Items with Index Term: estimating
Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599
Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.
Abdel-Razek, R H and McCaffer, R (1987) A change in the UK construction industry structure: Implications for estimating. Construction Management and Economics, 5(3), pp. 227-242. ISSN 01446193
Abdelaty, A; Jeong, H D; Dannen, B and Todey, F (2016) Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. Construction Management and Economics, 34(10), pp. 724-736. ISSN 0144-6193
Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.
Abourizk, S; Knowles, P and Hermann, U R (2001) Estimating labor production rates for industrial construction activities. Journal of Construction Engineering and Management, 127(6), pp. 502-511. ISSN 0733-9364
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988
Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.
Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364
Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988
Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X
Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.
Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364
Akinradewo, O; Aigbavboa, C and Oke, A (2020) Accuracy of road construction preliminary estimate: Examining the influencing factors. Built Environment Project and Asset Management, 10(5), pp. 657-671. ISSN 2044-124X
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193
Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.
Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia. DM thesis, University of Phoenix, USA.
Al-Harbi, K M; Johnston, D W and Fayadh, H (1994) Building construction detailed estimating practices in saudi arabia. Journal of Construction Engineering and Management, 120(4), pp. 774-784. ISSN 0733-9364
Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.
Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387
Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175
Al-Tawal, D R; Arafah, M and Sweis, G J (2021) A model utilizing the artificial neural network in cost estimation of construction projects in Jordan. Engineering, Construction and Architectural Management, 28(9), pp. 2466-2488. ISSN 0969-9988
Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Aldaiyat, R M R E (2017) Perception eccentricities in risk time dimension of construction professionals in the state of Kuwait. PhD thesis, Loughborough University, UK.
Alex, D P; Al Hussein, M; Bouferguene, A and Fernando, S (2010) Artificial neural network model for cost estimation: City of Edmonton's water and sewer installation services. Journal of Construction Engineering and Management, 136(7), pp. 745-756. ISSN 0733-9364
Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.
Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364
Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.
Allouche, E N; Ariaratnam, S T and Lueke, J S (2000) Horizontal directional drilling: Profile of an emerging industry. Journal of Construction Engineering and Management, 126(1), pp. 68-76. ISSN 0733-9364
Allouche, E N; Ariaratnam, S T and MacLeod, C W (2003) Software for planning and cost control in directional drilling projects. Journal of Construction Engineering and Management, 129(4), pp. 446-453. ISSN 0733-9364
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almarri, K; Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(8), pp. 1696-1711. ISSN 0969-9988
Almarri, K and Boussabaine, H (2025) Critical success factors for public–private partnerships in smart city infrastructure projects. Construction Innovation, 25(2), pp. 224-247. ISSN 1471-4175
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599
Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X
Alroomi, A; Jeong, D H S and Oberlender, G D (2012) Analysis of cost-estimating competencies using criticality matrix and factor analysis. Journal of Construction Engineering and Management, 138(11), pp. 1270-1280. ISSN 0733-9364
Alroomi, A S (2013) Integrative framework for sustainable development of the cost estimating profession. PhD thesis, Oklahoma State University, USA.
Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364
Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.
Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.
Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364
Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.
Alzubi, Y; Aljaafreh, A and Khatatbeh, A (2024) Application of machine learning techniques in estimating the construction cost of residential buildings in the middle East region. International Journal of Construction Management, 24(9), pp. 946-958. ISSN 1562-3599
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Aouad, G F; Child, T; Brandon, P S and Sarshar, M (1998) Linking construction information through VR using an object oriented environment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.
Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193
Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Asante, J; Kissi, E; Gyadu-Asiedu, W; Adinkrah-Appiah, K; Atta Nyamekye, C and Badu, B (2025) Factors influencing contractors services demand in developing countries: The case of the Ghanaian construction firms. International Journal of Construction Management, 25(15), pp. 1769-1777. ISSN 1562-3599
Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.
Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364
Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.
Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Aurangzeb, Q (2014) Impact of reclaimed asphalt pavements on pavement sustainability. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayinla, K; Cheung, F and Tawil, R A (2019) Towards an ontology-based approach to measuring productivity for offsite manufacturing method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175
Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.
Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364
Babakhani, J and Veysi, F (2024) Investigation and optimization of forced convective heat transfer around a tall building using experimental results. International Journal of Building Pathology and Adaptation, 42(5), pp. 893-913. ISSN 2398-4708
Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364
Badawy, M; Hussein, A; Elseufy, S M and Alnaas, K (2021) How to predict the rebar labours' production rate by using ANN model. International Journal of Construction Management, 21(4), pp. 427-438. ISSN 1562-3599
Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988
Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364
Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193
Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.
Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193
Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the number and distribution of new bidders for an upcoming construction auction. Journal of Construction Engineering and Management, 145(10): 040190561, ISSN 0733-9364
Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180
Barati, Khalegh (2018) Modeling fuel use, emissions and mass of on-road construction equipment through monitoring field operations. PhD thesis, University of New South Wales, Australia.
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.
Bayraktar, M E and Hastak, M (2010) Scoring approach to construction bond underwriting. Journal of Construction Engineering and Management, 136(9), pp. 957-967. ISSN 0733-9364
Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.
Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.
Beeston, D (1986) Combining risks in estimating. Construction Management and Economics, 4(1), pp. 75-79. ISSN 01446193
Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.
Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Bentley, D (2000) Control and emergence: The paradox of construction management. PhD thesis, University of Hertfordshire, UK.
Bentley, D and Stacey, R (1998) The potential for applying complex adaptive systems theory to the process of estimating in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771
Birnie, J (1996) Bias and financial management judgements. Journal of Financial Management of Property and Construction, 1(1), pp. 37-54. ISSN 1366-4387
Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.
Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180
Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Bonham, D R (2015) The derivation and implications of a master code of accounts for mechanical piping systems. PhD thesis, University of Colorado at Boulder, USA.
Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364
Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Bradley, P E and Kohler, N (2007) Methodology for the survival analysis of urban building stocks. Building Research & Information, 35(5), pp. 529-542. ISSN 0961-3218
Brady, L (2019) An investigation into the management of energy performance for building services systems: design to operation. PhD thesis, Liverpool John Moores University, UK.
Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364
Brizendine, A L (1997) Risk based analysis of levees. PhD thesis, West Virginia University, USA.
Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.
Bromilow, F J and Pawsey, M R (1987) Life cycle cost of university buildings. Construction Management and Economics, 5(4), ISSN 01446193
Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.
