Items with Index Term: duration
Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599
Abdelhamid, T S and Everett, J G (1999) Time series analysis for construction productivity experiments. Journal of Construction Engineering and Management, 125(2), pp. 87-95. ISSN 0733-9364
Abdelkhalek, S; Zayed, T and Eltoukhy, A E E (2025) Multifaceted optimization for bridge inspection process. Journal of Construction Engineering and Management, 151(5): 04025034, ISSN 0733-9364
Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.
Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.
AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364
Abourizk, S M and Halpin, D W (1992) Statistical properties of construction duration data. Journal of Construction Engineering and Management, 118(3), pp. 525-544. ISSN 0733-9364
Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Acheng, P O; Kibwami, N; Mukasa, T J; Odongkara, B B; Birungi, R; Semanda, J and Manga, M (2023) Building information modelling adoption in uganda's construction industry. International Journal of Construction Management, 23(13), pp. 2185-2208. ISSN 1562-3599
Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531
Adamtey, S and Kereri, J O (2023) Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers. Journal of Engineering, Design and Technology, 21(5), pp. 1481-1500. ISSN 1726-0531
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2026) Predicting construction schedule overruns during COVID-19 using ordinal logistic regression. International Journal of Building Pathology and Adaptation, 44(1), pp. 110-125. ISSN 2398-4708
Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988
Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.
Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.
Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364
Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364
Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.
Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988
Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387
Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.
Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599
Ahmed, Y (2009) The impact of work placements on the development of transferable skills in engineering. PhD thesis, Loughborough University, UK.
Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.
Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Ajayi, S O; Jones, W and Unuigbe, M (2019) Occupational stress management for UK construction professionals: Understanding the causes and strategies for improvement. Journal of Engineering, Design and Technology, 17(4), pp. 819-832. ISSN 1726-0531
Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387
Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules. PhD thesis, University of Maryland, College Park, USA.
Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.
Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364
Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.
Akin, F D; Damci, A and Arditi, D (2024) Optimum finance-based scheduling. Journal of Construction Engineering and Management, 150(9): 04024104, ISSN 0733-9364
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193
Al Haj, R A and El-Sayegh, S M (2015) Time-cost optimization model considering float-consumption impact. Journal of Construction Engineering and Management, 141(5): 04015001, ISSN 0733-9364
Al Hattab, M; Zankoul, E; Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(1), pp. 43-63. ISSN 1471-4175
Al Khatib, B A (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges. PhD thesis, University of Malaya, Malaysia.
Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.
Al Shamsi, H A A (2015) A framework for group leadership in the construction industry in Abu Dhabi. PhD thesis, University of Wolverhampton, UK.
Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.
Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175
Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
AlSaggaf, A and Jrade, A (2023) Arcspat: An integrated building information modeling (BIM) and geographic information system (GIS) model for site layout planning. International Journal of Construction Management, 23(3), pp. 505-527. ISSN 1562-3599
Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(5), pp. 1377-1396. ISSN 0969-9988
Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193
Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988
Albouwarthan, M A (2020) Prolonged heat exposure and health outcomes among construction workers in Saudi Arabia. DSc thesis, University of Massachusetts Lowell, USA.
Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.
Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988
Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193
Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Allouche, E N; Ariaratnam, S T and Lueke, J S (2000) Horizontal directional drilling: Profile of an emerging industry. Journal of Construction Engineering and Management, 126(1), pp. 68-76. ISSN 0733-9364
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Alshboul, O.; Al-Shboul, K.; Shehadeh, A. and Tatari, O. (2026) Advancing equipment management for construction: Introducing a new model for cost, time and quality optimization. Construction Innovation, 26(4), pp. 1191-1217. ISSN 1471-4175
Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.
Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.
Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364
Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.
Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175
Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Amirbeiki Tafti, F.; Han, J.; Katharina Wekenborg, M.; Vande Moere, A.; Schierz, J. H.; Heylighen, A. and Marquardt, G. (2026) Designing healthcare settings with sky and water: Insights from a virtual reality study. Building Research & Information, 54(4), pp. 447-468. ISSN 0961-3218
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364
Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599
Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364
Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364
Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599
Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988
Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364
Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988
Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364
Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364
Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364
Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193
Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364
Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Asgari, S; Afshar, A and Madani, K (2014) Cooperative game theoretic framework for joint resource management in construction. Journal of Construction Engineering and Management, 140(3): 04013066, ISSN 0733-9364
Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387
Asiedu, R O and Gyadu-Asiedu, W (2020) Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo. Journal of Engineering, Design and Technology, 18(3), pp. 583-600. ISSN 1726-0531
Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.
Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.
Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration. PhD thesis, University of Washington, USA.
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.
Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364
Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029
Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.
Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599
Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets. PhD thesis, University of Southampton, UK.
Bakhtiyari, S; Kalali, A; Taghi Akbari, L and Farahbod, F (2017) The experimental behavior of CFRP-strengthened reinforced concrete slabs with fire protection systems subjected to standard fire exposure. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 238-250. ISSN 1759-5916
Bala, K; Bustani, S A and Waziri, B S (2014) A computer-based cost prediction model for institutional building projects in Nigeria: An artificial neural network approach. Journal of Engineering, Design and Technology, 12(4), pp. 519-530.
Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.
Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988
Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364
Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193
Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364
Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364
Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.
Barkokebas, B; Al-Hussein, M and Hamzeh, F (2023) Assessment of digital twins to reassign multiskilled workers in offsite construction based on lean thinking. Journal of Construction Engineering and Management, 149(1): 04022143, ISSN 0733-9364
Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2000) Probabilistic monitoring of project performance using ss-curves. Journal of Construction Engineering and Management, 126(2), pp. 142-148. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Bashir, A M; Suresh, S; Proverbs, D and Gameson, R (2011) A critical, theoretical, review of the impacts of lean construction tools in reducing accidents on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Batselier, J and Vanhoucke, M (2015) Empirical evaluation of earned value management forecasting accuracy for time and cost. Journal of Construction Engineering and Management, 141(11): 05015010, ISSN 0733-9364
Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364
Beh, H J; Rashidi, A; Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(7), pp. 2854-2877. ISSN 0969-9988
Ben-Haim, Y and Laufer, A (1998) Robust reliability of projects with activity-duration uncertainty. Journal of Construction Engineering and Management, 124(2), pp. 125-131. ISSN 0733-9364
Bendi, D (2017) Developing an offsite readiness framework for Indian construction organisations. PhD thesis, University of Salford, UK.
Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Kaushik, A K (2021) Understanding off-site readiness in Indian construction organisations. Construction Innovation, 21(1), pp. 105-122. ISSN 1471-4175
Benjaoran, V and Bhokha, S (2009) Enhancing visualization of 4D CAD model compared to conventional methods. Engineering, Construction and Architectural Management, 16(4), pp. 392-408. ISSN 0969-9988
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988
Berawi, M A; Miraj, P; Arifuddin, R; Aulia, D and Rahma, S H (2022) Investigating current practice on disincentive programmes in the Indonesian construction industry. Journal of Construction in Developing Countries, 27(2), pp. 87-107. ISSN 1823-6499
Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.
Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988
Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.
Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364
Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.
Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988
Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364
Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364
Birrell, G S (1985) General contractors' management: How subs evaluate it. Journal of Construction Engineering and Management, 111(3), pp. 244-259. ISSN 0733-9364
Birrell, George Selbie (1978) The criteria by which construction prime and subcontractors evaluate the management performance of each other. DArch thesis, University of Michigan, USA.
Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364
Blyth, K; Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(2), pp. 329-347. ISSN 1609-9451
Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Bondin, I (2022) Inter-organisational relationships in construction projects: an analysis of inter-organisational relationships over time through the theoretical lens of trust and power. PhD thesis, Loughborough University, UK.
Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364
Boukendour, S and Bah, R (2001) The guaranteed maximum price contract as call option. Construction Management and Economics, 19(6), pp. 563-567. ISSN 01446193
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration I: Principles. Engineering, Construction and Architectural Management, 8(2), pp. 104-113. ISSN 0969-9988
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration ii: Application. Engineering, Construction and Architectural Management, 8(2), pp. 114-129. ISSN 0969-9988
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988
Brady, M (1991) Growing a housebuilder: Investigating a context for learning and modeling principles of transpersonal psychology. PhD thesis, Institute of Transpersonal Psychology, USA.
Brambilla, A; Candido, C; Sangiorgio, M F; Gocer, O and Gocer, K (2021) Can commercial buildings cope with Australian bushfires? An IAQ analysis. Buildings & Cities, 2(1), pp. 583-598. ISSN 2632-6655
Brett, R; Thomson, D and Dainty, A (2022) Exploring craft in construction with short-term ethnography: Reflections on a researcher's prior insight. Construction Management and Economics, 40(5), pp. 359-373. ISSN 01446193
Brown, S and Walker, G (2008) Understanding heat wave vulnerability in nursing and residential homes. Building Research & Information, 36(4), pp. 363-372. ISSN 0961-3218
Bruce-Konuah, A; Jones, R V and Fuertes, A (2023) A method for estimating scheduled and manual override heating behaviour and settings from measurements in low energy UK homes. International Journal of Building Pathology and Adaptation, 41(1), pp. 25-44. ISSN 23984708
Bu-Bushait, K A (1984) A descriptive examination of the relationships between the application of project management techniques and project characteristics. PhD thesis, Georgia State University, USA.
Burgett, J M and Chini, A R (2013) Effective energy efficiency measures for existing residential homes in the Florida market. International Journal of Construction Education and Research, 9(1), pp. 61-80. ISSN 1557-8771
Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.
Burleson, R C; Haas, C T; Tucker, R L and Stanley, A (1998) Multiskilled labor utilization strategies in construction. Journal of Construction Engineering and Management, 124(6), pp. 480-489. ISSN 0733-9364
Burnard, M D and Kutnar, A (2020) Human stress responses in office-like environments with wood furniture. Building Research & Information, 48(3), pp. 316-330. ISSN 0961-3218
Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193
Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.
C.R, A; Murali, S; Haq, M A; Bysani, T N and Narahari, N S (2023) Exoskeleton for lower extremities based on Indian anthropomorphism with gait allowance: Design and development. Journal of Engineering, Design and Technology, 21(5), pp. 1343-1372. ISSN 1726-0531
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364
Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.
Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364
Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.
Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.
Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364
Cates, G R (2004) Improving project management with simulation and completion distribution functions. PhD thesis, University of Central Florida, USA.
Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.
Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.
Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193
Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chan, P W (2016) Expert knowledge in the making: Using a processual lens to examine expertise in construction. Construction Management and Economics, 34(7-8), pp. 471-483. ISSN 01446193
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175
Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.
Cheetham, D W and Banfill, P F G (1980) An unusual case of delayed sulphate attack to concrete floor slabs. Construction Papers, 1(1), pp. 7-16. ISSN 0144-8587
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.
Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.
Chen, Q; Adey, B T; Haas, C and Hall, D M (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), pp. 471-508. ISSN 1471-4175
Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, M Y; Huang, K Y and Hutomo, M (2018) Multiobjective dynamic-guiding PSO for optimizing work shift schedules. Journal of Construction Engineering and Management, 144(9): 04018089, ISSN 0733-9364
Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364
Chevallier, N J and Russell, A D (2001) Developing a draft schedule using templates and rules. Journal of Construction Engineering and Management, 127(5), pp. 391-398. ISSN 0733-9364
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.
Choi, J and Song, H (2014) Evaluation of the modular method for industrial plant construction projects. International Journal of Construction Management, 14(3), pp. 171-180. ISSN 1562-3599
Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364
Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364
Choi, S D (2008) Postural balance and adaptations in transitioning sloped surfaces. International Journal of Construction Education and Research, 4(3), pp. 189-199. ISSN 1557-8771
Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X
Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.
Clawson, Bobie Sue Anna (2024) The influence of walking surface types on gait parameters, kinematics and worker perceptions in relation to slips, trips, and fall incidents in the construction industry. PhD thesis, Indiana University of Pennsylvania, USA.
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451
Colin, J and Vanhoucke, M (2016) Empirical perspective on activity durations for project-management simulation studies. Journal of Construction Engineering and Management, 142(1): 04015047, ISSN 0733-9364
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193
Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.
Coşkunoḡlu, O (1984) Optimal probabilistic compression of PERT networks. Journal of Construction Engineering and Management, 110(4), pp. 437-446. ISSN 0733-9364
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Cruz, C O and Marques, R C (2013) Exogenous determinants for renegotiating public infrastructure concessions: Evidence from Portugal. Journal of Construction Engineering and Management, 139(9), pp. 1082-1090. ISSN 0733-9364
Cruz, C O; Marques, R C and Pereira, I (2015) Alternative contractual arrangements for urban light rail systems: Lessons from two case studies. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(2), pp. 91-104. ISSN 01446193
Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193
Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.
Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531
Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364
Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.
Davis, C and Cochrane, S R (1987) Optimization of future manpower requirements in a multi-discipline consultancy. Construction Management and Economics, 5(1), pp. 45-56. ISSN 01446193
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Dawood, N and Sikka, S (2007) Measuring the effectiveness of 4D planning as a valuable communication tool. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.
De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364
De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364
Deng, Y and Poon, S W (2014) Mega-event flagships in transformation: Learning from Expo 2010 Shanghai China. Journal of Engineering, Design and Technology, 12(4), pp. 440-460.
Derakhshanfar, H; Ochoa, J J; Kirytopoulos, K; Mayer, W and Langston, C (2021) A cartography of delay risks in the Australian construction industry: Impact, correlations and timing. Engineering, Construction and Architectural Management, 28(7), pp. 1952-1978. ISSN 0969-9988
Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364
Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988
Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364
Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599
Djebarni, R (1993) Leadership patterns in the construction industry in Algeria. PhD thesis, University of Reading, UK.
Dodanwala, T C and Santoso, D S (2025) Critical factors influencing the bid/no-bid decisions of small and medium-sized contractors in Sri Lanka. International Journal of Construction Education and Research, 21(1), pp. 24-49. ISSN 1557-8771
Doerstling, K W (2003) Building inspectors: Bureaucrats, professionals or heroes? PhD thesis, University of Southern California, USA.
