Items with Index Term: evolutionary algorithm
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.
Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Elshaboury, N; Attia, T and Marzouk, M (2020) Application of evolutionary optimization algorithms for rehabilitation of water distribution networks. Journal of Construction Engineering and Management, 146(7): 04020069, ISSN 0733-9364
French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.
Jawad, D J (2003) Life cycle cost optimization for infrastructure facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Pham, V H S; Nguyen Dang, N T and Nam, N V (2025) Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning. Engineering, Construction and Architectural Management, 32(7), pp. 4852-4886. ISSN 0969-9988
Pham Vu Hong, S and Nguyen Thanh, V (2023) Application of artificial intelligence algorithm to optimize the design of water distribution system. International Journal of Construction Management, 23(16), pp. 2830-2840. ISSN 1562-3599
Rahimi, Y; Tavakkoli-Moghaddam, R; Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid approach to construction project risk management with simultaneous FMEA/ISO 31000/evolutionary algorithms: Empirical optimization study. Journal of Construction Engineering and Management, 144(6): 04018043, ISSN 0733-9364
Shaw, D; Miles, J and Gray, A (2007) Conceptual design of 'geodesic-like' domes using computational geometry. Architectural Engineering and Design Management, 3(4), pp. 238-248. ISSN 1745-2007
Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364
Singh Rajput, T and Thomas, A (2023) Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ann) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management, 23(13), pp. 2320-2332. ISSN 1562-3599
Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.
Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(2), pp. 157-171. ISSN 01446193
Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988
Waibel, C (2018) Simulation-based optimization of buildings and multi-energy systems. DSc thesis, ETH Zürich, Switzerland.
Wang, Y.; Zhao, W.; Cui, W. and Zhou, G. (2026) Comparison of five meta-heuristic algorithms in layout optimization of multiple tower cranes. Engineering, Construction and Architectural Management, 33(7), pp. 5849-5873. ISSN 0969-9988
Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364
Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.
Up a level