Items with Index Term: dispute

Number of items: 686.

Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364

Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364

Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England. PhD thesis, University of Strathclyde, UK.

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdallah, A; Assaf, S and Hassanain, M A (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management, 15(4), pp. 282-296. ISSN 1745-2007

Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599

Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.

Abdul Nabi, M and El-Adaway, I H (2022) Understanding disputes in modular construction projects: Key common causes and their associations. Journal of Construction Engineering and Management, 148(1): 04021184, ISSN 0733-9364

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.

Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Agapiou, A (2011) Scottish construction lawyers' awareness and experiences of alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 181-192. ISSN 17514304

Agapiou, A (2013) UK construction participants' experiences of adjudication. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 137-144. ISSN 17514312

Agapiou, A (2015) The factors influencing mediation referral practices and barriers to its adoption: A survey of construction lawyers in England and Wales. International Journal of Law in the Built Environment, 7(3), pp. 231-247. ISSN 1756-1450

Agapiou, A (2022) Briefing: The role of the technology and construction court in alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 61-64. ISSN 1751-4304

Agapiou, A and Clark, B (2011) Scottish construction lawyers and mediation: An investigation into attitudes and experiences. International Journal of Law in the Built Environment, 3(2), pp. 159-181. ISSN 1756-1450

Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.

Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.

Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193

Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X

Aibinu, A A; Ofori, G and Ling, F Y Y (2008) Explaining cooperative behavior in building and civil engineering projects' claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), pp. 681-691. ISSN 0733-9364

Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.

Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.

Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.

Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193

Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.

Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.

Ali, B; Aibinu, A and Paton-Cole, V (2023) Facilitating agreement in disruption claims through disruption analysis methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175

Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction. PhD thesis, Heriot-Watt University, UK.

Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175

Almeida, Rafael Goffinet de (2023) Spatialities of participation: Agencies between culture, politics and neoliberal subjectvation. PhD thesis, Universidade de São Paulo, Brazil.

Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364

Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.

Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599

Alsalman, A A (2012) Construction risks allocation: Optimal risk allocation decision support model. PhD thesis, Oregon State University, USA.

Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.

Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193

Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599

Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2023) Pursuing alignment of clients' and contractors' perceptions of client satisfaction in Saudi Arabian projects. Built Environment Project and Asset Management, 13(3), pp. 341-358. ISSN 2044-124X

Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Alzaben, A A (2016) Under the shadow of sharia law: the implementation of Government Procurement Agreement provisions by Saudi Arabian government tenders and procurement law. PhD thesis, University of Hull, UK.

Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.

Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599

Aminian, E (2015) A study of inter-firm opportunism in the construction industry. PhD thesis, University of Manchester, UK.

Aminuddin, F A B (2019) The compatibility of dispute resolution mechanisms with national culture in the construction industry: a case study of the Malaysian statutory adjudication regime. PhD thesis, University of Salford, UK.

Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708

Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165

Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.

Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599

Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364

Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364

Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria. PhD thesis, Kingston University, UK.

Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364

Asadi, R; Wilkinson, S and Rotimi, J O B (2023) The common causes of rework in construction contracts: A diagnostic approach. Journal of Engineering, Design and Technology, 21(4), pp. 1107-1133. ISSN 1726-0531

Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029

Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.

Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X

Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364

Atanasov, V; Greenwood, D and Robson, S (2020) The management of disputes as an element of construction transaction costs: An empirical study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Athanasakis, D (2007) Has multiparty arbitration failed in construction disputes? Legal and practical issues in drafting joinder provisions. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.

Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.

Ayhan, M; Dikmen, I and Talat Birgonul, M (2021) Predicting the occurrence of construction disputes using machine learning techniques. Journal of Construction Engineering and Management, 147(4): 04021022, ISSN 0733-9364

Ayodeji, A A (2008) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute. PhD thesis, National University of Singapore, Singapore.

Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.

Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.

Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312

Baatz, N (2012) The UK Construction Act process plant exclusion. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 205-206. ISSN 17514312

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(4), pp. 249-269. ISSN 0969-9988

Ballesteros-Lintao, R and Ameer Ali, N A N (2023) Readability and comprehensibility of Malaysian construction contracts. International Journal of Construction Management, 23(15), pp. 2649-2657. ISSN 1562-3599

Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.

Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599

Barros D'Sa, A A J (2003) Changes in the liabilities and concerns of the construction professions at the turn of the 21st century. PhD thesis, University of Manchester, UK.

Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.

Beaumont, B (2009) Confidentiality in arbitration: A myth or an achievable goal? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 141-146. ISSN 17514312

Besaiso, H and Fenn, P (2022) How international construction arbitrators make their decisions: Status of commercial norms and international construction law. Journal of Construction Engineering and Management, 148(9): 04022077, ISSN 0733-9364

Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450

Besaiso, H; Fenn, P; Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry. Engineering, Construction and Architectural Management, 25(2), pp. 241-256. ISSN 0969-9988

Beynon, K S (2005) Dispute resolution and access to justice, with particular reference to the construction industry in the United Kingdom. PhD thesis, Swansea University, UK.

Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364

Birgonul, M T and Ozdogan, I D (2001) Risks borne by foreign contractors doing business in Turkey. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Blanke, G and Kotb, S (2015) Construction disputes under UAE law: Some initial considerations. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 269-276. ISSN 17514304

Bogusz, B (2013) Regulating public/private interests in town and village greens. International Journal of Law in the Built Environment, 5(1), pp. 21-39. ISSN 17561469

Bouwer, K A (2016) Building disappointment: the limits and potential of tort liability for energy efficiency problems in domestic buildings. PhD thesis, University College London, UK.

Bowes, D (2007) Practitioners' perception of adjudication in UK construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Bowes, D (2008) Identifying barriers to the establishment of dispute boards in UK construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.

Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364

Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450

Britton, P and Bailey, J (2011) New homes and consumer rights: England and Australia compared. International Journal of Law in the Built Environment, 3(3), pp. 269-295. ISSN 1756-1450

Brooker, P (1997) Factors which impact on the choice of alternative dispute resolution in the construction industry. PhD thesis, Oxford Brookes University, UK.

Brooker, P (2011) Towards a code of professional conduct for construction mediators. International Journal of Law in the Built Environment, 3(1), pp. 24-47. ISSN 1756-1450

Brooker, P and Lavers, A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics, 15(6), pp. 519-526. ISSN 01446193

Bröchner, J; Josephson, P E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(6), pp. 392-400. ISSN 0961-3218

Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364

Burrell, P A (2017) Structural errors and failures in construction: is knowledge hidden? PhD thesis, Anglia Ruskin University, UK.

