Abdeen, F N; Gunatilaka, R N; Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(4), pp. 892-911. ISSN 1471-4175
Abdelhamid, T S and Everett, J G (2002) Physiological demands during construction work. Journal of Construction Engineering and Management, 128(5), pp. 427-437. ISSN 0733-9364
Abdelmassih, A; Faddoul, R and Geara, F (2023) Impact of autonomous solutions on earthmoving electrification using machine learning: Case study. Construction Innovation, 23(3), pp. 606-621. ISSN 1471-4175
AbouRizk, S and Mather, K (2000) Simplifying simulation modeling through integration with 3D CAD. Journal of Construction Engineering and Management, 126(6), pp. 475-483. ISSN 0733-9364
Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364
Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.
Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Alsugair, A M (1992) An intelligent resource allocation system. PhD thesis, Texas A&M University, USA.
Arditi, D; Kale, S and Tangkar, M (1997) Innovation in construction equipment and its flow into the construction industry. Journal of Construction Engineering and Management, 123(4), pp. 371-378. ISSN 0733-9364
Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364
Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364
Cable, J K; Jaselskis, E J; Walters, R C; Li, L and Bauer, C R (2009) Stringless Portland cement concrete paving. Journal of Construction Engineering and Management, 135(11), pp. 1253-1260. ISSN 0733-9364
Carmichael, D G (1986) Shovel-truck queues: A reconciliation of theory and practice. Construction Management and Economics, 4(2), pp. 161-177. ISSN 01446193
Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2), pp. 227-245. ISSN 1471-4175
Chi, S and Caldas, C H (2012) Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities. Journal of Construction Engineering and Management, 138(3), pp. 341-351. ISSN 0733-9364
Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364
Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364
Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.
Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364
El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.
El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364
Elazouni, A M and Basha, I M (1996) Evaluating the performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, 122(2), pp. 109-114. ISSN 0733-9364
Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364
Gambatese, J A and James, D E (2001) Dust suppression using truck-mounted water spray system. Journal of Construction Engineering and Management, 127(1), pp. 53-59. ISSN 0733-9364
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gransberg, D D (1996) Optimizing haul unit size and number based on loading facility characteristics. Journal of Construction Engineering and Management, 122(3), pp. 248-253. ISSN 0733-9364
Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.
Handa, V K and Barcia, R M (1986) Construction production planning. Journal of Construction Engineering and Management, 112(2), pp. 163-177. ISSN 0733-9364
Hasan, A and Kamardeen, I (2022) Occupational health and safety barriers for gender diversity in the Australian construction industry. Journal of Construction Engineering and Management, 148(9): 04022100, ISSN 0733-9364
Haycraft, W R (2011) History of construction equipment. Journal of Construction Engineering and Management, 137, pp. 720-723. ISSN 0733-9364
Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364
Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364
Kaboli, A S and Carmichael, D G (2014) Optimum scraper load time and fleet size for minimum emissions. International Journal of Construction Management, 14(4), pp. 209-226. ISSN 1562-3599
Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099
Kaboli, A S and Carmichael, D G (2016) An examination of the dret model and the influence of payload, haul grade and truck type on earthmoving emissions. International Journal of Construction Management, 16(2), pp. 95-108. ISSN 1562-3599
Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.
Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364
Kannan, G (2011) Field studies in construction equipment economics and productivity. Journal of Construction Engineering and Management, 137, pp. 823-828. ISSN 0733-9364
Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364
Karshenas, S (1989) Truck capacity selection for earthmoving. Journal of Construction Engineering and Management, 115(2), pp. 212-227. ISSN 0733-9364
Kazan, E E (2013) Analysis of fatal and nonfatal accidents involving earthmoving equipment operators and on-foot workers. PhD thesis, Wayne State University, USA.
Key, J M (1987) Earthmoving and heavy equipment. Journal of Construction Engineering and Management, 113(4), pp. 611-622. ISSN 0733-9364
Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364
Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.
Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193
Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364
Liu, C and Lu, M (2015) Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.
Louis, J and Dunston, P S (2017) Methodology for real-time monitoring of construction operations using finite state machines and discrete-event operation models. Journal of Construction Engineering and Management, 143(3): 04016106, ISSN 0733-9364
Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.
Marinelli, M and Lambropoulos, S (2013) Algorithmic method for scraper load-time optimization. Journal of Construction Engineering and Management, 139(5), pp. 459-465. ISSN 0733-9364
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.
Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175
Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193
Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364
Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364
Marzouk, M and Moselhi, O (2004) Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), pp. 105-113. ISSN 0733-9364
Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364
Mitchell Jr., Zane Windsor (1998) A statistical analysis of construction equipment repair costs using field data & the cumulative cost model. PhD thesis, Virginia Tech, USA.
Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.
Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364
Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364
Mustaffa, N K (2022) Alternative configurations of earthmoving loading practices toward emissions reduction. Journal of Construction Engineering and Management, 148(1): 04021177, ISSN 0733-9364
Mustaffa, Nur Kamaliah (2018) Emissions, production and cost in construction operations. PhD thesis, University of New South Wales, Australia.
Naghshbandi, S N; Varga, L and Hu, Y (2022) Technology capabilities for an automated and connected earthwork roadmap. Construction Innovation, 22(4), pp. 768-788. ISSN 1471-4175
Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364
Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029
Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X
Oloufa, A A (1988) A framework for the operational simulation of construction projects. PhD thesis, University of California, Berkeley, USA.
Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364
Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364
Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Rekapalli, P V and Martinez, J C (2011) Discrete-event simulation-based virtual reality environments for construction operations: Technology introduction. Journal of Construction Engineering and Management, 137(3), pp. 214-224. ISSN 0733-9364
Rezazadeh Azar, E; Dickinson, S and McCabe, B (2013) Server-customer interaction tracker: Computer vision-based system to estimate dirt-loading cycles. Journal of Construction Engineering and Management, 139(7), pp. 785-794. ISSN 0733-9364
Rylander, D (2021) Productivity improvements in construction transport operation through lean thinking and systems of systems. PhD thesis, Malardalen University, Sweden.
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175
Selinger, S (1983) Economic service life of building construction equipment. Journal of Construction Engineering and Management, 109(4), pp. 398-405. ISSN 0733-9364
Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175
Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193
Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.
Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Motamedisedeh, O. and Rahimian, F. (2026) Modelling risk factors in earthmoving equipment operations on Australian construction sites: A fuzzy DEMATEL approach. Engineering, Construction and Architectural Management, 33(3), pp. 2118-2153. ISSN 0969-9988
Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Sheikhkhoshkar, M. and Rahimian, F. (2026) An advanced exploration of technological functionalities addressing risk factors in earthmoving equipment operation on construction sites: A systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1846-1876. ISSN 2046-6099
Soltanmohammadlou, Nazi (2025) A sociotechnical system for earthmoving equipment safety in Australian construction sites. PhD thesis, Queensland University of Technology, Australia.
Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364
Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175
Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193
Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364
Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364
Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364
Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.
Tsimberdonis, A I and Murphree, E L (1994) Equipment management through operational failure costs. Journal of Construction Engineering and Management, 120(3), pp. 522-535. ISSN 0733-9364