Items with Index Term: estimation

Number of items: 769.

Abdel-Hamid, M and Mohamed Abdelhaleem, H (2022) Impact of poor labor productivity on construction project cost. International Journal of Construction Management, 22(12), pp. 2356-2363. ISSN 1562-3599

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

Abotaleb, I S and El-Adaway, I H (2017) Construction bidding markup estimation using a multistage decision theory approach. Journal of Construction Engineering and Management, 143(1): 04016079, ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1991) Visual interactive fitting of beta distributions. Journal of Construction Engineering and Management, 117(4), pp. 589-605. ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599

Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599

Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531

Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Aghimien, E I and Li, D H W (2022) Application of luminous efficacies for daylight illuminance data generation in subtropical Hong Kong. Smart and Sustainable Built Environment, 11(2), pp. 271-293. ISSN 2046-6099

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2020) Residential adaptations as users' tacit means of communicating spatial needs in housing design: A case study. Journal of Engineering, Design and Technology, 18(6), pp. 1593-1613. ISSN 1726-0531

Agyemang, E.; Deku, C. S.; Owusu-Mante, S.; Forkuor, J. B.; Dwumah, P. and Ofori-Dua, K. (2026) Housing adaptations for climate resilience: Predictors of climate-responsive housing in coastal and savannah zones. Smart and Sustainable Built Environment, pp. 1-25. ISSN 2046-6099

Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X

Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X

Aiyetan, A O and Das, D K (2023) Use of drones for construction in developing countries: Barriers and strategic interventions. International Journal of Construction Management, 23(16), pp. 2888-2897. ISSN 1562-3599

Ajayi, S; Saad, A; Oyegoke, A and Alaka, H (2024) Enhancing productivity and sustainability through BIM-based plugins: A case study of AutoBIM carbon diagnostics system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364

Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.

Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.

Akinradewo, O; Aigbavboa, C and Oke, A (2020) Accuracy of road construction preliminary estimate: Examining the influencing factors. Built Environment Project and Asset Management, 10(5), pp. 657-671. ISSN 2044-124X

Akinradewo, O I; Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects' estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(3), pp. 407-421. ISSN 1366-4387

Aksözen, M; Hassler, U; Rivallain, M and Kohler, N (2017) Mortality analysis of an urban building stock. Building Research & Information, 45(3), pp. 259-277. ISSN 0961-3218

Aktas, C B (2011) Impact of product lifetime on life cycle assessment results. PhD thesis, University of Pittsburgh, USA.

Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.

Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.

Al-Hashimy, H N H (2025) The relationship between financial management strategies and firm financial performance: the moderating role of firm size. Journal of Financial Management of Property and Construction, 30(2), pp. 295-317. ISSN 1366-4387

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193

Aldemir, Bora (2022) An agent based model for exploring the effects of overconfidence on the winner's curse in construction projects. PhD thesis, Izmir Institute of Technology, Turkey.

Alex, D P; Al Hussein, M; Bouferguene, A and Fernando, S (2010) Artificial neural network model for cost estimation: City of Edmonton's water and sewer installation services. Journal of Construction Engineering and Management, 136(7), pp. 745-756. ISSN 0733-9364

Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599

Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364

Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364

Alkhorayef, A N M (2014) Improving decision making on large scale investment projects: A psychological perspective. PhD thesis, University of Leeds, UK.

Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.

Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.

Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988

Almås, A J and Hygen, H O (2012) Impacts of sea level rise towards 2100 on buildings in Norway. Building Research & Information, 40(3), pp. 245-259. ISSN 0961-3218

Alnaser, N W and Alnaser, W E (2022) Modelling the yield of 8.64 kw PV panels installed on a rooftop of a building in the Kingdom of Bahrain. Smart and Sustainable Built Environment, 11(1), pp. 162-174. ISSN 2046-6099

Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029

Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X

Alqahtani, A and Whyte, A (2016) Evaluation of non-cost factors affecting the life cycle cost: An exploratory study. Journal of Engineering, Design and Technology, 14(4), pp. 818-834.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364

Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.

Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data. PhD thesis, Carnegie Mellon University, USA.

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.

Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364

Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599

Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364

Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364

Apinayan, K.; Perera, B. A. K. S.; Weerasooriya, D. and Ranadewa, K. A. T. O. (2026) Adaptability of BIM technology for detailed cost estimation in Sri Lankan construction industry. Journal of Engineering, Design and Technology, 24(3), pp. 633-665. ISSN 1726-0531

Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.

Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.

Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599

Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions. PhD thesis, North Carolina State University, USA.

Artmann, N; Gyalistras, D; Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(2), pp. 111-128. ISSN 0961-3218

Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.

Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X

Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387

Atmaca, N (2017) Life-cycle assessment of post-disaster temporary housing. Building Research & Information, 45(5), pp. 524-538. ISSN 0961-3218

Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.

Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364

Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175

Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.

Azman, M A; Abdul-Samad, Z; Lee, B L; Skitmore, M; Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(2), pp. 618-637. ISSN 0969-9988

Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364

Baby, S.; Talebi, S.; Lai, J. H. K.; Tien, P. W. and Kagioglou, M. M. (2026) Mitigating cost estimation challenges in bahrain's construction industry: A problem-solving approach. Built Environment Project and Asset Management, 16(3), pp. 542-560. ISSN 2044-124X

Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Badawy, M; Hussein, A; Elseufy, S M and Alnaas, K (2021) How to predict the rebar labours' production rate by using ANN model. International Journal of Construction Management, 21(4), pp. 427-438. ISSN 1562-3599

Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364

Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364

Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193

Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599

Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364

Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364

Barra, B. Q.; Soares, C. A. P.; de Castro, I. P. and Longo, O. C. (2026) Framework for extracting project quantities for construction cost estimation using 5D BIM in an openBIM environment. Journal of Engineering, Design and Technology, pp. 1-24. ISSN 1726-0531

Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364

Basha, M (2021) Intra-sector firm performance and its determinants in the UK construction industry. PhD thesis, University of Westminster, UK.

Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364

Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599

Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.

Benjaoran, V; Dawood, N and Scott, D (2004) Bespoke precast productivity estimation with neural network model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988

Bidanset, P; McCord, M; Davis, P and Sunderman, M (2019) An exploratory approach for enhancing vertical and horizontal equity tests for ad valorem property tax valuations using geographically weighted regression. Journal of Financial Management of Property and Construction, 24(2), pp. 231-250. ISSN 1366-4387

Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364

Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.

Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180

Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bollen, R (2000) Applying quantitative techniques to evaluate residential development profitability. Journal of Financial Management of Property and Construction, 5(1-2), pp. 51-64. ISSN 1366-4387

Bordass, B (2000) Cost and value: Fact and fiction. Building Research & Information, 28(5-6), pp. 338-352. ISSN 0961-3218

Bourikas, L; Costanza, E; Gauthier, S; James, P A B; Kittley-Davies, J; Ornaghi, C; Rogers, A; Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(2), pp. 148-16. ISSN 0961-3218

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Boussabaine, A H and Elhag, T (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(6), pp. 745-755. ISSN 01446193

Boussabaine, A H and Elhag, T M S (1999) Knowledge discovery in residential construction project cost data. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Brady, L (2019) An investigation into the management of energy performance for building services systems: design to operation. PhD thesis, Liverpool John Moores University, UK.

Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.

Bu, Z; Liu, J and Liu, J (2025) Impact of emotions on the behavioral strategies of PPP project stakeholders: An rdeu evolutionary game analysis. Engineering, Construction and Architectural Management, 32(4), pp. 2242-2271. ISSN 0969-9988

Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364

Campo, S (2002) Asymmetry and risk aversion in first -price sealed bid auctions: Identification, estimation, and applications. PhD thesis, University of Southern California, USA.

Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.

Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.

Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Cha, G; Park, S and Oh, T (2019) A terrestrial lidar-based detection of shape deformation for maintenance of bridge structures. Journal of Construction Engineering and Management, 145(12): 04019075, ISSN 0733-9364

Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175

Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193

Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193

Chan, T S-F (1996) Residential construction, liquidity constraints, and monetary policy transmission. PhD thesis, Washington University in St. Louis, USA.

Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.

Chancellor, W and Abbott, M (2015) The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176-186. ISSN 01446193

Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364

Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X

Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, F-C (2021) Deep learning studies for vision-based condition assessment and attribute estimation of civil infrastructure systems. PhD thesis, Purdue University, USA.

Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364

Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364

Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193

Chen, K W; Teitelbaum, E; Meggers, F; Pantelic, J and Rysanek, A (2021) Exploring membrane-assisted radiant cooling for designing comfortable naturally ventilated spaces in the tropics. Building Research & Information, 49(5), pp. 483-495. ISSN 0961-3218

Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364

Chen, Xinyu (2025) Multimodal data fusion-based ergonomic assessment method for construction workers. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Cho, M; Bugg, R; Sattineni, A and Redden, L (2021) Wood waste minimization practices in residential construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Choi, K (2008) Applications of ITS archived data for improved highway planning and design. PhD thesis, University of Wisconsin - Madison, USA.

Choi, Y S; Lim, I; Kim, T; Cho, H and Kang, K I (2016) Case study of the core structure succeeding method for tall building construction. Journal of Construction Engineering and Management, 142(12): 05016017, ISSN 0733-9364

Chokwitthaya, C (2020) A framework for augmenting building performance models using machine learning and immersive virtual environment. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Chong, D; Wang, Y; Chen, L and Yu, B (2016) Modeling and validation of energy consumption in asphalt mixture production. Journal of Construction Engineering and Management, 142(12): 04016069, ISSN 0733-9364

Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.

Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364

Christodoulou, S E (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neural networks. PhD thesis, Columbia University, USA.

Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.

Crippa, J; Boeing, L C; Caparelli, A P A; da Costa, M R M M; Scheer, S; Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(5), pp. 491-503. ISSN 2044-124X

D'Amato, M and Kauko, T (2012) Sustainability and risk premium estimation in property valuation and assessment of worth. Building Research & Information, 40(2), pp. 174-185. ISSN 0961-3218

Dabirian, S; Abbaspour, S; Khanzadi, M and Ahmadi, M (2022) Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 22(2), pp. 182-191. ISSN 1562-3599

Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988

Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599

Das, P P; Khatri, V N; Doley, R; Dutta, R K and Yadav, J S (2024) Estimation of bearing capacity of shallow footings on layered sand using finite elements analysis. Journal of Engineering, Design and Technology, 22(2), pp. 385-403. ISSN 1726-0531

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Davis, K A (2004) Information technology change in the architecture, engineering, and construction industry: An investigation of individuals' resistance. PhD thesis, Virginia Tech, USA.

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193

Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Doloi, H (2009) Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), pp. 1099-1109. ISSN 1466433X

Dosumu, B A (2022) Development of a construction project risk management framework: A case study of major Nigerian cities. PhD thesis, University of Manchester, UK.

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531

Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193

Duncan, K; Philips, P and Prus, M (2012) Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws. Engineering, Construction and Architectural Management, 19(3), pp. 320-334. ISSN 0969-9988

Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988

Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364

Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.

Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364

Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364

Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services costs estimation: Comment. Construction Management and Economics, 16(1), pp. 105-108. ISSN 01446193

Eizakshiri, F; Chan, P W and Emsley, M (2011) Delays, what delays? A critical review of the literature on delays in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.

Elghaish, F; Matarneh, S; Abdellatef, E; Rahimian, F; Hosseini, M R and Farouk Kineber, A (2025) Multi-layers deep learning model with feature selection for automated detection and classification of highway pavement cracks. Smart and Sustainable Built Environment, 14(2), pp. 511-535. ISSN 2046-6099

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Elhag, T M S and Boussabaine, A H (2001) Tender price estimation using artificial neural networks. Journal of Financial Management of Property and Construction, 6(3), pp. 193-208. ISSN 1366-4387

Elhag, T M S and Boussabaine, A H (2002) Tender price estimation using artificial neural networks II: Modelling. Journal of Financial Management of Property and Construction, 7(1), pp. 49-64. ISSN 1366-4387

Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304

Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387

Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Etemadinia, H and Tavakolan, M (2021) Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects. International Journal of Construction Management, 21(1), pp. 93-112. ISSN 1562-3599

Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387

Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364

Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364

Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531

Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988

Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988

Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.

Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387

Flinkman, M (1994) The market for sawnwood in Germany: Analysis and forecast to the year 2000. SkoglDr thesis, Sveriges Lantbruksuniversitet, Sweden.

Forbes, D; Smith, S D and Horner, M (2009) Risk and its analysis in the sustainability assessment of the built environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988

Fortune, C and Hinks, J (1997) Model selection criteria in building project price forecast formulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Freitas, J A; Sanquetta, C R; Iwakiri, S and de Mello Maron da Costa, M D R (2021) The use of wood construction materials as a way of carbon storage in residential buildings in Brazil. International Journal of Construction Management, 21(3), pp. 292-298. ISSN 1562-3599

Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988

Ganesan, S; Lau, S S Y; Wong, K C and Chau, K W (2004) Growth of finance, insurance and real estate (FIRE) and office space absorption in Hong Kong. Journal of Financial Management of Property and Construction, 9(2), pp. 103-117. ISSN 1366-4387

Ganguly, I (2008) Modeling alternatives and visualization of product adoption and usage in the residential construction industry. PhD thesis, University of Washington, USA.