Bruce-Konuah, A; Jones, R V and Fuertes, A (2023) A method for estimating scheduled and manual override heating behaviour and settings from measurements in low energy UK homes. International Journal of Building Pathology and Adaptation, 41(1), pp. 25-44. ISSN 23984708
Bugg, R A and Redden, L W (2020) Assessment and improvement of a required construction management service-learning course. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.
Capano, C D (2007) Construction operations analysis for development of historical cost databases. PhD thesis, Marquette University, USA.
Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364
Carr, R I (1983) Impact of number of bidders on competition. Journal of Construction Engineering and Management, 109(1), pp. 61-73. ISSN 0733-9364
Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364
Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.
Cesare, C M D and Ruddock, L (1997) Equity in property taxation: A model for establishing a fair property tax system. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.
Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.
Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364
Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364
Chanyotha, S (1991) Generic cost estimates, site screening, and site design of low- and intermediate-level waste system. PhD thesis, University of Arizona, USA.
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364
Chao, L C and Liou, C N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(8), pp. 835-843. ISSN 1466433X
Chao, L C and Skibniewski, M J (1995) Neural network method of estimating construction technology acceptability. Journal of Construction Engineering and Management, 121(1), pp. 130-142. ISSN 0733-9364
Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.
Chau, K W (1993) Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(5), pp. 370-383. ISSN 01446193
Chavoshy, A; Amini Hosseini, K and Hosseini, M (2018) Resiliency cube: A new approach for parametric analysis of earthquake resiliency in urban road networks. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 317-332. ISSN 1759-5916
Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.
Chen, S; Tian, Y; Jin, L and Xiang, L (2021) Estimating the frequency of exposure to uncertain hazards: Impact of wind conditions on concrete dam construction. Journal of Construction Engineering and Management, 147(2): 04020167, ISSN 0733-9364
Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chen, Y E; Ahiaga-Dagbui, D; Thaheem, M and Shrestha, A (2022) Optimism bias in transport project cost appraisal: A review of the current body of knowledge. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Cheng, M. Y.; Sholeh, M. N. and Poetra, B. A. (2026) Predicting the construction cost-time tradeoff using optimized hybrid deep learning for risk preference decision making. International Journal of Construction Management, 26(10), pp. 2018-2044. ISSN 1562-3599
Cheng, E W L; Li, H; Shen, L Y and Fong, P S W (2002) Ranking of construction information for various functions of the general contractors: A preliminary study. Journal of Construction Research, 3(1), pp. 181-191. ISSN 1609-9451
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364
Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X
Chi Man Hui, E; Omar, I and Ismail, M (2009) Kotaka's model in land acquisition for infrastructure provision in Malaysia. Journal of Financial Management of Property and Construction, 14(3), pp. 194-207. ISSN 1366-4387
Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.
Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.
Choi, S; Kim, D Y; Han, S H and Kwak, Y H (2014) Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning. Journal of Construction Engineering and Management, 140(1): 04013026, ISSN 0733-9364
Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.
Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.
Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.
Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.
Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771
Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.
Dada, J O and Jagboro, G O (2012) Core skills requirement and competencies expected of quantity surveyors: Perspectives from quantity surveyors, allied professionals and clients in Nigeria. Construction Economics and Building, 12(4), pp. 78-90. ISSN 2204-9029
Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531
Dandan, T H; Sweis, G; Sukkari, L S and Sweis, R J (2020) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology, 18(4), pp. 787-819. ISSN 1726-0531
Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988
Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599
Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Dawood, N N (2000) Forecasting of cost indices in the Greek construction industry: A joint methodology approach. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dawood, N N (2001) Development of a forecasting methodology for cost indices: An application to the Greek construction industry. Journal of Construction Procurement, 7(1), pp. 42-50. ISSN 1358-9180
Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988
De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193
De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.
Delaney, F T and Wamuziri, S C (2001) Mergers and acquisitions in the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.
Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.
Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Diekmann, J E (1983) Probabilistic estimating: Mathematics and applications. Journal of Construction Engineering and Management, 109(3), pp. 297-308. ISSN 0733-9364
Dikmen, I; Birgonul, M T; Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(4), pp. 369-386. ISSN 0969-9988
Dmaidi, N (1995) Simplified estimating and control procedures for the offshore oil construction industry. PhD thesis, University of Dundee, UK.
Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364
Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.
Doyle, A and Hughes, W P (2000) The influence of project complexity on estimating accuracy. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499
Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.
Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988
Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Edwards, D J and Holt, G D (2000) Estivate: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52-62. ISSN 0969-9988
Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387
Edwards, D J; Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(4), pp. 427-435. ISSN 01446193
Edwards, P J and Edwards, M (1995) A price-rationalized approach to item separation in the measurement of concrete work. Construction Management and Economics, 13(6), pp. 485-491. ISSN 01446193
Egger, C S (2015) Sewer rehabilitation planning under uncertainty. PhD thesis, ETH Zürich, Switzerland.
Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.
Ekung, S; Odesola, I A and Adewuyi, T (2022) Green cost premium for attaining energy-efficiency rating in Nigeria's hot-humid residential buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 248-268. ISSN 23984708
El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364
El-Kholy, A M and Akal, A Y (2021) Determining the stationary financial cause of contracting firms failure. International Journal of Construction Management, 21(8), pp. 818-833. ISSN 1562-3599
El-Kholy, A M; Tahwia, A M and Elsayed, M M (2022) Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models. International Journal of Construction Management, 22(9), pp. 1675-1689. ISSN 1562-3599
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364
Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175
Elliott, J W; Glick, S and Valdes-Vasquez, R (2019) Student perceptions of model-based estimating. International Journal of Construction Education and Research, 15(2), pp. 118-135. ISSN 1557-8771
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Elshaboury, N; Mohammed Abdelkader, E; Al-Sakkaf, A and Bagchi, A (2025) A deep convolutional neural network for predicting electricity consumption at grey nuns building in Canada. Construction Innovation, 25(2), pp. 270-289. ISSN 1471-4175
Emetere, M E (2019) A modified approach to estimating thermodynamic impact on buildings: A case study of poor urban setting in Lagos state. Journal of Engineering, Design and Technology, 17(1), pp. 115-135. ISSN 1726-0531
Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.
Esders, M C (2017) Consideration of uncertain future demand and decision flexibility in the determination of intervention programs for buildings. DSc thesis, ETH Zürich, Switzerland.
Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.
Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X
Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193
Eze, E C; Aghimien, D O; Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(6), pp. 2205-2223. ISSN 0969-9988
Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364
Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364
Farrell, M L (1997) Illiquidity, uncertainty and the impact of the term structure of interest rates on the valuation of real estate in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 2(3), pp. 5-30. ISSN 1366-4387
Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.
Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387
Fifield, L-J (2017) Monitoring UK hospital building type performance. PhD thesis, Loughborough University, UK.
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Flanagan, R and Norman, G (1982) Risk analysis: An extension of price prediction techniques for building work. Construction Papers, 1(3), pp. 27-34. ISSN 0144-8587
Flood, C and Scott, L (2020) Thermal analysis and post construction verification. International Journal of Building Pathology and Adaptation, 38(1), pp. 51-67. ISSN 23984708
Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Forbes, D; Smith, S D and Horner, M (2009) Risk and its analysis in the sustainability assessment of the built environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ford, D N; Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), pp. 343-351. ISSN 01446193
Fox, D S J (1994) Knowledge-based systems for the demolition industry. PhD thesis, University of Portsmouth, UK.
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Fu, E; Newell, D; Becker, A; Schwegler, B and Fischer, M (2013) Is adaptation sustainable? A method to estimate climate-critical construction resource capacity. Construction Innovation, 13(2), pp. 202-216. ISSN 1471-4175
Galvin, R (2023) How prebound effects compromise the market premium for energy efficiency in German house sales. Building Research & Information, 51(5), pp. 501-517. ISSN 0961-3218
Gao, J; Ren, H; Ma, X; Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(8), pp. 1652-1671. ISSN 0969-9988
Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.
García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.
García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599
Gardner, B J; Gransberg, D D and Jeong, H D (2016) Reducing data-collection efforts for conceptual cost estimating at a highway agency. Journal of Construction Engineering and Management, 142(11): 04016057, ISSN 0733-9364
Garg, S and Misra, S (2022) Understanding the components and magnitude of the cost of quality in building construction. Engineering, Construction and Architectural Management, 29(1), pp. 26-48. ISSN 0969-9988
Garg, S and Misra, S (2023) Framework for estimating quality-related incentive and disincentive in construction projects. Journal of Construction Engineering and Management, 149(5): 04023018, ISSN 0733-9364
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Ghanem, A (2023) Integrated framework for multi-hazard resilience assessment of infrastructures. PhD thesis, University of Hawai'i at Manoa, USA.
Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531
Gharaibeh, L.; Lantz, B. and Eriksson, K. M. (2026) Bridging the gap: A framework for monetizing BIM by integrating industry insights for informed decision-making. Smart and Sustainable Built Environment, 15(2), pp. 710-728. ISSN 2046-6099
Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.
Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.
Gholizadeh, P and Esmaeili, B (2020) Cost of occupational incidents for electrical contractors: Comparison using robust-factorial analysis of variance. Journal of Construction Engineering and Management, 146(7): 0001861, ISSN 0733-9364
Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364
Goh, Y M (2015) Empirical investigation of the average deployment force of personal fall-arrest energy absorbers. Journal of Construction Engineering and Management, 141(1): 04014059, ISSN 0733-9364
Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599
Goodman, R E (1998) Taxonomy of knowledge requirements for executives of general contracting and construction management enterprises. PhD thesis, Georgia Institute of Technology, USA.
Goyal, P K; Datta, T K and Vijay, V K (2012) Vulnerability of rural houses to cyclonic wind. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 20-41. ISSN 1759-5916
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gransberg, D D and Riemer, C (2009) Impact of inaccurate engineer's estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), pp. 1138-1145. ISSN 0733-9364
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193
Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Guerra, Beatriz Chinelato (2021) BIM-based construction waste management and circular economy for resource recovery. PhD thesis, University of Texas at Austin, USA.
Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193
Gurmu, A; Kamardeen, I and Mahmood, M N (2023) Blended pedagogical model for effective teaching of building measurement and estimating. International Journal of Construction Management, 23(7), pp. 1138-1147. ISSN 1562-3599
Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175
Gyadu-Asiedu, W (2009) Assessing construction project performance in Ghana: modelling practitioners' and clients perspectives. PhD thesis, Eindhoven University of Technology, Netherlands.
Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession. PhD thesis, University of Birmingham, UK.
Hackett, J A and Hicks, C M (2007) Estimating as a profession in UK construction. Engineering, Construction and Architectural Management, 14(1), pp. 26-51. ISSN 0969-9988
Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988
Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.
Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2021) Environmental impacts cost assessment model of residential building using an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 3190-3215. ISSN 0969-9988
Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364
Hammad, M W; Abbasi, A and Ryan, M J (2018) Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method. Journal of Construction Engineering and Management, 144(4): 04018011, ISSN 0733-9364
Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.
Haraguchi, M and Kim, S (2016) Critical infrastructure interdependence in New York city during hurricane sandy. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 133-143. ISSN 1759-5916
Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hassan, M E M (2017) Modeling the macroeconomic impact of construction spending as a public policy tool - the case of employment. PhD thesis, Purdue University, USA.
Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364
Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988
Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.
He, N (2016) Conceptual cost modeling of innovative industrial estates using sysml and case-based reasoning. PhD thesis, National University of Singapore, Singapore.
He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. PhD thesis, Columbia University, USA.
Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127(6), pp. 461-468. ISSN 0733-9364
Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988
Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364
Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Herbsman, Z and Mitrani, J D (1984) INES: An interactive estimating system. Journal of Construction Engineering and Management, 110(1), pp. 19-33. ISSN 0733-9364
Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X
Hicks, J C (1992) Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118(3), pp. 545-560. ISSN 0733-9364
Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Hildreth, J C (2020) Effect of period length on forecasting maintenance and repair costs for heavy equipment by the period cost based methodology. International Journal of Construction Education and Research, 16(3), pp. 167-179. ISSN 1557-8771
Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387
Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180
Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.
Hooshangi, N; Mahdizadeh Gharakhanlou, N and Ghaffari-Razin, S R (2024) Urban search and rescue (USAR) simulation in earthquake environments using queuing theory: estimating the appropriate number of rescue teams. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 1-18. ISSN 1759-5916
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.
Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model. PhD thesis, University of Bath, UK.
