Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531

Adeleye, T; Huang, M; Huang, Z and Sun, L (2013) Predicting loss for large construction companies. Journal of Construction Engineering and Management, 139(9), pp. 1224-1236. ISSN 0733-9364

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.

Albagoury, S. H. and AbdelMaksoud, K. M. (2026) Integrating socio-economic impact assessment into the reconstruction plan for Derna, Libya. International Journal of Disaster Resilience in the Built Environment, pp. 1-13. ISSN 1759-5908

Alhmoudi, A A and Aziz, Z (2016) Integrated framework for early warning system in UAE. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 361-373. ISSN 1759-5916

Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.

Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599

Aziz, Z; Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: An analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(2), pp. 178-205. ISSN 1366-4387

Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.

Borg, R P; Borg Axisa, G; Ophiyandri, T and Hakam, A (2020) The development of inter-regional and intra-regional cooperation frameworks for multi-hazard early warning systems in South and South-East Asia. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 265-279. ISSN 1759-5916

Bowes, D and Arnold, S (2009) The engineering and construction contract and its implications for project programming procedures. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.

Clegg, G; Haigh, R and Amaratunga, D (2022) Towards an improved understanding of participation in natural hazard early warning systems. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 615-631. ISSN 1759-5916

Cumiskey, L; Werner, M; Meije, K; Fakhruddin, S H M and Hassan, A (2015) Improving the social performance of flash flood early warnings using mobile services. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 57-72. ISSN 1759-5916

Das, D K (2022) Exploring the factors and measures to improve safety in road construction in India. Journal of Construction in Developing Countries, 27(1), pp. 139-152. ISSN 1823-6499

Datta, S D; Sobuz, M H R; Nafe Assafi, M; Sutan, N M; Islam, M N; Mannan, M B; Akid, A S M and Hasan, N M S (2025) Critical project management success factors analysis for the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 482-511. ISSN 2398-4708

Dikmen, I; Birgonul, M T; Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(4), pp. 369-386. ISSN 0969-9988

Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364

Dutta, R and Basnayake, S (2018) Gap assessment towards strengthening early warning systems. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 198-215. ISSN 1759-5916

Edirisinghe, R and Jadhav, A (2017) Is the smart safety vest a brutal innovation? Evaluation of microclimate performance using a thermal manikin. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Emuze, F (2018) Foreseeing countermeasures for construction safety violations in South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Enshassi, A; Shakalaih, S and AlKilani, S (2019) Strategies for community participation in pre-disaster phase in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 23(2), pp. 107-127. ISSN 1823-6499

Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(2), pp. 157-180. ISSN 01446193

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Haigh, R; Sakalasuriya, M M; Amaratunga, D; Basnayake, S; Hettige, S; Premalal, S and Jayasinghe Arachchi, A (2020) The upstream-downstream interface of sri lanka's tsunami early warning system. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 219-240. ISSN 1759-5916

Hajikazemi, S.; Duryan, M.; Smyth, H.; Yuan, F. and Liu, C. (2026) Exploring mindfulness as a tool for recognition and prevention of burnout in construction and engineering. Engineering, Construction and Architectural Management, 33(7), pp. 5675-5694. ISSN 0969-9988

Hamza, M and Månsson, P (2020) The human dimension of early warning: a viewpoint. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 263-274. ISSN 1759-5916

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Husna, C; Firdaus, R; Wardani, E and Jannah, S R (2022) Disaster preparedness among disaster management agency officers: A study from rural and urban areas in aceh, Indonesia. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 484-497. ISSN 1759-5916

Istijono, B; Hakam, A and Ophiyandri, T (2016) Landslide hazard of Maninjau area. International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 302-312. ISSN 1759-5916

Jayasekara, R U; Jayathilaka, G S; Siriwardana, C; Amaratunga, D; Haigh, R; Bandara, C and Dissanayake, R (2023) Identifying gaps in early warning mechanisms and evacuation procedures for tsunamis in Sri Lanka, with a special focus on the use of social media. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 1-20. ISSN 1759-5916

Kazar, G and Comu, S (2022) Exploring the relations between the physiological factors and the likelihood of accidents on construction sites. Engineering, Construction and Architectural Management, 29(1), pp. 456-475. ISSN 0969-9988

Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.

Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364

Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364

Kodikara Edirisinghe, R. and Gunathilake, L. (2026) An IoT-based heat stress management system for the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2200-2219. ISSN 0969-9988

Koksal, A and Arditi, D (2004) Predicting construction company decline. Journal of Construction Engineering and Management, 130(6), pp. 799-807. ISSN 0733-9364

Kumar, N.; Modi, S. and Kumar, P. (2026) The Kedarnath tragedy of 2013: Intersections of natural fury and human negligence in the Himalayan region. International Journal of Disaster Resilience in the Built Environment, pp. 1-13. ISSN 1759-5908

Kumar, S; Singh, L K; Roy, L B; Kumar, R and Lal, D (2025) Enhancing the sustainability of slope stability in embankment construction by leveraging smart sensors and monitoring systems for data-driven insights. International Journal of Construction Management, 25(16), pp. 2102-2120. ISSN 1562-3599

Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988

Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.

Li, M; Lin, Q and Jin, H (2023) Research on near-miss incidents monitoring and early warning system for building construction sites based on blockchain technology. Journal of Construction Engineering and Management, 149(12): 04023124, ISSN 0733-9364

Liu, J; Guo, Y; Martek, I; Chen, C and Tian, J (2022) A phase-oriented evaluation framework for China's PPP projects. Engineering, Construction and Architectural Management, 29(9), pp. 3737-3753. ISSN 0969-9988

Lummen, N S; Shirozu, H; Okada, N and Yamada, F (2016) Flood risk management an illustrative approach. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 388-405. ISSN 1759-5916

Mendes, J M; Tavares, A O and Santos, P P (2020) Social vulnerability and local level assessments: A new approach for planning. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 15-43. ISSN 1759-5916

Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.

Mohanty, S; Dabral, A; Chatterjee, R and Shaw, R (2022) Shelter management during pandemics: Lessons from cascading risks of cyclones and COVID-19. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 72-88. ISSN 1759-5916

Moohialdin, Ammar (2020) A real-time worker activity intensity identification system for construction workers under hot and humid weather conditions. PhD thesis, Queensland University of Technology, Australia.

Nabi, M A; El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(5): 04024024, ISSN 0733-9364

Pal, I; Ghosh, S; Dash, I and Mukhopadhyay, A (2023) Review of tsunami early warning system and coastal resilience with a focus on Indian ocean. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 593-610. ISSN 1759-5916

Palojärvi, L (2009) Managing risks in the international growth business of Finnish construction contractors and building product suppliers. PhD thesis, Helsinki University of Technology, Finland.

Perera, C; Jayasooriya, D; Jayasiri, G; Randil, C; Bandara, C; Siriwardana, C; Dissanayake, R; Hippola, S; Sylva, K; Kamalrathne, T and Kulatunga, A (2020) Evaluation of gaps in early warning mechanisms and evacuation procedures for coastal communities in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 415-433. ISSN 1759-5916

Pewdum, W; Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(6), pp. 544-557. ISSN 0969-9988

Piao, Y; Xu, W; Wang, T K and Chen, J H (2021) Dynamic fall risk assessment framework for construction workers based on dynamic Bayesian network and computer vision. Journal of Construction Engineering and Management, 147(12): 04021171, ISSN 0733-9364

Pinheiro, A T K and Hokugo, A (2019) Effectiveness of early warning and community cooperation for evacuation preparedness from mega-risk type coastal hazard in childcare centers. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 260-275. ISSN 1759-5916

Pitigala Liyana Arachchi, I S; Siriwardana, C; Amaratunga, D and Haigh, R (2022) Evaluation of societal trust on multi-hazard early warning (MHEW) mechanism: Sri Lankan context. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 533-553. ISSN 1759-5916