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599

Gaspar, P L and De Brito, J (2008) Service life estimation of cement-rendered facades. Building Research & Information, 36(1), pp. 44-55. ISSN 0961-3218

Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X

Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Genc, O (2023) Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: A relative importance index (rii) and exploratory factor analysis (EFA) approach. International Journal of Construction Management, 23(6), pp. 979-987. ISSN 1562-3599

Gharaibeh, L.; Lantz, B. and Eriksson, K. M. (2026) Bridging the gap: A framework for monetizing BIM by integrating industry insights for informed decision-making. Smart and Sustainable Built Environment, 15(2), pp. 710-728. ISSN 2046-6099

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364

Goh, Y M (2015) Empirical investigation of the average deployment force of personal fall-arrest energy absorbers. Journal of Construction Engineering and Management, 141(1): 04014059, ISSN 0733-9364

Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175

Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599

Goncalves, V L; Costanzo, V; Fabbri, K and Rakha, T (2022) Overheating assessment in Passivhaus dwellings: The influence of prediction tools. Buildings & Cities, 3(1), pp. 153-167. ISSN 2632-6655

Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193

Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Graham, L D and Smith, S D (2003) A hybrid model to improve the estimation of concreting operations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gransberg, D D and Riemer, C (2009) Impact of inaccurate engineer's estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), pp. 1138-1145. ISSN 0733-9364

Guerra, Beatriz Chinelato (2021) BIM-based construction waste management and circular economy for resource recovery. PhD thesis, University of Texas at Austin, USA.

Gundes, S (2011) Input structure of the construction industry: A cross-country analysis, 1968-90. Construction Management and Economics, 29(6), pp. 613-621. ISSN 1466433X

Gurmu, A; Hosseini, M R; Arashpour, M and Lioeng, W (2025) Development of building defects dashboards and stochastic models for multi-storey buildings in Victoria, Australia. Construction Innovation, 25(2), pp. 594-619. ISSN 1471-4175

Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364

Guven, H and Tanik, A (2020) Water-energy nexus: Sustainable water management and energy recovery from wastewater in eco-cities. Smart and Sustainable Built Environment, 9(1), pp. 54-70. ISSN 2046-6099

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Habermann, N and Hedel, R (2018) Damage functions for transport infrastructure. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 420-434. ISSN 1759-5916

Hackett, J A and Hicks, C M (2007) Estimating as a profession in UK construction. Engineering, Construction and Architectural Management, 14(1), pp. 26-51. ISSN 0969-9988

Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.

Hamza, M; Shahid, S; Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(3), pp. 413-425. ISSN 1562-3599

Han, J; Kim, J; Kim, S and Wang, S (2024) Effectiveness of image augmentation techniques on detection of building characteristics from street view images using deep learning. Journal of Construction Engineering and Management, 150(10): 04024129, ISSN 0733-9364

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.

Hanggara, D and Wijeyewickrema, A C (2020) Vulnerability assessment of reinforced concrete buildings in Indonesia subjected to tsunami inundation forces. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 204-218. ISSN 1759-5916

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988

Hassan, O A B and Anderstedt, R (2017) Estimation of drying time of fresh concrete slabs: A comparative study. Journal of Engineering, Design and Technology, 15(2), pp. 134-148.

Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 0969-9988

Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364

Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988

Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988

He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364

He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. PhD thesis, Columbia University, USA.

Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364

Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364

Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Ho, K H; Hui, E C M and Su, H (2010) Examining fuzzy tactical asset allocation (FTAA) as an alternative to modern portfolio theory (MPT) asset allocation for international and direct real estate investment. Journal of Financial Management of Property and Construction, 15(1), pp. 71-94. ISSN 1366-4387

Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364

Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.

Hsieh, H H Y (2005) The 1990s Taiwan residential construction boom: A supply side interpretation. Construction Management and Economics, 23(3), pp. 265-284. ISSN 01446193

Hu, Songbo (2023) Identification and prevention of crane operational hazards by integrating BIM and pathfinding algorithm in construction planning. PhD thesis, Monash University, Australia.

Huang, H; Zhang, C and Hammad, A (2021) Effective scanning range estimation for using tls in construction projects. Journal of Construction Engineering and Management, 147(9): 04021106, ISSN 0733-9364

Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X

Hughes, A J (2022) On risk-based decision-making for structural health monitoring. PhD thesis, University of Sheffield, UK.

Hwang, J.; Bagh, S. and Han, K. (2026) Toward automated SLAM-to-BIM for digital twin applications: BIM-assisted 360-degree camera-based visual SLAM using reference point-based bundle adjustment. Journal of Construction Engineering and Management, 152(10): 04026161, ISSN 0733-9364

Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988

Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364

Inácio, M F M (1999) The building deconstruction process and the debris trail: towards a dynamic model. PhD thesis, University of Salford, UK.

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Isaton, Camila (2023) A collaborative risk identification model with cost risk simulation: A case study of a port logistics storage yard. PhD thesis, Universidade Federal de Santa Catarina, Brazil.

Islam, M M and Mohamed, S (2009) Bid-winning potential optimization for concession schemes with imprecise investment parameters. Journal of Construction Engineering and Management, 135(8), pp. 690-700. ISSN 0733-9364

Ismail, N M M I (2015) Factors in building design that improve building maintainability in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.

Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364

Jablonowski, C J (2015) Quantitative method to model the underreporting of safety incidents. Journal of Construction Engineering and Management, 141(5): 06014012, ISSN 0733-9364

Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988

Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.

Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599

Jafary, P; Shojaei, D; Rajabifard, A and Ngo, T (2024) BIM and real estate valuation: Challenges, potentials and lessons for future directions. Engineering, Construction and Architectural Management, 31(4), pp. 1642-1677. ISSN 0969-9988

Jafarzadeh, R; Ingham, J M; Wilkinson, S; González, V and Aghakouchak, A A (2014) Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management, 140(2): 04013044, ISSN 0733-9364

Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.

Jarder, S L N; Garciano, L E O and Maruyama, O (2021) Probable maximum loss of a pipe network due to earthquakes: A case study in iloilo city, Philippines. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 223-237. ISSN 1759-5916

Jefferies, D and Schweber, L (2022) Professional judgement: An institutional logic approach to contractor tender pricing. Buildings & Cities, 3(1), pp. 518-533. ISSN 2632-6655

Jennings, W (2012) Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), pp. 455-462. ISSN 1466433X

Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364

Ji, S H; Park, M and Lee, H S (2012) Case adaptation method of case-based reasoning for construction cost estimation in Korea. Journal of Construction Engineering and Management, 138(1), pp. 43-52. ISSN 0733-9364

Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.

