Items with Index Term: exercise
Aagaard, L K and Christensen, T H (2024) Provide or prevent? Exploring sufficiency imaginaries within Danish systems of provision. Buildings & Cities, 5(1), pp. 434-450. ISSN 2632-6655
Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.
Abeysinghe, G and Urand, D (1999) Why use enactable models of construction processes? Journal of Construction Engineering and Management, 125(6), pp. 437-447. ISSN 0733-9364
Abideen, Dania Khairy (2024) A framework for integrating building information modelling with operations and maintenance for buildings. PhD thesis, University of Manchester, UK.
Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. PhD thesis, Loughborough University, UK.
Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Adu Gyamfi, B and Shaw, R (2022) The impact of COVID-19 pandemic on public engagement approaches to disaster preparedness for foreign residents: Case of Tokyo metropolitan area, Japan. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 269-285. ISSN 1759-5916
Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.
Agapiou, A (2015) The factors influencing mediation referral practices and barriers to its adoption: A survey of construction lawyers in England and Wales. International Journal of Law in the Built Environment, 7(3), pp. 231-247. ISSN 1756-1450
Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193
Aijazi, O (2015) Social repair and structural inequity: Implications for disaster recovery practice. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 454-467. ISSN 1759-5916
Aka, A; Bello, A O; Bamgbade, A A and Bilau, A A (2024) Age-performance consideration in the recruitment of tradespeople in Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 386-404. ISSN 0969-9988
Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Akintola, A; Venkatachalam, S and Root, D (2017) New BIM roles' legitimacy and changing power dynamics on BIM-enabled projects. Journal of Construction Engineering and Management, 143(9): 04017066, ISSN 0733-9364
Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Al Haj, R A and El-Sayegh, S M (2015) Time-cost optimization model considering float-consumption impact. Journal of Construction Engineering and Management, 141(5): 04015001, ISSN 0733-9364
Al-Fahad, J Y (2012) Reform of building codes, regulations, administration and enforcement in Kuwait: within the legal, administrative, technical & social framework. PhD thesis, Loughborough University, UK.
Al-Qawasmi, J (2016) Vernacular as a renewable resource: Toward region-specific architecture in Saudi Arabia, a case from KFUPM. Architectural Engineering and Design Management, 12(2), pp. 81-96. ISSN 1745-2007
Almeida, Rafael Goffinet de (2023) Spatialities of participation: Agencies between culture, politics and neoliberal subjectvation. PhD thesis, Universidade de São Paulo, Brazil.
Alshehri, A R (2016) Quality management system for building maintenance. PhD thesis, Heriot-Watt University, UK.
Alyousif, A T (2010) The influence of national culture on the management practices of construction companies in the United Arab Emirates. PhD thesis, London South Bank University, UK.
Amoah, C and Pretorius, L (2020) Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case study of construction systems. Journal of Engineering, Design and Technology, 18(3), pp. 611-634. ISSN 1726-0531
Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(6), pp. 749-770. ISSN 0969-9988
An, Mi Sun (2024) Framework for interactive, individualized feedback design to improve thinking skills in construction education. PhD thesis, Texas A&M University, USA.
Andreu, I C and Oreszczyn, T (2004) Architects need environmental feedback. Building Research & Information, 32(4), pp. 313-328. ISSN 0961-3218
Ariaratnam, S T and MacLeod, C W (2002) Financial outlay modeling for a local sewer rehabilitation strategy. Journal of Construction Engineering and Management, 128(6), pp. 486-495. ISSN 0733-9364
Ashcroft, D; Egbelakin, T; Jing, J and Rasheed, E O (2019) Cost comparison of seismic damage resisting systems for modules in multi-storey buildings. Journal of Engineering, Design and Technology, 17(2), pp. 330-346. ISSN 1726-0531
Asif, M (2019) An empirical study on life cycle assessment of double-glazed aluminium-clad timber windows. International Journal of Building Pathology and Adaptation, 37(5), pp. 547-564. ISSN 23984708
Augenbroe, G; Verheij, H and Schwarzm Ller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(3), pp. 259-271. ISSN 0969-9988
Babalola, O O (2011) A model based framework for semantic interpretation of architectural construction drawings. PhD thesis, Georgia Institute of Technology, USA.
Baker, H; Velikova, M; Smith, S D; Masterton, G and Hewlett, B (2024) Understanding and learning from failure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 3-14. ISSN 17514304
Barber Jr., H M (2013) Economic assessment of the construction industry: A construction-economics nexus. PhD thesis, Mississippi State University, USA.
Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(2), pp. 217-253. ISSN 1609-9451
Barr, B (2008) UK civil engineering education in the twenty-first century. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 17-23. ISSN 17514312
Barrett, P S; Sexton, M G and Green, L (1999) Integrated delivery systems for sustainable construction. Building Research & Information, 27(6), pp. 397-404. ISSN 0961-3218
Bartiaux, F (2022) Gender roles and domestic power in energy-saving home improvements. Buildings & Cities, 3(1), pp. 824-841. ISSN 2632-6655
Behzad, N (2016) Leadership and management balance for rehabilitating distressed construction projects. PhD thesis, Arizona State University, USA.
Beitelmal, J A (1999) Development of appropriate technology road condition monitoring system: Case study of the city of Benghazi in Libya. PhD thesis, University of Newcastle upon Tyne, UK.
Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.