Caiden, D (2017) Engineering expert witness work: What the lawyers require. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 181-185. ISSN 17514304

Cakmak, P I (2022) The stakeholders' perspective on the factors contributing to construction disputes. International Journal of Building Pathology and Adaptation, 40(5), pp. 712-727. ISSN 23984708

Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.

Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.

Candaş, A B and Tokdemir, O B (2022) Automated identification of vagueness in the FIDIC silver book conditions of contract. Journal of Construction Engineering and Management, 148(4): 04022007, ISSN 0733-9364

Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364

Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988

Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364

Cecilia, M M (2016) Requirements for the effective statutory adjudication practice in the South African construction industry. PhD thesis, University of Pretoria, South Africa.

Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988

Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.

Chammout, B; El-Adaway, I H; Abdul Nabi, M and Assaad, R H (2024) Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(9): 04024109, ISSN 0733-9364

Chan, E H W (1997) Amicable dispute resolution in the people's republic of China and its implications for foreign-related construction disputes. Construction Management and Economics, 15(6), pp. 539-548. ISSN 01446193

Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364

Chan, E H W and Tse, R Y C (2003) Cultural considerations in international construction contracts. Journal of Construction Engineering and Management, 129(4), pp. 375-381. ISSN 0733-9364

Chan, H-W E (2003) A study of factors relevant to disputes arising in international construction projects involving both European and Asian cultural factors. PhD thesis, King's College London, UK.

Chan, Hon-Wan Edwin (2003) A study of contractual provisions relevant to disputes arising in international construction projects involving both European and East Asian cultural factors. PhD thesis, King's College London (University of London), UK.

Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029

Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.

Chapman, M (2016) Litigation following UK Water Resources Act section 110 appeal. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 85-90. ISSN 17514304

Chapman, M L (2011) First ever appeal under section 110 of the uk water resources act 1991. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 203-208. ISSN 17514304

Chapman, P H J (2009) Dispute boards on major infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 7-16. ISSN 17514312

Charlson, J (2014) Law for engineering undergraduates on accredited courses 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 201-206. ISSN 17514304

Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.

Charlson, J; Baldwin, R and Harrison, J (2014) Early perceptions of allowing adjudication of oral contracts. International Journal of Law in the Built Environment, 6(3), pp. 233-249. ISSN 1756-1450

Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chen, C (2015) A proactive approach for change management and control on construction projects. PhD thesis, University of California, Berkeley, USA.

Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.

Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.

Cheung, S O and Chow, P T (2011) Withdrawal in construction project dispute negotiation. Journal of Construction Engineering and Management, 137(12), pp. 1071-1079. ISSN 0733-9364

Cheung, S O; Chow, P T and Yiu, T W (2009) Contingent use of negotiators' tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 135(6), pp. 466-476. ISSN 0733-9364

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(2), pp. 321-348. ISSN 0969-9988

Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Cheung, S O; Ng, S T; Lam, K C and Sin, W S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(2), pp. 117-127. ISSN 1471-4175

Cheung, S O and Pang, K H Y (2013) Anatomy of construction disputes. Journal of Construction Engineering and Management, 139(1), pp. 15-23. ISSN 0733-9364

Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193

Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364

Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193

Cheung, S O; Yiu, K T W and Suen, H (2004) Construction negotiation online. Journal of Construction Engineering and Management, 130(6), pp. 844-852. ISSN 0733-9364

Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364

Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364

Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599

Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.

Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.

Chinyio, E; Gameson, R and Suresh, S (2011) The management of construction stakeholders by higher education institutions (HEIs) in the United Kingdom (UK): A pilot study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Chong, H Y and Zin, R M (2012) Selection of dispute resolution methods: Factor analysis approach. Engineering, Construction and Architectural Management, 19(4), pp. 428-443. ISSN 0969-9988

Chong, H Y; Zin, R M and Chong, S C (2013) Employing data warehousing for contract administration: E-dispute resolution prototype. Journal of Construction Engineering and Management, 139(6), pp. 611-619. ISSN 0733-9364

Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988

Chow, P T; Kong, F and Cheung, S O (2012) Mediating and moderating effect of tension on withdrawal-commitment relationship in construction dispute negotiation. Journal of Construction Engineering and Management, 138(10), pp. 1230-1238. ISSN 0733-9364

Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Coggins, J; Elliott, R F and Bell, M (2010) Towards harmonisation of construction industry payment legislation: A consideration of the success afforded by the East and West coast models in Australia. Construction Economics and Building, 10(3), pp. 14-35. ISSN 2204-9029

Coggins, J and O’Leary, T (2008) The validity of adjudicators' determinations containing errors of law: The NSW judicial approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Coggins, J K and Donohoe, S (2012) The validity of adjudicators' determinations containing errors of law: A comparison of the judicial approach in England and New South Wales. International Journal of Law in the Built Environment, 4(2), pp. 116-125. ISSN 1756-1450

Coggins, Jeremy Keith (2012) A proposal for harmonisation of security of payment legislation in the Australian building and construction industry. PhD thesis, University of Adelaide, Australia.

Coleman, C E; Mwanaumo, E M; Muya, M and Rahman, R A (2025) Financial challenges leading to premature contract termination in Ghanaian construction industry: Causes and mitigation strategies. Journal of Construction Business and Management, 7(2), pp. 45-66.

Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.

Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.

Dagenais, D A (2007) Introduction to good faith in construction contracts. Construction Management and Economics, 25(7), pp. 715-721. ISSN 1466433X

Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599

Daoud, O E K (1997) The architect/engineer's role in rehabilitation work. Journal of Construction Engineering and Management, 123(1), pp. 1-5. ISSN 0733-9364

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.

De Asís Ramírez, F; Seco, A and Miqueleiz, L (2013) The arbitration process in civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 43-46. ISSN 17514304

De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364

Diekmann, J E and Girard, M J (1995) Are contract disputes predictable? Journal of Construction Engineering and Management, 121(4), pp. 355-363. ISSN 0733-9364

Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364

Diekmann, J E and Nelson, M C (1985) Construction claims: Frequency and severity. Journal of Construction Engineering and Management, 111(1), pp. 74-81. ISSN 0733-9364

Dikmen, I; Birgonul, M T; Ozorhon, B and Eren, K (2008) Critical success factors for partnering in the Turkish construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Dithebe, K; Thwala, W D D; Aigbavboa, C O; Edwards, D J; Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(2), pp. 325-342. ISSN 1726-0531

Do, S T; Nguyen, V T and Nguyen, N H (2023) Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, 30(9), pp. 3817-3839. ISSN 0969-9988

Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175

Dorée, A G (1997) Construction procurement by Dutch municipalities. Journal of Construction Procurement, 3(3), pp. 78-88. ISSN 1358-9180

Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364

Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.

