Items with Index Term: execution plan

Number of items: 26.

Abbas, M A; Ajayi, S O; Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(4), pp. 1306-1324. ISSN 1726-0531

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Ajayi, S O; Oyebiyi, F and Alaka, H A (2023) Facilitating compliance with BIM ISO 19650 naming convention through automation. Journal of Engineering, Design and Technology, 21(1), pp. 108-129. ISSN 1726-0531

Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988

Carroll, L C (2024) Framework to develop a credible final accounts system for South African construction projects. PhD thesis, University of Pretoria, South Africa.

Celoza, Amelia McLean (2022) The impact of contractual and legal factors on information management in AEC project delivery. PhD thesis, University of Texas at Austin, USA.

Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(3), pp. 207-221. ISSN 1745-2007

Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.

Dwairi, S (2018) Development of an Ontology-based framework and tool for Employer Information Requirements (OntEIR). PhD thesis, University of the West of England, Bristol, UK.

Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364

Heesom, D; Boden, P; Hatfield, A; Rooble, S; Andrews, K and Berwari, H (2021) Developing a collaborative HBIM to integrate tangible and intangible cultural heritage. International Journal of Building Pathology and Adaptation, 39(1), pp. 72-95. ISSN 23984708

Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499

Mahazir, M.; Zainudin, N. M. and Rahman, R. A. (2026) Modeling causes and strategies in BIM execution plan development: A PLS-SEM approach. Construction Innovation, pp. 1-31. ISSN 1471-4175

Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Noor, R N H R M; Ibrahim, C K I C and Belayutham, S (2021) Making sense of multi-actor social collaboration in building information modelling Level 2 projects: A case in Malaysia. Construction Economics and Building, 21(4), pp. 89-114. ISSN 2204-9029

Olugboyega, O and Windapo, A (2022) Investigating the strategic planning of BIM adoption on construction projects in a developing country. Journal of Construction in Developing Countries, 27(2), pp. 183-204. ISSN 1823-6499

Oraee, M; Hosseini, M R; Edwards, D and Papadonikolaki, E (2022) Collaboration in BIM-based construction networks: A qualitative model of influential factors. Engineering, Construction and Architectural Management, 29(3), pp. 1194-1217. ISSN 0969-9988

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Sackey, E and Akotia, J (2017) Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects. Construction Innovation, 17(3), pp. 273-293. ISSN 1471-4175

Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.

Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364