Best, R (2011) Developing a basket of resources as a tool for collecting construction cost data internationally. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Birnie, J (2000) Assessing the extent of construction management research in the UK by means of the RAE, and the ARCOM and COBRA conferences. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Blanco, J (2016) Beyond the checklist: An approach to understand practitioner experience during sustainable design process. Architectural Engineering and Design Management, 12(4), pp. 266-278. ISSN 1745-2007
Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193
Bogusz, B (2013) Regulating public/private interests in town and village greens. International Journal of Law in the Built Environment, 5(1), pp. 21-39. ISSN 17561469
Bordalo Faustino, P (2017) Public procurement award criteria in the EU member states: a comparative study of the discretionary powers of contracting authorities. PhD thesis, University of Nottingham, UK.
Bosher, L; Dainty, A; Carrillo, P and Glass, J (2007) Built-in resilience to disasters: A pre-emptive approach. Engineering, Construction and Architectural Management, 14(5), pp. 434-446. ISSN 0969-9988
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Workplace stress, stress effects, and coping mechanisms in the construction industry. Journal of Construction Engineering and Management, 140(3): 4013059, ISSN 0733-9364
Brooks, T and Spillane, J (2017) Lies, damned lies and quality management systems: A pilot case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Brown, J D (2012) Corporate responsibility in the UK construction industry: a study of activities and reporting. PhD thesis, University of Nottingham, UK.
Cabahug, R R; Golding, P; Edwards, D J and Nicholas, J (2002) Cognitive 'visual' processing and manual dexterity: The influence of eye-to-hand coordination on a plant operator’s aptitude. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Capra, M (2010) Collaborative mixed reality environments: an application for civil engineering. PhD thesis, University of Nottingham, UK.
Carrillo, P (1994) Technology transfer: A survey of international construction companies. Construction Management and Economics, 12(1), pp. 45-51. ISSN 01446193
Cassar, R and Martin, H (2016) How to choose a project manager under uncertainty. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Castillo Campoverde, T O (2018) Multidimensional analysis of the interaction between the organization, management pratices and performance in construction. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Cavill, C A (2014) Fitness for purpose evaluation of stables in current use in the UK. PhD thesis, University of Salford, UK.
Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, P W; Abbott, C; Cooper, R and Aouad, G (2005) Building future scenarios: A reflection for the research agenda. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chan, Zenobia Tin Yan (2024) Alms and influence the dynamics of inducements and concessions in international politics. PhD thesis, Princeton University, USA.
Chang, J; Jaskula, K; Papadonikolaki, E; Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions? Built Environment Project and Asset Management, 14(4), pp. 509-528. ISSN 2044-124X
Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Chen, Y; Ruikar, K and Carrillo, P M (2008) Electronic procurement benchmarking exercise in the AEC industry sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.
Cheung, S O and Pang, K H Y (2013) Anatomy of construction disputes. Journal of Construction Engineering and Management, 139(1), pp. 15-23. ISSN 0733-9364
Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.
Cho, J G (2008) Open source project managment: From the integrated control perspective. PhD thesis, Claremont Graduate University, USA.
Chotia, V and Rao, N V M (2018) Infrastructure financing and economic growth in India: An empirical investigation. Journal of Financial Management of Property and Construction, 23(3), pp. 258-273. ISSN 1366-4387
Chung, J Y (1984) Comparison of safety programs and employee attitudes within university of California facilities management departments. PhD thesis, University of California, Santa Barbara, USA.
Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Close, R and Loosemore, M (2014) Breaking down the site hoardings: Attitudes and approaches to community consultation during construction. Construction Management and Economics, 32(7-8), pp. 816-828. ISSN 01446193
Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Cole, R J (1999) Building environmental assessment methods: Clarifying intentions. Building Research & Information, 27(4-5), pp. 230-246. ISSN 0961-3218
Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771
Costa, A C B (2014) The effects of organizational justice and exercise on the relationship between job stressors and employee health. PhD thesis, Portland State University, USA.
Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.
Craigen, A (1990) Britain's school building estate: evaluation by life cycle for effective maintenance, with an illustrated study on Glasgow schools. PhD thesis, University of Strathclyde, UK.
Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364
Dainty, A R J; Bagilhole, B M and Neale, R H (1997) Analytical strategies for dealing with qualitative data in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Daud, M N; Adnan, Y M; Mohd, I and Aziz, A A (2011) Developing a model for Malaysia's office classification. Building Research & Information, 39(3), pp. 301-313. ISSN 0961-3218
Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175
Dawood, N and Sikka, S (2007) Measuring the effectiveness of 4D planning as a valuable communication tool. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
De Silva, N; Weerasinghe, N; Madhusanka, H W N and Kumaraswamy, M (2018) Enablers of relational integrated value networks (RIVANS) for total facilities management (TFM). Journal of Financial Management of Property and Construction, 23(2), pp. 170-184. ISSN 1366-4387
Deakin, M (1998) Local Authority property management: A management exercise. Journal of Financial Management of Property and Construction, 3(1), pp. 43-72. ISSN 1366-4387
Deakin, M; Huovila, P; Rao, S; Sunikka, M and Vreeker, R (2002) The assessment of sustainable urban development. Building Research & Information, 30(2), pp. 95-108. ISSN 0961-3218
Delgado-Hernández, D J (2005) A framework for building quality into construction projects. PhD thesis, University of Birmingham, UK.
Den Hartog, J P (2004) Designing indoor climate. PhD thesis, Delft University of Technology, Netherlands.