Huang, Y L and Lin, W (2010) Does debt structure matter? Estimating contractor default barrier by the down-and-out call option approach. Construction Management and Economics, 28(9), pp. 947-958. ISSN 1466433X
Hubbard, B J and Middaugh, B (2013) Leveraging bluetooth consumer electronics as proximity sensors to construction health hazards. International Journal of Construction Education and Research, 9(2), pp. 117-131. ISSN 1557-8771
Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(8), pp. 883-892. ISSN 1466433X
Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hung, C Y and Cheng, E W L (2014) Estimating contractors' efficiency with panel data: Comparison of the data envelopment analysis, Cobb-Douglas and translog production function methods. Construction Innovation, 14(3), pp. 274-291. ISSN 1471-4175
Hussey, H; Thurairajah, N; Ginige, K and Goulding, J (2019) Establishing descriptions of building work in UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Hutchings, D M and Christofferson, J P (2004) Management practices of residential construction companies producing 25 or fewer units annually. International Journal of Construction Education and Research, 1(1), pp. 34-44. ISSN 1557-8771
Hutchings, Sally J (2023) An investigation of methods used to estimate the future burden of disease due to occupation. PhD thesis, University of Manchester, UK.
Hwang, S (2009) Dynamic regression models for prediction of construction costs. Journal of Construction Engineering and Management, 135(5), pp. 360-367. ISSN 0733-9364
Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364
Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364
Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988
Idrus, A and Newman, J (2003) Ifess: A computer tool to aid structural engineers at the conceptual design stage. Construction Innovation, 3(3), pp. 127-143. ISSN 1471-4175
Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.
Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.
Inácio, M F M (1999) The building deconstruction process and the debris trail: towards a dynamic model. PhD thesis, University of Salford, UK.
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193
Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.
Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.
Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.
Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771
Jackson, S H; Griffith, A; Stephenson, P and Smith, J (1997) Risk management tools and techniques used when estimating initial budgets for building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Jafari, A; Valentin, V and Berrens, R P (2017) Estimating the economic value of energy improvements in U.S. Residential housing. Journal of Construction Engineering and Management, 143(8): 04017048, ISSN 0733-9364
Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Jeljeli, M N (1994) A risk-based methodology for estimating contractors' liability in superfund cleanup construction. PhD thesis, University of Wisconsin - Madison, USA.
Jiang, H and Liu, C (2014) A panel vector error correction approach to forecasting demand in regional construction markets. Construction Management and Economics, 32(12), pp. 1205-1221. ISSN 01446193
Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.
Jiang, Y and Bai, Y (2020) Estimation of construction site elevations using drone-based orthoimagery and deep learning. Journal of Construction Engineering and Management, 146(8): 04020086, ISSN 0733-9364
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.
Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771
John, S T; Sarkar, P and Davis, R (2023) A long-range wide-area network system for monitoring early-age concrete compressive strength. Journal of Construction Engineering and Management, 149(1): 04022148, ISSN 0733-9364
Johnston, D W; Kahn, K P and Phillips, J B (1989) Formwork pressures in tall and thick concrete walls. Journal of Construction Engineering and Management, 115(3), pp. 444-461. ISSN 0733-9364
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.
Kahandawa, R; Domingo, N; Chawynski, G and Uma, S R (2021) Factors impacting post-earthquake damage repair cost estimations. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 29-49. ISSN 1759-5916
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(1), pp. 8-25. ISSN 0969-9988
Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193
Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364
Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364
Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175
Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364
Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599
Kašpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain. PhD thesis, University of Leeds, UK.
Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.
Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988
Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.
Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364
Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.
Kempton, J; Chapman, K and Alani, A M (2002) Surveyor element lifetime predictions and the anchoring and adjustment heuristic. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kenley, R and Wilson, O D (1986) A construction project cash flow model: an idiographic approach. Construction Management and Economics, 4(3), pp. 213-232. ISSN 01446193
Kenley, R and Wilson, O D (1989) A construction project net cash flow model. Construction Management and Economics, 7(1), pp. 3-18. ISSN 01446193
Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.
Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.
Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499
Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364
Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J; Kamari, M; Lee, S and Ham, Y (2021) Large-scale visual data-driven probabilistic risk assessment of utility poles regarding the vulnerability of power distribution infrastructure systems. Journal of Construction Engineering and Management, 147(10): 04021121, ISSN 0733-9364
Kim, J M; Yum, S G; Adhikari, M D and Bae, J (2024) A LSTM algorithm-driven deep learning approach to estimating repair and maintenance costs of apartment buildings. Engineering, Construction and Architectural Management, 31(13), pp. 369-389. ISSN 0969-9988
Kim, S (2013) Hybrid EVAS-CBR system for the preliminary cost estimation of high-rise buildings. PhD thesis, University of Reading, UK.
Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.
Kim, S; Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(2), pp. 681-695. ISSN 0969-9988
Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364
Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.
Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.
Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.
Kodikara, G W and McCaffer, R (1993) Flow of estimating data in Sri Lankan building contractor organizations. Construction Management and Economics, 11(5), pp. 341-346. ISSN 01446193
Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193
Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Kumar, S; Yadav, N; Singh, M and Kachhawa, S (2019) Estimating India's commercial building stock to address the energy data challenge. Building Research & Information, 47(1), pp. 24-37. ISSN 0961-3218
Kumar, S D; Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(3), pp. 364-373.
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599
Kurvinen, A; Huovari, J; Lahtinen, M; Sen, T and Saari, A (2024) A dynamic model for estimating the long-term need for repairs and renovations in residential buildings. Building Research & Information, 52(5), pp. 533-550. ISSN 0961-3218
Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364
Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.
Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193
Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Larew, R E (1976) A quantitative approach to estimating and pricing in a construction company. PhD thesis, University of Iowa, USA.
Laryea, S A (2008) How contractors take account of risk in the tender process: Theory and practice. PhD thesis, University of Reading, UK.
Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.
Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364
Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.
Lee, C and Park, K K H (2022) Forecasting trading volume in local housing markets through a time-series model and a deep learning algorithm. Engineering, Construction and Architectural Management, 29(1), pp. 165-178. ISSN 0969-9988
Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Lee, G and Lee, S (2022) Importance of testing with independent subjects and contexts for machine-learning models to monitor construction workers' psychophysiological responses. Journal of Construction Engineering and Management, 148(9): 04022082, ISSN 0733-9364
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Lee, J C (2010) Evaluating the sustainability of construction with recycled materials. PhD thesis, University of Wisconsin - Madison, USA.
Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988
Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364
Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.
Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364
Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364
Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Leung, M Y; Skitmore, M and Chan, Y S (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075. ISSN 1466433X
Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lewis, B T (1983) Building maintenance planning and estimating system. Construction Management and Economics, 1(3), pp. 217-231. ISSN 01446193
Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218
Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988
Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364
Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Licher, Monica Katherine (2016) Estimating post-construction costs of a changing urban stormwater program. PhD thesis, Virginia Tech, USA.
Liddiard, R (2014) Room-scale profiles of space use and electricity consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 72-94. ISSN 0961-3218
Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387
Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X
Liu, C; Lyle, B and Langston, C (2003) Estimating demolition costs for single residential buildings. Construction Economics and Building, 3(2), pp. 33-42. ISSN 2204-9029
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X
Loosemore, M; Braham, R; Yiming, Y and Bronkhorst, C (2020) Relational determinants of construction project outcomes: A social network perspective. Construction Management and Economics, 38(11), pp. 1061-1076. ISSN 01446193
Lopes, J P; Oliveira, R A and Abreu, M I (2019) Estimating the built environment stock in Cape Verde. Engineering, Construction and Architectural Management, 26(5), pp. 814-826. ISSN 0969-9988
Lopes, M A R; Antunes, C H; Reis, A and Martins, N (2017) Estimating energy savings from behaviours using building performance simulations. Building Research & Information, 45(3), pp. 303-319. ISSN 0961-3218
Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364
Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.
Lowe, D (2003) The development of early stage design cost estimating expertise: Effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(2), pp. 79-88. ISSN 1366-4387
Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.
Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.
Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364
Lu, W; Webster, C; Peng, Y; Chen, X and Zhang, X (2017) Estimating and calibrating the amount of building-related construction and demolition waste in urban China. International Journal of Construction Management, 17(1), pp. 13-24. ISSN 1562-3599
Lucke, T; Beecham, S and Qu, Y Y (2016) Estimating flow rates through individual outlets of siphonic roof drainage systems. Building Research & Information, 44(3), pp. 289-300. ISSN 0961-3218
Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas. PhD thesis, University of Wisconsin - Madison, USA.
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988
Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364
Mak, S and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), pp. 303-320. ISSN 01446193
Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193
Mak, S and Wong, L (1997) Estimating using risk analysis for construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Mak, S W (1995) Risk analysis in construction: A paradigm shift from a hard to soft approach. Construction Management and Economics, 13(5), pp. 385-392. ISSN 01446193
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364
Manjia, M; Pettang, C and Abanda, F H (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), pp. 69-90. ISSN 1823-6499
Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X
Marston, V K (1985) Interdependence of the functional element costs of buildings. PhD thesis, University of Portsmouth, UK.
Marteinsson, B (2003) Durability and the factor method of ISO 15686-1. Building Research & Information, 31(6), pp. 416-426. ISSN 0961-3218
Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193
Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364
Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(2), pp. 111-124. ISSN 1471-4175
Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364
Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.
Mathur, Sandeep (2024) Managing data science initiatives as exploratory projects : A new approach to program management. PhD thesis, University of Technology Sydney, Australia.
Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matthews, J C (2010) Integrated, multi-attribute decision support system for the evaluation of underground utility construction methods. PhD thesis, Louisiana Tech University, USA.
Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.
Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.
Mayer, R H J (1982) Cost estimates from stochastic geometric programs. PhD thesis, University of Delaware, USA.
Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.
Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.
McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.
McCaffer, R (2000) The management process within contractors' companies. DSc thesis, University of Strathclyde, UK.
McCloughan, P (2004) Construction sector concentration: Evidence from Britain. Construction Management and Economics, 22(9), pp. 979-990. ISSN 01446193
McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771
McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.
McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Melanta, S; Miller-Hooks, E and Avetisyan, H G (2013) Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), pp. 547-555. ISSN 0733-9364
Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599
Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364
Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs. PhD thesis, Oklahoma State University, USA.
Milošević, I; Kovačević, M and Petronijević, P (2021) Estimating residual value of heavy construction equipment using ensemble learning. Journal of Construction Engineering and Management, 147(7): 04021073, ISSN 0733-9364
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Mintah, K; Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(2), pp. 133-151. ISSN 1366-4387
Mirzaei, J; Amiri Hanzaei, H; Khaleghi, H and Kashani, H (2024) Cost estimation models for seismic retrofit of masonry school buildings. International Journal of Construction Management, 24(8), pp. 843-853. ISSN 1562-3599
Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.
Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.
Moharrami, S; Bayat, A and Abourizk, S (2022) Modeling microtunnel boring machine penetration rate using a mechanistic approach. Journal of Construction Engineering and Management, 148(11): 04022128, ISSN 0733-9364
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193
Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364
Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364
Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193
Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364
Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.
Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.
Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.
Mulekezi, L (1990) The design of project estimating systems. PhD thesis, University of Birmingham, UK.
Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(5), pp. 575-585. ISSN 01446193
Murillo, K P; Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(8), pp. 1801-1819. ISSN 0969-9988
Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988
Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099
Naizghi, M S (2021) Factors affecting implementation of earned value management (EVM) in construction projects. PhD thesis, Wayne State University, USA.
Nasir, H; Ahmed, H; Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), pp. 595-607. ISSN 01446193
Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364
Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nepal, Jaya (2015) Reliability-based performance assessment and optimum maintenance of corroded reinforced concrete structures. PhD thesis, University of Greenwich, UK.
Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.
Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.
Newman, P W (2015) Transport infrastructure and sustainability: A new planning and assessment framework. Smart and Sustainable Built Environment, 4(2), pp. 140-153. ISSN 2046-6099
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.
Nobe, M D (1996) Decision support for real estate development cost estimating. PhD thesis, Texas A&M University, USA.
O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer- aided estimating systems for the construction industry. Construction Management and Economics, 11(1), pp. 30-44. ISSN 01446193
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364
Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007
Ogunlana, O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(2), pp. 133-150. ISSN 01446193
Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Ogwang, A (2016) Threshold-based resurfacing policies in pavement management to minimize costs and greenhouse gas emissions. PhD thesis, UniversityofCalifornia, Berkeley, USA.
Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.
Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X
Oke, A E; Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology, 17(6), pp. 1161-1173. ISSN 1726-0531
Olabanji, O M and Mpofu, K (2020) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology, 18(2), pp. 451-479. ISSN 1726-0531
Olatunji, O A and Sher, W (2014) Perspectives on modelling BIM-enabled estimating practices. Construction Economics and Building, 14(4), pp. 32-53. ISSN 2204-9029
Olatunji, O A and Sher, W (2015) Estimating in geometric 3D CAD. Journal of Financial Management of Property and Construction, 20(1), pp. 24-49. ISSN 1366-4387
Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387
Ostrovsky, Y (2003) Four studies of lifecycle patterns of housing arrangements in Canada. PhD thesis, York University, Canada.
Oteifa, S and Baldwin, A (1991) Estimators' tasks and computer-aided estimating systems: A survey of fcec member companies. Construction Management and Economics, 9(6), pp. 543-552. ISSN 01446193
Oteifa, S A (1991) An investigation into civil engineering estimators' decision making and expertise. PhD thesis, Loughborough University, UK.
Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.
Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531
Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599
Paik, S; Kim, J; Kim, Y and Kim, H (2025) Safety analysis and localization of scaffold joints using uav-acquired images. Journal of Construction Engineering and Management, 151(12): 04025194, ISSN 0733-9364
Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599
Paliari, José Carlos (2008) Method for the prognosis of productivity and the unitary consumption of materials: Hydraulic building systems. PhD thesis, Universidade de São Paulo, Brazil.
Pan, N F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), pp. 1241-1252. ISSN 1466433X
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.
Pantouvakis, J-P (1990) Declarative - configurable estimating systems for the construction industry. PhD thesis, University of Nottingham, UK.
Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.
Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499
Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.
Pasquire, C; Pennanen, A; Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(1), pp. 52-63. ISSN 1366-4387
Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.
Patel, D A (2015) Estimating the number of fatal accidents and investigating the determinants of safety performance in indian construction. PhD thesis, Indian Institute of Technology Delhi, India.
Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Peng, M (2012) Dam risk analysis and dynamic decision making. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Perera, A A D A J (1989) Cost effective designs. PhD thesis, Loughborough University, UK.
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Perera, B A K S; Samarakkody, A L and Nandasena, S R (2020) Managing financial and economic risks associated with high-rise apartment building construction in Sri Lanka. Journal of Financial Management of Property and Construction, 25(1), pp. 143-162. ISSN 1366-4387
Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218
Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.
Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364
Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.
Pheng, L S and Hongbin, J (2004) Estimation of international construction performance: Analysis at the country level. Construction Management and Economics, 22(3), pp. 277-289. ISSN 01446193
Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.
Poh, P S H and Malcolm W. Horner, R (1995) Cost-significant modelling: Its potential for use in south-east Asia. Engineering, Construction and Architectural Management, 2(2), pp. 121-139. ISSN 0969-9988
Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.
Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218
Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.
Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364
Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Rahman, S (2010) Knowledge-based decision support system for multi criteria roofing material selection and cost modelling. PhD thesis, University of Ulster, UK.
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2009) A knowledge-based decision support system for roofing materials selection and cost estimating: A conceptual framework and data modelling. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Rahmouni, S and Smail, R (2020) A design approach towards sustainable buildings in Algeria. Smart and Sustainable Built Environment, 9(3), pp. 229-245. ISSN 2046-6099
Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X
Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs. PhD thesis, Auckland University of Technology, New Zealand.
Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364
Rapp, R R and Pan, J (2010) Disaster restoration professional body of knowledge. International Journal of Construction Education and Research, 6(3), pp. 202-218. ISSN 1557-8771
Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099
Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175
Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364
Redden, L and Bugg, R A (2022) Efficacy and benefits of a required service-learning course in construction management education. International Journal of Construction Education and Research, 18(4), pp. 315-332. ISSN 1557-8771
Rees, S W; Zhou, Z and Thomas, H R (2006) Multidimensional simulation of earth-contact heat transfer. Building Research & Information, 34(6), pp. 565-572. ISSN 0961-3218
Richardson, S (2017) Embodied carbon assessment and decision making under uncertainty: case studies of UK supermarket construction. EngD thesis, University of Reading, UK.
Rijal, H B; Humphreys, M A and Nicol, J F (2009) Understanding occupant behaviour: The use of controls in mixed-mode office buildings. Building Research & Information, 37(4), pp. 381-396. ISSN 0961-3218
Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364
Roberts, B M; Allinson, D and Lomas, K J (2023) Evaluating methods for estimating whole house air infiltration rates in summer: Implications for overheating and indoor air quality. International Journal of Building Pathology and Adaptation, 41(1), pp. 45-72. ISSN 23984708
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Rodrigo, M N N; Perera, S; Senaratne, S and Jin, X (2022) Systematic development of a data model for the blockchain-based embodied carbon (bec) estimator for construction. Engineering, Construction and Architectural Management, 29(9), pp. 3311-3330. ISSN 0969-9988
Rodrigo, N; Perera, S; Senaratne, S and Jin, X (2024) Development of a blockchain-based embodied carbon estimator. Built Environment Project and Asset Management, 14(6), pp. 914-936. ISSN 2044-124X
Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599
Ross, A D and Goulding, J S (2006) The construction estimator's approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(1),
Rowings, J E and Walker, R O (1984) Construction energy use. Journal of Construction Engineering and Management, 110(4), pp. 447-458. ISSN 0733-9364
Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193
Rupp, S H and Plagmann, M (2019) Characterisation of air permeability of common ceiling linings and penetrations. International Journal of Building Pathology and Adaptation, 37(4), pp. 448-460. ISSN 23984708
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.
Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988
Saka, N and Lowe, J G (2010) The impact of the petroleum sector on the output of the Nigerian construction sector. Construction Management and Economics, 28(12), pp. 1301-1312. ISSN 1466433X
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(2), pp. 214-241. ISSN 0969-9988
Salam, M A; Sarkar, S; Blackwood, D J and Staines, H J (1999) High-rise building construction in Bangladesh: Experience of questionnaire development and on-site data collection. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Samo, S R (1999) Energy conservation in UK housing and the effect of building regulations. PhD thesis, University of Manchester, UK.
Sandhaus, G (1998) Neural networks for cost estimating in project management. PhD thesis, Swansea University, UK.
Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988
Seo, S and Hwang, Y (2001) Estimation of CO2 emissions in life cycle of residential buildings. Journal of Construction Engineering and Management, 127(5), pp. 414-418. ISSN 0733-9364
Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(2), pp. 157-164. ISSN 0961-3218
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Severn, B W (1980) A simplified methodology for evaluating rural road proposals for less developed countries. PhD thesis, University of New Mexico, USA.
Sha, K; Deng, X; Chen, Q and Xie, B (1997) Evolution of cost estimating system in China: Intelligent estimator for Shandong Province (IES) to general intelligent estimator (GIE). Building Research & Information, 25(1), pp. 11-14. ISSN 0961-3218
Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.
Shahandashti, S M; Razavi, S N; Soibelman, L; Berges, M; Caldas, C H; Brilakis, I; Teizer, J; Vela, P A; Haas, C; Garrett, J; Akinci, B and Zhu, Z (2011) Data-fusion approaches and applications for construction engineering. Journal of Construction Engineering and Management, 137, pp. 863-869. ISSN 0733-9364
Shaheen, A A; Fayek, A R and Abourizk, S M (2007) Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), pp. 325-334. ISSN 0733-9364
Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.
Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364
Sharma, N; Sood, R and Laishram, B (2025) A hybrid PLS-SEM-ANN approach to COQ optimization. Construction Management and Economics, 43(11), pp. 938-960. ISSN 0144-6193
Sharrard, A L; Matthews, H S and Roth, M (2007) Environmental implications of construction site energy use and electricity generation. Journal of Construction Engineering and Management, 133(11), pp. 846-854. ISSN 0733-9364
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Shaurette, M (2011) Safety and health education for demolition and reconstruction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 129-138. ISSN 17514312
Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(2), pp. 118-126. ISSN 0969-9988
Shi, X; Qiao, Y; Zhao, X; Liu, Y; Liu, C; Huang, R and Cui, Y (2025) Improving emergency evacuation capacity for subway stations based on agent-based modelling. Construction Innovation, 25(6), pp. 1865-1881. ISSN 1471-4175
Shiha, A and El-Adaway, I H (2026) From ports to projects: Estimating the impact of supply chain volatility and trade policy changes on construction material prices. Journal of Construction Engineering and Management, 152(6): 04026064, ISSN 0733-9364
Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Shipworth, D (2002) A stochastic framework for embodied greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(1), pp. 16-24. ISSN 0961-3218
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Shrestha, K; Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: In-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(6), pp. 927-944. ISSN 0969-9988
Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.
Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.
Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531
Simons, A E; Redden, L and Collins, W (2023) Sitework knowledge for entry-level construction professionals: Academic and industry perceptions. International Journal of Construction Education and Research, 19(2), pp. 199-220. ISSN 1557-8771
Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364
Sing, M C P; Luk, S Y Y; Chan, K H C; Liu, H J and Humphrey, R (2024) Scan-to-BIM technique in building maintenance projects: Practicing quantity take-off. International Journal of Building Pathology and Adaptation, 42(6), pp. 1250-1262. ISSN 2398-4708
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singh, S (1987) Cost models for approximate cost estimation of structural systems in commercial high rise buildings. PhD thesis, National University of Singapore, Singapore.
Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988
Skitmore, M; Runeson, G and Chang, X (2006) Construction price formation: Full-cost pricing or neoclassical microeconomic theory? Construction Management and Economics, 24(7), pp. 773-783. ISSN 1466433X
Sloan, B; McLeod, B N; Smith, R M and Goodall, W L (1996) A functional cost approach in the development and use of a project budget cost limit estimator (PBCLE) for capitol building works. Journal of Financial Management of Property and Construction, 1(1), pp. 89-100. ISSN 1366-4387
Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.
Smallwood, J J and Cumberlege, R (2016) Construction management and quantity surveying students perceptions towards production analysis and measuring quantities for construction purposes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364
Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364
Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.
Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.
Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364
Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364
Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Soutos, M and Lowe, D J (2011) Elemental cost estimating: Current UK practice and procedure. Journal of Financial Management of Property and Construction, 16(2), pp. 147-162. ISSN 1366-4387
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.
Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029
Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.
Stephen, M and Picken, D (2000) Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), pp. 130-136. ISSN 0733-9364
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.
Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364
Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.
Sun, B; Wu, J; You, H and Du, J (2025) Estimating belief updates in AI-driven drone controls for urban search and rescue operations. Journal of Construction Engineering and Management, 151(9): 04025128, ISSN 0733-9364
Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364
Sun, J; Murphy, M R; Hazlett, D G; Shuai, C and Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6): 04025049, ISSN 0733-9364
Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364
Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387
Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387
Swei, O; Gregory, J and Kirchain, R (2017) Probabilistic approach for long-run price projections: Case study of concrete and asphalt. Journal of Construction Engineering and Management, 143(1): 05016018, ISSN 0733-9364
Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Tah, J H M; Aouad, G; Lee, A and Wu, S (2004) Conceptual information modelling for risk analysis and management in an nD-modelling environment. Journal of Construction Procurement, 10(1),
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175
Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988
Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364
Tang, W; Cui, Q; Zhang, F and Chen, Y (2019) Urban rail-transit project investment benefits based on compound real options and trapezoid fuzzy numbers. Journal of Construction Engineering and Management, 145(1): 05018016, ISSN 0733-9364
Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364
Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988
Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916
Tavakoli, A (1986) Transient response analysis of a dual cycle system. Journal of Construction Engineering and Management, 112(3), pp. 403-410. ISSN 0733-9364
Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193
Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.
Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599
Teo, P; Gajanayake, A; Jayasuriya, S; Izaddoost, A; Perera, T; Naderpajouh, N and Wong, P S P (2022) Application of a bottom-up approach to estimate economic impacts of building maintenance projects: Cladding rectification program in Australia. Engineering, Construction and Architectural Management, 29(1), pp. 333-353. ISSN 0969-9988
Teo, P and Love, P E D (2017) Re-examining the association between quality and safety performance in construction: From heterogeneous to homogeneous datasets. Journal of Construction Engineering and Management, 143(6): 04017011, ISSN 0733-9364
Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.
Thekinen, J D; Pandey, N; Mollaoglu, S; Duva, M; Frank, K and Zhao, D (2023) Detecting information bottlenecks in architecture engineering construction projects for integrative project management. Journal of Construction Engineering and Management, 149(12): 04023135, ISSN 0733-9364
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Thomas, H R and Daily, J (1983) Crew performance measurement via activity sampling. Journal of Construction Engineering and Management, 109(3), pp. 309-320. ISSN 0733-9364
Thorpe, T (1992) Information flow in house building organisations. PhD thesis, Loughborough University, UK.