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Dong, Z; Qin, R; Zou, P; Yao, X; Cui, P; Zhang, F and Yang, Y (2025) Occupational health risk assessment of PC production-caused pollution based on damage assessment and cyclic mitigation model. Engineering, Construction and Architectural Management, 32(6), pp. 3679-3699. ISSN 0969-9988
Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175
Dowsett, R; Green, M; Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(2), pp. 193-211. ISSN 1471-4175
Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364
Du Plessis, C and Sherratt, F (2020) Construction 4.0 and built assets in-use: Creating an e-topia or dystopia? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 182-189. ISSN 17514304
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Duff, A R (1980) A stochastic analysis of activity duration. Construction Papers, 1(1), pp. 63-69. ISSN 0144-8587
Duff, A R (1987) Interference in stochastic flow-line models. Journal of Construction Engineering and Management, 113(3), pp. 385-398. ISSN 0733-9364
Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.
Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: Statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(1), pp. 97-106. ISSN 1466433X
Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988
Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988
Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364
Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364
Edwards, D J; Cabahug, R R and Nicholas, J (2003) The impact of training and education characteristics upon plant operator maintenance proficiency. Journal of Engineering, Design and Technology, 1(2), pp. 119-134. ISSN 1726-0531
Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387
Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175
Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988
Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.
Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599
Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.
El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.
El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.
El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364
El-Bibany, H (1997) Parametric constraint management in planning and scheduling: Computational basis. Journal of Construction Engineering and Management, 123(3), pp. 348-353. ISSN 0733-9364
El-Deeb, K (2024) Energy performance assessment of venetian blinds in south-oriented residential spaces in hot arid desert climates. Construction Innovation, 24(6), pp. 1460-1482. ISSN 1471-4175
El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364
El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364
El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Sayegh, S M and Rabie, M M (2016) Modified price plus time bi-parameter bidding model incorporating float loss impact. International Journal of Construction Management, 16(4), pp. 267-280. ISSN 1562-3599
ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988
Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), pp. 199-211. ISSN 1466433X
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364
Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193
Elfving, J A (2022) A decade of lessons learned: Deployment of lean at a large general contractor. Construction Management and Economics, 40(7-8), pp. 548-561. ISSN 01446193
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones. PhD thesis, University of Florida, USA.
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988
Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.
Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304
Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.
Enshassi, A; Abdul-Aziz, A R and Abushaban, S (2012) Analysis of contractors performance in Gaza Strip construction projects. International Journal of Construction Management, 12(2), pp. 65-79. ISSN 1562-3599
Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(4), pp. 387-399. ISSN 0969-9988
Eriksson, P E; Volker, L; Kadefors, A; Lingegård, S; Larsson, J and Rosander, L (2019) Collaborative procurement strategies for infrastructure projects: A multiple-case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 197-205. ISSN 17514304
Eriksson, T (2015) Developing routines in large inter-organisational projects: A case study of an infrastructure megaproject. Construction Economics and Building, 15(3), pp. 4-18. ISSN 2204-9029
Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X
Esmalian, A (2022) Understanding social equity in infrastructure systems resilience. PhD thesis, Texas A&M University, USA.
Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364
Ezeoke, G C (2021) Duration, control, and success factors of Nigerian public infrastructure projects. PhD thesis, Walden University, USA.
Fan, S (2009) The effect of using group decision support systems on the processes and outcomes of value management studies. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364
Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364
Farag, F; McDermott, P and Huelin, C A (2016) The development of an activity zone conceptual framework to improve social value implementation in construction projects using human activity systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175
Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599
Fellows, R and Liu, A M M (2012) Managing organizational interfaces in engineering construction projects: Addressing fragmentation and boundary issues across multiple interfaces. Construction Management and Economics, 30(8), pp. 653-671. ISSN 1466433X
Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Fente, J; Schexnayder, C and Knutson, K (2000) Defining a probability distribution function for construction simulation. Journal of Construction Engineering and Management, 126(3), pp. 234-241. ISSN 0733-9364
Fini, A A F; Akbarnezhad, A; Rashidi, T H and Waller, S T (2018) Dynamic programming approach toward optimization of workforce planning decisions. Journal of Construction Engineering and Management, 144(2): 04017113, ISSN 0733-9364
Firouzi, A and Khayyati, M (2020) Bayesian updating of Copula-based probabilistic project-duration model. Journal of Construction Engineering and Management, 146(5): 04020046, ISSN 0733-9364
Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364
Fisher, W H (2017) The use of arbitration in the construction industry in England and Wales: an evaluation of its continuing role following the Arbitration Act 1996. PhD thesis, University of Wolverhampton, UK.
Fitzpatrick, T and Molloy, J (2014) The role of NGOs in building sustainable community resilience. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 292-304. ISSN 1759-5916
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364
Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364
Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364
Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988
Foster, S R (2020) Management strategies for improving construction industry ethics. PhD thesis, Walden University, USA.
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.
Frey, Shane (2024) Department of defense project management team leaders: Team dynamics and teamwork strategies during complex construction projects. EdD thesis, University of Massachusetts Global, USA.
Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364
Gambatese, J A and Rajendran, S (2012) Flagger illumination during nighttime construction and maintenance operations. Journal of Construction Engineering and Management, 138(2), pp. 250-257. ISSN 0733-9364
Gao, J; Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(9), pp. 2147-2168. ISSN 0969-9988
Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364
Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.
Gauthier, S and Shipworth, D (2015) Behavioural responses to cold thermal discomfort. Building Research & Information, 43(3), pp. 355-370. ISSN 0961-3218
Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.
Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364
George, R (2007) Information flow to support front end planning. PhD thesis, Clemson University, USA.
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099
Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.
Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.
Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.
Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364
Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364
Goedert, J D and Rokooei, S (2016) Project-based construction education with simulations in a gaming environment. International Journal of Construction Education and Research, 12(3), pp. 208-223. ISSN 1557-8771
Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599
Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.
Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation. PhD thesis, Purdue University, USA.
González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364
Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364
Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.
Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X
Grisham, T and Walker, D H T (2006) Nurturing a knowledge environment for international construction organizations through communities of practice. Construction Innovation, 6(4), pp. 217-231. ISSN 1471-4175
Grosskopf, K R (2010) Post-disaster recovery and reconstruction safety training. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 322-333. ISSN 1759-5916
Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.
Gupta, R; Gregg, M and Cherian, R (2020) Developing a new framework to bring consistency and flexibility in evaluating actual building performance. International Journal of Building Pathology and Adaptation, 38(1), pp. 228-255. ISSN 23984708
Gurjao, S (2010) Inclusivity: understanding the careers of women in the construction industry. PhD thesis, University of Reading, UK.
Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364
Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364
Haas, T C; Rodriguez, A M; Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(6), pp. 633-641. ISSN 01446193
Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.
Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.
Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364
Hale, D R; Shrestha, P P; Gibson, G E and Migliaccio, G C (2009) Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), pp. 579-587. ISSN 0733-9364
Hamideh, Z (2013) The under-reporting of injuries for Hispanic workers in construction. PhD thesis, University of Utah, USA.
Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193
Hamzeh, F R; Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration? Construction Management and Economics, 33(4), pp. 243-258. ISSN 01446193
Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364
Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.
Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.