Deng, F (2004) Expert and decision-support system approaches for construction project financing and cash flow management for large infrastructure projects. PhD thesis, State University of New York at Buffalo, USA.
Denny-Smith, G and Loosemore, M (2018) Cultural counterfactuals: Assessing the impact of indigenous social procurement in Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Dewberry, C; Hayes, A and Sarhan, S (2018) Behavioural assessments in construction procurement: A bandwagon of institutional waste? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Dewundara Maha Galappaththi Arachchige, N M S (2021) Innovation in construction project-based firms through the lens of exploratory and exploitative learning : effects of social capital and collaborative environment. PhD thesis, University of Hong Kong, Hong Kong.
Donegan, H A; Dodd, F J and Warren, A (1996) A consensus strategy for post-occupancy assessment in school design. Journal of Financial Management of Property and Construction, 1(3), pp. 53-70. ISSN 1366-4387
Doukakis, J P (2024) A case study of a mechanics of solids course in civil engineering education. PhD thesis, Rutgers The State University of New Jersey, USA.
Duke, A K (2001) A telepresence environment for concurrent life-cycle design and construction. PhD thesis, Loughborough University, UK.
Echeverria-Valiente, E; Garcia-Alvarado, R; Celis-D’Amico, F and Saelzer-Fuica, G (2019) Integrated design experiences for energy-efficient housing in Chile. Construction Innovation, 19(2), pp. 236-255. ISSN 1471-4175
Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.
El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988
El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387
ElShafei, R (2022) Managers' risk perception and the adoption of sustainable consumption strategies in the hospitality sector: The moderating role of stakeholder salience attributes. Smart and Sustainable Built Environment, 11(1), pp. 1-18. ISSN 2046-6099
Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364
Ellis, R C T; Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), pp. 483-493. ISSN 01446193
English, J (2002) Managing cultural differences to improve industrial efficiency. Building Research & Information, 30(3), pp. 196-204. ISSN 0961-3218
Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing. PhD thesis, University of the West of England, Bristol, UK.
Fahy, P (2007) Cross cultural training and the effective integration of the construction supply chain. PhD thesis, University College London, UK.
Falorca, J F (2019) Main functions for building maintenance management: An outline application. International Journal of Building Pathology and Adaptation, 37(5), pp. 490-509. ISSN 23984708
Farouk Kineber, A; Othman, I B; Oke, A E and Chileshe, N (2022) Modelling the relationship between value management's activities and critical success factors for sustainable buildings. Journal of Engineering, Design and Technology, 20(2), pp. 414-435. ISSN 1726-0531
Fateh, M A M and Mohammad, M F (2017) Industrialized building system provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), pp. 67-80. ISSN 1823-6499
Fortune, C and Birnie, J (2000) Money illusions and the judgements of professional quanitity surveyors. Journal of Financial Management of Property and Construction, 5(1-2), pp. 41-50. ISSN 1366-4387
Fortune, C and Lees, M (1997) Cognitive errors of judgement, learning style characteristics and clients' early cost advisors. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Fortune, C and Lees, M (1998) Quality in strategic cost advice: The effect of anchoring and adjustment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Fortune, C and Lees, M (2001) Systematic errors of judgement and the formulation of strategic cost advice for construction clients. Journal of Financial Management of Property and Construction, 6(2), pp. 81-93. ISSN 1366-4387
Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.
Garsden, B R (1995) Postconstruction evaluation. Journal of Construction Engineering and Management, 121(1), pp. 37-42. ISSN 0733-9364
Gavieta, R C (1997) Socio-economic and spatial indicators for household energy for a tropical urban community in urban Manila. Building Research & Information, 25(2), pp. 124-128. ISSN 0961-3218
Ghanbaripour, A N; Langston, C and Yousefi, A (2017) Implementation of 3D integration model for project delivery success: Case study. Journal of Construction Engineering and Management, 143(8): 05017012, ISSN 0733-9364
Goedert, J D and Rokooei, S (2016) Project-based construction education with simulations in a gaming environment. International Journal of Construction Education and Research, 12(3), pp. 208-223. ISSN 1557-8771
Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.
Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364
Gorse, C A (2003) Conflict and conflict management in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Gorse, C A and Sanderson, A M (2007) Exploring group work dynamics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Gottlieb, S C and Jensen, J S (2016) Governmentalities of construction: From mortar to modular systems and markets. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Graham, B; Gahan, D and Thomas, K (2007) The application of knowledge management practices in the procurement and construction of cleanroom projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Green, S D (1999) Partnering: the propaganda of corporatism? Journal of Construction Procurement, 5(2), pp. 177-186. ISSN 1358-9180
Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.
Gunnigan, L (2007) Increasing effectiveness of public private partnerships in the Irish construction industry. PhD thesis, University of Salford, UK.
Gunning, J G and Keaveney, M (1998) A transverse examination of occupational stress among a cross-disciplinary population of Irish construction professionals. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Guo, H B (2022) From corporate social responsibility to creating shared value: Competitive strategies for Chinese international construction companies on the "one belt one road". PhD thesis, University of Hong Kong, Hong Kong.
Haddad, S; Osmond, P and King, S (2017) Revisiting thermal comfort models in Iranian classrooms during the warm season. Building Research & Information, 45(4), pp. 457-473. ISSN 0961-3218
Hartmann, A D A M L (2008) A role-play approach for teaching research methodology in construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Heath, T; Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(6), pp. 543-549. ISSN 01446193
Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.
Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364
Hellström, M; Wikström, R; Gustafsson, M and Luotola, H (2016) The value of project execution services: A problem and uncertainty perspective. Construction Management and Economics, 34(4-5), pp. 272-285. ISSN 01446193
Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771
Hodgson, W (2021) Using participatory housing construction methods to develop small sites in public ownership. PhD thesis, University of London, University College London, UK.
Hosseinian, S M (2016) An optimal time incentive/disincentive -based compensation in contracts with multiple agents. Construction Economics and Building, 16(4), pp. 35-53. ISSN 2204-9029
Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 0969-9988
Huang, Y L and Lin, T C (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(8), pp. 670-686. ISSN 01446193
Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364
Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.
Hussein, H A A (2023) Integrating augmented reality technologies into architectural education: Application to the course of landscape design at port said university. Smart and Sustainable Built Environment, 12(4), pp. 721-741. ISSN 2046-6099
Idoro, G I (2009) Clients' perception of construction project leaders in the Nigerian banking industry. Journal of Engineering, Design and Technology, 7(3), pp. 264-281. ISSN 1726-0531
Ilter, D and Dikbas, A (2008) The use of key attrıbutes ın alternatıve dıspute resolutıon (ADR) process desıgn. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Izumi, T; Sukhwani, V; Surjan, A and Shaw, R (2021) Managing and responding to pandemics in higher educational institutions: Initial learning from COVID-19. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 51-66. ISSN 1759-5916
Jafari, A and Love, P E D (2013) Quality costs in construction: Case of Qom monorail project in iran. Journal of Construction Engineering and Management, 139(9), pp. 1244-1249. ISSN 0733-9364
Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.
Jin, B and Xu, X (2025) Rental price index forecasts of residential properties using Gaussian process regressions. Journal of Financial Management of Property and Construction, 30(3), pp. 416-454. ISSN 1366-4387
Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.
Karaiskos, P; Munian, Y; Martinez-Molina, A and Alamaniotis, M (2026) Indoor air quality prediction modeling for a naturally ventilated fitness building using rnn-LSTM artificial neural networks. Smart and Sustainable Built Environment, 15(1), pp. 384-406. ISSN 2046-6099
Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364
Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.
Kempton, J; Nicol, S; Anumba, C J and Dickens, J (2000) Analysis of surveyor variability from data obtained from surveys of dwellings represented on video film. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193
Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988
King, A P; Knight, A D and Griffith, A (2001) Understanding the dynamics of novation: A contractor's perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
King, C J (2012) Project management skills of the future. PhD thesis, Arizona State University, USA.
Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Koolwijk, J; van Oel, C and Bel, M (2022) The interplay between financial rules, trust and power in strategic partnerships in the construction industry. Engineering, Construction and Architectural Management, 29(3), pp. 1089-1108. ISSN 0969-9988
Kornakova, M and March, A (2017) The role of citizens in DRR planning exercises: When to inform or consult. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 209-222. ISSN 1759-5916
Krcmar, C A (2022) Indian women construction workers' social construction of human security. PhD thesis, University of Massachusetts Boston, USA.
Kristiansen, K; Emmitt, S and Bonke, S (2005) Changes in the Danish construction sector: The need for a new focus. Engineering, Construction and Architectural Management, 12(5), pp. 502-511. ISSN 0969-9988
Kulczak, R; Piroozfar, P A E and Harder, M K (2015) Managing sustainability through decision processes: The influence of values and frames. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kumar, S; Yadav, N; Singh, M and Kachhawa, S (2019) Estimating India's commercial building stock to address the energy data challenge. Building Research & Information, 47(1), pp. 24-37. ISSN 0961-3218
Kumaraswamy, M M (2006) Accelerating construction industry development. Journal of Construction in Developing Countries, 11(1), pp. 73-94. ISSN 1823-6499
Kumaraswamy, M M; Ling, F Y Y; Anvuur, A M and Rahman, M M (2007) Targeting relationally integrated teams for sustainable PPPs. Engineering, Construction and Architectural Management, 14(6), pp. 581-596. ISSN 0969-9988
Lad, V H; Patel, D A; Chauhan, K A and Patel, K A (2024) Prioritisation of bridge for improving its resilience using multi-criteria decision-making techniques. Engineering, Construction and Architectural Management, 31(7), pp. 2952-2976. ISSN 0969-9988
Lam, E W M; Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(1),
Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.
Lansley, P (2007) Making sense of research quality assessment. Engineering, Construction and Architectural Management, 14(1), pp. 7-25. ISSN 0969-9988
Lansley, P (2013) Research assessment and the activity hypothesis. Engineering, Construction and Architectural Management, 20(1), pp. 7-28. ISSN 0969-9988
Lansley, P R (1998) The winning streak in construction research. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lansley, P R (1999) Determinants of performance of UK universities in built environment and town and country planning research. Engineering, Construction and Architectural Management, 6(4), pp. 391-402. ISSN 0969-9988
Lavers, A P (1986) Professional negligence in the property-related professions. PhD thesis, National University of Singapore, Singapore.
Leblanc, H (2012) Knowledge mapping and process modelling to develop a sustainability-related knowledge management strategy for Scottish housing association planned works. PhD thesis, Glasgow Caledonian University, UK.
Leblanc, H; Thomson, C and Cameron, I (2015) Developing a sustainability KM strategy for HA planned works. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 49-65. ISSN 17514304
Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.
Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.
Levy, R (1975) The concept of system identification and its application to the built environment. PhD thesis, University of Manchester, UK.
