Items with Index Term: early contractor involvement
Atkinson, R J; Tennakoon, M and Wedawatta, G (2023) Use of new models of construction procurement to enhance collaboration in construction projects: The UK construction industry perspective. Journal of Financial Management of Property and Construction, 28(1), pp. 45-63. ISSN 1366-4387
Botha, P S; van der Walt, J D; Scheepbouwer, E and Barutha, P J (2024) A tool for reporting the optimal timing of preconstruction services in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 240-252. ISSN 17514304
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Callaghan, Stephen (2023) Model and strategies for early contractor involvement in large linear engineering construction projects. PhD thesis, Queensland University of Technology, Australia.
Charles, Robert Douglas (2025) An investigation into the performance and implementation of the early contractor involvement procurement model within the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.
Chen, L; Manley, K; Lewis, J; Helfer, F and Widen, K (2018) Procurement and governance choices for collaborative infrastructure projects. Journal of Construction Engineering and Management, 144(8): 04018071, ISSN 0733-9364
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), pp. 1902-1909. ISSN 1562-3599
Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304
Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304
Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.
Hastie, J; Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(4), pp. 429-456. ISSN 1471-4175
Ishtiaque, T A; Wondimu, P A and Klakegg, O J (2025) Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: The client's perception. International Journal of Construction Management, 25(10), pp. 1227-1238. ISSN 1562-3599
Ishtiaque, T A; Wondimu, P A; Memic, N; Andersen, B S; Lædre, O and Klakegg, O J (2025) Ranking the benefits of early contractor involvement: a client's perspective. International Journal of Construction Management, 25(6), pp. 728-739. ISSN 1562-3599
Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X
Kumar, D and Zhang, C (2025) Carbon emission reduction in construction industry: Qualitative insights on procurement, policies and artificial intelligence. Built Environment Project and Asset Management, 15(3), pp. 399-414. ISSN 2044-124X
Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X
Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304
Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304
Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988
Memić, N; Tadayon, A; Ishtiaque, T A; Klakegg, O J; Wondimu, P A and Lædre, O (2025) How to find the optimal time for contractor involvement in infrastructure projects? Engineering, Construction and Architectural Management, 32(11), pp. 7651-7677. ISSN 0969-9988
Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers. PhD thesis, University of Salford, UK.
Ng, M S; Graser, K and Hall, D M (2023) Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study. Architectural Engineering and Design Management, 19(1), pp. 39-55. ISSN 1745-2007
Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.
Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007
Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175
Opoku, A and Ibrahim-Adam, R (2018) Early contractor involvement in government construction projects in Ghana. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Osaily, Y; Copping, A; McCann, S and Uddin, T (2019) Exploring the value of demolition contractor involvement at the design stage of construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Osuizugbo, I C; Fauzi, M A; Omer, M M; Njogo, B O and Orekan, A A (2024) Research trends on early contractor involvement in construction projects: A bibliometric analysis. Construction Economics and Building, 24(4-5), pp. 160-178. ISSN 2204-9029
Osuizugbo, I C; Omer, M M; Rahman, R A and Oshodi, O S (2024) A systematic search and review of early contractor involvement in construction project development. Built Environment Project and Asset Management, 14(6), pp. 835-857. ISSN 2044-124X
Rahman, M M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(2), pp. 217-233. ISSN 2044-124X
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007
Rahmani, F and Leifels, K (2018) Abductive grounded theory: A worked example of a study in construction management. Construction Management and Economics, 36(10), pp. 565-583. ISSN 01446193
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193
Rosander, L and Kadefors, A (2019) From project to policy: Implementing a collaborative procurement strategy in a public client organisation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193
Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(3), pp. 252-267. ISSN 0969-9988
Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387
Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.
Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Walker, A; Greenwood, D and Johansen, E (2010) User engagement and quality in the design of UK schools. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988
Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wondimu, P A; Lohne, J and Lædre, O (2018) Competitive dialogue in Norwegian public infrastructure projects. Journal of Construction Engineering and Management, 144(10): 05018011, ISSN 0733-9364
af Hällström, A and Bosch-Sijtsema, P (2019) Early contractor involvement in the construction industry: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Up a level