Items with Index Term: excavation
Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.
Abdeen, F N; Gunatilaka, R N; Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(4), pp. 892-911. ISSN 1471-4175
Abusnina, H (2019) Combining engineering and data-driven approaches to model the risk of excavation damage to underground natural gas facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Adjei, S; Ankrah, N; Ndekugri, I and Searle, D (2015) Investigating the extent to which waste management legislation affects waste management practices within the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.
Adjei, S D; Ankrah, N A; Ndekugri, I and Searle, D (2018) Sustainable construction and demolition waste management: Comparison of corporate and project level drivers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364
Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.
Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ali, S; Zayed, T and Hegab, M (2007) Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems. Journal of Construction Engineering and Management, 133(10), pp. 743-748. ISSN 0733-9364
Alnahari, Mohammed Saeed (2023) Exploring the potential of blockchain technology for improved management and safety of underground utilities. PhD thesis, Arizona State University, USA.
An, X; Zheng, F; Wang, Z; Li, Z; Jiao, Y and An, H (2025) Dynamic risk assessment approach for deep foundation pit construction based on the integration of multisource data using D-S evidence theory. Journal of Construction Engineering and Management, 151(10): 04025155, ISSN 0733-9364
Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599
Arefizadeh, H and Shahir, H (2020) Three-dimensional analysis of anchored wall with concrete bearing pads. Journal of Engineering, Design and Technology, 18(6), pp. 1469-1486. ISSN 1726-0531
Ariaratnam, S T; Lueke, J S and Allouche, E N (1999) Utilization of trenchless construction methods by Canadian municipalities. Journal of Construction Engineering and Management, 125(2), pp. 76-86. ISSN 0733-9364
Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364
Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988
Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988
Barras, G C and Mayo, R E (1995) Minidirectional drilling for installation of underground electrical conduit. Journal of Construction Engineering and Management, 121(4), pp. 364-369. ISSN 0733-9364
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364
Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364
Cabahug, R R; Golding, P; Edwards, D J and Nicholas, J (2002) Cognitive 'visual' processing and manual dexterity: The influence of eye-to-hand coordination on a plant operator’s aptitude. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.
Chen, Xilin (2025) Sustainability of underground infrastructure: Digitalisation-based embodied carbon assessment and design optimisation. PhD thesis, Monash University, Australia.
Cho, M (1994) Productivity analysis in construction using an expert system approach. PhD thesis, University of Manchester, UK.
Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364
Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364
Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.
Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364
Edwards, D J and Holt, G D (2000) Estivate: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52-62. ISSN 0969-9988
El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599
El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.
El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364
Ezzeldine, O Y (1995) Design of tunnels constructed using pressurized shield methods. PhD thesis, University of Alberta, Canada.
Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364
Farmer, I W (1996) Performance of chain trenchers in mixed ground. Journal of Construction Engineering and Management, 122(2), pp. 115-124. ISSN 0733-9364
Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.
Feng, Z; Lovreglio, R; Yiu, T W; Acosta, D M; Sun, B and Li, N (2024) Immersive virtual reality training for excavation safety and hazard identification. Smart and Sustainable Built Environment, 13(4), pp. 883-907. ISSN 2046-6099
Flynn, M A and Sampson, J M (2012) Trench safety-using a qualitative approach to understand barriers and develop strategies to improve trenching practices. International Journal of Construction Education and Research, 8(1), pp. 63-79. ISSN 1557-8771
Forsythe, P and Ding, G (2014) Greenhouse gas emissions from excavation on residential construction sites. Construction Economics and Building, 14(4), pp. 1-10. ISSN 2204-9029
Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.
Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.
Ghazal, N M (1992) Design of excavation operations using expert systems. PhD thesis, University of Cincinnati, USA.
Grimm, Alec G (2023) Modeling and monitoring construction site sediment control measures to improve design, performance, and longevity. PhD thesis, Ohio State University, USA.
Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364
Hagerty, D J; Schmitt, N G and Vandevelde, G T (1988) Shot-rock fill construction: Case history. Journal of Construction Engineering and Management, 114(3), pp. 489-502. ISSN 0733-9364
Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364
Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X
Hu, Q; Bai, Y; He, L; Cai, Q; Tang, S; Ma, G; Tan, J and Liang, B (2020) Intelligent framework for worker-machine safety assessment. Journal of Construction Engineering and Management, 146(5): 04020045, ISSN 0733-9364
Huang, X; Bernd, D and Bernold, L E (1996) Innovative technology development for safe excavation. Journal of Construction Engineering and Management, 122(1), pp. 91-96. ISSN 0733-9364
Huang, X and Bernold, L E (1997) CAD-integrated excavation and pipe laying. Journal of Construction Engineering and Management, 123(3), pp. 318-323. ISSN 0733-9364
Hulshizer, A J and Desai, A J (1984) Shock vibration effects on freshly placed concrete. Journal of Construction Engineering and Management, 110(2), pp. 266-285. ISSN 0733-9364
Idoro, G I (2011) Effect of mechanisation on occupational health and safety performance in the Nigerian construction industry. Journal of Construction in Developing Countries, 16(2), pp. 27-45. ISSN 1823-6499
Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364
Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.