Lingard, H; Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: An overlooked dimension of group-level safety climate in the construction industry. Engineering, Construction and Architectural Management, 18(2), pp. 159-175. ISSN 0969-9988
Lingard, H and Turner, M (2015) Improving the health of male, blue collar construction workers: A social ecological perspective. Construction Management and Economics, 33(1), pp. 18-34. ISSN 01446193
Liu, A; Fellows, R and Fang, Z (2003) The power paradigm of project leadership. Construction Management and Economics, 21(8), pp. 819-829. ISSN 01446193
Logcher, R D; Wang, M T and Chen, F H S (1989) Knowledge processing for construction management data base. Journal of Construction Engineering and Management, 115(2), pp. 196-211. ISSN 0733-9364
Long, G (2010) A detailed investigation of the applicability and utility of simulation and gaming in the teaching of civil engineering students. PhD thesis, University of Nottingham, UK.
Loosemore, M (1996) Crisis management in building projects: a longitudinal investigation of communication and behaviour patterns within a grounded theory framework. PhD thesis, University of Reading, UK.
Lu, W; Ye, M; Flanagan, R and Ye, K (2016) Corporate social responsibility disclosures in international construction business: Trends and prospects. Journal of Construction Engineering and Management, 142(1): 04015053, ISSN 0733-9364
Luane Assunção Paiva, M; Clara Beatriz Ferreira de, O and Reymard Savio Sampaio de, M (2022) Allocating scarce financial resources effectively through function analysis in social housing projects. Built Environment Project and Asset Management, 12(1), pp. 96-110. ISSN 2044-124X
Luck, R (2007) Analysing talk-in-interaction between architects and users. PhD thesis, University of Reading, UK.
Lützkendorf, T; Fan, W and Lorenz, D (2011) Engaging financial stakeholders: Opportunities for a sustainable built environment. Building Research & Information, 39(5), pp. 483-503. ISSN 0961-3218
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Mahdi, H S and Carmichael, D G (2014) An optimal target cost contract with a risk neutral owner. Engineering, Construction and Architectural Management, 21(5), pp. 586-604. ISSN 0969-9988
Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(2), pp. 191-204. ISSN 01446193
Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193
Male, S P (1984) A critical investigation of professionalism in quantity surveying. PhD thesis, Heriot-Watt University, UK.
Malla, V and Delhi, V S K (2022) Determining interconnectedness of barriers to interface management in large construction projects. Construction Economics and Building, 22(2), pp. 69-101. ISSN 2204-9029
Maloney, W F; Cameron, I and Hare, B (2007) Tradesmen involvement in health and safety. Journal of Construction Engineering and Management, 133(4), pp. 297-305. ISSN 0733-9364
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A competency-based training guide model for labourers in construction. International Journal of Construction Management, 23(8), pp. 1323-1333. ISSN 1562-3599
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour: Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour – Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management. PhD thesis, University of Alberta, Canada.
Mao, X; Zhang, X and Abourizk, S M (2009) Enhancing value engineering process by incorporating inventive problem-solving techniques. Journal of Construction Engineering and Management, 135(5), pp. 416-424. ISSN 0733-9364
Martínez Avíla, C (2018) Stakeholder participation in property development. PhD thesis, Lund University, Sweden.
Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988
Mattar, M H and Cheah, C Y J (2006) Valuing large engineering projects under uncertainty: Private risk effects and real options. Construction Management and Economics, 24(8), pp. 847-860. ISSN 1466433X
Maytorena Sanchez, Eunice S (2003) Building conversion process: a cognitive exploration. PhD thesis, University College London, UK.
McAleenan, P; McAleenan, C; Ayers, G; Behm, M and Beachem, Z (2019) The ethics deficit in occupational safety and health monitoring technologies. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 93-100. ISSN 17514304
McLean, W P (2004) Inspector discretion and industry compliance in the street-level implementation of building codes. PhD thesis, University of New Orleans, USA.
Mezher, T; Abdul-Malak, M A; Arnaout, S and Bassil, Z (2004) Public project programming system (3PS): A decision support system for public sector investment. Construction Innovation, 4(2), pp. 99-111. ISSN 1471-4175
Michieka, N M; Razek, N H A and Gearhart, R S (2023) Modelling the impact of oil price changes and investment decisions on construction wages in the U.S. Construction Management and Economics, 41(6), pp. 500-518. ISSN 01446193
Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451
Minh, Huynh Quang (2016) Developing skilled labour: An analysis of the major factors which enable and hinder employee training in construction companies in Vietnam. DBA thesis, Western Sydney University, Australia.
Mireku, E K; Kissi, E; Abu, I M A; Acheampong, A and Armah, N K P (2025) Strategies for the development of mental toughness of construction professionals: The case of Ghana. Journal of Engineering, Design and Technology, 23(5), pp. 1447-1462. ISSN 1726-0531
Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364
Moncaster, A (2012) Constructing sustainability: connecting the social and the technical in a case study of school building projects. PhD thesis, University of East Anglia, UK.
Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.
Munir, M; Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(6), pp. 1171-1191. ISSN 0969-9988
Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Murtagh, N; Badi, S; Shi, Y; Wei, S and Yu, W (2022) Living with air-conditioning: Experiences in Dubai, Chongqing and London. Buildings & Cities, 3(1), pp. 10-27. ISSN 2632-6655
Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America. PhD thesis, Indiana State University, USA.
Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.