El-Adaway, I H; Abotaleb, I S; Eid, M S; May, S; Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: Comparative analysis approach. Journal of Construction Engineering and Management, 144(6): 04018031, ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.

Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364

Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175

Elmarsafi, G M (2008) Interorganizational collaboration: Transformation strategies to reduce construction disputes in the construction industry. PhD thesis, Capella University, USA.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Eom, C S J and Paek, J H (2009) Risk index model for minimizing environmental disputes in construction. Journal of Construction Engineering and Management, 135(1), pp. 34-41. ISSN 0733-9364

Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364

Ey, W; Zuo, J and Han, S (2014) Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(3), pp. 148-155. ISSN 1562-3599

Ezulike, E I and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(2), pp. 144-149. ISSN 0969-9988

Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364

Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175

Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988

Fatima, Zahra (2024) Pakistan's international investment policy: Towards a new generation of fair and equitable treatment provisions. PhD thesis, Canterbury Christ Church University, UK.

Fellows, R and Liu, A (2010) Conflict on multi-national construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 101-109. ISSN 17514312

Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.

Fenn, P; Lowe, D and Speck, C (1997) Conflict and dispute in construction. Construction Management and Economics, 15(6), pp. 513-518. ISSN 01446193

Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364

Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304

Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364

Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process. PhD thesis, Virginia Commonwealth University, USA.

Fisher, W H (2017) The use of arbitration in the construction industry in England and Wales: an evaluation of its continuing role following the Arbitration Act 1996. PhD thesis, University of Wolverhampton, UK.

Fobiri, G; Musonda, I and Muleya, F (2025) Using reality capture technology for efficient cost valuation and work verification of construction projects. Construction Innovation, 25(7), pp. 50-75. ISSN 1471-4175

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364

Forman, M and Haugbølle, K (2009) Arbitration and expert appraisals of defects in construction: What do companies learn? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Fox, J V S (2014) Incentives and limits in letters of intent: Are they worth the paper they're written on? International Journal of Law in the Built Environment, 6(3), pp. 214-232. ISSN 1756-1450

Fu, Y and Zhang, S (2015) The interaction of trust and contractual governance on dispute negotiation strategy in contractor-subcontractor relationships. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.

Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.

Gamil, Y and Abdul Rahman, I (2023) Impact of poor communication on dispute occurrence in the construction industry: A preliminary exploratory study of Yemen construction industry. International Journal of Construction Management, 23(16), pp. 2729-2735. ISSN 1562-3599

Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.

Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.

Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.

Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Gibbs, D. J.; Lord, W.; Emmitt, S. B. A. and Ruikar, K. (2015) BIM and construction contracts: Cpc 2013's approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 1751-4304

Gibbs, D J; Lord, W; Emmitt, S B A and Ruikar, K (2015) BIM and construction contracts: CPC 2013’s approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 17514304

Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.

Gill, A; Gray, J; Skitmore, M and Callaghan, S (2015) Comparison of the effects of litigation and adr in South-East Queensland. International Journal of Construction Management, 15(3), pp. 254-263. ISSN 1562-3599

Gorse, C A (2004) Monitoring, planning and tracking: Delay, disruption and legal risk management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Gould, N and King, C (2010) The mediation of construction disputes: Recent research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 29-39. ISSN 17514312

Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364

Greeff, T N (2018) Justification for the recognition of a new nominate contract based on project defect management. LLD thesis, University of Pretoria, South Africa.

Greenwood, D J and Yates, D J (2006) The determinants of successful partnering: A transaction cost perspective. Journal of Construction Procurement, 12(1),

Gregory-Stevens, J; Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(2), pp. 123-136. ISSN 1756-1450

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Gunarathna, C; Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(2), pp. 178-201. ISSN 0969-9988

Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), pp. 1233-1255. ISSN 0969-9988

Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364

Gupta, P and Jha, K N (2024) Integration of blockchain in contract management for prevention of construction disputes: A systematic literature review and conceptual framework. International Journal of Construction Management, 24(10), pp. 1054-1065. ISSN 1562-3599

Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(2), pp. 989-1015. ISSN 0969-9988

Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988

Hagberg, J and Styhre, A (2013) The production of social space: Shopping malls as relational and transductive spaces. Journal of Engineering, Design and Technology, 11(3), pp. 354-374. ISSN 1726-0531

Haji Abdullah, M A b (2015) An investigation of the development of mediation in the UK construction industry. PhD thesis, University of Manchester, UK.

Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531

Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation. PhD thesis, Concordia University, Canada.

Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364

Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364

Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364

Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193

Harmon, K M J (2003) Effectiveness of dispute review boards. Journal of Construction Engineering and Management, 129(6), pp. 674-679. ISSN 0733-9364

Harmon, K M J (2003) Dispute review boards and construction conflicts: Attitudes and opinions of construction industry members. PhD thesis, Nova Southeastern University, USA.

Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364

Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.

Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304

Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988

Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.

Hester, W T; Kuprenas, J A and Thomas, H R (1987) Arbitration: A look at its form and performance. Journal of Construction Engineering and Management, 113(3), pp. 353-367. ISSN 0733-9364

Hillig, J B; Dan-Asabe, D; Donyavi, S; Dursun, O and Thampuratty, A (2010) Fidic's red book 1999 edition: A study review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 129-133. ISSN 17514312

Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599

Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364

Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708

Horgan, I (2014) The influence of an online collaboration tool on relationships in inter-organisational networks. PhD thesis, Victoria University, Australia.

Hsu, C L; Wang, J T and Hou, H Y (2023) A blockchain-based parametric model library for knowledge sharing in building information modeling collaboration. Journal of Construction Engineering and Management, 149(11): 04023107, ISSN 0733-9364

Hughes, W P and Shinoda, H (1999) Achieving satisfactory contractual terms for the engineer's role. In: Hughes, W P (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.

Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364

Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.

Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312

Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364

Ibbs, C W (1986) Brand name or equalproduct specifications. Journal of Construction Engineering and Management, 112(1), pp. 1-13. ISSN 0733-9364

Ibbs, C W; Bates, L C and Echeverry, D (1987) Owner-furnished equipment (OFE) contract practices. Journal of Construction Engineering and Management, 113(2), pp. 249-263. ISSN 0733-9364

Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364

Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499

Ibrahim, W A B (2016) Regulatory framework for adjudicators in the Malaysian construction industry. PhD thesis, University of Strathclyde, UK.

Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007

Illankoon, I M C S; Tam, V W Y; Le, K N and Ranadewa, K A T O (2022) Causes of disputes, factors affecting dispute resolution and effective alternative dispute resolution for Sri Lankan construction industry. International Journal of Construction Management, 22(2), pp. 218-228. ISSN 1562-3599

Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450

Ilter, D and Dikbas, A (2009) An analysis of the key challenges to the widespread use of mediation in the Turkish construction industry. International Journal of Law in the Built Environment, 1(2), pp. 143-155. ISSN 1756-1450

Ioannou, P G and Awwad, R E (2010) Below-average bidding method. Journal of Construction Engineering and Management, 136(9), pp. 936-946. ISSN 0733-9364

Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Iseley, D T (1991) Trenchless excavation construction methods: Classification and evaluation. Journal of Construction Engineering and Management, 117(3), pp. 521-536. ISSN 0733-9364

Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.

Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599

Ive, G and Chang, C Y (2007) The principle of inconsistent trinity in the selection of procurement systems. Construction Management and Economics, 25(7), pp. 677-690. ISSN 1466433X

Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(1), pp. 50-65. ISSN 2204-9029

Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364

Jafari, D M (2012) Resolution of multiparty construction disputes under the Singapore international arbitration legal framework. PhD thesis, National University of Singapore, Singapore.

Jagannathan, M and Delhi, V S K (2022) Identifying focus areas to decode the decision to litigate contractual disputes in construction. Engineering, Construction and Architectural Management, 29(8), pp. 2976-2998. ISSN 0969-9988

Jagannathan, M and Delhi, V S K (2023) Decoding a construction organisation's tendency to litigate: An understanding through financial statements. Built Environment Project and Asset Management, 13(3), pp. 453-470. ISSN 2044-124X

Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X

Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175

Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jarratt, A (2015) Mediation insights: Practical ways to shape the outcome. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 130-134. ISSN 17514304

Jaskula, Klaudia (2024) Blockchain-enabled CBIM for lifecycle data provenance. PhD thesis, University College London, UK.

Jelodar, M B; Yiu, T W and Wilkinson, S (2015) Systematic representation of relationship quality in conflict and dispute: For construction projects. Construction Economics and Building, 15(1), pp. 89-103. ISSN 2204-9029

Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364

Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X

Jia, M and Zhao, L (2025) Evolutionary analysis of information-based construction management promotion using a government-enterprise evolutionary game model. Engineering, Construction and Architectural Management, 32(1), pp. 349-373. ISSN 0969-9988

Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.

Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.

Kangari, R (1995) Construction documentation in arbitration. Journal of Construction Engineering and Management, 121(2), pp. 201-208. ISSN 0733-9364

Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364

Kassab, M; Hegazy, T and Hipel, K (2010) Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136(12), pp. 1249-1257. ISSN 0733-9364

Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364

Kavaarpuo, G; Tiwari, P and Martel, A (2026) Transaction costs and innovation outcomes: Lessons from early adopters of housebuilding innovations. Construction Innovation, 26(1), pp. 236-259. ISSN 1471-4175

Kayaga, S (2008) Public-private delivery of urban water services in Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 147-155. ISSN 17514312

Keevil, P S (1998) Feasibility of representing selected elements of the 1985 building regulations in prolog or other rule-based form. PhD thesis, Open University, UK.

Kennedy, P and Milligan, J L (2000) Cost of the adjudication process in the UK since the introduction of the Housing Grants, Construction and Regeneration Act 1996. Journal of Financial Management of Property and Construction, 5(3), pp. 171-180. ISSN 1366-4387

Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193

Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364

Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499

Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364

Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.

Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304

Kineber, A F; Oke, A E; Ali, A H; Dosumu, O; Fakunle, K and Olanrewaju, O I (2025) Critical application areas of radio frequency identification (RFID) technology for sustainable construction in developing countries: The case of Nigeria. Journal of Engineering, Design and Technology, 23(3), pp. 895-916. ISSN 1726-0531

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. PhD thesis, Nottingham Trent University, UK.

Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(2), pp. 99-110. ISSN 1366-4387

Klimas, E (2011) A general duty to co-operate in construction contracts? An international review. International Journal of Law in the Built Environment, 3(1), pp. 83-96. ISSN 1756-1450

Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988

Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364

Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029

Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.

Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kumaraswamy, M M (1996) The pursuit of quality in Hong Kong construction. Engineering, Construction and Architectural Management, 3(4), pp. 289-306. ISSN 0969-9988

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988

Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(3), pp. 228-237. ISSN 0969-9988

Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364

Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364

Kwon, N; Song, K; Lee, H S; Kim, J and Park, M (2018) Construction noise risk assessment model focusing on construction equipment. Journal of Construction Engineering and Management, 144(6): 04018034, ISSN 0733-9364

Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.

Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.

Lal, H (2009) Disputes under the UK's 'new' Construction Act. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 151-155. ISSN 17514312

Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Lam, P T I (2004) An investigation into the use of specifications in procuring construction works. Journal of Construction Procurement, 10(2),

Lane, P M M and Watson, M J (2010) Effectiveness of dispute adjudication boards, South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 171-177. ISSN 17514312

Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X

Laryea, S A and Hughes, W P (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(6), pp. 558-572. ISSN 0969-9988

Lau, E and Rowlinson, S (2005) The value base of trust for the construction industry. Journal of Construction Procurement, 11(1),

Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304

Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599

Lee, G; Moon, S and Chi, S (2023) Reference section identification of construction specifications by a deep structured semantic model. Engineering, Construction and Architectural Management, 30(9), pp. 4358-4386. ISSN 0969-9988

Lee, K R and Fenn, P (2007) Investigation of critical factors affecting successful mediation: Korean mediation users perspectives. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499

Leung, R H M and Hui, B T F (2020) Success in construction mediation in Hong Kong, China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 114-119. ISSN 17514304

Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364

Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X

Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364

Li, K and Cheung, S O (2016) The potential of bias in multi-tier construction dispute resolution processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364

Liang, S (2013) Legal aspects of privately financed infrastructure projects (PFIPs) in China: the case for international standards. PhD thesis, University of Leeds, UK.

