Items with Index Term: eigenvector
Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193
Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.
Guevara, J; Herrera, L and Salazar, J (2022) Interorganizational sponsor networks in road and social infrastructure PPP equity markets. Journal of Construction Engineering and Management, 148(4): 04022009, ISSN 0733-9364
Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.
Lertpaitoonpan, W (2000) Bridge damage detection using a system identification method. PhD thesis, University of Florida, USA.
Malla, V; K.V, P and Delhi, V S K (2026) Analysing inhibitors to BIM implementation: A social network theoretical perspective. Construction Innovation, 26(1), pp. 198-218. ISSN 1471-4175
Nabizadeh, M; Khalilzadeh, M; Ebrahimnejad, S and Ershadi, M J (2021) Developing a fuzzy goal programming model for health, safety and environment risks based on hybrid fuzzy FMEA-vikor method. Journal of Engineering, Design and Technology, 19(2), pp. 317-338. ISSN 1726-0531
Prince, M W (1988) Strategic planning in construction firms: Perceptions and personal characteristics of the manager, strategic planning behaviour, and subjective performance in a large scale survey of the canadian construction industry. PhD thesis, University of Bradford, UK.
Salmaninezhad, M and Jazayeri Moghaddas, S M (2023) A multi-attribute approach to select the best method for repairing river bridge columns. Engineering, Construction and Architectural Management, 30(1), pp. 1-18. ISSN 0969-9988
Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364
Tsai, H; Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(5), pp. 545-554. ISSN 1466433X
Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364
Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364
Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988
Zarghami, S A and Gunawan, I (2020) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(2), pp. 341-355. ISSN 0969-9988
Zarghami, S A; Gunawan, I and Schultmann, F (2019) Entropy of centrality values for topological vulnerability analysis of water distribution networks. Built Environment Project and Asset Management, 9(3), pp. 412-425. ISSN 2044-124X
Up a level