Mwaiseje, S S; McHopa, A D and Panga, F P (2026) Supply risk management and timely completion of force account construction projects among local government authorities in dodoma, Tanzania. International Journal of Building Pathology and Adaptation, 44(1), pp. 91-109. ISSN 2398-4708
Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.
Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.
Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364
Ndekugri, I; Smith, N and Hughes, W P (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(7), pp. 791-799. ISSN 1466433X
Newman, W M (1968) An investigation of methods of using computers for processing and storing architectural designs. PhD thesis, Imperial College London, UK.
Newton, S (2016) The being of construction management expertise. Construction Management and Economics, 34(7-8), pp. 458-470. ISSN 01446193
Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.
Novak, V M; Fernandez-Anez, N and Shiraishi, K (2017) Rethinking resilience planning: From problems to potential. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 412-424. ISSN 1759-5916
Nwachukwu, C V; Udeaja, C; Chileshe, N and Okere, C E (2017) The critical success factors for stakeholder management in the restoration of built heritage assets in the UK. International Journal of Building Pathology and Adaptation, 35(4), pp. 304-331.
Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Developing an effective renovation plan: The influence of data collection tools. International Journal of Building Pathology and Adaptation, 36(1), pp. 63-76. ISSN 23984708
Ojo, G K; Adeyeye, G M; Opawole, A and Kajimo-Shakantu, K (2019) Gender differences in workplace stress response strategies of quantity surveyors in Southwestern Nigeria. International Journal of Building Pathology and Adaptation, 37(5), pp. 718-732. ISSN 23984708
Okoroh, M I (1992) Knowledge based decision support system for the selection and appointment of sub-contractors for building refurbishment contracts. PhD thesis, Loughborough University, UK.
Olbina, S and Glick, S (2023) Using integrated hands-on and virtual reality (VR) or augmented reality (AR) approaches in construction management education. International Journal of Construction Education and Research, 19(3), pp. 341-360. ISSN 1557-8771
Olowa, T; Witt, E and Lill, I (2023) Building information modelling (BIM)–enabled construction education: Teaching project cash flow concepts. International Journal of Construction Management, 23(9), pp. 1494-1505. ISSN 1562-3599
Oteifa, S A (1991) An investigation into civil engineering estimators' decision making and expertise. PhD thesis, Loughborough University, UK.
Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2025) Smart housing adaptations register with user matching functionalities for different mobility categories for the social housing sector. International Journal of Building Pathology and Adaptation, 43(2), pp. 177-196. ISSN 2398-4708
Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2025) Development of a smart home suitability indicator and indicative self-assessment platform for the disabled facilities grants (dfgs). International Journal of Building Pathology and Adaptation, 43(2), pp. 139-158. ISSN 2398-4708
Oyegoke, A S; Fisher, B W; Ajayi, S; Omotayo, T S and Ewuga, D (2024) The disruptive factors and longevity effects of covid-19 and brexit on the SMEs construction supply chain in the UK. Journal of Financial Management of Property and Construction, 29(1), pp. 115-134. ISSN 1366-4387
Ozener, O O (2009) Studio education for integrated practice using building information modeling. PhD thesis, Texas A&M University, USA.
O’Riain, E; Spillane, J and Sherratt, F (2018) Healthy, happy workers? The consequences of commuting between Northern Ireland and Great Britain. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451
Pallubinsky, H; Kingma, B R M; Schellen, L; Dautzenberg, B; van Baak, M A and van Marken Lichtenbelt, W D (2017) The effect of warmth acclimation on behaviour, thermophysiology and perception. Building Research & Information, 45(7), pp. 800-807. ISSN 0961-3218
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.
Park, J (2011) Best-value in Korean public building construction. PhD thesis, University of Southampton, UK.
Pheng, L S and Pong, C Y (2003) Integrating ISO 9001 and ohsas 18001 for construction. Journal of Construction Engineering and Management, 129(3), pp. 338-347. ISSN 0733-9364
Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364
Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.
Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: An empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(1), pp. 45-56. ISSN 01446193
Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364
Polson, D R (2020) Assessment of applications of optimisation to building design and energy modelling. PhD thesis, University of London, University College London, UK.
Potts, M; McDermott, P and Stephenson, A (2016) A systems approach to strategic infrastructure delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 95-105. ISSN 17514304
Pourzolfaghar, Z (2011) Improving knowledge capture during conceptual design phase of building projects. PhD thesis, Universiti Putra Malaysia, Malaysia.
Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029
Praharaj, S and Han, H (2019) Building a typology of the 100 smart cities in India. Smart and Sustainable Built Environment, 8(5), pp. 400-414. ISSN 2046-6099
Proctor-Parker, C and Stopforth, R (2024) Radio frequency identification (RFID) stock control and geo-location data system from a moving vehicle. Journal of Engineering, Design and Technology, 22(1), pp. 159-181. ISSN 1726-0531
Puybaraud, M-C (2001) A model of the role of management in construction fire safety failure scenarios. PhD thesis, Heriot-Watt University, UK.
Quigley, D; Heaney, G and Odeyinka, H (2012) Factors of sustainability in building design: Establishing their relative significance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.
Ratcliffe, J S (2001) Built environment futures: A general examination of the role of future studies in built environment policy formulation, with a particular appraisal of the use of the foresight principal through scenario planning techniques in the framing, testing and imp. PhD thesis, Ulster University, UK.
