B and Stiemer, S F (1985) Steel construction evaluation by MLR-strategies. Journal of Construction Engineering and Management, 111(2), pp. 149-156. ISSN 0733-9364
Franze, Anthony (2024) Augmented fabrication: An Australian industry 4.0 augmented reality (ar) framework. PhD thesis, Queensland University of Technology, Australia.
Fuyama, H (1993) Computer assisted conceptual structural design of steel buildings. PhD thesis, Stanford University, USA.
Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364
Gallardo, C A S; Granja, A D and Picchi, F A (2014) Productivity gains in a line flow precast concrete process after a basic stability effort. Journal of Construction Engineering and Management, 140(4): B4013004, ISSN 0733-9364
Gamal, A; Nashaat, B; Shahda, M M and Nosier, S R (2024) Ten questions concerning the integration of digital fabrication techniques into the architectural design process. Architectural Engineering and Design Management, 20(1), pp. 120-149. ISSN 1745-2007
Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector. PhD thesis, University of Liverpool, UK.
Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.
Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364
Globa, A; Costin, G; Tokede, O; Wang, R; Khoo, C K and Moloney, J (2022) Hybrid kinetic facade: Fabrication and feasibility evaluation of full-scale prototypes. Architectural Engineering and Design Management, 18(6), pp. 791-811. ISSN 1745-2007
Gotthelf, H; Ozbek, M E and Guggemos, A (2013) Potential efficiency gains from early involvement of steel fabricators and erectors: Lessons learned from the nrel research support facility project. International Journal of Construction Education and Research, 9(2), pp. 147-160. ISSN 1557-8771
Graser, K; Kahlert, A and Hall, D M (2021) Dfab house: Implications of a building-scale demonstrator for adoption of digital fabrication in AEC. Construction Management and Economics, 39(10), pp. 853-873. ISSN 01446193
Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.
Gupta, N K; Thakre, G D and Kumar, M (2020) Dry sliding wear performance on self-healing Al6061 composites. Journal of Engineering, Design and Technology, 18(5), pp. 1357-1370. ISSN 1726-0531
Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Henin, Eliya E A (2012) Efficient precast/prestressed floor system for building construction. PhD thesis, University of Nebraska - Lincoln, USA.
Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364
Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.
Ho Song, M and Fischer, M (2020) Empirical determination of the smallest batch sizes for daily planning. Journal of Construction Engineering and Management, 146(3): 04020011, ISSN 0733-9364
Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364
Hovde, G O (1995) Fatigue and overload reliability of offshore structural systems, considering the effect of inspection and repair. DrIng thesis, Universitetet i Trondheim Norges Tekniske Hogskole, Norway.
Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems. PhD thesis, University of Michigan, USA.
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364
Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.
Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.
Hyde, R (2023) An investigation into the relationship between technical design, fabrication process and material development for the production of thin, lightweight, high-performance concrete cladding components for the construction of beautiful, durable and resilient building envelopes. PhD thesis, Queen's University Belfast, UK.
Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(2), pp. 158-167. ISSN 1726-0531
Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364
Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364
Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175
Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.
Katoch, V and Mohan, S (2019) Design and fabrication of a safety frame for workers carrying out head lifting at construction sites. Journal of Engineering, Design and Technology, 17(6), pp. 1250-1265. ISSN 1726-0531
Kawecki, L R (2010) Environmental performance of modular fabrication: Calculating the carbon footprint of energy used in the construction of a modular home. PhD thesis, Arizona State University, USA.
Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.
Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.
Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364
Lee, D; Nie, G Y and Han, K (2024) Automatic and real-time joint tracking and three-dimensional scanning for a construction welding robot. Journal of Construction Engineering and Management, 150(3): 04023165, ISSN 0733-9364
Lee, G and Kim, S (2012) Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique. Journal of Construction Engineering and Management, 138(11), pp. 1322-1330. ISSN 0733-9364
Lei, Z; Chen, Q; Altaf, M S and Cao, K (2024) Defining information requirements for off-site construction management: An industry case study from Canada. Journal of Construction Engineering and Management, 150(12): 05024014, ISSN 0733-9364
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Lienhard, J and Eversmann, P (2021) New hybrids–from textile logics towards tailored material behaviour. Architectural Engineering and Design Management, 17(3-4), pp. 169-174. ISSN 1745-2007
Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029
Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century. PhD thesis, George Washington University, USA.
Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175
Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.
Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Matsuzaki, M; Uchikawa, C and Mitamura, T (1990) Advanced fabrication and erection techniques for long suspension bridge cables. Journal of Construction Engineering and Management, 116(1), pp. 112-129. ISSN 0733-9364
McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655
Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.
Meng, Y (2023) Multi-objective optimal design and assessment framework of freeform timber structure oriented by robotic automation construction. PhD thesis, University of Sheffield, UK.
Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193
Mimendi Cruz, Jose Leonel (2021) Digital workflow for the design, construction and management of natural bamboo pole structures. PhD thesis, University College London, UK.
Modeen, T; Pasquire, C and Soar, R (2005) Ubiquitous customization: Utilizing rapid manufacturing in the production of design and architecture. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.
Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029
Mostafa, S and Chileshe, N (2018) Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural Engineering and Design Management, 14(1-2), pp. 139-157. ISSN 1745-2007
Mostafa, S; Kim, K P; Tam, V W Y and Rahnamayiezekavat, P (2020) Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. International Journal of Construction Management, 20(2), pp. 146-156. ISSN 1562-3599
Mustapha, K; Alhiyafi, J; Shafi, A and Olatunji, S O (2023) Support vector machines for predicting the compressive response of defected 3D printed polymeric sandwich structures. Journal of Engineering, Design and Technology, 21(3), pp. 819-839. ISSN 1726-0531
Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.
Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364
Neamat, S D; Haido, J H and Wardeh, G (2025) Investigating pozzolanic glass waste's role in reinforcing ultra-high-performance concrete beams for enhanced sustainability. International Journal of Building Pathology and Adaptation, 43(4), pp. 633-651. ISSN 2398-4708
Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364
Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364
O'Connor, J T; O'Brien, W J and Choi, J O (2015) Standardization strategy for modular industrial plants. Journal of Construction Engineering and Management, 141(9): 4015026, ISSN 0733-9364
Ofori-Kuragu, J K and Osei-Kyei, R (2021) Mainstreaming pre-manufactured offsite processes in construction: are we nearly there? Construction Innovation, 21(4), pp. 743-760. ISSN 1471-4175
Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364
O’Connor, J T; Rusch, S E and Schulz, M J (1987) Constructability concepts for engineering and procurement. Journal of Construction Engineering and Management, 113(2), pp. 235-248. ISSN 0733-9364
Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364
Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.
Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175
Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.
Popovic, D (2020) The development and use of product platforms in single-family industrialized house building. PhD thesis, Jönköping University, Sweden.
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.
Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599
Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364
Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Ruikar, D (2004) Design process improvement using a model based approach. PhD thesis, University of Nottingham, UK.
Said, H; Rajagopalan, A and Hall, D M (2025) Longitudinal analysis of interorganizational collaborative networks of cross-laminated timber (CLT) construction. Construction Innovation, 25(6), pp. 1840-1864. ISSN 1471-4175
Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364
Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.
Sayed, E (2022) Biomimetic intelligence for systemic innovation in the built environment. PhD thesis, University of Northumbria at Newcastle, UK.
Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.
Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364
Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364
Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.
Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance. PhD thesis, University of Nevada, Las Vegas, USA.
Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.
Smith, S A (1986) Iron and steel in long-span construction 1847-1890: A study of change and innovation. PhD thesis, Imperial College London, UK.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Somani, N; Tyagi, Y K and Gupta, N K (2024) An investigation on the influence of sintering temperature on microstructural, physical and mechanical properties of cu-sic composites. Journal of Engineering, Design and Technology, 22(1), pp. 77-88. ISSN 1726-0531
Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364
Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.
Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364
Song, M H (2019) Formalization of smallest workface boundary (SWFB): Toward generating and operating level of development (LOD) 400-based daily bill of materials (BOM). PhD thesis, Stanford University, USA.
Song, M H and Fischer, M (2020) Generating a daily bill of materials at level of development 400 using the smallest workface boundary. Journal of Construction Engineering and Management, 146(5): 04020035, ISSN 0733-9364
Stefańska, A; Cygan, M; Batte, K and Pietrzak, J (2021) Application of timber and wood-based materials in architectural design using multi-objective optimisation tools. Construction Economics and Building, 21(3), pp. 105-121. ISSN 2204-9029
Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.
Svatoš-Ražnjević, H; Boeva, Y; Kropp, C and Menges, A (2025) Trajectories from standard to incremental and pioneering innovation in timber construction: Multi-storey timber buildings in Germany, Austria, and Switzerland. Building Research & Information, 53(6), pp. 734-758. ISSN 0961-3218
Sędzicki, D.; Nyka, L. and Cudzik, J. (2026) Algorithmic optimization of climbing plant positioning and cnc fabrication for urban microclimate enhancement. Building Research & Information, 54(5), pp. 588-610. ISSN 0961-3218
Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.
Tamke, M; Sinke Baranovskaya, Y; Monteiro, F; Lienhard, J; La Magna, R and Ramsgaard Thomsen, M (2021) Computational knit–design and fabrication systems for textile structures with customised and graded CNC knitted fabrics. Architectural Engineering and Design Management, 17(3-4), pp. 175-195. ISSN 1745-2007
Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364
Touran, A and Ladick, D R (1989) Application of robotics in bridge deck fabrication. Journal of Construction Engineering and Management, 115(1), pp. 35-52. ISSN 0733-9364
Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.
Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. PhD thesis, University of California, Berkeley, USA.
Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364
Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.
Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364
Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.
Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364
Winn, K R (2014) Inter-scalar multivariable decision making framework for the architectural envelope. PhD thesis, Rensselaer Polytechnic Institute, USA.
Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.
Wu, K (2019) Robotic assembly: A generative architectural design strategy through component arrangements in highly-constrained design spaces. PhD thesis, Princeton University, USA.
Yadavalli, H V; Krishna Mohan, T V; Rangarajan, S and Albert, S K (2022) Design, fabrication, testing and operation of a simulation facility for high temperature molten salt studies. Journal of Engineering, Design and Technology, 20(6), pp. 1369-1387. ISSN 1726-0531
Yi, H (2022) 4D-printed parametric façade in architecture: Prototyping a self-shaping skin using programmable two-way shape memory composite (twsmc). Engineering, Construction and Architectural Management, 29(10), pp. 4132-4152. ISSN 0969-9988
Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175
Up a level