Items with Index Term: expert system
Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis. PhD thesis, University of Alberta, Canada.
Abdelgawad, M A M and Fayek, A R (2010) Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management, 136(9), pp. 1028-1036. ISSN 0733-9364
Adeyemi, H O; Adejuyigbe, S B; Ismaila, S O and Adekoya, A F (2015) Low back pain assessment application for construction workers. Journal of Engineering, Design and Technology, 13(3), pp. 419-434.
Ahmad, I U (1988) Bidding strategy: Multicriteria decision-making approach. PhD thesis, University of Cincinnati, USA.
Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.
Akbari, S; Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(4), pp. 534-558. ISSN 0969-9988
Akrawi, S G (1998) Sensing and real-time expert system for a masonry building robot. PhD thesis, City, University of London, UK.
Al-Bizri, S (1995) Design management plan generator, knowledge-based system for planning the design processes in the construction industry. PhD thesis, University of Reading, UK.
Al-Hammad, I A (1991) A knowledge-based framework for construction methods selection. PhD thesis, University of British Columbia, Canada.
Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988
Aliasgari, R; Fan, C; Li, X; Golabchi, A and Hamzeh, F (2024) MOCAP and ai-based automated physical demand analysis for workplace safety. Journal of Construction Engineering and Management, 150(7): 04024060, ISSN 0733-9364
Alim, S (1985) Fuzzy expert systems in civil engineering. PhD thesis, Imperial College London, UK.
Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364
Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.
Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(2), pp. 82-91. ISSN 0961-3218
Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988
Allen, S (1997) Information management for housing maintenance: a systemic view. PhD thesis, University of Salford, UK.
Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193
Alsugair, A M (1992) An intelligent resource allocation system. PhD thesis, Texas A&M University, USA.
Amirkhanian, S N and Baker, N J (1992) Expert system for equipment selection for earth-moving operations. Journal of Construction Engineering and Management, 118(2), pp. 318-331. ISSN 0733-9364
Andersen, T O M and Gaarslev, A (1996) Perspectives on artificial intelligence in the construction industry. Engineering, Construction and Architectural Management, 3(1-2), pp. 3-14. ISSN 0969-9988
Aouad, G F; Kawooya, A A O and Price, A D F (1996) Construction planning models: A review of history, capabilities and limitations. Journal of Construction Procurement, 2(2), pp. 19-37. ISSN 1358-9180
Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193
Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193
Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364
Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.
Azimzadeh, F (2000) COSTEFF model: A computer-based knowledge source for improving cost effectiveness of engineering and construction projects. DEng thesis, Lamar University - Beaumont, USA.
Aziz, Hayder (2007) A methodology for the distributed and collaborative management of engineering knowledge. PhD thesis, Cranfield University, UK.
Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.
Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364
Balloffet, A F (1992) Applications of decision support systems in water resources planning: The goal-setting stage. PhD thesis, Colorado State University, USA.
Basri, H (1994) An expert system for preliminary landfill design in developing countries. PhD thesis, University of Leeds, UK.
Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.
Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.
Bender, M J (1996) A framework for collaborative planning and investigations of decision support tools for hydro development. PhD thesis, University of Manitoba, Canada.
Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Bowen, P A and Edwards, P J (1985) Cost modelling and price forecasting: Practice and theory in perspective. Construction Management and Economics, 3(3), pp. 199-215. ISSN 01446193
Brandon, P S (1990) The development of an expert system for the strategic planning of construction projectss. Construction Management and Economics, 8(3), pp. 285-300. ISSN 01446193
Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(1), pp. 57-69. ISSN 01446193
Bright, K (1992) Computer assisted teaching system for the diagnosis of building defects. Construction Management and Economics, 10(3), pp. 203-226. ISSN 01446193
Bubbers, G and Christian, J (1992) Hypertext and claim analysis. Journal of Construction Engineering and Management, 118(4), pp. 716-730. ISSN 0733-9364
Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.
Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(2), pp. 111-123. ISSN 1358-9180
Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364
Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Chellappa, V and Luximon, Y (2026) Computer-aided technologies for posture-based ergonomic risk assessment in construction: A systematic review. International Journal of Construction Management, 26(2), pp. 316-331. ISSN 1562-3599
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.
Chevallier, N J and Russell, A D (2001) Developing a draft schedule using templates and rules. Journal of Construction Engineering and Management, 127(5), pp. 391-398. ISSN 0733-9364
Cho, M (1994) Productivity analysis in construction using an expert system approach. PhD thesis, University of Manchester, UK.
Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364
Cooke, T; Lingard, H; Blismas, N and Stranieri, A (2008) ToolSHeD™: The development and evaluation of a decision support tool for health and safety in construction design. Engineering, Construction and Architectural Management, 15(4), pp. 336-351. ISSN 0969-9988
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193
De La Garza, J M and Mitropoulos, P (1991) Technology-transfer (t2) model for expert systems. Journal of Construction Engineering and Management, 117(4), pp. 736-755. ISSN 0733-9364
De La Garza, J M and Mitropoulos, P (1992) Flavors and mixins of expert systems technology transfer model for AEC industry. Journal of Construction Engineering and Management, 118(3), pp. 435-453. ISSN 0733-9364
Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364
Diekmann, J E and Kraiem, Z (1988) Explanation of construction engineering knowledge in expert systems. Journal of Construction Engineering and Management, 114(3), pp. 364-389. ISSN 0733-9364
Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations. PhD thesis, University of Florida, USA.
Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193
Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities. PhD thesis, University of Alberta, Canada.
Elbarkouky, M M G and Fayek, A R (2011) Fuzzy similarity consensus model for early alignment of construction project teams on the extent of their roles and responsibilities. Journal of Construction Engineering and Management, 137(6), pp. 432-440. ISSN 0733-9364
Elbarkouky, M M G and Robinson Fayek, A (2011) Fuzzy preference relations consensus approach to reduce conflicts on shared responsibilities in the owner managing contractor delivery system. Journal of Construction Engineering and Management, 137(8), pp. 609-618. ISSN 0733-9364
Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry. PhD thesis, University of Florida, USA.
Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.
Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364
Figueiredo, W C (1995) A KBES to analyze the environmental impact of proposed highway design alternatives. PhD thesis, University of Central Florida, USA.
Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures. PhD thesis, Stanford University, USA.
Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364
Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364
Fisher, N (1990) The use of structured data analysis as a construction management research tool: 1. The technique. Construction Management and Economics, 8(4), pp. 341-362. ISSN 01446193
Formoso, C T (1991) A knowledge based framework for planning house building projects. PhD thesis, University of Salford, UK.
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Fung, C K A (1996) Development of a TQM model for improving business performance based on surveys conducted in Hong Kong, Japan and the UK. PhD thesis, De Montfort University, UK.
Ghazal, N M (1992) Design of excavation operations using expert systems. PhD thesis, University of Cincinnati, USA.
Gowri, K and Depanni, S (1998) The health and safety expert system (HASES): An expert system framework for building inspections. Engineering, Construction and Architectural Management, 5(1), pp. 92-101. ISSN 0969-9988
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.
Hanna, A S; Willenbrock, J H and Sanvido, V E (1992) Knowledge acquisition and development for formwork selection system. Journal of Construction Engineering and Management, 118(1), pp. 179-198. ISSN 0733-9364
Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364
Hussain, M A D (2001) Value engineering expert system in suburban highway design (VEESSHD). PhD thesis, University of Pittsburgh, USA.
Iliescu, S (2000) A case-based reasoning approach to the designing of building envelopes. PhD thesis, Concordia University, Canada.
Ismail, Z A (2019) An integrated computerised maintenance management system (I-CMMS) for IBS building maintenance. International Journal of Building Pathology and Adaptation, 37(3), pp. 326-343. ISSN 23984708
Ismail, Z A (2021) Implementation of BIM technology for knowledge transfer in IBS building maintenance projects. International Journal of Building Pathology and Adaptation, 39(1), pp. 115-134. ISSN 23984708
Ismail, Z A and Motawa, I (2019) Integrating CMMS, expert system, and BIM for IBS building maintenance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Kang, M M K (2014) Development of an expert system for sustainable pavement preservation strategies (es2p2s). PhD thesis, University of Wisconsin - Madison, USA.
Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.
Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.
Kim, M P and Adams, K (1989) An expert system for construction contract claims. Construction Management and Economics, 7(3), pp. 249-262. ISSN 01446193
Koo, T K and Tiong, R (1993) An expert system for assessing the performance of RC beams and slabs. Construction Management and Economics, 11(5), pp. 347-357. ISSN 01446193
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Kumaraswamy, M M (1991) Evaluating the management of construction projects. PhD thesis, Loughborough University, UK.
Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(2), pp. 38-51. ISSN 1358-9180
Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Lee, Y L and Lee, Y (2021) Developing an autonomous psychological behaviour of virtual user to atypical architectural geometry. Building Research & Information, 49(1), pp. 69-83. ISSN 0961-3218
Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599
Li, H (1996) Selecting KBES development techniques for applications in the construction industry. Construction Management and Economics, 14(1), pp. 67-74. ISSN 01446193
Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(2), pp. 101-106. ISSN 0961-3218
Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193
Lin, L-k (1994) Improving the productivity of roadway construction job sites with a portable expert system. PhD thesis, University of Utah, USA.