Praveen, D and Kunnampalli, J (2024) Evaluating the impacts of anticipated sea level rise, climate change and land use land cover scenarios on the rice crop in Alappuzha, Kerala and strategies to build climate responsive agriculture. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 755-775. ISSN 1759-5916

Rahayu, H P; Comfort, L K; Haigh, R; Amaratunga, D and Khoirunnisa, D (2020) A study of people-centered early warning system in the face of near-field tsunami risk for Indonesian coastal cities. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 241-262. ISSN 1759-5916

Salama, M; El Hamid, M A and Keogh, B (2008) Investigating the causes of delay within oil and gas projects in the UAE. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Shafaat, A; Marbouti, F and Mahfouz, T (2023) Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), pp. 2348-2357. ISSN 1562-3599

Shandraseharan, A and Kulatunga, U (2023) Social media for disaster management: The Sri Lankan context. International Journal of Construction Management, 23(4), pp. 648-655. ISSN 1562-3599

Sharaborova, Gulnara (2015) Towards best practices in project management: Profiling professional excellence in identifying and acting on early warning signs in complex projects within a Russian context. PhD thesis, RMIT University, Australia.

Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193

Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2008) Incentives in the Chinese construction industry. Journal of Construction Engineering and Management, 134(7), pp. 457-467. ISSN 0733-9364

Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193

Wang, P; Wang, K; Huang, Y and Fenn, P (2024) A contingency approach for time-cost trade-off in construction projects based on machine learning techniques. Engineering, Construction and Architectural Management, 31(11), pp. 4677-4695. ISSN 0969-9988

Wickramaratne, S (2010) Design and analysis of tsunami warning and evacuation systems. PhD thesis, University of Calgary, Canada.

Wickramaratne, S; Ruwanpura, J; Ranasinghe, U; Walawe-Durage, S; Adikariwattage, V and Wirasinghe, S C (2012) Ranking of natural disasters in Sri Lanka for mitigation planning. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 115-132. ISSN 1759-5916

Wu, H-C (2007) Business failure prediction model for the construction industry using financial ratios and entropy measures with discriminant analysis. PhD thesis, University of Warwick, UK.

Xu, W and Wang, T K (2023) Construction worker safety prediction and active warning based on computer vision and the gray absolute decision analysis method. Journal of Construction Engineering and Management, 149(4): 04023014, ISSN 0733-9364

Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Yan, H; Liu, C; Yang, X and Feng, K (2025) Real-time digital twin-driven 3D near-miss detection system at construction sites. Journal of Construction Engineering and Management, 151(4): 04025021, ISSN 0733-9364

Yang, W; Zhang, F; Wang, H; Wu, J; Nie, Z and Li, L (2023) Synchronous control theory and first test of time-varying upper operation and chassis attitude maintenance for truck cranes. Journal of Construction Engineering and Management, 149(1): 04022156, ISSN 0733-9364

Yuliana, D. K.; Tiwi, D. A.; Akhirianto, N. A.; Andikasari, L. Y.; Frederik, M. C. G.; Marwanta, B.; Riyandari, R.; Qonita, Z.; Sakya, A. E.; Souisa, M. and Kayadoe, F. J. (2026) Bridging the resource mobilization gap in tsunami preparedness: Evidence from small-island communities in ambon bay, Indonesia. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 446-465. ISSN 1759-5908

Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction. PhD thesis, Oklahoma State University, USA.

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zhong, S; Sun, Z; Huang, Q and Cao, C (2011) A framework for geographical surveillance of disease in China. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 256-267. ISSN 1759-5916

Zhou, Y and Elhag, T (2007) Financial assessment using neural networks. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Zhou, Z; Li, Q and Wu, W (2012) Developing a versatile subway construction incident database for safety management. Journal of Construction Engineering and Management, 138(10), pp. 1169-1180. ISSN 0733-9364

This list was generated on Sat Aug 22 02:06:53 2026 UTC.