Items with Index Term: discounted cash flow
Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364
Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Atkinson, J G B (2008) Market influences on low carbon energy designs in buildings. EngD thesis, University of Surrey, UK.
Carmichael, D G and Balatbat, M C A (2008) The influence of extra projects on overall investment feasibility. Journal of Financial Management of Property and Construction, 13(3), pp. 161-175. ISSN 1366-4387
Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364
Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Clarke, R N (1988) A managerial approach to forecasting for the construction industry. PhD thesis, Queen's University Belfast, UK.
Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364
Farrell, M L (1996) Real property valuation in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 1(1), pp. 5-20. ISSN 1366-4387
Farrell, M L (1997) Illiquidity, uncertainty and the impact of the term structure of interest rates on the valuation of real estate in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 2(3), pp. 5-30. ISSN 1366-4387
Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(2), pp. 5-32. ISSN 1366-4387
Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193
Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.
Meins, E; Wallbaum, H; Hardziewski, R and Feige, A (2010) Sustainability and property valuation: A risk-based approach. Building Research & Information, 38(3), pp. 280-300. ISSN 0961-3218
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Mintah, K; Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(2), pp. 133-151. ISSN 1366-4387
Mintah, Kwabena (2019) Is there value in waiting? An empirical study of real options application to Australian property developments. PhD thesis, RMIT University, Australia.
Mirzadeh, I and Birgisson, B (2016) Evaluation of highway projects under government support mechanisms based on an option-pricing framework. Journal of Construction Engineering and Management, 142(4): 04015094, ISSN 0733-9364
Okpala, D C (1991) Evaluation and selection of construction projects in Nigeria. Construction Management and Economics, 9(1), pp. 51-61. ISSN 01446193
Owusu-Manu, D G; Amo-Asamoah, E; Ghansah, F A and Asumadu, G (2022) An analysis of the economic viability of waste-to-energy generation in the kumasi metropolis of Ghana. Journal of Financial Management of Property and Construction, 27(1), pp. 1-15. ISSN 1366-4387
Pellegrini-Masini, G; Bowles, G; Peacock, A D; Ahadzi, M and Banfill, P F G (2010) Whole life costing of domestic energy demand reduction technologies: Householder perspectives. Construction Management and Economics, 28(3), pp. 217-229. ISSN 1466433X
Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.
Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions. II: Feasible prompt payment discount scenarios. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: A real option-pricing approach. Journal of Financial Management of Property and Construction, 7(2), pp. 75-90. ISSN 1366-4387
Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.
Wilkinson, S (1996) The current and potential use of life cycle costing in the New Zealand construction industry. Journal of Financial Management of Property and Construction, 1(3), pp. 43-52. ISSN 1366-4387
Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X
Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364
Up a level