Reddy, A S; Kumar, P R and Raj, P A (2022) Entropy-based fuzzy TOPSIS framework for selection of a sustainable building material. International Journal of Construction Management, 22(7), pp. 1194-1205. ISSN 1562-3599
Reed, B (2007) Forum: Shifting from 'sustainability' to regeneration. Building Research & Information, 35(6), pp. 674-680. ISSN 0961-3218
Reid, A; Poade, D and Langford, S (2025) Deskercise: the impact of 10 minutes of exercise on mental and physical wellbeing in the construction industry. International Journal of Construction Management, 25(10), pp. 1197-1206. ISSN 1562-3599
Rooke, J A and Kagioglou, M (2007) Criteria for evaluating research: The unique adequacy requirement of methods. Construction Management and Economics, 25(9), pp. 979-987. ISSN 1466433X
Ruokamo, E; Kylkilahti, E; Lettenmeier, M and Toppinen, A (2024) Are people willing to share living space? Household preferences in Finland. Buildings & Cities, 5(1), pp. 601-619. ISSN 2632-6655
Sanvido, V E (1984) Designing productivity management and control systems for construction projects. PhD thesis, Stanford University, USA.
Schoenwitz, M (2014) Aligning product and processes to customer needs in prefabricated house building. PhD thesis, Cardiff University, UK.
Serag-Eldin, Gamil M (2010) A conflict management model for architectural design collaboration. PhD thesis, University of California, USA.
Shaddad, M Y I (1983) The influence of management on construction system productivity at the project level : A conceptual system causal research model. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Shafie, K (1995) Building refurbishment contracts bid decision knowledge and its applicationan a knowledge based decision support system (ADJUBID). PhD thesis, University of London, University College London, UK.
Shahruddin, S and Siti Hamidah, H (2024) Navigating paradoxes of identity and leadership in the age of digital transformation of construction industry: Architects' experiences and perceptions. Construction Management and Economics, 42(7), pp. 591-609. ISSN 01446193
Shapira, A and Schexnayder, C J (1999) Selection of mobile cranes for building construction projects. Construction Management and Economics, 17(4), pp. 519-527. ISSN 01446193
Sharma, V; Bapat, P; Garg, S; Degezelle, D and Gajjar, D (2024) Critical project impact factors for federal capital facility projects. Journal of Construction Engineering and Management, 150(10): 04024138, ISSN 0733-9364
Sheriff, A M; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2011) Developing a metadata standard for multimedia content management: A case study. Architectural Engineering and Design Management, 7(3), pp. 157-176. ISSN 1745-2007
Sherratt, F (2014) We will force you to be well: Positive liberty, power and the health and wellbeing of construction workers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Sherratt, F (2015) Legitimizing public health control on sites? A critical discourse analysis of the responsibility deal construction pledge. Construction Management and Economics, 33(5-6), pp. 444-452. ISSN 01446193
Short, C A and Al-Maiyah, S (2009) Design strategy for low-energy ventilation and cooling of hospitals. Building Research & Information, 37(3), pp. 264-292. ISSN 0961-3218
Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218
Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218
Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.
Siebert, M (2019) Concrete and the barriers to innovation in UK housebuilding. PhD thesis, University of Nottingham, UK.
Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(2), pp. 113-125. ISSN 0969-9988
Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Siva, J and Gajendran, T (2023) The hidden barriers to social value delivery in megaprojects: Investigating the decision-making environment. Built Environment Project and Asset Management, 13(4), pp. 610-628. ISSN 2044-124X
Smallwood, J and Allen, C (2020) The impact of a first-year orientation team building exercise. Construction Economics and Building, 20(3), pp. 142-159. ISSN 2204-9029
Smith, S D; Beausang, P; Moriarty, D and Campbell, J M (2008) Subjectivity in data extraction: A study based on construction hazard identification. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), pp. 1-18. ISSN 1823-6499
Sourani, A (2008) Realising sustainable construction through procurement stratergies. PhD thesis, Loughborough University, UK.
Sourani, A and Sohail, M (2013) Enabling sustainable construction in UK public procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 297-312. ISSN 17514312
Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988
Straub, A (2002) Strategic technical management of housing stock: Lessons from Dutch housing associations. Building Research & Information, 30(5), pp. 372-381. ISSN 0961-3218
Sumner, M and Slattery, D (2010) The impact of leadership effectiveness and team processes on team performance in construction. International Journal of Construction Education and Research, 6(3), pp. 179-201. ISSN 1557-8771
Sun, H; Wang, Y and Meng, J (2019) A trading and pricing method of expansion options for BOT freeway projects in China. Engineering, Construction and Architectural Management, 26(7), pp. 1406-1423. ISSN 0969-9988
Tam, C M and Tong, T K L (2011) Conflict analysis study for public engagement programme in infrastructure planning. Built Environment Project and Asset Management, 1(1), pp. 45-60. ISSN 2044-124X
Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193
Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.
Tello, L M (2017) Theorizing the state of health practices and climate in construction via fourfold structuration. PhD thesis, Arizona State University, USA.
Thomas Ng, S; Skitmore, R M and Sharma, T (2001) Towards a human resource information system for Australian construction companies. Engineering, Construction and Architectural Management, 8(4), pp. 238-249. ISSN 0969-9988
Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Tomašević, V (2004) Developing productive relationships in the construction industry. PhD thesis, University of Cambridge, UK.
Toor, S U R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(2), pp. 149-167. ISSN 1471-4175
Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X
Turner, P L (2017) A realist exploration of small firm tendering for public sector contracts: a micro-foundational study of capability. PhD thesis, Manchester Metropolitan University, UK.