Tien, I (2014) Bayesian network methods for modeling and reliability assessment of infrastructure systems. PhD thesis, University of California, Berkeley, USA.
Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.
Touran, A (1993) Probabilistic cost estimating with subjective correlations. Journal of Construction Engineering and Management, 119(1), pp. 58-71. ISSN 0733-9364
Tran, H; Robert, D; Gunarathna, P and Setunge, S (2024) Estimating cost of bridge closure for bridge network rehabilitation priorities. Journal of Construction Engineering and Management, 150(7): 04024071, ISSN 0733-9364
Truong-Hong, L; Lindenbergh, R and Nguyen, T A (2022) Structural assessment using terrestrial laser scanning point clouds. International Journal of Building Pathology and Adaptation, 40(3), pp. 345-379. ISSN 23984708
Tse, R Y C; Ho, C W and Ganesan, S (1999) Matching housing supply and demand: An empirical study of Hong Kong's market. Construction Management and Economics, 17(5), pp. 625-633. ISSN 01446193
Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 83-95. ISSN 0969-9988
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Vasenin, M (2022) A data-driven approach to green investments: environmental performance, mispricing, and momentum. PhD thesis, Northumbria University, UK.
Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Victoria, M F (2017) Developing decision support models for early stage embodied carbon management in buildings. PhD thesis, Northumbria University, UK.
Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: Neural networks versus traditional methods. Construction Innovation, 1(4), pp. 227-243. ISSN 1471-4175
Wahalathantri, B; Lokuge, W; Karunasena, W and Setunge, S (2018) Quantitative assessment of flood discharges and floodway failures through cross-cultivation of advancement in knowledge and traditional practices. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 435-456. ISSN 1759-5916
Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988
Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364
Wang, N and Horner, M (2007) CSI model for estimating road maintenance projects. Construction Management and Economics, 25(12), pp. 1269-1281. ISSN 1466433X
Wang, N; Horner, R M W and El-Haram, M (2004) Fuzzy logic approach to a generic elemental whole life costing model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Wang, X; Shi, L; Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(2), pp. 483-501. ISSN 0969-9988
Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.
Wang, Y; Zuo, J; Pan, M; Tu, B; Chang, R D; Liu, S; Xiong, F and Dong, N (2024) Cost prediction of building projects using the novel hybrid RA-ANN model. Engineering, Construction and Architectural Management, 31(6), pp. 2563-2582. ISSN 0969-9988
Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), pp. 563-577. ISSN 1466433X
Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.
Weber, R E (2024) Spatial computing for building performance and design. PhD thesis, Massachusetts Institute of Technology, USA.
Weerasinghe, A S; Ramachandra, T and Rotimi, J O B (2022) Towards sustainable commercial buildings: An analysis of operation and maintenance (O&M) costs in Sri Lanka. Smart and Sustainable Built Environment, 11(3), pp. 454-468. ISSN 2046-6099
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.
White, T; Ariaratnam, S T and Michael, J (2012) Subterranean infrastructure reconnaissance for manmade and natural hazards and disasters. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 66-86. ISSN 1759-5916
Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.
Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193
Williams, T P (1991) Hypertext data base applications in construction. Journal of Construction Engineering and Management, 117(3), pp. 460-467. ISSN 0733-9364
Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364
Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988
Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029
Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451
Wood, G and Ellis, R (2001) An exploration of approaches to risk management applications within UK construction projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364
Xiao, Xue (2021) Improving the long-term use of case-based reasoning model in early construction cost estimation. PhD thesis, Queensland University of Technology, Australia.
Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988
Xu, J (2001) CAD-based integrated simulation environment (CAD-ise). PhD thesis, University of Alberta, Canada.
Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708
Yang, I T (2008) Distribution-free Monte Carlo simulation: Premise and refinement. Journal of Construction Engineering and Management, 134(5), pp. 352-360. ISSN 0733-9364
Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364
Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.
Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(2), pp. 41-58. ISSN 1366-4387
Yoo, J.; Hwang, S.; Seo, J. and Choi, B. (2026) Feasibility of a wearable 360° camera for personalized proximity warning on construction sites. Journal of Construction Engineering and Management, 152(6): 04026079, ISSN 0733-9364
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193
Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988
Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364
Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364
Zhang, Y; Peng, Z; Lu, W and Webster, C (2025) Profit-sensitive generative design for high-rise building morphologies: Innovations in 3D form generation and cost-revenue assessment. Building Research & Information, 53(4), pp. 435-457. ISSN 0961-3218
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhao, J; Cao, Y and Xiang, Y (2024) Pose estimation method for construction machine based on improved alphapose model. Engineering, Construction and Architectural Management, 31(3), pp. 976-996. ISSN 0969-9988
Zhao, L and Freiheit, T (2017) Estimating good design attributes from generalized drivers to provide early assistance to design requirements analysis. Journal of Engineering, Design and Technology, 15(3), pp. 317-340.
Zhao, Z Y; Tang, C; Zhang, X and Skitmore, M (2017) Agglomeration and competitive position of contractors in the international construction sector. Journal of Construction Engineering and Management, 143(6): 04017004, ISSN 0733-9364
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Zhou, J; Tam, V W Y; Qin, Y and Illankoon, C (2024) A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022). International Journal of Construction Management, 24(9), pp. 997-1006. ISSN 1562-3599
Zhou, T (2023) Embodied robot teleoperation in construction. PhD thesis, University of Florida, USA.
Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.
Zhou, Z; Li, Q and Wu, W (2012) Developing a versatile subway construction incident database for safety management. Journal of Construction Engineering and Management, 138(10), pp. 1169-1180. ISSN 0733-9364
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
Zhu, Y and Issa, R (2017) Computer simulation for construction education using the structure-behavior-function theory: A pilot study on learning estimating concepts. International Journal of Construction Education and Research, 13(2), pp. 142-60. ISSN 1557-8771
Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364
Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.
de Valence, Gerard (2001) Construction deflators and measurement of output. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ürge-Vorsatz, D; Harvey, L D D; Mirasgedis, S and Levine, M D (2007) Mitigating CO2 emissions from energy use in the world's buildings. Building Research & Information, 35(4), pp. 379-398. ISSN 0961-3218
Up a level