Logcher, R D; Wang, M T and Chen, F H S (1989) Knowledge processing for construction management data base. Journal of Construction Engineering and Management, 115(2), pp. 196-211. ISSN 0733-9364
Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.
Mahmoud, H M (1998) Applying a fuzzy logic expert system in the selection of bridge deck joints. PhD thesis, University of Central Florida, USA.
Mak, S W (1995) Risk analysis in construction: A paradigm shift from a hard to soft approach. Construction Management and Economics, 13(5), pp. 385-392. ISSN 01446193
Maor, I (2002) Conceptual design and selection of HVAC&r systems by combining knowledge based expert system with a building energy simulation program. PhD thesis, Drexel University, USA.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364
Martin, H and Ramjarrie, K (2021) Cloud contractor selection model for design-build open tender. Journal of Construction Engineering and Management, 147(4): 04021020, ISSN 0733-9364
Marzouk, M; ElSharkawy, M; Elsayed, P and Eissa, A (2020) Resolving deterioration of heritage building elements using an expert system. International Journal of Building Pathology and Adaptation, 38(5), pp. 721-735. ISSN 23984708
Marzouk, M and Zaher, M (2020) Artificial intelligence exploitation in facility management using deep learning. Construction Innovation, 20(4), pp. 609-624. ISSN 1471-4175
McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364
Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Milligan, C E (1992) Integrated construction coordination change response system. PhD thesis, Texas A&M University, USA.
Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.
Mohamed, E; Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(6), pp. 2328-2357. ISSN 0969-9988
Mohan, S (1990) Expert systems applications in construction management and engineering. Journal of Construction Engineering and Management, 116(1), pp. 87-99. ISSN 0733-9364
Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration. PhD thesis, Concordia University, Canada.
Moselhi, O; Hegazy, T and Fazio, P (1991) Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), pp. 606-625. ISSN 0733-9364
Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364
Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.
Murtaza, M B (1993) A decision support model integrating neural networks and an expert system for construction modularization. PhD thesis, University of Houston, USA.
Naderpajouh, N and Afshar, A (2008) A case-based reasoning approach to application of value engineering methodology in the construction industry. Construction Management and Economics, 26(4), pp. 363-372. ISSN 1466433X
Nuhu, B K; Aliyu, I; Adegboye, M A; Ryu, J K; Olaniyi, O M and Lim, C G (2021) Distributed network-based structural health monitoring expert system. Building Research & Information, 49(1), pp. 144-159. ISSN 0961-3218
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Okoroh, M I (1992) Knowledge based decision support system for the selection and appointment of sub-contractors for building refurbishment contracts. PhD thesis, Loughborough University, UK.
Okoroh, M I and Torrance, V B (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17(3), pp. 315-327. ISSN 01446193
Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(2), pp. 175-186. ISSN 01446193
Oteifa, S and Baldwin, A (1991) Estimators' tasks and computer-aided estimating systems: A survey of fcec member companies. Construction Management and Economics, 9(6), pp. 543-552. ISSN 01446193
Oteifa, S A (1991) An investigation into civil engineering estimators' decision making and expertise. PhD thesis, Loughborough University, UK.
Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.
Phythian, G J (1991) Applications of knowledge-based expert systems in recurrent competitive bidding. PhD thesis, Loughborough University, UK.
Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Pourezzat, A A; Nejati, M and Mollaee, A (2010) Dataflow model for managing urban disasters: The experience of Bam earthquake. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 84-102. ISSN 1759-5916
Poveda, C A and Fayek, A R (2009) Predicting and evaluating construction trades foremen performance: Fuzzy logic approach. Journal of Construction Engineering and Management, 135(9), pp. 920-929. ISSN 0733-9364
Revadigar, S P (1996) Automated analysis of building seismic records. PhD thesis, University of Houston, USA.
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.
Russell, J S; Skibniewski, M J and Cozier, D R (1990) Qualifier-2: Knowledge-based system for contractor prequalification. Journal of Construction Engineering and Management, 116(1), pp. 157-171. ISSN 0733-9364
Sage, D J (2016) Rethinking construction expertise with posthumanism. Construction Management and Economics, 34(7-8), pp. 446-457. ISSN 01446193
Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Saoud, E A B (1996) Expert systems for management training in the construction industry. PhD thesis, University of Edinburgh, UK.