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liao, L; Ye, Y; Wei, N; Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(5), pp. 2053-2076. ISSN 0969-9988

Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029

Lin, S and Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4): 04025015, ISSN 0733-9364

Lindebaum, D and Jordan, P J (2012) Relevant but exaggerated: The effects of emotional intelligence on project manager performance in construction. Construction Management and Economics, 30(7), pp. 575-583. ISSN 1466433X

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liyanawatta, T N; Francis, M and Ranadewa, K A T O (2024) Avoiding construction disputes: A comprehensive framework for pre-contract planning. International Journal of Construction Management, 24(12), pp. 1282-1294. ISSN 1562-3599

Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599

Lonsdale, J and Lucas, C (2019) The influence of key performance indicators on relationship and performance of joint venture construction projects in the UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(2), pp. 125-135. ISSN 1466433X

Loosemore, M; Nguyen, B T and Denis, N (2000) An investigation into the merits of encouraging conflict in the construction industry. Construction Management and Economics, 18(4), pp. 447-456. ISSN 01446193

Lopez, R and Amara, A (2018) Comparison of dispute boards and statutory adjudication in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 70-78. ISSN 17514304

Love, P; Davis, P; Ellis, J and Cheung, S O (2010) Dispute causation: Identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(4), pp. 404-423. ISSN 0969-9988

Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387

Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988

Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988

Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708

Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312

Madenli, O; Atasoy, G and Dikmen, I (2026) Identification and categorization of defects in construction specifications utilizing natural language processing. Journal of Construction Engineering and Management, 152(5): 04026044, ISSN 0733-9364

Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mai, M H (2019) The issue of cultural heritage protection in international investment in the mining and construction sectors. PhD thesis, University of Glasgow, UK.

Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana. PhD thesis, University of Wolverhampton, UK.

Mante, J (2015) Resolving infrastructure-related construction disputes in developing countries: The Ghana experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Maqsoom, A; Wazir, S J; Choudhry, R M; Thaheem, M J and Zahoor, H (2020) Influence of perceived fairness on contractors' potential to dispute: Moderating effect of engineering ethics. Journal of Construction Engineering and Management, 146(1): 4019090, ISSN 0733-9364

Marques, C P (2004) Selected issues in business and contractual relationships in private construction projects in Canada/China deals. PhD thesis, University of Calgary, Canada.

Marshall, H (2012) Adjudication enforcement: Partial final determinations and insolvency. International Journal of Law in the Built Environment, 4(1), pp. 60-74. ISSN 1756-1450

Martínez Alonso, Wilfrido (2024) An NLP approach to understand construction long text. PhD thesis, Stanford University, USA.

Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175

Maseko, L and Root, D (2021) Collaborative risk management within the design phase of green buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(5), pp. 519-527. ISSN 1466433X

Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X

Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499

Mawdesley, M J; Al-Jibouri, S H and Clark-Hughes, J (2002) A proactive control approach to agreeing entitlement to claims in construction. Journal of Financial Management of Property and Construction, 7(1), pp. 41-48. ISSN 1366-4387

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Memon, S A (2017) Hong Kong relational contracting : an investigation into the attitudes and behaviours of contractors' project teams. PhD thesis, University of Hong Kong, Hong Kong.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Mewomo, M C (2019) The construction industry stakeholders preliminary views on the proposed South African prompt payment and statutory adjudication regulations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Mirzaee, A M; Pourrostam, T; Majrouhi Sardroud, J; Hosseini, M R; Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: A causal-predictive model. Engineering, Construction and Architectural Management, 31(1), pp. 405-431. ISSN 0969-9988

Mitropoulos, P and Howell, G (2001) Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering and Management, 127(3), pp. 223-231. ISSN 0733-9364

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.

Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364

Moore, S (2020) RICS professional education and training for quantity surveyors and the extent to which it is relevant in the current UK built environment market. DProf thesis, University of Salford, UK.

Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), pp. 679-687. ISSN 0144-6193

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

Moyo, T; Mukawa, M; Moyo, C and Chigara, B (2023) Expected competencies of quantity surveyors in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 19-42. ISSN 1823-6499

Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), pp. 7-26. ISSN 1823-6499

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Mulhorn, W L (1987) Sources of conflict as perceived by architects and New Jersey public school officials when involved in a building project. EdD thesis, Temple University, USA.

Mullen, J (2017) The selection of expert witnesses. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 125-130. ISSN 17514304

Musenero, L; Baroudi, B and Gunawan, I (2023) Critical issues affecting dispute resolution practice in infrastructure public-private partnerships. Journal of Construction Engineering and Management, 149(3): 04023001, ISSN 0733-9364

Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.

Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Naimi, M (2013) Contract and claim prevention in major projects: a study on petrochemical projects in Iran. PhD thesis, University of Manchester, UK.

Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X

Nazlim, B (2012) Resolving construction disputes in Dubai. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 85-90. ISSN 17514312

Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364

Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988

Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193

Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(4), pp. 380-395. ISSN 0969-9988

Ndekugri, I; Smith, N and Hughes, W P (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(7), pp. 791-799. ISSN 1466433X

Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364

Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.

Neshat, N (2013) Conceptualization, measurement and empirical exploration of selected supply chain risk constructs. DSc thesis, ETH Zürich, Switzerland.

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.

Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599

Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364

Nguyen, T H D; Chileshe, N and Rameezdeen, R (2018) External stakeholder strategic actions in construction projects: A Vietnamese study. Construction Management and Economics, 36(8), pp. 443-458. ISSN 01446193

Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.

Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175

Nyström, J (2008) A quasi-experimental evaluation of partnering. Construction Management and Economics, 26(5), pp. 531-541. ISSN 1466433X

O'Neill, T; Spillane, J P and Carmody, S (2022) The composition and classification of interpersonal conflict in Irish construction small and medium-sized enterprises: A case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: A risk approach. Engineering, Construction and Architectural Management, 1(2), pp. 103-114. ISSN 0969-9988

Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599

Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387

Ojiako, U; Mashele, T and Chipulu, M (2014) Ubuntu within the South African construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 83-90. ISSN 17514304

Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.

Okello, J F; Bowa, O and Migosi, J (2025) The role of project delivery methods on the execution of construction projects in the Kenyan judiciary. Construction Economics and Building, 25(1), pp. 49-68. ISSN 2204-9029

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.

Okudan, O and Çevikbaş, M (2022) Alternative dispute resolution selection framework to settle disputes in public-private partnership projects. Journal of Construction Engineering and Management, 148(9): 04022086, ISSN 0733-9364

Olatunde, N A; Awodele, I A and Adebayo, B O (2022) Impact of COVID-19 pandemic on indigenous contractors in a developing economy. Journal of Engineering, Design and Technology, 20(1), pp. 267-280. ISSN 1726-0531

Olusola, J. and Phung, Q. (2026) A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1284-1298. ISSN 1562-3599

Omopariola, E D; Olugboyega, O; Windapo, A O and Albert, I (2022) Establishing the cost and time performances of projects executed by South African construction companies using different payment systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Osman, I A (2022) Impacts of global pandemics on construction projects and dispute resolution provisions. PhD thesis, University of Illinois at Chicago, USA.

Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Otim, M A; Kyalisiima, C; Tutesigensi, A; Mutikanga, H E and Kayondo, M (2023) Avoiding disputes through effective procurement in large construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Otim, M A; Tutesigensi, A and Mutikanga, H E (2022) Can professionalism make contract disputes in infrastructure projects disappear? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531

Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.

Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988

Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.

Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.

Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.

Patterson, R (2009) Using NEC contracts to manage risk and avoid disputes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 157-167. ISSN 17514312

Paulson, B C and Fondahl, J W (1983) Craft jurisdiction impact on construction. Journal of Construction Engineering and Management, 109(4), pp. 369-386. ISSN 0733-9364

Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599

Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531

Perry, L J (2006) Industrial disputes in the construction sector. Construction Economics and Building, 6(1), pp. 42-50. ISSN 2204-9029

Phillips-Alonge, O K (2017) The influence of partnering on the occurrence and cost of construction conflicts and disputes. PhD thesis, Northcentral University, USA.

Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.

Prinsloo, H F (2016) Toward a decision framework for the analysis of construction claims. PhD thesis, University of Pretoria, South Africa.

Prolas, L A M (2019) In search of efficiency: an analysis of adjudication under the Ontario Construction Act. JD thesis, Queen's University Belfast, UK.

Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(3), pp. 241-251. ISSN 1466433X

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Qadir, N; Brooks, T and Quigg, E (2023) Potential for construction statutory adjudication in Pakistan: taking lessons from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 91-102. ISSN 17514304

Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364

Rahman, M M and Kumaraswamy, M M (2001) Appraising the potential for joint risk management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450

Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364

Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Ramachandra, T and Rotimi, J O (2011) The nature of payment problems in the New Zealand construction industry. Construction Economics and Building, 11(2), pp. 22-33. ISSN 2204-9029

Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ramachandra, T and Rotimi, J O B (2015) Causes of payment problems in the New Zealand construction industry. Construction Economics and Building, 15(1), pp. 43-55. ISSN 2204-9029

Rameezdeen, R; Gunarathna, N and Assistant, R (2003) Organisational culture in construction: An employee perspective. Construction Economics and Building, 3(1), pp. 19-30. ISSN 2204-9029

Rameezdeen, R and Rodrigo, A (2013) Textual complexity of standard conditions used in the construction industry. Construction Economics and Building, 13(1), pp. 1-12. ISSN 2204-9029

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029

Ranasinghe, A (2012) Construction arbitration in Sri Lanka. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 91-94. ISSN 17514312

Randolph Thomas, H; Smith, G R and Wirsching, S M (1995) Understanding defective specifications. Journal of Construction Engineering and Management, 121(1), pp. 55-65. ISSN 0733-9364

Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.

Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988

Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.

Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364

Royal, S; Lehoux, N and Blanchet, P (2022) New home warranty schemes: Developing a theoretical comparative framework using qualitative content analysis. International Journal of Building Pathology and Adaptation, 40(4), pp. 499-522. ISSN 23984708

Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364

Rutter, D and Potter, B (2003) The role of multi-criterion decision methods (MCDM) in securing best value from buildings procured through PPP/PFI. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304

Ryan, C; Spillane, J P and Bradley, J G (2023) Legal issues facing adjudication in the Irish construction industry: A discussion. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.

Saeb, A; Danuri, M S M; Mohamed, O and Zakaria, N (2021) A mechanism for dispute resolution in the Iranian construction industry. Journal of Construction in Developing Countries, 26(1), pp. 205-226. ISSN 1823-6499

Saeb, A; Mohd Danuri, M S B; Zakaria, N B and Mohamed, O B (2020) A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3), pp. 211-230. ISSN 1557-8771

Salami, B A; Ajayi, S O and Oyegoke, A S (2023) Tackling the impacts of covid-19 on construction projects: An exploration of contractual dispute avoidance measures adopted by construction firms. International Journal of Construction Management, 23(7), pp. 1196-1204. ISSN 1562-3599

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Schubert, F N (1991) U.S. Army corps of engineers and Afghanistan's highways 1960–1967. Journal of Construction Engineering and Management, 117(3), pp. 445-459. ISSN 0733-9364

Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364

Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364

Senaratne, S and Mayuran, J (2015) Documentation management based on ISO for construction industries in developing countries. Journal of Construction in Developing Countries, 20(2), pp. 81-95. ISSN 1823-6499

Seneviratne, K and Michael, G V (2020) Disputes in time bar provisions for contractors' claims in standard form of contracts. International Journal of Construction Management, 20(4), pp. 335-346. ISSN 1562-3599

Shahhosseini, V and Hajarolasvadi, H (2021) A conceptual framework for developing a BIM-enabled claim management system. International Journal of Construction Management, 21(2), pp. 208-222. ISSN 1562-3599

Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988

Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Shin, K-C (2000) Identification of critical dispute characteristics (CDCs) during construction project operations. PhD thesis, Georgia Institute of Technology, USA.

Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387

Shugart, C T (1998) Regulation-by-contract and municipal services: The problem of contractual incompleteness. PhD thesis, Harvard University, USA.

Sidoli, J S (2021) Disputing in the built environment. PhD thesis, Open University, UK.

Sidoli Del Ceno, J (2011) An investigation into lawyer attitudes towards the use of mediation in commercial property disputes in England and Wales. International Journal of Law in the Built Environment, 3(2), pp. 182-198. ISSN 1756-1450

Sidoli del Ceno, J (2012) A process account of construction mediation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Sidoli del Ceno, J (2014) Compulsory mediation: Civil justice, human rights and proportionality. International Journal of Law in the Built Environment, 6(3), pp. 286-299. ISSN 1756-1450

Sidoli del Ceno, J; George, H and Vols, M (2015) Adjudication in tenancy deposit scheme disputes: Agents' perspectives. International Journal of Law in the Built Environment, 7(2), pp. 162-172. ISSN 1756-1450

Silva, P M; Domingo, N and Ameer Ali, N A N (2024) Causes of disputes in the construction industry: a systematic literature review. Journal of Financial Management of Property and Construction, 29(2), pp. 193-210. ISSN 1366-4387

Silva, P M; Domingo, N and Ameer Ali, N A N (2025) An interactive pre-contract dispute avoidance toolkit for New Zealand construction industry. Construction Innovation, 25(7), pp. 268-291. ISSN 1471-4175

Silva, P M; Domingo, N and Ali, N A N A (2025) Pre-contract measures to avoid potential disputes in the New Zealand construction industry. Construction Economics and Building, 25(2), pp. 235-252. ISSN 2204-9029

Sinclair, S (2016) Designing + (dis)assembling disputes: an ethnography of disputes & lawyers in the construction industry. PhD thesis, University of Westminster, UK.