Han, Y; Yin, Z; Zhang, J; Jin, R and Yang, T (2020) Eye-tracking experimental study investigating the influence factors of construction safety hazard recognition. Journal of Construction Engineering and Management, 146(8): 04020091, ISSN 0733-9364
Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364
Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Hare, B and Cameron, I (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(6), pp. 568-578. ISSN 0969-9988
Hariga, M and El-Sayegh, S M (2011) Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. ISSN 0733-9364
Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harris, R A; Bowlby, W and Cohn, L F (1987) Method for analyzing construction haul noise impacts. Journal of Construction Engineering and Management, 113(1), pp. 6-16. ISSN 0733-9364
Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364
Harty, C; Themsen, T N and Tryggestad, K (2014) Risk management and uncertainty in infrastructure projects: What role(s) for knowledge and construction management? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364
Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193
Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364
Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175
Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Hassler, U and Kohler, N (2014) The ideal of resilient systems and questions of continuity. Building Research & Information, 42(2), pp. 158-167. ISSN 0961-3218
Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation, 20(1), pp. 43-60. ISSN 1471-4175
Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X
Hayne, G; Kumar, B and Hare, B (2017) Design hazard identification and the link to site experience. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 85-94. ISSN 17514304
He, W; Shi, Y and Kong, D (2019) Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM. Journal of Engineering, Design and Technology, 17(5), pp. 929-942. ISSN 1726-0531
Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364
Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.
Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364
Henneberry, J and Rowley, S (2002) Property market processes and development outcomes in cities and regions. Journal of Financial Management of Property and Construction, 7(1), pp. 3-15. ISSN 1366-4387
Hiete, M; Merz, M and Schultmann, F (2011) Scenario-based impact analysis of a power outage on healthcare facilities in Germany. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 222-244. ISSN 1759-5916
Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364
Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364
Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.
Hooshangi, N; Mahdizadeh Gharakhanlou, N and Ghaffari-Razin, S R (2024) Urban search and rescue (USAR) simulation in earthquake environments using queuing theory: estimating the appropriate number of rescue teams. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 1-18. ISSN 1759-5916
Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.
Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.
Horman, Michael J (2000) Process dynamics: Buffer management in building project operations. PhD thesis, University of Melbourne, Australia.
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: A case study in construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 321-363. ISSN 0969-9988
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Hou, W and Ran, W (2025) Unveiling the effects of influencing factors on PPP project capital structure in China using machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 8621-8641. ISSN 0969-9988
Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364
Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364
Huebner, G M; Watson, N E; Direk, K; McKenna, E; Webborn, E; Hollick, F; Elam, S and Oreszczyn, T (2021) Survey study on energy use in UK homes during COVID-19. Buildings & Cities, 2(1), pp. 952-969. ISSN 2632-6655
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hummer, J E; Arocho, I and Rasdorf, W (2017) Approach to assessing tradeoffs between construction equipment fleet emissions and cost. Journal of Construction Engineering and Management, 143(5): 04016122, ISSN 0733-9364
Huong, H T L and Dzung, L H (2020) Criteria for flood warning levels in Vietnam. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 645-658. ISSN 1759-5916
Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.
Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.
Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364
Hwang, S; Park, M; Lee, H S and Lee, S (2016) Hybrid simulation framework for immediate facility restoration planning after a catastrophic disaster. Journal of Construction Engineering and Management, 142(8): 4016026, ISSN 0733-9364
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Ibrahim, K; Adebowale, O J; Dodo, M; Zailani, B M; Lukman, O and Kajimo-Shakantu, K (2024) Challenges and coping strategies of built environment students during students industrial work experience scheme (siwes): Perspective from Nigeria. International Journal of Construction Education and Research, 20(2), pp. 157-176. ISSN 15578771
Ibrahim, M (2016) Analyzing decision making in alternative contracting for highway pavement rehabilitation projects. PhD thesis, Florida International University, USA.
Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.
Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.
Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364
Irizarry, J (2005) Safety issues in steel erection: Impact on task durations and risk perception of ironworkers. PhD thesis, Purdue University, USA.
Irizarry, J (2011) Application of methods analysis to steel erection tasks: Identification of factors affecting labor performance. International Journal of Construction Management, 11(4), pp. 31-47. ISSN 1562-3599
Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364
Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.
Ishdorj, S; Ahn, C R and Park, M (2024) Major factors influencing safety knowledge-sharing behaviors of construction field workers: Worker-to-worker level safety communication. Journal of Construction Engineering and Management, 150(4): 04024021, ISSN 0733-9364
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364
Islam, M S (2024) Identification of seasonal drought and its impacts on cropping season in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 516-529. ISSN 1759-5916
Ismaeel, W S E; Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: Accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(4), pp. 360-377. ISSN 1745-2007
Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry. PhD thesis, University of Michigan, USA.
Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.
Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599
Ivanoff, D J and Diekmann, J E (1989) Project-labor agreements in construction industry. Journal of Construction Engineering and Management, 115(4), pp. 567-584. ISSN 0733-9364
Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599
Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ICT in construction projects: A Swedish case study. Construction Management and Economics, 28(1), pp. 13-23. ISSN 1466433X
Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.
Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems. PhD thesis, North Carolina State University, USA.
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364
Jeelani, I; Albert, A; Han, K and Azevedo, R (2018) Are visual search patterns predictive of hazard recognition performance? Empirical investigation using eye-tracking technology. Journal of Construction Engineering and Management, 145(1): 04018115, ISSN 0733-9364
Jens, K and Gregg, J S (2021) The impact on human behaviour in shared building spaces as a result of COVID-19 restrictions. Building Research & Information, 49(8), pp. 827-841. ISSN 0961-3218
Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.
Jia, A Y; Loosemore, M; Gilbert, D and Rowlinson, S (2016) Shielding workers from heat stress: Reconciling the paradoxes of protection and production logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Jin, X H and Ling, F Y Y (2005) Model for fostering trust and building relationships in China's construction industry. Journal of Construction Engineering and Management, 131(11), pp. 1224-1232. ISSN 0733-9364
Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.
Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193
Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193
Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), pp. 256-266. ISSN 0969-9988
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988
Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988
Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364
Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364
Kannimuthu, M; Raphael, B; Palaneeswaran, E and Kuppuswamy, A (2019) Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Built Environment Project and Asset Management, 9(1), pp. 44-63. ISSN 2044-124X
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988
Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364
Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988
Karni, R (1987) A systematic approach to stochastic scheduling. Construction Management and Economics, 5(3), pp. 187-198. ISSN 01446193
Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193
Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.
Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364
Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364
Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kavanagh, D P (1985) SIREN: A repetitive construction simulation model. Journal of Construction Engineering and Management, 111(3), pp. 308-323. ISSN 0733-9364
Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988
Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387
Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364
Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988
Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.
Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.
Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364
Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364
Kim, H (2002) Knowledge discovery and machine learning in construction project databases. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364
Kim, S Y; Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: Case study of international development projects. Engineering, Construction and Architectural Management, 28(4), pp. 1114-1133. ISSN 0969-9988
Kiomjian, D; Srour, I and Srour, F J (2020) Knowledge sharing and productivity improvement: An agent-based modeling approach. Journal of Construction Engineering and Management, 146(7): 04020076, ISSN 0733-9364
Kipling, J; Newton, R and Ormerod, M (2011) Accessing emergency rest centres in the UK: Lessons learnt. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 47-58. ISSN 1759-5916
Kirby, A M; Dietz, J E; Matson, E T; Pekny, J F and Wojtalewicz, C (2015) Major city evacuation planning using simulation modeling. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 397-408. ISSN 1759-5916
Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364
Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364
Koolwijk, J; van Oel, C; Vrijhoef, R and Wamelink, J W F (2015) Partnering in construction: A field study to further develop the framework of supply chain integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.
Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.
Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.
Kumaraswamy, M M and Chan, D W M (1995) Determinants of construction duration. Construction Management and Economics, 13(3), pp. 209-217. ISSN 01446193
Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(2), pp. 88-98. ISSN 1358-9180
Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.
Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.
Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364
Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le, T (2009) Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors. PhD thesis, University of Texas at Austin, USA.
Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364
Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364
Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364
Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364
Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364
Lee, W V and Steemers, K (2017) Exposure duration in overheating assessments: A retrofit modelling study. Building Research & Information, 45(1-2), pp. 60-82. ISSN 0961-3218
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Legard, D A (1983) Probabilistic analysis of an idealized model of construction projects. Construction Management and Economics, 1(1), pp. 31-45. ISSN 01446193
Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364
Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.
Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364
Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Li, J.; Chen, Z.; Li, Z.; Kong, L. and Zhang, H. (2026) Integrating computer vision and audio signals for concrete vibration activity recognition and assessment. Journal of Construction Engineering and Management, 152(7): 04026099, ISSN 0733-9364
Li, T.; Ling, F. Y. Y.; Li, Z.; Dou, Y. and Guo, Z. (2026) Portfolio optimization of prefabricated interior building component systems: A multistakeholder perspective. Journal of Construction Engineering and Management, 152(9): 04026154, ISSN 0733-9364
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.
Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry. PhD thesis, University of Sheffield, UK.
Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction. PhD thesis, Columbia University, USA.
Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364
Lian, J K M; Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(1), pp. 77-89. ISSN 0969-9988
Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Liao, L; Gan, C; Yang, J and Liang, Y (2025) Impacts of safety capacity and personalized safety training on construction workers' hazard recognition using eye-tracking technology. Journal of Construction Engineering and Management, 151(6): 04025050, ISSN 0733-9364
Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364
Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364
Lishner, I and Shtub, A (2023) The compounding effect of multiple disruptions on construction projects. International Journal of Construction Management, 23(6), pp. 1061-1068. ISSN 1562-3599
Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X
Liu, J; Love, P E D; Smith, J; Regan, M and Palaneeswaran, E (2015) Review of performance measurement: Implications for public-private partnerships. Built Environment Project and Asset Management, 5(1), pp. 35-51. ISSN 2044-124X
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364
Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.
Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X
Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364
Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364
Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364
Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364
Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.
Loosemore, M; Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 3075-3093. ISSN 0969-9988
Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.
Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364
Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364
Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364
Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Luo, S; Liu, Z; Yang, X; Lu, Q and Yin, J (2019) Construction technology of warm and hot mix epoxy asphalt paving for long-span steel bridge. Journal of Construction Engineering and Management, 145(12): 04019074, ISSN 0733-9364
Luo, X; Li, H; Huang, T and Skitmore, M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management, 142(8): 4016031, ISSN 0733-9364
Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599
Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364
Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708
Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364
Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364
Ma, S; Li, Z and Shen, Y (2025) Decision-making framework for selecting sustainable prefabricated residential building technology schemes under minimum assembly rate constraints. Journal of Construction Engineering and Management, 151(8): 04025100, ISSN 0733-9364
Maaith, N. and Sharmin, T. (2026) Socio-technical drivers of energy use in low-income housing in Jordan: Insights from a regression-based study. Building Research & Information, 54(4), pp. 510-533. ISSN 0961-3218
Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599
Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.
Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364
Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988
Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Manege, S L and Kennedy, C J (2022) Investigating whole life costing awareness in Tanzania building construction industry. International Journal of Construction Management, 22(15), pp. 2914-2921. ISSN 1562-3599
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364
Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.
Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Maria, C and Hollander, J B (2025) Urban façades and human stress: Evaluating façades' texture and layout. Building Research & Information, 53(8), pp. 1039-1057. ISSN 0961-3218
Maritz, M J and Hattingh, V (2015) Electronic communication in the construction industry. Journal of Engineering, Design and Technology, 13(1), pp. 74-93.
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.
Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175
Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364
Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.
Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364
Md-Ulang, N (2012) Communication of construction health and safety information in design. PhD thesis, Loughborough University, UK.
Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364
Mejía, G and Franco-Duran, D M (2017) Evidence-based improvement policies in public management: A case study of public projects in Barrancabermeja City, Colombia. Journal of Construction in Developing Countries, 22(2), pp. 55-66. ISSN 1823-6499
Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Mengistu, D G; Ashene, D A and Halabo, H A (2024) Technology and innovation development in Ethiopian construction industry: the challenges and improvement mechanisms. Journal of Engineering, Design and Technology, 22(6), pp. 1936-1957. ISSN 1726-0531
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.
Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364
Minchin, R E; Li, X; Issa, R R and Vargas, G G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007, ISSN 0733-9364
Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364
Mohammed, A W (2016) Agent-based modeling of abc methods for decisionmaking in highway bridge projects including uncertainty and several stakeholders. PhD thesis, Western Michigan University, USA.
Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Moreno, M; Ortiz, R and Ortiz, P (2024) Remote sensing to assess the risk for cultural heritage: Forecasting potential collapses due to rainfall in historic fortifications. International Journal of Building Pathology and Adaptation, 42(1), pp. 92-113. ISSN 23984708
Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364
Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364
Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.
Morua Padilla, E (1986) Resource strategies for dynamic construction project management. PhD thesis, University of Michigan, USA.
Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364
Moselhi, O; Fazio, P and Hason, S (1992) Automation of concrete slab-on-grade construction. Journal of Construction Engineering and Management, 118(4), pp. 731-748. ISSN 0733-9364
Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364
Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193
Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.
Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364
Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988
Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364
Mpofu, B; Ochieng, E G; Moobela, C and Pretorius, A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), pp. 346-376. ISSN 0969-9988
Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.
Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.
Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364
Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.
Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.
Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364
Nasirzadeh, F; Khanzadi, M and Mir, M (2018) A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: An application to model construction workers' safety behavior. International Journal of Construction Management, 18(2), pp. 132-143. ISSN 1562-3599
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Navab-Kashani, R; Gay, L F and Bayat, A (2015) Productivity improvement of sewer CCTV inspection through time study and route optimization. Journal of Construction Engineering and Management, 141(6): 04015009, ISSN 0733-9364
Navon, R (1995) Economic benefits of lightweight versus conventional construction methods. Journal of Construction Engineering and Management, 121(1), pp. 27-36. ISSN 0733-9364
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.
Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193
Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193
Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.
Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.
Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175
Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193
O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364
O'Shaughnessy, R D (1992) Criteria civil engineers use in deciding whether or not to participate in non-credit continuing engineering education programs. EdD thesis, University of Illinois at Urbana-Champaign, USA.
Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system. PhD thesis, University of Michigan, USA.
Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193
Okoroh, M I (2000) An evaluation of residential speculative developers' subcontractors perceived risks. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X
Oleinik, P (2018) Method for creating a work management plan of a construction company. International Journal of Construction Management, 18(5), pp. 446-451. ISSN 1562-3599
Oliveira, Iberê Pinheiro de (2023) Criteria for building certification and assessment: An integrated approach to degradation and performance. PhD thesis, Universidade de Brasília, Brazil.