Jiang, Q (2020) Estimation of construction project building cost by back-propagation neural network. Journal of Engineering, Design and Technology, 18(3), pp. 601-609. ISSN 1726-0531

Jiang, W; Martek, I; Hosseini, M R and Chen, C (2021) Political risk management of foreign direct investment in infrastructure projects: Bibliometric-qualitative analyses of research in developing countries. Engineering, Construction and Architectural Management, 28(1), pp. 125-153. ISSN 0969-9988

Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.

Jiang, Y and Bai, Y (2020) Estimation of construction site elevations using drone-based orthoimagery and deep learning. Journal of Construction Engineering and Management, 146(8): 04020086, ISSN 0733-9364

Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771

Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364

Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364

John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364

Jolly Cyril, E and Singla, H K (2020) Comparative analysis of profitability of real estate, industrial construction and infrastructure firms: Evidence from India. Journal of Financial Management of Property and Construction, 25(2), pp. 273-291. ISSN 1366-4387

Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: A systematic review. Engineering, Construction and Architectural Management, 30(3), pp. 1271-1299. ISSN 0969-9988

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Jung, S-K (1993) A study of single-family residential construction activity: Simultaneous transfer function (STF) analysis. PhD thesis, Georgia State University, USA.

Kaboli, A S and Carmichael, D G (2016) An examination of the dret model and the influence of payload, haul grade and truck type on earthmoving emissions. International Journal of Construction Management, 16(2), pp. 95-108. ISSN 1562-3599

Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364

Kahandawa, R; Domingo, N; Chawynski, G and Uma, S R (2021) Factors impacting post-earthquake damage repair cost estimations. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 29-49. ISSN 1759-5916

Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364

Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988

Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Kar, S and Jha, K N (2021) Investigation into lead time of construction materials and influencing factors. Journal of Construction Engineering and Management, 147(3): 01998, ISSN 0733-9364

Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988

Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364

Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099

Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599

Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364

Kempton, J; Chapman, K and Alani, A M (2002) Surveyor element lifetime predictions and the anchoring and adjustment heuristic. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), pp. 643-668. ISSN 0969-9988

Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.

Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.

Khalid, G (1994) Obsolescence in hedonic price estimation of the financial impact of commercial office buildings: The case of Kuala Lumpur. Construction Management and Economics, 12(1), pp. 37-44. ISSN 01446193

Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Khorrami Shad, H; Tak Wing Yiu, K; Lovreglio, R and Feng, Z (2024) State-of-the-art analysis of the integration of augmented reality with construction technologies to improve construction safety. Smart and Sustainable Built Environment, 13(6), pp. 1434-1449. ISSN 2046-6099

Khosrowshahi, F (1996) Value profile analysis of contruction projects. Journal of Financial Management of Property and Construction, 1(1), pp. 55-76. ISSN 1366-4387

Khuncumchoo, N (2007) Roof maintenance record analysis toward proactive maintenance policies. PhD thesis, Georgia Institute of Technology, USA.

Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364

Kim, B; Lee, H; Park, H and Kim, H (2013) Estimation of greenhouse gas emissions from land-use changes due to road construction in the republic of Korea. Journal of Construction Engineering and Management, 139(3), pp. 339-346. ISSN 0733-9364

Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364

Kim, H (2002) Knowledge discovery and machine learning in construction project databases. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.

Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193

Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.

Kiziltas, S and Akinci, B (2009) Contextual information requirements of cost estimators from past construction projects. Journal of Construction Engineering and Management, 135(9), pp. 841-852. ISSN 0733-9364

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708

Koc, K and Okudan, O (2021) Assessment of life cycle risks of deconstruction in urban regeneration projects. Journal of Construction Engineering and Management, 147(10): 04021137, ISSN 0733-9364

Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X

Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.

Korishetti, A. C. and Malemath, V. S. (2026) Optimal block search mechanism using deep recurrent neural network for enabling the code-efficiency in hevc. Journal of Engineering, Design and Technology, 24(4), pp. 35-62. ISSN 1726-0531

Kraemer, K W (1982) An econometric analysis of residential construction in the U.S., 1964-1980. PhD thesis, State University of New York at Binghamton, USA.

Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.

Kumar, A; Srivastava, V; Tabash, M I and Chawda, D (2022) Profitability determinants of infrastructure public private partnerships (PPPs): Empirical evidence from Indian data. Journal of Financial Management of Property and Construction, 27(1), pp. 91-111. ISSN 1366-4387

Kumar, R; Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(4), pp. 1014-1037. ISSN 0969-9988

Kumar, S D; Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(3), pp. 364-373.

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988

Kumari, P; Reddy, S R N and Yadav, R (2024) Indoor occupancy detection and counting system based on boosting algorithm using different sensor data. Building Research & Information, 52(1-2), pp. 87-106. ISSN 0961-3218

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599

Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193

Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.

Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387

Lazarski, A (2014) The importance of contextual factors on the accuracy of estimates in project management: An emergence of a framework for more realistic estimation process. PhD thesis, University of Bradford, UK.

Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364

Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, G and Lee, S (2022) Importance of testing with independent subjects and contexts for machine-learning models to monitor construction workers' psychophysiological responses. Journal of Construction Engineering and Management, 148(9): 04022082, ISSN 0733-9364

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Lee, J and Ham, Y (2021) Physiological sensing-driven personal thermal comfort modelling in consideration of human activity variations. Building Research & Information, 49(5), pp. 512-524. ISSN 0961-3218

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Lee, M; Jeong, J and Lee, J (2025) Development of a quantitative assessment method for occupational accident risk of construction workers using resource and cost information in the preconstruction stage. Journal of Construction Engineering and Management, 151(12): 04025208, ISSN 0733-9364

Leo, L S; Buccolieri, R and Di Sabatino, S (2018) Scale-adaptive morphometric analysis for urban air quality and ventilation applications. Building Research & Information, 46(8), pp. 931-951. ISSN 0961-3218

Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364

Leung, M Y; Liu, A M M and Wong, M M K (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(1), pp. 55-67. ISSN 01446193

Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193

Leung, M Y; Olomolaiye, P; Chong, A and Lam, C C Y (2005) Impacts of stress on estimation performance in Hong Kong. Construction Management and Economics, 23(9), pp. 891-903. ISSN 01446193

Leung, M Y; Skitmore, M and Chan, Y S (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075. ISSN 1466433X

Leung, M Y; Yu, J and Chong, M L A (2016) Effects of stress and commitment on the performance of construction estimation participants in Hong Kong. Journal of Construction Engineering and Management, 142(2): 04015081, ISSN 0733-9364

Leung, M Y; Zhang, H and Skitmore, M (2008) Effects of organizational supports on the stress of construction estimation participants. Journal of Construction Engineering and Management, 134(2), pp. 84-93. ISSN 0733-9364

Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Levinson, D M (1998) On whom the toll falls: A model of network financing. PhD thesis, University of California, Berkeley, USA.

Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(8), pp. 805-815. ISSN 1466433X

Li, J. and Li, Y. (2026) A mini review of greenhouse gas emissions and mitigation strategies in the building sector. International Journal of Building Pathology and Adaptation, 44(5), pp. 1302-1328. ISSN 2398-4708

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988

Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193

Li, H; Shen, L Y and Love, P E D (1999) Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125(3), pp. 185-189. ISSN 0733-9364

Li, M; Allinson, D and Lomas, K (2020) Estimation of building heat transfer coefficients from in-use data: Impacts of unmonitored energy flows. International Journal of Building Pathology and Adaptation, 38(1), pp. 38-50. ISSN 23984708

Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Li, Y; Liu, J; Du, X and Zhong, R Y (2025) Creating value from data resources: Research on a service ecosystem symbiosis model of digital transportation infrastructure. Journal of Construction Engineering and Management, 151(9): 05025009, ISSN 0733-9364

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364

Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364

Lindelöf, D and Morel, N (2008) Bayesian estimation of visual discomfort. Building Research & Information, 36(1), pp. 83-96. ISSN 0961-3218

Ling, F Y Y (2005) Global factors affecting margin-size of construction projects. Journal of Construction Research, 6(1), pp. 91-106. ISSN 1609-9451

Liu, C; Itoh, Y and Dawood, N N (2001) Financial analysis on the influence of infrastructure construction on regional economic development. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X

Liu, L and Zhu, K (2007) Improving cost estimates of construction projects using phased cost factors. Journal of Construction Engineering and Management, 133(1), pp. 91-95. ISSN 0733-9364

Liu, Lan (2020) Design guidance and development of construction stormwater technologies. PhD thesis, Auburn University, USA.

Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.

Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, Q; Feng, Y; London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(2), pp. 116-137. ISSN 01446193

Liu, Q; Ye, G and Feng, Y (2020) Workers' safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(3), pp. 765-784. ISSN 0969-9988

Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193

Liu, X; Xu, F; Zhang, Z and Sun, K (2025) Fall-portent detection for construction sites based on computer vision and machine learning. Engineering, Construction and Architectural Management, 32(3), pp. 1499-1521. ISSN 0969-9988

Locatelli, G and Mancini, M (2012) Looking back to see the future: Building nuclear power plants in Europe. Construction Management and Economics, 30(8), pp. 623-637. ISSN 1466433X

Lokuge, W; Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(3), pp. 332-344. ISSN 2044-124X

Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.

Lopes, M A R; Antunes, C H; Reis, A and Martins, N (2017) Estimating energy savings from behaviours using building performance simulations. Building Research & Information, 45(3), pp. 303-319. ISSN 0961-3218

Lou, Y (2022) Interconnections among energy consumption, carbon emissions, and economic impacts for sustainable buildings. PhD thesis, University of Colorado at Boulder, USA.

Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364

Lu, R (2010) Impacts of local item dependence of testlet items with the multistage tests for pass-fail decisions. PhD thesis, University of Maryland, College Park, USA.

Lu, W; Webster, C; Peng, Y; Chen, X and Zhang, X (2017) Estimating and calibrating the amount of building-related construction and demolition waste in urban China. International Journal of Construction Management, 17(1), pp. 13-24. ISSN 1562-3599

Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364

Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Luong Hai, N and Tuan, N A (2023) Modeling of planning function management in Vietnam's public construction works. Built Environment Project and Asset Management, 13(2), pp. 201-216. ISSN 2044-124X

Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry. PhD thesis, University of Manchester, UK.

Lühr, G J; Bosch-Rekveldt, M and Radujković, M (2023) The last-planner-system's impact on project culture. Journal of Engineering, Design and Technology, 21(5), pp. 1303-1322. ISSN 1726-0531

Mahamid, I and Bruland, A (2012) Cost deviation in road construction projects: The case of Palestine. Construction Economics and Building, 12(1), pp. 58-71. ISSN 2204-9029

Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.

Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099

Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Mamantzis, Dimitrios E (2005) Successful project leadership: An analysis of the Greek construction market. PhD thesis, University College London, UK.

Manavazhi, M R (2004) Assessment of the propensity for revisions in design projects through the dichotomous characterization of designer effort. Construction Management and Economics, 22(1), pp. 47-54. ISSN 01446193

Manavazhi, M R and Xunshi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(4), pp. 379-391. ISSN 01446193

Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.

Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364

Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.

Manu, E; Ankrah, N; Chinyio, E and Proverbs, D (2013) A cognitive approach to trust management in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 232-239. ISSN 17514312

Maor, I (2002) Conceptual design and selection of HVAC&r systems by combining knowledge based expert system with a building energy simulation program. PhD thesis, Drexel University, USA.

Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599

Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.

Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304

Martino, Antonello (2017) The historical landscape of ports: From the definition of a methodology for the risk assessment to the identification of guidelines for port heritage preservation. PhD thesis, Politecnico di Bari, Italy.

Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

McCord, M; Davis, P; McCord, J; Haran, M and Davison, K (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: A polytomous universal model approach. Journal of Financial Management of Property and Construction, 25(2), pp. 247-271. ISSN 1366-4387

Mehmet, O and Yorucu, V (2008) Explosive construction in a micro-state: Environmental limit and the Bon curve: Evidence from North Cyprus. Construction Management and Economics, 26(1), pp. 79-88. ISSN 1466433X

Mejía, G and Franco-Duran, D M (2017) Evidence-based improvement policies in public management: A case study of public projects in Barrancabermeja City, Colombia. Journal of Construction in Developing Countries, 22(2), pp. 55-66. ISSN 1823-6499

Melanta, S; Miller-Hooks, E and Avetisyan, H G (2013) Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), pp. 547-555. ISSN 0733-9364

Mhady, A A; Gürgün, A P; Budayan, C and Koc, K (2025) New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, 151(11): 04025160, ISSN 0733-9364

Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364

Miller, L; Mannering, F and Abraham, D M (2009) Effectiveness of speed control measures on nighttime construction and maintenance projects. Journal of Construction Engineering and Management, 135(7), pp. 614-619. ISSN 0733-9364

Mirshekarlou, B R (2018) An investigation of material waste management in prefabricated construction industry and developing an integrated waste management tool. PhD thesis, Middle East Technical University, Turkey.

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mitchell, Z; Hildreth, J and Vorster, M (2011) Using the cumulative cost model to forecast equipment repair costs: Two different methodologies. Journal of Construction Engineering and Management, 137, pp. 817-822. ISSN 0733-9364

Mitra, A and Munir, K (2019) Influence of big data in managing cyber assets. Built Environment Project and Asset Management, 9(4), pp. 503-514. ISSN 2044-124X

Mofokeng, M; Alhassan, A L and Zeka, B (2024) Public-private partnerships and economic growth: A sectoral analysis from developing countries. International Journal of Construction Management, 24(10), pp. 1029-1037. ISSN 1562-3599

Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.

Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599

Mojtahedi, Seyed Mohammad Hossein (2014) Stakeholder attributes and approaches in natural disaster risk management in the built environment: The case of flood risk management in transport infrastructure. PhD thesis, University of Sydney, Australia.

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Moragane, H P M N L B; Perera, B A K S; Palihakkara, A D and Ekanayake, B (2024) Application of computer vision for construction progress monitoring: A qualitative investigation. Construction Innovation, 24(2), pp. 446-469. ISSN 1471-4175

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Moselhi, O; Hegazy, T and Fazio, P (1991) Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), pp. 606-625. ISSN 0733-9364

Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364

Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.

Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364

Musarat, M A; Alaloul, W S and Liew, M S (2022) Inflation rate and labours' wages in construction projects: Economic relation investigation. Engineering, Construction and Architectural Management, 29(6), pp. 2461-2494. ISSN 0969-9988

Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364

Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.

Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099

Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.

Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X

Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.

Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.

Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193

Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988

Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029

Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708

Nikolaidis, N and Roumboutsos, A (2013) A PPP renegotiation framework: A road concession in Greece. Built Environment Project and Asset Management, 3(2), pp. 264-278. ISSN 2044-124X

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.

Njoku, A I (2014) Evaluation of the impact of adherence to project governance principles on the outcome of large infrastructure projects implemented in developing economies, with Nigeria as an example. PhD thesis, University of Bradford, UK.

Notman, D; Norman, G; Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-95). Construction Management and Economics, 16(4), pp. 409-416. ISSN 01446193

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599

Ogunseiju, O; Odeyinka, H A and Yusuf, A O (2023) Usage of building information modelling in quantity surveying firms in Nigeria. Journal of Construction Business and Management, 6(2), pp. 27-37. ISSN 2521-0165

Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364

Ojo, A E; Ammasoma, D and Adelakun, J O (2023) Responsiveness of the construction sector to fiscal policy in Nigeria. Journal of Construction in Developing Countries, 28(2), pp. 121-137. ISSN 1823-6499

Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X

Omar Attallah, S; Senouci, A; Kandil, A and al-Derham, H (2013) Utilization of life-cycle analysis to evaluate sustainability rating systems for construction projects with a case study on qatar sustainability assessment system (qsas). Smart and Sustainable Built Environment, 2(3), pp. 272-287. ISSN 2046-6099

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Ongkowijoyo, C and Doloi, H (2017) Determining critical infrastructure risks using social network analysis. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 5-26. ISSN 1759-5916

Orooji, F (2015) Risk-based wind loss and mitigation for residential wood framed construction. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387

Ostrovsky, Y (2003) Four studies of lifecycle patterns of housing arrangements in Canada. PhD thesis, York University, Canada.

Othman, A A E and El-Saeidy, Y A (2024) Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology, 22(2), pp. 578-597. ISSN 1726-0531

Othman, A A E and Kamal, A R (2024) A framework for enhancing building maintainability through facilitating early suppliers' involvement in the design process. Journal of Engineering, Design and Technology, 22(4), pp. 1231-1256. ISSN 1726-0531

Ottaviani, F M; De Marco, M; Audisio, A; Wong, J and Belack, C (2024) A brief review of artificial intelligence techniques for conceptual cost estimation in construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Owusu-Manu, D G; Edwards, D J; Mohammed, A; Thwala, W D and Birch, T (2019) Short run causal relationship between foreign direct investment (FDI) and infrastructure development. Journal of Engineering, Design and Technology, 17(6), pp. 1202-1221. ISSN 1726-0531

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599

Paek, J H; Lee, Y W and Ock, J H (1993) Pricing construction risk: Fuzzy set application. Journal of Construction Engineering and Management, 119(4), pp. 743-756. ISSN 0733-9364

Palaniappan, S; Bashford, H; Li, K; Fafitis, A and Stecker, L (2009) Carbon emissions based on transportation for post-tensioned slab foundation construction: A production home building study in the greater phoenix arizona area. International Journal of Construction Education and Research, 5(4), pp. 236-260. ISSN 1557-8771

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599

Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364

Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships. PhD thesis, University of Texas at Austin, USA.

Panthi, K; Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(2), pp. 79-94. ISSN 1557-8771

Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599

Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364

Patel, D A (2015) Estimating the number of fatal accidents and investigating the determinants of safety performance in indian construction. PhD thesis, Indian Institute of Technology Delhi, India.

Patil, S; Goudar, M and Kharadkar, R (2022) Neural network-based estimation of lighting condition in indoor environment with improved brain storm algorithm. Journal of Engineering, Design and Technology, 20(6), pp. 1565-1580. ISSN 1726-0531

Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364

Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988

Pekuri, A; Pekuri, L and Haapasalo, H (2015) Business models and project selection in construction companies. Construction Innovation, 15(2), pp. 180-197. ISSN 1471-4175

Pereira, E; Han, S; Abourizk, S and Hermann, U (2017) Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level. Journal of Construction Engineering and Management, 143(6): 05017004, ISSN 0733-9364

Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218

Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364

Pham, T Q D; Le-Hong, T and Tran, X V (2023) Efficient estimation and optimization of building costs using machine learning. International Journal of Construction Management, 23(5), pp. 909-921. ISSN 1562-3599

Pheng, L S and Hongbin, J (2004) Estimation of international construction performance: Analysis at the country level. Construction Management and Economics, 22(3), pp. 277-289. ISSN 01446193

Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.

Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364

Pleités Lemus, G R (2020) Wage inequality and policy in the United States unionized construction industry from 1907 to 2012. PhD thesis, University of Utah, USA.

Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175

Ponnaluru, S S (2009) Empirical analysis of used construction equipment and auction house revenues. PhD thesis, Washington State University, USA.

Poon, C S; Yu, A T W; Wong, S W and Cheung, E (2004) Management of construction waste in public housing projects in Hong Kong. Construction Management and Economics, 22(7), pp. 675-689. ISSN 01446193

Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry. PhD thesis, University of Bath, UK.

Praticò, F G (2007) Quality and timeliness in highway construction contracts: A new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(3), pp. 305-313. ISSN 1466433X

Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data. PhD thesis, University of California, Berkeley, USA.

Påsse, D; Disney, O; Roupé, M and Johansson, M (2022) Cost-estimation in construction: Building information modelling versus total BIM. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.

Rambaldi, A N (1992) A regional market model for construction aggregate materials. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(4), pp. 395-406. ISSN 01446193

Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364

Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175

Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Investigation of waste diversion rates in the construction and demolition sector in Australia. Built Environment Project and Asset Management, 11(3), pp. 427-439. ISSN 2044-124X

Rempelos, G (2023) A whole life carbon model for railway track system interventions. PhD thesis, University of Southampton, UK.

Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499

Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Roberts, B M; Allinson, D and Lomas, K J (2023) Evaluating methods for estimating whole house air infiltration rates in summer: Implications for overheating and indoor air quality. International Journal of Building Pathology and Adaptation, 41(1), pp. 45-72. ISSN 23984708

Robinson, Benjamin Tyrell (2021) Identifying and pricing risk in residential development. PhD thesis, RMIT University, Australia.

Roghanian, E; Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), pp. 1-13. ISSN 1562-3599

Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), pp. 127-146. ISSN 1823-6499

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Sacks, R; Rozenfeld, O and Rosenfeld, Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), pp. 726-736. ISSN 0733-9364

Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364

Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364

Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.

Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175

Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.

Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364

Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.

Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in Tehran. Journal of Construction in Developing Countries, 23(2), pp. 129-150. ISSN 1823-6499

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364

Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.

Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387

Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.

Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.

Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499

Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988

Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599

Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364

Seo, S and Hwang, Y (2001) Estimation of CO2 emissions in life cycle of residential buildings. Journal of Construction Engineering and Management, 127(5), pp. 414-418. ISSN 0733-9364

Seong, J; Kim, H s and Jung, H J (2025) Development of a robust hazardous area tracking algorithm for pan-tilt-zoom (ptz) cameras at construction sites under harsh conditions. Engineering, Construction and Architectural Management, 32(13), pp. 384-405. ISSN 0969-9988

Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364

Shamshiri, A; Ryu, K R; Park, J Y and Choi, K (2023) Project phase-based contingency adjustment framework for infrastructure renewal projects. Journal of Construction Engineering and Management, 149(2): 04022176, ISSN 0733-9364

Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599

Shashwat, S; Zingre, K and Thurairajah, N (2022) Enhancing building energy efficiency estimation by integrating microclimate conditions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364

Shi, Q and Wang, Z (2025) Spatial-temporal evaluation of total-factor energy efficiency in Chinese construction industry based on three-stage super-efficiency sbm-DEA model. Engineering, Construction and Architectural Management, 32(9), pp. 5716-5742. ISSN 0969-9988

Shih, R C S; Gayley, A and Doro-on, A M (2005) Risk analysis of terrorism on U.S. Cargo transportation infrastructure. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364

Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193

Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364

Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.

Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988

Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: A panel data analysis. Journal of Financial Management of Property and Construction, 24(1), pp. 19-38. ISSN 1366-4387

Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988

Siva Rama Krishna, U and Naga Satish Kumar, C (2022) A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. International Journal of Construction Management, 22(9), pp. 1756-1764. ISSN 1562-3599

Skibniewski, M J and Kassouf, P J (1990) Potential for application of plastic liner plates in tunnelling works. Construction Management and Economics, 8(1), pp. 3-11. ISSN 01446193

Skinner, D (1998) Forecasting models of activity in industrial and commercial building. PhD thesis, University of Salford, UK.

Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.

Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364

Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364

Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364

Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364

Sridarran, P; Keraminiyage, K and Herszon, L (2017) Improving the cost estimates of complex projects in the project-based industries. Built Environment Project and Asset Management, 7(2), pp. 173-184. ISSN 2044-124X

Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. DPA thesis, University of Illinois at Springfield, USA.

Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029

Stenis, J (2005) Industrial management models with emphasis on construction waste. PhD thesis, Lund University, Sweden.

Stenlund, K L; Ryd, N and Vennström, A (2009) Client's decisions in strategic briefs and their impact on user values. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sterner, E (2000) Life-cycle costing and its use in the Swedish building sector. Building Research & Information, 28(5-6), pp. 387-393. ISSN 0961-3218

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364

Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.

Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364

Sun, W (2023) A self-localized smart hardhat system for construction 4.0. PhD thesis, Columbia University, USA.

Sun, Z (2000) Reliability-based method for stability of mine entry design and evaluation. PhD thesis, West Virginia University, USA.

Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364

Talaq, J (2004) Antecedents and consequences of motivation: an examination of motivation as mediator to human and organisational performance. PhD thesis, University of Wolverhampton, UK.

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193

Tam, V W Y; Liu, L and Le, K N (2023) Modelling and quantitation of embodied, operational and mobile energies of buildings: A holistic review from 2012 to 2021. Engineering, Construction and Architectural Management, 30(9), pp. 4045-4079. ISSN 0969-9988

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tan, W (1996) The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(6), pp. 537-542. ISSN 01446193

Tan, Y and Shen, L (2010) A fuzzy competence requirement (FCR) model for competitive bidding strategy. Construction Innovation, 10(1), pp. 75-88. ISSN 1471-4175

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tanikawa, H and Hashimoto, S (2009) Urban stock over time: Spatial material stock analysis using 4d-GIS. Building Research & Information, 37(5-6), pp. 483-502. ISSN 0961-3218

Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364

Tian, Z; Yu, Y; Xu, F and Zhang, Z (2023) Dynamic hazardous proximity zone design for excavator based on 3D mechanical arm pose estimation via computer vision. Journal of Construction Engineering and Management, 149(7): 04023048, ISSN 0733-9364

Tino Balestra, C E; Alessi Reichert, T; Savaris, G; Pansera, W A and Medeiros-Junior, R A (2020) Nondestructive method for estimation of chloride profiles: Correlation between electrical resistivity and holliday-empirical equation. Journal of Construction Engineering and Management, 146(10): 04020119, ISSN 0733-9364

Tirado Fabian, D R (2022) Contribution to the development of a model for the analysis of stocks and flows of waste materials from buildings at a territorial scale. DSc thesis, ETH Zürich, Switzerland.

Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988

Tran, H; Robert, D; Gunarathna, P and Setunge, S (2024) Estimating cost of bridge closure for bridge network rehabilitation priorities. Journal of Construction Engineering and Management, 150(7): 04024071, ISSN 0733-9364

Trinh, M T (2018) Developing resilient safety culture for construction projects in Vietnam. PhD thesis, Western Sydney University, Australia.

Trinh, M T; Feng, Y and Mohamed, S (2019) Framework for measuring resilient safety culture in Vietnam's construction environment. Journal of Construction Engineering and Management, 145(2): 04018127, ISSN 0733-9364

Truong-Hong, L; Lindenbergh, R and Nguyen, T A (2022) Structural assessment using terrestrial laser scanning point clouds. International Journal of Building Pathology and Adaptation, 40(3), pp. 345-379. ISSN 23984708

Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.

Tse, R Y C; Ho, C W and Ganesan, S (1999) Matching housing supply and demand: An empirical study of Hong Kong's market. Construction Management and Economics, 17(5), pp. 625-633. ISSN 01446193

Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X

Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193

Tudor, L G (1987) Modeling OSHA's inspection decision and the compliance decision of the firm. PhD thesis, George Washington University, USA.

