Items with Index Term: distortion
Acosta, D (1986) Application of production planning methods to improve productivity: Issues from the Venezuelan construction industry. PhD thesis, University of California, Berkeley, USA.
Almasabha, G; Shehadeh, A; Alshboul, O and Al Hattamleh, O (2024) Structural performance of buried reinforced concrete pipelines under deep embankment soil. Construction Innovation, 24(5), pp. 1280-1296. ISSN 1471-4175
Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.
Chan, Y K; Huang, C H; Chao Yi, N; Tseng, H H; Lin, C H; Chang, R F and Chan, M H (2026) A study of detection systems for safety guardrails at construction sites: Innovative applications of image processing and perspective correction. Journal of Construction Engineering and Management, 152(4): 04026018, ISSN 0733-9364
Chancellor, W and Abbott, M (2015) The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176-186. ISSN 01446193
Fei, C; Xiahou, P and Wang, F (2020) Design and control of grid connected inverter for harmonic suppression. Journal of Engineering, Design and Technology, 18(5), pp. 1349-1356. ISSN 1726-0531
Ingraham, A T (2001) Bidder-auctioneer cheating in sealed-bid auctions. PhD thesis, University of Maryland, College Park, USA.
Khosrowshahi, F (1989) A new mathematically based model for forecasting construction project expenditure pattern. PhD thesis, South Bank Polytechnic, UK.
Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.
Korishetti, A. C. and Malemath, V. S. (2026) Optimal block search mechanism using deep recurrent neural network for enabling the code-efficiency in hevc. Journal of Engineering, Design and Technology, 24(4), pp. 35-62. ISSN 1726-0531
Kwofie, T E; Amos-Abanyie, S; Fugar, F; Afram, S O; Aigbavboa, C O and Olympio, G F (2023) Nature of communication performance among multi-teams in mass housing project delivery: A fuzzy set theory approach. International Journal of Construction Management, 23(9), pp. 1506-1517. ISSN 1562-3599
Kwofie, T E; Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(5), pp. 628-641. ISSN 2044-124X
Leino, J L (2008) Community and private sector approaches to development in Kenya. PhD thesis, University of California, Berkeley, USA.
Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(2), pp. 103-113. ISSN 1466433X
Makarfi, U and Udeaja, C (2019) To formulate a conceptual model for innovation: Reframing theoretical constructs of BIM adoption within SME organisations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Makarfi, U U (2022) Digital prototype framework for understanding building information modelling adoption: Nigerian small and medium architectural firms. PhD thesis, University of Salford, UK.
Matsebe, O; Mpofu, K; Agee, J T and Ayodeji, S P (2015) Corner features extraction: Underwater SLAM in structured environments. Journal of Engineering, Design and Technology, 13(4), pp. 556-569.
Mello, Simone Gueresi de (2023) Urban transformation in pieces: Financing, regulation, and implementation tricks of social interest housing in the consortium urban operations of the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.
Nasarre-Aznar, S (2015) "Robinhoodian" courts' decisions on mortgage law in Spain. International Journal of Law in the Built Environment, 7(2), pp. 127-147. ISSN 1756-1450
Nesan Lenin, J (2011) Integrated e-bidding framework for construction. International Journal of Construction Education and Research, 7(4), pp. 243-258. ISSN 1557-8771
Nguyen, T; Elelu, K; Le, T and Le, C (2026) Enhancing auditory safety warnings in highway construction zones with loud noise using generative artificial intelligence. Journal of Construction Engineering and Management, 152(3): 04025283, ISSN 0733-9364
Peltola, T and Mansikkamäki, P (2007) Formable multilayer PCB structure: Design and technology demonstrator. Journal of Engineering, Design and Technology, 5(2), pp. 148-158. ISSN 1726-0531
Qin, X (2010) The impact of political forces on urban land ownership reform in transitional China. International Journal of Law in the Built Environment, 2(3), pp. 206-217. ISSN 1756-1450
Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X
Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.
Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach. DArch thesis, University of Michigan, USA.
Verzobio, A (2020) Supporting rational decision-making in civil engineering. PhD thesis, University of Strathclyde, UK.
Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
Yoo, J.; Hwang, S.; Seo, J. and Choi, B. (2026) Feasibility of a wearable 360° camera for personalized proximity warning on construction sites. Journal of Construction Engineering and Management, 152(6): 04026079, ISSN 0733-9364
Up a level