Items with Index Term: earthwork

Number of items: 81.

Aghimien, D O; Aigbavboa, C O; Oke, A E and Thwala, W D (2020) Mapping out research focus for robotics and automation research in construction-related studies: A bibliometric approach. Journal of Engineering, Design and Technology, 18(5), pp. 1063-1079. ISSN 1726-0531

Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599

Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364

Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364

Chennarapu, H; Garala, T K; Chennareddy, R; Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction quality control of earth fills using dynamic cone penetrometer. Journal of Construction Engineering and Management, 144(9): 04018086, ISSN 0733-9364

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.

Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.

De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364

Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364

Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.

Dutch, W G (1989) The capital cost aspects of the environmental impact of new highways in association with the new design technique: the commercial route methodology. PhD thesis, Loughborough University, UK.

Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364

Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Han, S; Jiang, Y and Bai, Y (2022) Fast-pgmed: Fast and dense elevation determination for earthwork using drone and deep learning. Journal of Construction Engineering and Management, 148(4): 04022008, ISSN 0733-9364

Haronian, E and Sacks, R (2021) Production control in earthworks: Concepts and metrics. Journal of Construction Engineering and Management, 147(10): 04021127, ISSN 0733-9364

Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599

Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.

Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364

Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364

Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364

Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Liu, C and Lu, M (2015) Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Mawdesley, M J; A-Jibouri, S H; Askew, W H and Patterson, D E (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2(4), pp. 249-268. ISSN 1471-4175

Mawdesley, M J; Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(2), pp. 83-89. ISSN 0969-9988

Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.

McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.

McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364

McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mello Saraiva Caldeira, L M and Brito, A (2014) Use of soil-rock mixtures in dam construction. Journal of Construction Engineering and Management, 140(8): 04014030, ISSN 0733-9364

Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988

Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamad Karimi, S; Jamshid Mousavi, S; Kaveh, A and Afshar, A (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), pp. 181-190. ISSN 0733-9364

Mohamed, M and Tran, D Q (2023) Examining critical factors and their combination effects on quality of roadway construction operations. International Journal of Construction Management, 23(15), pp. 2637-2648. ISSN 1562-3599

Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Naghshbandi, S N; Varga, L and Hu, Y (2022) Technology capabilities for an automated and connected earthwork roadmap. Construction Innovation, 22(4), pp. 768-788. ISSN 1471-4175

Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.

Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988

Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364

Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029

Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364

Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.

Pinheiro Santos Fernandes, P G; Elias Arantes, A and Ferreira Nobre Júnior, E (2024) Optimization model for earthwork allocations considering the construction of multiple haul roads: GIS-based integrated approach. Journal of Construction Engineering and Management, 150(4): 05024001, ISSN 0733-9364

Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shao, L; Guo, S; Dong, Y; Niu, H and Zhang, P (2023) Cause analysis of construction collapse accidents using association rule mining. Engineering, Construction and Architectural Management, 30(9), pp. 4120-4142. ISSN 0969-9988

Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175

Shi, M; Wang, J; Li, Q; Cui, B; Guan, S and Zeng, T (2022) Accelerated earth-rockfill dam compaction by collaborative operation of unmanned roller fleet. Journal of Construction Engineering and Management, 148(7): 04022046, ISSN 0733-9364

Shoaib Khan, M; Kim, J; Park, S; Lee, S and Seo, J (2021) Methodology for voxel-based earthwork modeling. Journal of Construction Engineering and Management, 147(10): 04021111, ISSN 0733-9364

Simons, A E; Redden, L and Collins, W (2023) Sitework knowledge for entry-level construction professionals: Academic and industry perceptions. International Journal of Construction Education and Research, 19(2), pp. 199-220. ISSN 1557-8771

Slattery, K T and Slattery, D K (2013) Modeling earth surfaces for highway earthwork computation using terrestrial laser scanning. International Journal of Construction Education and Research, 9(2), pp. 132-146. ISSN 1557-8771

Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.

Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Sheikhkhoshkar, M. and Rahimian, F. (2026) An advanced exploration of technological functionalities addressing risk factors in earthmoving equipment operation on construction sites: A systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1846-1876. ISSN 2046-6099

Taher, A; Vahdatikhaki, F and Hammad, A (2022) Formalizing knowledge representation in earthwork operations through development of domain ontology. Engineering, Construction and Architectural Management, 29(6), pp. 2382-2414. ISSN 0969-9988

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364

Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364

Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364

Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.

Ugwu, O O; Tah, J and Howes, R (1998) Optimizing construction method selection strategies in an integrated decision support environment: Results of application to earthworks operations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364

Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.

Whyte, A and Donaldson, J (2015) Digital model data distribution in civil engineering contracts. Built Environment Project and Asset Management, 5(3), pp. 248-260. ISSN 2044-124X

Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.

This list was generated on Sat Aug 22 01:59:35 2026 UTC.