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193
Oloke, D A; Edwards, D J and Thorpe, T A (2003) Predicting construction plant breakdown time using time series modelling. Journal of Engineering, Design and Technology, 1(2), pp. 202-221. ISSN 1726-0531
Omobhude, O C (2019) Inclusive policy making process for sustainable development: Empirical cases of oil and infrastructure sectors in Nigeria. PhD thesis, National Yang Ming Chiao Tung University, Taiwan R.O.C..
Omopariola, E D and Windapo, A O (2019) Domino effect of timely payment of contractors on project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Oo, B L; Lim, T H B and Zhang, Y (2021) Women workforce in construction during the COVID-19 pandemic: Challenges and strategies. Construction Economics and Building, 21(4), pp. 38-59. ISSN 2204-9029
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Ormeño Zender, Y and García de Soto, B (2021) Use of scrum in the rehabilitation of a commercial building in Peru. Construction Innovation, 21(2), pp. 145-163. ISSN 1471-4175
Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531
Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988
Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(4), pp. 531-552. ISSN 23984708
O’Connor, J T (1985) Impacts of constructability improvement. Journal of Construction Engineering and Management, 111(4), pp. 404-410. ISSN 0733-9364
Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Padilla, E M and Carr, R I (1991) Resource strategies for dynamic project management. Journal of Construction Engineering and Management, 117(2), pp. 279-293. ISSN 0733-9364
Paek, J H and Ock, J H (1996) Innovative building construction technique: Modified up/down method. Journal of Construction Engineering and Management, 122(2), pp. 141-146. ISSN 0733-9364
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Pakkala, T A; Köliö, A; Lahdensivu, J and Pentti, M (2019) Predicted corrosion rate on outdoor exposed concrete structures. International Journal of Building Pathology and Adaptation, 37(5), pp. 679-698. ISSN 23984708
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Pan, W; Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218
Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.
Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.
Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.
Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364
Parsi, M; Baradaran, V and Hosseinian, A H (2025) Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: Multiagent optimization methodology. Engineering, Construction and Architectural Management, 32(4), pp. 2614-2645. ISSN 0969-9988
Patterson, M R (2017) Skin fit and retrofit: Challenging the sustainability of curtainwall practice in tall buildings. PhD thesis, University of Southern California, USA.
Paulson, B C; Chan, W T and Koo, C C (1987) Construction operations simulation by microcomputer. Journal of Construction Engineering and Management, 113(2), pp. 302-314. ISSN 0733-9364
Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Peng, J and Liu, X J (2024) Labor resource allocation under extremely short construction period based on the inverse optimization method. Engineering, Construction and Architectural Management, 31(3), pp. 1254-1271. ISSN 0969-9988
Peng, M (2012) Dam risk analysis and dynamic decision making. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599
Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.
Pewdum, W; Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(6), pp. 544-557. ISSN 0969-9988
Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Platt, R T (1998) Development of a ready-to-assemble construction system. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.
Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X
Porter, K A (2000) Assembly-based vulnerability of buildings and its uses in seismic performance evaluation and risk-management decision-making. PhD thesis, Stanford University, USA.
Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364
Prasertrungruang, T and Hadikusumo, B H W (2007) Heavy equipment management practices and problems in Thai highway contractors. Engineering, Construction and Architectural Management, 14(3), pp. 228-241. ISSN 0969-9988
Pu, W; Xu, F; Chen, R and Marques, R C (2020) PPP project procurement model selection in China: Does it matter? Construction Management and Economics, 38(2), pp. 126-139. ISSN 01446193
Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364
Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364
Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599
Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.
Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364
Rahat, R; Pradhananga, P and ElZomor, M (2024) Evaluation of safe-to-fail flood solution alternatives and integration of safe-to-fail concept in AEC education to develop resilient coastal cities. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 244-258. ISSN 1759-5916
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708
Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988
Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499
Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Ranasinghe, M (1994) Quantification and management of uncertainty in activity duration networks. Construction Management and Economics, 12(1), pp. 15-29. ISSN 01446193
Ranasinghe, M (1998) Risk management in the insurance industry: Insights for the engineering construction industry. Construction Management and Economics, 16(1), pp. 31-39. ISSN 01446193
Rapaport, C and Ashkenazi, I (2019) Drop down or flee out? New official earthquake recommended instructions for schools and kindergartens in Israel. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 52-64. ISSN 1759-5916
Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099
Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708
Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708
Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364
Ren, Z; Atout, M and Jones, J (2008) Root causes of construction project delays in Dubai. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rezakhani, P (2022) Project scheduling and performance prediction: A fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(6), pp. 2233-2244. ISSN 0969-9988
Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599
Rezakhani, P (2023) Empirical study of housing recovery and property abandonment following valley fire in California: Insights from neighborhood characteristics and building attributes. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 628-639. ISSN 1759-5916
Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.
Rodger, R G (1976) Scottish urban housebuilding, 1870-1914. PhD thesis, University of Edinburgh, UK.
Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599
Roghanian, E; Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), pp. 1-13. ISSN 1562-3599
Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364
Rosenfeld, Y; Navon, R and Cohen, L (1998) Methodology for prioritizing cost-effective construction technologies. Journal of Construction Engineering and Management, 124(3), pp. 176-184. ISSN 0733-9364
Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916
Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364
Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: A deterministic analysis. Construction Management and Economics, 9(5), pp. 467-479. ISSN 01446193
Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364
Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.
Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364
Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364
Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X
Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364
Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.
Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.
Saha, Swapan Kumar (2002) Predicting realistic performance rate and optimum inspection rate in construction. PhD thesis, University of Western Sydney, Australia.
Sailer, K; Utley, M; Pachilova, R; Fouad, A T Z; Li, X; Jayaram, H and Foster, P J (2025) Lanes, clusters, sightlines: Modelling patient flow in medical clinics. Buildings & Cities, 6(1), pp. 201-218. ISSN 2632-6655
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988
Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364
Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364
Samarakkody, A L; Perera, B A K S and Palliyaguru, R (2022) Appropriateness of soft landings concept for avoiding malpractices in Sri Lankan building projects. International Journal of Construction Management, 22(14), pp. 2817-2829. ISSN 1562-3599
Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499
Samuel, D (2018) Risk-based tender evaluation using multicriteria decision analysis in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 58-69. ISSN 17514304
Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364
Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599
Satterfield, J H (2020) Strategies for improving the performance of multigenerational cohorts in the construction industry. PhD thesis, Walden University, USA.
Saurin, T A; Formoso, C T; Reck, R; Beck Da Silva Etges, B M and Ribeiro, J L D (2015) Findings from the analysis of incident-reporting systems of construction companies. Journal of Construction Engineering and Management, 141(9): 501500, ISSN 0733-9364
Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364
Schubert, F N (1991) U.S. Army corps of engineers and Afghanistan's highways 1960–1967. Journal of Construction Engineering and Management, 117(3), pp. 445-459. ISSN 0733-9364
Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(2), pp. 153-177. ISSN 01446193
Scott, D and Krishnan, V (1983) Appropriate technology for Fiji. Construction Papers, 2(1), pp. 51-61. ISSN 0144-8587
Scullion, J (2002) Are deep approaches to learning possible in vocational degree courses in construction? A phenomenological inquiry. EdD thesis, Open University, UK.
Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Senior, B A (1996) Electrical construction foreman task scheduling. Journal of Construction Engineering and Management, 122(4), pp. 363-369. ISSN 0733-9364
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193
Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364
Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.
Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.
Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364
Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364
Shapira, A; Filin, S and Wicnudel, A (2014) Quantitative analysis of blind tower-crane lifts using laser-scanning information. Construction Innovation, 14(3), pp. 383-403. ISSN 1471-4175
Shapira, A and Glascock, J D (1996) Culture of using mobile cranes for building construction. Journal of Construction Engineering and Management, 122(4), pp. 298-307. ISSN 0733-9364
Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.
Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.
Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.
Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364
Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193
Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599
Shikhrobat, M B; Kabiri, S and Flanagan, R (2019) Project planning and scheduling using system dynamics for dealing with complexity on construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Shipworth, M; Firth, S K; Gentry, M I; Wright, A J; Shipworth, D T and Lomas, K J (2010) Central heating thermostat settings and timing: Building demographics. Building Research & Information, 38(1), pp. 50-69. ISSN 0961-3218
Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988
Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.
Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175
Short, C A and Lomas, K J (2007) Exploiting a hybrid environmental design strategy in a US continental climate. Building Research & Information, 35(2), pp. 119-143. ISSN 0961-3218
Short, K M (2013) The impact of experiential learning: Assessing the outcomes of internship experiences for students entering the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.
Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364
Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364
Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364
Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599
Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364
Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.
Skitmore, M (1992) Parameter prediction for cash flow forecasting models. Construction Management and Economics, 10(5), pp. 397-413. ISSN 01446193
Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(3), pp. 208-217. ISSN 0961-3218
Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.
Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: The case of saudi Arabia. Engineering, Construction and Architectural Management, 30(6), pp. 2545-2563. ISSN 0969-9988
Sohail, M and Edum-Fotwe, F T (2000) Cost-duration tool for policy decision on micro and small projects. Journal of Financial Management of Property and Construction, 5(3), pp. 111-122. ISSN 1366-4387
Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.
Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.
Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Spaulding, W M; Bridge, A and Skitmore, M (2005) The use of function analysis as the basis of value management in the Australian construction industry. Construction Management and Economics, 23(7), pp. 723-731. ISSN 01446193
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.
Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Stoy, C; Dreier, F and Schalcher, H R (2007) Construction duration of residential building projects in Germany. Engineering, Construction and Architectural Management, 14(1), pp. 52-64. ISSN 0969-9988
Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364
Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Su, Z X; Wei, H Y; Zou, X and Qi, J X (2019) Zero-one formulation for a partial resource-constrained project scheduling problem with generalized precedence relations. Journal of Construction Engineering and Management, 145(3): 04018142, ISSN 0733-9364
Subbiah, A (2012) An investigation of the factors influencing the success of construction planning for the 2012 olympic stadium: An ethnographic study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Suchowerska, R; Loosemore, M and Barraket, J (2024) How employment-focused social procurement tackles health inequities: An investigation of Australia’s construction industry using determinants of health theory. Construction Management and Economics, 42(11-12), pp. 977-991. ISSN 01446193
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364
Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.
Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218
Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Tam, T H; Abdul Rahman, M Z; Harun, S; Shahid, S; Try, S; Jamal, M H; Ismail, Z; Razak, K A; Ghani, M K and Abdul Wahab, Y F (2025) Flood hazard assessment using design rainfall under climate change scenarios in the Kelantan River Basin, Malaysia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 1-19. ISSN 1759-5908
Tam, V W Y; Kim, K and Brohier, A (2021) Life-cycle analysis by using the alternative sustainable water innovations in residential dwellings. International Journal of Construction Management, 21(11), pp. 1143-1155. ISSN 1562-3599
Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175
Tang, P (2013) Assessing decision making strategies in construction management by using a schedule-based simulation framework. PhD thesis, Michigan Technological University, USA.
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Taofeeq, M D; Adeleke, A Q and Lee, C K (2020) Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), pp. 1543-1569. ISSN 1726-0531
Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599
Tavakoli, A (1983) Productivity analysis of heavy construction operations. PhD thesis, Georgia Institute of Technology, USA.
Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364
Taylor, D D J (2018) Tools for managing intermittent water supplies. PhD thesis, Massachusetts Institute of Technology, USA.
Taylor, S (2015) Sourcing of public sector building surveying and engineering professional services : A framework for progression. PhD thesis, University of Salford, UK.
Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364
Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.
Thanaraj, D P; Anand, N and Arulraj, P (2019) Experimental investigation of mechanical properties and physical characteristics of concrete under standard fire exposure. Journal of Engineering, Design and Technology, 17(5), pp. 878-903. ISSN 1726-0531
Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.
Thiele, Brett James (2024) A financial decision support tool for improved project and portfolio profit performance in project-based organisations. PhD thesis, University of New South Wales, Australia.
Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531
Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988
Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364
Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer. PhD thesis, Stanford University, USA.
Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193
Touran, A (1997) Probabilistic model for tunneling project using Markov chain. Journal of Construction Engineering and Management, 123(4), pp. 444-449. ISSN 0733-9364
Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364
Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Ugulu, R; Arewa, A and Stephen, A (2019) Relationship between labour productivity and curved wall construction in high-rise building projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X
Umar, M; Ofem, M I; Anwar, A S and Salisu, A G (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(4), pp. 809-827. ISSN 1726-0531
Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193
Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988
Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.
Valikoniene, L (2015) Resource buffers in critical chain project management. PhD thesis, University of Manchester, UK.
Van Buiten, M and Hartmann, A (2015) Asset management perspective on the duration of public-private partnership contracts: Cost-control trade-off? Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.
Vaziri, K; Carr, P G and Nozick, L K (2007) Project planning for construction under uncertainty with limited resources. Journal of Construction Engineering and Management, 133(4), pp. 268-276. ISSN 0733-9364
Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(2), pp. 171-182. ISSN 2044-124X
Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364
Votto, R; Lee Ho, L and Berssaneti, F (2021) Earned duration management control charts: Role of control limit width definition for construction project duration monitoring. Journal of Construction Engineering and Management, 147(9): 04021108, ISSN 0733-9364
Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(2), pp. 149-159. ISSN 01446193
Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks. PhD thesis, North Carolina State University, USA.
Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364
Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364
Wang, Q; Tang, R; Guo, Z and Wu, J (2026) Impacts of policy instrument combinations on the collaborative innovation of generic technology for green building: Tripartite evolutionary game analysis. Journal of Construction Engineering and Management, 152(4): 04026014, ISSN 0733-9364
Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988
Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364
Wang, H (2000) A follow-up study of workers with soft tissue injuries using the databases of the Ontario workplace safety and insurance board (WSIB). PhD thesis, University of Toronto, Canada.
Wang, H; Chen, X; Wang, J; Guan, W and Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4): 04025009, ISSN 0733-9364
Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364
Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988
Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364
Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.