Iseley, D T (1991) Trenchless excavation construction methods: Classification and evaluation. Journal of Construction Engineering and Management, 117(3), pp. 521-536. ISSN 0733-9364
Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.
Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.
Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(2), pp. 96-110. ISSN 2046-6099
Kakoto, T and Skibniewski, M (1991) Engineering decision support of automated shield tunneling. Journal of Construction Engineering and Management, 117(4), pp. 674-690. ISSN 0733-9364
Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.
Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kitamura, A and Takeuchi, Y (1983) Seikan tunnel. Journal of Construction Engineering and Management, 109(1), pp. 25-38. ISSN 0733-9364
Kloukinas, D (2015) Neolithic building technology and the social context of construction practices: The case of Northern Greece. PhD thesis, Cardiff University, UK.
Koehn, E and Brown, G (1985) Climatic effects on construction. Journal of Construction Engineering and Management, 111(2), pp. 129-137. ISSN 0733-9364
Kolera, B T and Bernold, L E (2006) Intelligent utility locating tool for excavators. Journal of Construction Engineering and Management, 132(9), pp. 919-927. ISSN 0733-9364
Lau, S C; Lu, M and Poon, C S (2014) Formalized approach to discretize a continuous plant in construction simulations. Journal of Construction Engineering and Management, 140(8): 04014032, ISSN 0733-9364
Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. PhD thesis, University of Texas at Austin, USA.
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364
Lee, J; Lorenc, S J and Bernold, L E (2003) Comparative performance evaluation of tele-operated pipe laying. Journal of Construction Engineering and Management, 129(1), pp. 32-40. ISSN 0733-9364
Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364
Lema, N M and Price, A D F (1996) Construction process performance variability: Focus on labour productivity. Building Research & Information, 24(6), pp. 339-350. ISSN 0961-3218
Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364
Lin, S (2022) Risk analysis and management for excavation engineering via multi-criteria decision making modeling. PhD thesis, National University of Singapore, Singapore.
Lingard, H.; Cooke, T. and Gharaie, E. (2013) A case study analysis of fatal incidents involving excavators in the Australian construction industry. Engineering, Construction and Architectural Management, 20(5), pp. 488-504. ISSN 0969-9988
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Luo, Y; Hu, D; Yao, Q; Wang, J; Chen, X; Li, H and Shi, M (2025) Blasting and sliding parameter optimization for efficient autonomous construction rock debris sliding transportation in an inclined shaft. Journal of Construction Engineering and Management, 151(11): 04025162, ISSN 0733-9364
Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364
Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364
Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid genetic algorithm and linear programming for bulldozer emissions and fuel-consumption management using continuously variable transmission. Journal of Construction Engineering and Management, 144(7): 04018053, ISSN 0733-9364
Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Moharrami, S; Bayat, A and Abourizk, S (2022) Modeling microtunnel boring machine penetration rate using a mechanistic approach. Journal of Construction Engineering and Management, 148(11): 04022128, ISSN 0733-9364
Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.
Moore, B C (1993) Modeling risk of lunar construction activities: A technology assessment approach. PhD thesis, Georgia Institute of Technology, USA.
Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988
Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364
Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.
Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.
Nash, W R (1985) Raise boring in civil and mining applications. Journal of Construction Engineering and Management, 111(1), pp. 15-30. ISSN 0733-9364
Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Olayiwola, J; Yusuf, A O; Akanmu, A A; Murzi, H; Gao, X and Afsari, K (2025) Construction practice knowledge for complementing classroom teaching during site visits. Smart and Sustainable Built Environment, 14(1), pp. 119-139. ISSN 2046-6099
Otchere-Darko, E; Atuah, L; Opoku, R and Koranteng, C (2025) Redefining green roof systems with climbers: Simulation of a conceptual model for thermal-radiative performance and plant vitality. International Journal of Building Pathology and Adaptation, 43(3), pp. 528-547. ISSN 2398-4708
Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988
Priyadarshini, Shalini (2025) Setu: Safety in excavation and trenching for you a training and decision-making support tool for worker safety in excavation and trenching operations in construction. PhD thesis, Carnegie Mellon University, USA.