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988

Singla, H K and Samanta, P K (2022) Identification of critical success factors (CSFs) for real estate developers (reds) in India. Journal of Financial Management of Property and Construction, 27(1), pp. 76-90. ISSN 1366-4387

Skaik, S (2017) Operational problems and solutions of statutory complex adjudication: Stakeholders' perspectives. International Journal of Law in the Built Environment, 9(2), pp. 162-175. ISSN 1756-1450

Skaik, S; Coggins, J and Mills, A (2015) A proposed roadmap to optimise the adjudication of complex payment disputes in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Skaik, S; Coggins, J and Mills, A (2015) Investigating the factors influencing the quality of adjudication of complex payment disputes in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.

Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers. PhD thesis, University of the West of England, Bristol, UK.

Soltani, Z (2018) Investigating the persuasiveness of forensic information models for jurors in construction disputes. PhD thesis, Texas A&M University, USA.

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364

Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Stipanowich, T J (1997) At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6), pp. 505-512. ISSN 01446193

Strahorn, S; Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387

Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Tabish, S Z S and Jha, K N (2018) Beyond the iron triangle in public construction projects. Journal of Construction Engineering and Management, 144(8): 04018067, ISSN 0733-9364

Taghizadeh, K; Alizadeh, M and Yavari Roushan, T (2021) Cooperative game theory solution to design liability assignment issues in BIM projects. Journal of Construction Engineering and Management, 147(9): 04021103, ISSN 0733-9364

Taher, N A b A (2009) Understanding and preventing construction conflict, claims and disputes: a critical in-depth study into their causes and recommendations to control in the United Arab Emirates. PhD thesis, University of South Wales, UK.

Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.

Tajul Ariffin H L and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: An initial review of literature. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tamburro, N and Wood, P (2014) Alliancing in Australia: Competing for thought leadership. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 75-82. ISSN 17514304

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.

Tawalare, A and Laishram, B (2018) Relational contracting conceptual model for public sector construction organisations: An Indian context. Construction Economics and Building, 18(2), pp. 70-91. ISSN 2204-9029

Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387

Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Teller, J (2001) An on-line glossary as a way to foster the construction of a common culture among urban experts, stakeholders and decision-makers. Construction Innovation, 1(4), pp. 259-271. ISSN 1471-4175

Tembo-Silungwe, C K and Khatleli, N (2018) Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5): 04018021, ISSN 0733-9364

Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: A case study of movement continuity. Construction Management and Economics, 29(2), pp. 131-144. ISSN 1466433X

Tetteh, M O and Chan, A P C (2019) Review of concepts and trends in international construction joint ventures research. Journal of Construction Engineering and Management, 145(10): 04019057, ISSN 0733-9364

Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364

Thomas, H R; Smith, G R and Mellott, R E (1994) Interpretation of construction contracts. Journal of Construction Engineering and Management, 120(2), pp. 321-336. ISSN 0733-9364

Thomas, H R; Smith, G R and Ponderlick, R M (1992) Resolving contract disputes based on differing-site-condition clause. Journal of Construction Engineering and Management, 118(4), pp. 767-779. ISSN 0733-9364

Thomas, H R; Smith, G R and Ponderlick, R M (1992) Resolving contract disputes based on misrepresentations. Journal of Construction Engineering and Management, 118(3), pp. 472-487. ISSN 0733-9364

Thomas, H R; Smith, G R and Wright, D E (1990) Resolving disputes over contract notice requirements. Journal of Construction Engineering and Management, 116(4), pp. 738-755. ISSN 0733-9364

Thomas Ng, S; Skitmore, R M and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(2), pp. 155-165. ISSN 0969-9988

Tian, S; Abdalla, A; Tang, Y; Zhang, G and Cao, X (2026) Construction disputes: A systematic review of definitions, antecedents, and resolutions. International Journal of Construction Management, 26(5), pp. 857-874. ISSN 1562-3599

Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364

Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988

Tobin, A G V (2009) Conflict-resolution competencies for the construction professional. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 181-184. ISSN 17514312

Torkanfar, Navid (2025) Blockchain-enabled digitalized trust in construction industry: Reforming trust and collaboration through technology. PhD thesis, University of Toronto, Canada.

Tran, H and Carmichael, D G (2013) A contractor's classification of owner payment practices. Engineering, Construction and Architectural Management, 20(1), pp. 29-45. ISSN 0969-9988

Trushell, I (2016) Everything's coming up (silk) roses. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Trushell, I; Clark, B and Agapiou, A (2014) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Trushell, I; Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(2), pp. 101-122. ISSN 1756-1450

Trushell, I and Egware, O (2015) Formal education and the practise of negotiation: Benefits for quantity surveyors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Trushell, I and Morrison, S (2015) Ownership of materials: A Scottish/English dichotomy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Tsai, J S and Chi, C S F (2009) Influences of Chinese cultural orientations and conflict management styles on construction dispute resolving strategies. Journal of Construction Engineering and Management, 135(10), pp. 955-964. ISSN 0733-9364

Tsai, J S and Chi, C S F (2015) Learning for win-win collaboration. Journal of Construction Engineering and Management, 141(7): 4015013, ISSN 0733-9364

Uher, T and Brand, M (2007) A comparative analysis of the operation of 'compulsory rapid adjudication' in New South Wales and New Zealand. Construction Management and Economics, 25(7), pp. 765-775. ISSN 1466433X

Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(2), pp. 163-176. ISSN 1358-9180

Uher, T E and Brand, M C (2008) Claimants' view of the performance of adjudication in New South Wales. Engineering, Construction and Architectural Management, 15(5), pp. 470-484. ISSN 0969-9988

Un, B; Erdiş, E; Aydınlı, S; Genç, O and Alboga, O (2025) Forecasting the outcomes of construction contract disputes using machine learning techniques. Engineering, Construction and Architectural Management, 32(10), pp. 6421-6444. ISSN 0969-9988

VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.

Vernali, R J (1992) The case of the California contractors state license board: A palette of conflict resolution strategies for the 1990s. DPA thesis, Golden Gate University, USA.