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.

Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988

Vijay, V; Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: A concept. Built Environment Project and Asset Management, 12(3), pp. 382-400. ISSN 2044-124X

Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988

Wahalathantri, B; Lokuge, W; Karunasena, W and Setunge, S (2018) Quantitative assessment of flood discharges and floodway failures through cross-cultivation of advancement in knowledge and traditional practices. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 435-456. ISSN 1759-5916

Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988

Walshaw, D (1991) Statistical analysis of wind speeds. PhD thesis, University of Sheffield, UK.

Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364

Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364

Wang, Y.; Zhao, W.; Cui, W. and Zhou, G. (2026) Comparison of five meta-heuristic algorithms in layout optimization of multiple tower cranes. Engineering, Construction and Architectural Management, 33(7), pp. 5849-5873. ISSN 0969-9988

Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193

Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, L; Zhang, P; Zhang, P; Li, R; Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(9), pp. 1127-1145. ISSN 0969-9988

Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(6), pp. 989-1003. ISSN 0969-9988

Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364

Wang, X; Shi, L; Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(2), pp. 483-501. ISSN 0969-9988

Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Wang, Z; Xie, W and Liu, J (2022) Regional differences and driving factors of construction and demolition waste generation in China. Engineering, Construction and Architectural Management, 29(6), pp. 2300-2327. ISSN 0969-9988

Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.

Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531

Westberg, K; Norén, J and Kus, H (2001) On using available environmental data in service life estimations. Building Research & Information, 29(6), pp. 428-439. ISSN 0961-3218

Wheat, P E (2013) Econometric cost analysis in vertically separated railways. PhD thesis, University of Leeds, UK.

White, T; Ariaratnam, S T and Michael, J (2012) Subterranean infrastructure reconnaissance for manmade and natural hazards and disasters. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 66-86. ISSN 1759-5916

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wickramaratne, S; Wirasinghe, S C and Ruwanpura, J (2020) An update of proposed Sri Lanka warning system for East and West Coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 169-186. ISSN 1759-5916

Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364

Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364

Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(4), pp. 254-262. ISSN 0969-9988

Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wu, H; Sun, X and Wu, Y (2022) Methods for probability distributions estimation of indoor environmental parameters and long-term IEQ assessment. Building Research & Information, 50(7), pp. 771-791. ISSN 0961-3218

Wu, K and García De Soto, B (2021) Lifting sequence optimization of luffing tower cranes considering motion paths with dynamic programming. Journal of Construction Engineering and Management, 147(10): 04021126, ISSN 0733-9364

Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364

Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364

Xiao, Xue (2021) Improving the long-term use of case-based reasoning model in early construction cost estimation. PhD thesis, Queensland University of Technology, Australia.

Xiong, Bo (2016) Improving cost estimation performance: An investigation of prediction technique and person-environment interaction. PhD thesis, Queensland University of Technology, Australia.

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364

Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Xu, M; Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): Quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(2), pp. 137-155. ISSN 2044-124X

Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.

Xue, G; Liu, S; Ren, L and Gong, D (2023) Adaptive cross-scenario few-shot learning framework for structural damage detection in civil infrastructure. Journal of Construction Engineering and Management, 149(5): 04023020, ISSN 0733-9364

Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X

Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.

Yeh, H H H (2011) Adjustment behaviour of capital structure over the business cycles: Evidence from the construction industry of Taiwan. Construction Management and Economics, 29(4), pp. 329-340. ISSN 1466433X

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364

Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599

Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(2), pp. 41-58. ISSN 1366-4387

Yoo, J.; Hwang, S.; Seo, J. and Choi, B. (2026) Feasibility of a wearable 360° camera for personalized proximity warning on construction sites. Journal of Construction Engineering and Management, 152(6): 04026079, ISSN 0733-9364

Yoon, S; Kim, Y; Park, M and Ahn, C R (2023) Effects of spatial characteristics on the human-robot communication using deictic gesture in construction. Journal of Construction Engineering and Management, 149(7): 04023049, ISSN 0733-9364

Yoon, Y J (2012) Planning of optimal rehabilitation strategies for infrastructure using time float and multiyear prioritization approach. PhD thesis, Purdue University, USA.

Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364

Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.

Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193

Yu, X and Ergan, S (2021) Key variables in determining energy shaving capacity of buildings during demand response events. Journal of Construction Engineering and Management, 147(1): 04020146, ISSN 0733-9364

Yu, Y; Yang, X; Li, H; Luo, X; Guo, H and Fang, Q (2019) Joint-level vision-based ergonomic assessment tool for construction workers. Journal of Construction Engineering and Management, 145(5): 04019025, ISSN 0733-9364

Yuan, F; Tang, M and Hong, J (2020) Efficiency estimation and reduction potential of the Chinese construction industry via SE-DEA and artificial neural network. Engineering, Construction and Architectural Management, 27(7), pp. 1533-1552. ISSN 0969-9988

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

Yunpeng, G and Zaman, U (2024) Exploring mega-construction project success in China's vaunted belt and road initiative: The role of paternalistic leadership, team members' voice and team resilience. Engineering, Construction and Architectural Management, 31(9), pp. 3801-3825. ISSN 0969-9988

Zaman, U; Florez-Perez, L; Anjam, M; Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: Examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(6), pp. 2436-2462. ISSN 0969-9988

Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.

Zeng, C (2014) Automated building information extraction and evaluation from high-resolution remotely sensed data. PhD thesis, University of Western Ontario, Canada.

Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364

Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988

Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988

Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364

Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364

Zhao, J; Cao, Y and Xiang, Y (2024) Pose estimation method for construction machine based on improved alphapose model. Engineering, Construction and Architectural Management, 31(3), pp. 976-996. ISSN 0969-9988

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects. EngD thesis, George Washington University, USA.

Zhu, H; Hwang, B G; Ngo, J and Tan, J P S (2022) Applications of smart technologies in construction project management. Journal of Construction Engineering and Management, 148(4): 04022010, ISSN 0733-9364

Zhuravchak, R; Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: An inferential analysis. Building Research & Information, 50(6), pp. 662-680. ISSN 0961-3218

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364

Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364

al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175

al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029

d'Apolito, L and Hong, H (2020) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology, 18(3), pp. 689-703. ISSN 1726-0531

de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.

de Oliveira, R (1994) A methodology for housing design. PhD thesis, University of Waterloo, Canada.

van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193

van der Bent, H S (2022) Towards a future sustainable housing stock: Assessment of the energy performance of dwellings of non-profit housing associations. PhD thesis, Delft University of Technology, Netherlands.

Ökmen, O and Öztas, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(2), pp. 203-212. ISSN 1466433X

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sat Aug 22 01:55:57 2026 UTC.