Rajak, S and Vimal, V (2024) LSTM-CNN architecture for construction activity recognition using optimal positioning of wearables. Journal of Construction Engineering and Management, 150(12): 04024179, ISSN 0733-9364
Rankin, J (2023) Reinforcement learning for trench excavation. PhD thesis, Loughborough University, UK.
Rashad, A; Hegazy, H; Zhang, J; Mahdi, I; Abdel-Rasheed, I and Ebid, A (2025) Developing preliminary cost estimates for foundation systems of high-rise buildings. International Journal of Construction Management, 25(6), pp. 682-698. ISSN 1562-3599
S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988
Schexnayder, C J and David, S A (2002) Past and future of construction equipment: part iv. Journal of Construction Engineering and Management, 128(4), pp. 279-286. ISSN 0733-9364
Schnabel, J J and Martin, R E (1983) Parking garage supported on structural fill. Journal of Construction Engineering and Management, 109(3), pp. 286-296. ISSN 0733-9364
Schroeder, W L; Rybel, V W and Cochran, L (1986) Dewatering for opal springs powerhouse excavation. Journal of Construction Engineering and Management, 112(3), pp. 440-451. ISSN 0733-9364
Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175
Shen, X; Marks, E; Pradhananga, N and Cheng, T (2016) Hazardous proximity zone design for heavy construction excavation equipment. Journal of Construction Engineering and Management, 142(6): 05016001, ISSN 0733-9364
Shuster, W D; Burkman, C E; Grosshans, J; Dadio, S and Losco, R (2015) Green residential demolitions: Case study of vacant land reuse in storm water management in cleveland. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Smallwood, J J (2010) Excavation health and safety (H&S): A South African perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364
Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387
Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988
Tang, L; Chen, C; Li, H and Mak, D Y Y (2022) Developing a BIM GIS-integrated method for urban underground piping management in China: A case study. Journal of Construction Engineering and Management, 148(9): 05022004, ISSN 0733-9364
Tavakoli, A (1983) Productivity analysis of heavy construction operations. PhD thesis, Georgia Institute of Technology, USA.
Tekin, H (2022) The impact of COVID-19 on construction labor productivity: The case of Turkey. Engineering, Construction and Architectural Management, 29(9), pp. 3775-3806. ISSN 0969-9988
Uddin, S M J (2023) Leveraging social media platforms and generative AI technologies for construction industry applications. PhD thesis, North Carolina State University, USA.
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364
Wong, K C (2021) Factors affecting behavior of roadside construction workers in using personal protective equipment against dust and noise. PhD thesis, University of Hong Kong, Hong Kong.
Xiao, J; Li, X; Zhang, Z and Zhang, J (2018) Ontology-based knowledge model to support construction noise control in China. Journal of Construction Engineering and Management, 144(2): 04017103, ISSN 0733-9364
Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.
Xin, Z.; Dong, J.; Zeng, H.; Xiong, Z.; Wang, B.; Yan, J. and Wang, Z. (2026) Key parameters and integrated techniques for mechanized tunnel construction via drilling and blasting method. Journal of Construction Engineering and Management, 152(9): 04026148, ISSN 0733-9364
Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364
Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364
Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364
Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364
Zhang, X; Wang, M; Zhou, B and Wang, X (2018) Influence of factors on collapse risk of loess tunnel: A multi-index assessment model. Journal of Engineering, Design and Technology, 16(5), pp. 734-749. ISSN 1726-0531
Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.
Zhang, Y; Luo, H; Skitmore, M; Li, Q and Zhong, B (2018) Optimal camera placement for monitoring safety in metro station construction work. Journal of Construction Engineering and Management, 145(1): 04018118, ISSN 0733-9364
Zhang, Z J; Li, M G; Chen, J J; Wang, J H and Zeng, F Y (2017) Innovative construction method for oversized excavations with bipartition walls. Journal of Construction Engineering and Management, 143(8): 04017056, ISSN 0733-9364
Zhao, T; Liu, W; Zhang, L and Zhou, W (2018) Cluster analysis of risk factors from near-miss and accident reports in tunneling excavation. Journal of Construction Engineering and Management, 144(6): 04018040, ISSN 0733-9364
Zou, P X W and Zhang, G (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), pp. 620-627. ISSN 0733-9364
ter Huurne, R (2021) The role of risk attitudes: Discrepancies between human and computer-based risk analysis in the utility sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
ter Huurne, R and Coenen, T (2024) Exploring the barriers of ground penetrating radar adoption: A technological innovation system analysis. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.
Up a level