Verwey, J; Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors' conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), pp. 38-49. ISSN 2521-0165

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Wah, T K (2018) Legal analysis of construction defect claims within common law jurisdictions for Malaysia. PhD thesis, University of Malaya, Malaysia.

Wall, C J and Fellows, R (2010) The dispute resolution adviser (dra) system in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 179-184. ISSN 17514312

Wall, R; Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(2), pp. 137-160. ISSN 1756-1450

Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, J; Zhang, S; Fenn, P; Luo, X; Liu, Y and Zhao, L (2023) Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development. Journal of Construction Engineering and Management, 149(1): 03122010, ISSN 0733-9364

Wang, P (2019) The aetiology and progression of construction disputes between client and contractor in the UK. PhD thesis, University of Manchester, UK.

Wang, P; Fenn, P and Wang, K (2024) A novel approach for construction disputes causal inferences based on empirical data: A case-controlled method combined with Bradford Hill criteria. Engineering, Construction and Architectural Management, 31(11), pp. 4625-4644. ISSN 0969-9988

Wang, T; Tang, W; Qi, D; Shen, W and Huang, M (2016) Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4): 04015099, ISSN 0733-9364

Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.

Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Ward, P (2011) A UK and Australian perspective of the suitability of the scl protocols' provisions for dealing with float for adoption and use by the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ward, P; Sher, W; Gameson, R and Aranda-Mena, G (2007) Innovative protocols and technologies as a means of complying with the building and construction industry security of payments act 1999 (NSW) Australia. Construction Management and Economics, 25(7), pp. 747-763. ISSN 1466433X

Watson, M; Deshpande, N and Lasch, C (2025) Disaster vulnerability of the construction industry: Comparing impacts of hurricanes and the COVID-19 pandemic on Florida construction companies. Construction Management and Economics, 43(5), pp. 323-339. ISSN 0144-6193

Weddikkara, C (2003) The impact of professional culture on dispute resolution in the building industries of Australia and Sri-Lanka. PhD thesis, Murdoch University, Australia.

Weerasuriya, G T; Perera, S and Calheiros, R N (2025) Technological imperatives for issues in the certification of quality, progress, and payments in construction projects: A systematic review. Construction Economics and Building, 25(1), pp. 25-48. ISSN 2204-9029

Whaley, A (2020) Conflict and claims culture in construction. PhD thesis, University of Salford, UK.

Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364

Wright, J (2009) Mediation and dispute boards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 175-179. ISSN 17514312

Wu, H; Qian, Q K; Straub, A and Visscher, H J (2022) Factors influencing transaction costs of prefabricated housing projects in China: Developers' perspective. Engineering, Construction and Architectural Management, 29(1), pp. 476-501. ISSN 0969-9988

Wu, W; Wen, C; Yuan, Q; Chen, Q and Cao, Y (2025) Construction and application of knowledge graph for construction accidents based on deep learning. Engineering, Construction and Architectural Management, 32(2), pp. 1097-1121. ISSN 0969-9988

Xie, L L; Yang, Y; Hu, Y and Chan, A P C (2014) Understanding project stakeholders' perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(2), pp. 224-240. ISSN 0969-9988

Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364

Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364

Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: A transaction cost economics perspective. Journal of Financial Management of Property and Construction, 7(2), pp. 115-126. ISSN 1366-4387

Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: A review of current research. Journal of Financial Management of Property and Construction, 7(3), pp. 203-214. ISSN 1366-4387

Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.

Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599

Yean Yng Ling, F; Ming Hsia Ang, A and su yu Lim, S (2007) Encounters between foreigners and Chinese: Perception and management of cultural differences. Engineering, Construction and Architectural Management, 14(6), pp. 501-518. ISSN 0969-9988

Yeh, H H; Hsieh, T Y and Chen, J H (2017) Managing complex engineering interfaces of urban mass rapid transit projects. Journal of Construction Engineering and Management, 143(6): 05017001, ISSN 0733-9364

Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364

Yiu, T W; Cheung, S O and Siu, L Y (2012) Application of bandura's self-efficacy theory to examining the choice of tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 138(3), pp. 331-340. ISSN 0733-9364

Yiu, T W and Chung, Y N (2014) Face-saving tactics as an aid to construction negotiation in Hong Kong. Engineering, Construction and Architectural Management, 21(6), pp. 609-630. ISSN 0969-9988

Yiu, T W and Lai, W Y (2009) Efficacy of trust-building tactics in construction mediation. Journal of Construction Engineering and Management, 135(8), pp. 683-689. ISSN 0733-9364

Yogeswaran, K and Kumaraswamy, M M (1999) To instruct or not? The engineer's dilemma. Construction Management and Economics, 17(6), pp. 731-743. ISSN 01446193

Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-art review of blockchain-enabled construction supply chain. Journal of Construction Engineering and Management, 148(2): 03121008, ISSN 0733-9364

Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.

Younis, G E (2010) Minimizing construction disputes. PhD thesis, University of Salford, UK.

Yousefi, S (2009) Attitude-based strategic and tactical negotiations for conflict resolution in construction. PhD thesis, University of Waterloo, USA.

Yu, Dongwen (2025) Last call for impartiality: The role of the contract administrator in construction contracts. PhD thesis, University of Manchester, UK.

Yung, P and Rafferty, K (2015) Statutory adjudication in Western Australia: Adjudicators' views. Engineering, Construction and Architectural Management, 22(1), pp. 54-72. ISSN 0969-9988

Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364

Zeberga, M S; Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(6): 03124002, ISSN 0733-9364

Zhang, L (2019) To insist or to concede? Chinese contractors' behavioural strategies when handling disputed construction claims. PhD thesis, University of Manchester, UK.

Zhang, L; Fenn, P and Fu, Y (2019) To insist or to concede? Contractors' behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(3), pp. 424-443. ISSN 0969-9988

Zhang, L; Fu, Y and Lu, W (2021) Contract enforcement for claimants' satisfaction with construction dispute resolution: Moderating role of shadow of the future, fairness perception, and trust. Journal of Construction Engineering and Management, 147(2): 04020168, ISSN 0733-9364

Zhang, Y (2012) An investigation on cooperative behaviors in the Chinese construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364

Zhou, H; Gao, B; Tang, S; Li, B and Wang, S (2025) Intelligent detection on construction project contract missing clauses based on deep learning and NLP. Engineering, Construction and Architectural Management, 32(3), pp. 1546-1580. ISSN 0969-9988

Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364

Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988

de la Garza, J M; Vorster, M C and Parvin, C M (1991) Total float traded as commodity. Journal of Construction Engineering and Management, 117(4), pp. 716-727. ISSN 0733-9364

Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364