Tuuli, M M; Rowlinson, S and Koh, Y T (2010) Control modes and mechanisms in construction project teams: Drivers and consequences. Construction Management and Economics, 28(5), pp. 451-465. ISSN 1466433X
Usher, D (1990) Privatisation, partnerships and the building industry. PhD thesis, University of Bristol, UK.
V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.
Viking, A and Lidelöw, S (2015) Exploring industrialized housebuilders' interpretations of local requirements using institutional logics. Construction Management and Economics, 33(5-6), pp. 484-494. ISSN 01446193
Voelker, C; Permana, A; Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(1), pp. 18-34. ISSN 1366-4387
Volmink, P (2018) The treatment of non-responsive bids in South African public procurement law. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Wallace, W A (1987) The influence of design team communication content upon the architectural decision making process in the pre-contract design stages. PhD thesis, Heriot-Watt University, UK.
Wan, S K M and Kumaraswamy, M M (2009) Industrial management approaches for improving material control in building services works. Engineering, Construction and Architectural Management, 16(3), pp. 208-223. ISSN 0969-9988
Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364
Wang, J.; Dai, J.; Wang, X.; Gao, W.; Yao, X.; Dewancker, B. J. and Wang, Y. (2026) The role of health-oriented environmental design and personal attributes in promoting workplace healthy behaviours. Building Research & Information, 54(4), pp. 429-446. ISSN 0961-3218
Wang, M-T (1989) Knowledge processing for a construction management database. PhD thesis, Massachusetts Institute of Technology, USA.
Warwick, E (2015) Policy to reality: Evaluating the evidence trajectory for English eco-towns. Building Research & Information, 43(4), pp. 486-498. ISSN 0961-3218
Waters, J; Neale, R; Hutson, S and Mears, K (2005) A perceptual assessment of personal safety in relation to university campus facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Watson, P and Davis, R (2002) The application of the European foundation for quality management excellence model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Weerasinghe, U G D (2012) Development of a framework to assess sustainability of building projects. PhD thesis, University of Calgary, Canada.
Wei, F; Hwang, B G; Zainal, N S B and Zhu, H (2024) Trust, team effectiveness, and strategies: A comparative study between virtual and face-to-face teams. Journal of Construction Engineering and Management, 150(7): 04024065, ISSN 0733-9364
Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.
West, J (2014) Collaborative patterns and power imbalance in strategic alliance networks. Journal of Construction Engineering and Management, 140(6): 4014010, ISSN 0733-9364
Wickramaratne, S (2010) Design and analysis of tsunami warning and evacuation systems. PhD thesis, University of Calgary, Canada.
Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980. PhD thesis, University of Newcastle upon Tyne, UK.
Windapo, A O and Goulding, J S (2015) Understanding the gap between green building practice and legislation requirements in South Africa. Smart and Sustainable Built Environment, 4(1), pp. 67-96. ISSN 2046-6099
Wong, C H (2001) Investigation of contractor selection criteria and development of contractor classification model: a UK case. PhD thesis, University of Wolverhampton, UK.
Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.
Wood, A (2006) Demystifying construction: Technology in architectural education. Architectural Engineering and Design Management, 2(1-2), pp. 5-18. ISSN 1745-2007
Wusu, G E; Alaka, H; Yusuf, W; Mporas, I; Toriola-Coker, L and Oseghale, R (2024) A machine learning approach for predicting critical factors determining adoption of offsite construction in Nigeria. Smart and Sustainable Built Environment, 13(6), pp. 1408-1433. ISSN 2046-6099
Xie, Q and Yuan, X (2022) Functioning and environment: Exploring outdoor activity-friendly environments for older adults with disabilities in a Chinese long-term care facility. Building Research & Information, 50(1-2), pp. 43-59. ISSN 0961-3218
Younes, B (2013) A framework for invoice management in construction. PhD thesis, University of Alberta, Canada.
Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364
Yu, A T W; Javed, A A; Lam, T I; Shen, G Q and Sun, M (2018) Integrating value management into sustainable construction projects in Hong Kong. Engineering, Construction and Architectural Management, 25(11), pp. 1475-1500. ISSN 0969-9988
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364
Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.
Zhang, J; Zou, W and Kumaraswamy, M (2015) Developing public private people partnership (4P) for post disaster infrastructure procurement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 468-484. ISSN 1759-5916
Zhang, S (2022) The development of a low carbon prefabricated house. PhD thesis, University of Nottingham, UK.
Zhang, X Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.
Zhou, H (2021) Institution building, organisational restructuring and everyday negotiations in Uganda's roads sector. PhD thesis, SOAS, University of London, UK.
Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.
de Neufville, R and King, D (1991) Risk and need-for-work premiums in contractor bidding. Journal of Construction Engineering and Management, 117(4), pp. 659-673. ISSN 0733-9364
de Souza, M P; Fialho, B C; Ferreira, R C; Fabricio, M M and Codinhoto, R (2023) Modelling and coordination of building design: An experience of BIM learning/upskilling. Architectural Engineering and Design Management, 19(1), pp. 74-91. ISSN 1745-2007
de Vries, J (2023) A corrective justice account of building authority liability in Canadian negligence law. PhD thesis, University of Western Ontario, Canada.
dos Santos, A (1999) Application of flow principles in the production management of construction sites. PhD thesis, University of Salford, UK.
Up a level