Sarkar, A; Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(1), pp. 51-58. ISSN 0961-3218
Sawhney, A and Mund, A (2001) Intellicranes: An integrated crane type and model selection system. Construction Management and Economics, 19(2), pp. 227-237. ISSN 01446193
Sayed, T A E (1995) A highway safety expert system: A new approach to safety programs. PhD thesis, University of British Columbia, Canada.
Scott, D and Yang, J (1991) Setting the pace with paces: A new concept of using an expert system for project analysis and control. Construction Management and Economics, 9(6), pp. 529-541. ISSN 01446193
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Shafie, K (1995) Building refurbishment contracts bid decision knowledge and its applicationan a knowledge based decision support system (ADJUBID). PhD thesis, University of London, University College London, UK.
Shafiee, S; Piroozfar, P; Forberg, L F; Hansen, H N and Farr, E (2025) Enhancing efficiency and sustainability in construction: a product configurator for customizable off-site building solutions. Architectural Engineering and Design Management, 21(3), pp. 450-466. ISSN 1745-2007
Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.
Shahhosseini, V and Hajarolasvadi, H (2021) A conceptual framework for developing a BIM-enabled claim management system. International Journal of Construction Management, 21(2), pp. 208-222. ISSN 1562-3599
Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364
Shaked, O and Warszawski, A (1995) Knowledge-based system for construction planning of high-rise buildings. Journal of Construction Engineering and Management, 121(2), pp. 172-182. ISSN 0733-9364
Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.
Smadi, O G (2000) Knowledge-based expert system pavement management optimization. PhD thesis, Iowa State University, USA.
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451
Stapelberg, Rudolph Frederick (2004) Methodology for determining the integrity of process engineering design. PhD thesis, Griffith University, Australia.
Stephenson, P; Morrey, I; Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(5-6), pp. 396-408. ISSN 0969-9988
Syal, M; Duah, D; Samuel, S; Mazor, M; Mo, Y and Cyr, T (2014) Information framework for intelligent decision support system for home energy retrofits. Journal of Construction Engineering and Management, 140(1): 04013030, ISSN 0733-9364
Tah, J H M; Carr, V and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(4), pp. 327-338. ISSN 0969-9988
Tansley, D S W (1989) A knowledge-based system approach to helping engineers understand codes of practice. PhD thesis, Loughborough University, UK.
Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.
Tommelein, I D (2020) Design science research in construction management: Multi-disciplinary collaboration on the SightPlan system. Construction Management and Economics, 38(4), pp. 340-354. ISSN 01446193
Torres Formoso, C (1991) A knowledge-based framework for planning house building projects. PhD thesis, University of Salford, UK.
Touran, A (1990) Integration of simulation with expert systems. Journal of Construction Engineering and Management, 116(3), pp. 480-493. ISSN 0733-9364
Ugwu, O O and Tah, J H M (2002) Development and application of a hybrid genetic algorithm for resource optimization and management. Engineering, Construction and Architectural Management, 9(4), pp. 304-317. ISSN 0969-9988
Usman, Z S (2023) Using Semantic Web technologies to recommend sustainable building technology products. PhD thesis, Oxford Brookes University, UK.
Vargas, C A (1998) Investigating construction falls using fault tree analysis and developing a prototype tool to reduce falls using expert system and computer-assisted instruction methods. PhD thesis, Ohio State University, USA.
Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.
Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364
Wang, M-T (1989) Knowledge processing for a construction management database. PhD thesis, Massachusetts Institute of Technology, USA.
Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.
Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(2), pp. 179-190. ISSN 01446193
Wee, S (1993) A prototype of an expert system for pavement maintenance and rehabilitation strategy in the state of Ohio (espresso). PhD thesis, Ohio State University, USA.
Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), pp. 95-102. ISSN 01446193
Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.
Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.
Wong, K C and Albert, T P S (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(2), pp. 95-103. ISSN 01446193
Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: Intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(4), pp. 1026-1047. ISSN 1471-4175
Yamakawa, S (1997) The development of a framework for inter-diciplinary building design working, and the application of intelligent knowledge-base system techniques. PhD thesis, Cranfield University, UK.
Yang, J (1991) An expert system for project analysis and control. PhD thesis, Queensland University of Technology, Australia.
Yang, J B (2004) Hybrid AI system for retaining wall selection. Construction Innovation, 4(1), pp. 33-52. ISSN 1471-4175
Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364
Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218
de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.
van den Adel, J F; Al-Jibouri, S H; Karim, U F A and Mawdesley, M (2003) Integrated foundation design of buildings: Case demonstration of a prototype expert system. Journal of Engineering, Design and Technology, 1(1), pp. 55-74. ISSN 1726-0531
Up a level