Wang, W C and Demsetz, L A (2000) Application example for evaluating networks considering correlation. Journal of Construction Engineering and Management, 126(6), pp. 467-474. ISSN 0733-9364
Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364
Wang, X; Wang, X and Huang, Y (2019) Chinese construction worker reluctance toward vocational skill training. Journal of Engineering, Design and Technology, 17(1), pp. 155-171. ISSN 1726-0531
Wang, Y; Goodrum, P M; Haas, C; Glover, R and Vazari, S (2010) Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. Construction Management and Economics, 28(12), pp. 1269-1285. ISSN 1466433X
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2009) Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the U.S. Industrial construction sector. Journal of Construction Engineering and Management, 135(10), pp. 999-1008. ISSN 0733-9364
Wang, Y and Shao, L (2018) Understanding occupancy and user behaviour through Wi-Fi-based indoor positioning. Building Research & Information, 46(7), pp. 725-737. ISSN 0961-3218
Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.
Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.
Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Wantanakorn, D (2000) Effects of management errors on construction projects. PhD thesis, University of Nottingham, UK.
Wantanakorn, D; Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112-120. ISSN 0969-9988
Warszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(5), pp. 447-459. ISSN 01446193
Weiss, T (2021) Energy flexibility and shiftable heating power of building components and technologies. Smart and Sustainable Built Environment, 10(4), pp. 740-758. ISSN 2046-6099
Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.
Whang, S W; Flanagan, R and Kim, K P (2025) An analysis of the optimal research and development investment level of contractor using the panel threshold regression model. International Journal of Construction Management, 25(16), pp. 2007-2019. ISSN 1562-3599
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193
Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Williams, R C; Hildreth, J C and Vorster, M C (2009) Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135(12), pp. 1299-1306. ISSN 0733-9364
Williams, T (1999) Allocation of contingency in activity duration networks. Construction Management and Economics, 17(4), pp. 441-447. ISSN 01446193
Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Wu, X.; Schmidt, R.; Wilcockson, T. D.; Wang, W. and Liu, H. (2026) Eye-tracking and place attachment: Visual and emotional engagement in higher education atrium spaces. Building Research & Information, 54(5), pp. 652-669. ISSN 0961-3218
Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.
Wu, Z and Ma, G (2023) Automatic generation of BIM-based construction schedule: Combining an ontology constraint rule and a genetic algorithm. Engineering, Construction and Architectural Management, 30(10), pp. 5253-5279. ISSN 0969-9988
Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Xie, X.; Liao, L.; Wen, Y.; Li, S. and Mo, L. (2026) Understanding safety hazard identification in construction: Role of emotion, gender, and regulatory focus. Journal of Construction Engineering and Management, 152(9): 04026136, ISSN 0733-9364
Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988
Xu, T.; Song, Z.; Fan, S. and Guo, D. (2026) Improved risk assessment model using the cloud theory of the existing tunnel in foundation pit construction environment. Engineering, Construction and Architectural Management, 33(5), pp. 3737-3760. ISSN 0969-9988
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Xue, J; Shen, G Q; Deng, X; Ogungbile, A J and Chu, X (2023) Evolution modeling of stakeholder performance on relationship management in the dynamic and complex environments of megaprojects. Engineering, Construction and Architectural Management, 30(4), pp. 1536-1557. ISSN 0969-9988
Xue, J; Shen, G Q; Li, Y; Han, S and Chu, X (2021) Dynamic analysis on public concerns in Hong Kong-zhuhai-macao bridge: Integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 147(6): 04021049, ISSN 0733-9364
Xue, J; Shen, G Q; Yang, R J; Zafar, I and Ekanayake, E M A C (2020) Dynamic network analysis of stakeholder conflicts in megaprojects: Sixteen-year case of Hong Kong-Zhuhai-Macao Bridge. Journal of Construction Engineering and Management, 146(9): 04020103, ISSN 0733-9364
Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control. PhD thesis, University of the West of England, Bristol, UK.
Yamusa, M. A.; Dandago, A. A.; Lawal, H. S.; Saka, A. B.; Abubakar, M. and Abdullahi, M. (2025) Quantitative evaluation and modelling of uncertainty factors impacting duration of building renovation projects. Engineering, Construction and Architectural Management, 33(5), pp. 4181-4210. ISSN 0969-9988
Yan, D; Ding, Y; Sunindijo, R Y; Wang, C C and Yang, Z (2026) Key factors in women's managerial advancement in the construction industry: Insights from machine learning. International Journal of Construction Management, 26(4), pp. 679-693. ISSN 1562-3599
Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X
Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364
Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193
Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364
Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988
Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988
Yang, L and Shi, J J (2010) Experimental study on the impact of rainfall on RCC construction. Journal of Construction Engineering and Management, 136(5), pp. 477-483. ISSN 0733-9364
Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.
Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364
Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364
Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364
Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.
Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364
Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364
Yiğit, A Y; Gamze Hamal, S N; Ulvi, A and Yakar, M (2024) Comparative analysis of mobile laser scanning and terrestrial laser scanning for the indoor mapping. Building Research & Information, 52(4), pp. 402-417. ISSN 0961-3218
Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193
Yoon, J; Yu, I and Jung, D (2018) Factors needed for the development of a constructability assessment model for building renovation and extension in Korea. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Young, B A (1988) Career development in construction management. PhD thesis, University of Manchester, UK.
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Yu, H.; Peng, Z. and Wu, Z. (2026) Coupled analysis and simulation of safety risks in deep foundation pit construction for subway stations based on the N-K model and system dynamics. Journal of Construction Engineering and Management, 152(7): 04026088, ISSN 0733-9364
Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364
Zafar, I; Wuni, I Y; Shen, G Q P; Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(4), pp. 732-750. ISSN 1562-3599
Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zarghami, S A (2022) Forecasting project duration in the face of disruptive events: A resource-based approach. Journal of Construction Engineering and Management, 148(5): 04022016, ISSN 0733-9364
Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364
Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988
Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364
Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms. PhD thesis, University of Maryland, College Park, USA.
Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364
Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364
Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(1), pp. 75-88. ISSN 1466433X
Zhang, H; Li, H and Lu, M (2008) Modeling time-constraints in construction operations through simulation. Journal of Construction Engineering and Management, 134(7), pp. 545-554. ISSN 0733-9364
Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364
Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 0969-9988
Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364
Zhang, L and Qi, J (2012) Controlling path and controlling segment analysis in repetitive scheduling method. Journal of Construction Engineering and Management, 138(11), pp. 1341-1345. ISSN 0733-9364
Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364
Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364
Zhang, W; Zhang, H and Yu, L (2023) Collaborative planning for stacking and installation of prefabricated building components regarding crane-collision avoidance. Journal of Construction Engineering and Management, 149(6): 04023029, ISSN 0733-9364
Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364
Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364
Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.
Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599
Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007
Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599
Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364
Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364
Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364
Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771
Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988
Zohrehvandi, S; Khalilzadeh, M; Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(2), pp. 716-738. ISSN 0969-9988
Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988
Zou, H and Zhou, G (2024) Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy. International Journal of Construction Management, 24(12), pp. 1271-1281. ISSN 1562-3599
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364
Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364
Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.
al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029
de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218
de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.
van Niekerk, J; Wium, J and de Koker, N (2022) The value of data from construction project site meeting minutes in predicting project duration. Built Environment Project and Asset Management, 12(5), pp. 738-753. ISSN 2044-124X
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364