Items with Index Term: dismantling

Number of items: 21.

Aijazi, O (2015) Social repair and structural inequity: Implications for disaster recovery practice. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 454-467. ISSN 1759-5916

Chen, C (2016) Crane planning optimization for construction. PhD thesis, National University of Singapore, Singapore.

Furusaka, S (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(2), pp. 157-176. ISSN 01446193

Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218

Ibe, C. N. (2026) Optimising sustainable deconstruction strategies for concrete structures: A multi-criteria decision-making framework approach. International Journal of Building Pathology and Adaptation, 44(3), pp. 773-788. ISSN 2398-4708

Jayasinghe, R S; Rameezdeen, R and Chileshe, N (2023) Modelling the cause and effect relationship risks in reverse logistics supply chains for demolition waste. Engineering, Construction and Architectural Management, 30(9), pp. 4018-4044. ISSN 0969-9988

Joubert, F; Steyn, E and Pretorius, L (2021) Using the HAZOP method to conduct a risk assessment on the dismantling of large industrial machines and associated structures: Case study. Journal of Construction Engineering and Management, 147(1): 05020021, ISSN 0733-9364

Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364

Li, Mei (2012) A waste management system for small and medium enterprises engaged in office building retrofit projects. PhD thesis, Queensland University of Technology, Australia.

Longo, Leticia França Mattaraia (2020) Design for disassembly and BIM: Design tools to improve the reuse of materials. PhD thesis, Universidade de São Paulo, Brazil.

Lützkendorf, T and Balouktsi, M (2022) Embodied carbon emissions in buildings: Explanations, interpretations, recommendations. Buildings & Cities, 3(1), pp. 964-973. ISSN 2632-6655

Mehran Mahmoudi, M; Seyed Hossein Hosseini, N and Rahimi, F (2024) Integrating complete disassembly planning with deconstructability assessment to facilitate designing deconstructable buildings. Architectural Engineering and Design Management, 20(1), pp. 150-167. ISSN 1745-2007

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Quarmby, T (2011) Safe, healthy and sustainable demolition. PhD thesis, Loughborough University, UK.

Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193

Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364

Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.

Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.

Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007

Yang, J; Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(9): 04024118, ISSN 0733-9364

This list was generated on Sat Aug 22 02:24:55 2026 UTC.