Items with Index Term: effort cost
Han, J; Gu, F and Wu, G (2023) Managing cooperation in multipartner project teams with heterogeneous team members. Journal of Construction Engineering and Management, 149(10): 04023101, ISSN 0733-9364
Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 0969-9988
Hosseinian, S M and Jaberi, A (2025) Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 1278-1302. ISSN 0969-9988
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Up a level