Items with Index Term: deviation
Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599
AbdulAzeez, A D; Etubi, U and Umar, B (2019) An assessment of multi-skilling in addressing skills shortage in Nigerian construction firms. African Journal of Built Environment Research, 3(1), pp. 1-13. ISSN 2414-0236
Abhulimen, P E (2024) The influence of information-sharing and trust on competitiveness and organizational performance in construction supply chain management. DBA thesis, Keiser University, USA.
Abu Hanipah, A F F and Tahar, K N (2018) Development of the 3D dome model based on a terrestrial laser scanner. International Journal of Building Pathology and Adaptation, 36(2), pp. 122-136. ISSN 23984708
Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908
Abudu, Haruna Domanamwin; Mewomo, Cecilia Modupe; Adjei, Kofi Owusu and Bondinuba, Francis Kwesi (2026) The influence of technical and non-technical emergency response systems on infrastructure resilience. Journal of Construction Business and Management, 8(S1), pp. 30-47. ISSN 2521-0165
Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387
Adegoke, A.; Akanmu, A. and Terreno, S. (2026) Aligning visual data practices with construction decision making: Delphi-based investigation. Journal of Construction Engineering and Management, 152(8): 04026119, ISSN 0733-9364
Adeyemi, O and Oke, A (2022) Factors affecting mentoring of professionals in construction firms: Nigerian quantity surveyors' perspective. International Journal of Construction Management, 22(12), pp. 2300-2307. ISSN 1562-3599
Adinyira, E; Agyekum, K; Manu, P; Mahamadu, A M and Olomolaiye, P (2022) Lessening procurement deviations using procurement post reviews: Evidence from Ghana. Journal of Financial Management of Property and Construction, 27(2), pp. 199-219. ISSN 1366-4387
Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.
Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.
Aghimien, D O; Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations: a Delphi study. Engineering, Construction and Architectural Management, 27(10), pp. 3171-3188. ISSN 0969-9988
Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708
Agyekum, K; Adinyira, E and Amudjie, J (2021) Ethical misconducts within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana. Journal of Engineering, Design and Technology, 19(5), pp. 1101-1123. ISSN 1726-0531
Agyekum, K; Goodier, C and Oppon, J A (2022) Key drivers for green building project financing in Ghana. Engineering, Construction and Architectural Management, 29(8), pp. 3023-3050. ISSN 0969-9988
Agyekum, K; Kissi, E; Danku, J C; Ampratwum, G and Amegatsey, G S (2020) Factors driving the career progression of construction project managers. Journal of Engineering, Design and Technology, 18(6), pp. 1773-1791. ISSN 1726-0531
Agyekum, K; Pittri, H; Botchway, E A and Dompey, A M A (2024) Key attributes of designers' competencies for design-for-deconstruction implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 117-126. ISSN 17514304
Al-Atesh, E A; Rahmawati, Y; Zawawi, N A W A and Utomo, C (2023) A decision-making model for supporting selection of green building materials. International Journal of Construction Management, 23(5), pp. 922-933. ISSN 1562-3599
Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387
Al-Mohammad, M S; Haron, A T; Esa, M; Aloko, M N; Alhammadi, Y; Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: Evidence from countries with different income levels. Construction Innovation, 23(3), pp. 683-710. ISSN 1471-4175
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Algahtany, M (2018) Assessment and development of contractors' mitigation practices towards risks out of contractors' control in the Saudi construction industry. PhD thesis, Arizona State University, USA.
Alkaissy, M; Arashpour, M; Zeynalian, M and Li, H (2022) Worksite accident impacts on construction and infrastructure: Nondeterministic analysis of subsectors and organization sizes. Journal of Construction Engineering and Management, 148(6): 04022023, ISSN 0733-9364
Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.
Almeida, Y. and Calejo, R. (2026) Innovation in public works management: Proposal for a performance evaluation model based on cost and deadline indicators. Construction Management and Economics, 44(9), pp. 721-740. ISSN 0144-6193
Almeida, L; Tam, V W Y; Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: A green and non-green building comparison. Engineering, Construction and Architectural Management, 27(8), pp. 1939-1962. ISSN 0969-9988
Almusharraf, A and Whyte, A (2016) Task-based defect management: Anatomical classification. Built Environment Project and Asset Management, 6(3), pp. 345-358. ISSN 2044-124X
Alvanchi, A; Bajalan, Z and Iravani, P (2021) Emission assessment of alternative dam structure types, a novel approach to consider in new dam projects. Construction Innovation, 21(2), pp. 203-217. ISSN 1471-4175
Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), pp. 349-371. ISSN 1366-4387
Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
Aoieong, R T; Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: Model development. Construction Management and Economics, 20(2), pp. 179-192. ISSN 01446193
Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599
Asare, E; Owusu-Manu, D G; Ayarkwa, J; Martek, I and Edwards, D J (2026) Empirical perspective of working capital management practices among large building construction firms in Ghana. Construction Innovation, 26(3), pp. 768-785. ISSN 1471-4175
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Azeem, S; Naeem, M A; Waheed, A and Thaheem, M J (2017) Examining barriers and measures to promote the adoption of green building practices in Pakistan. Smart and Sustainable Built Environment, 6(3), pp. 86-100. ISSN 2046-6099
Azim, S W (2011) Understanding and managing project complexity. PhD thesis, University of Manchester, UK.
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
Azzazy, S; Ghaffarianhoseini, A; GhaffarianHoseini, A; Naismith, N; Doan, D T and Hollander, J B (2025) The significance of indoor thermal comfort on occupants' perception: In university buildings in auckland, New Zealand. Building Research & Information, 53(1-2), pp. 19-39. ISSN 0961-3218
Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Babalola, O and Jimoh, J A (2018) Analysis of the drivers and benefits of BIM incorporation into quantity surveying profession: Academia and students' perspectives. Journal of Engineering, Design and Technology, 16(5), pp. 750-766. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: A case of Nigeria. Smart and Sustainable Built Environment, 11(1), pp. 110-125. ISSN 2046-6099
Babatunde, S O; Perera, S; Ekundayo, D and Adeleke, D S (2020) An investigation into BIM uptake among contracting firms: An empirical study in Nigeria. Journal of Financial Management of Property and Construction, 26(1), pp. 23-48. ISSN 1366-4387
Babatunde, S O; Perera, S; Ekundayo, D and Adeleye, T E (2020) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction, 25(1), pp. 61-81. ISSN 1366-4387
Babatunde, S O; Udeaja, C and Adekunle, A O (2021) Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms. International Journal of Building Pathology and Adaptation, 39(1), pp. 48-71. ISSN 23984708
Bajere, P A (1996) Maintenance conditions and occupant behavior in government-provided housing in Lagos, Nigeria. DIT thesis, University of Northern Iowa, USA.
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364
Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(2), pp. 217-253. ISSN 1609-9451
Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599
Bello, A O; Olanrewaju, O I; Gbenga, P O; Khan, A A and Isa, R B (2025) Exploring the barriers to digital twin adoption in the Nigerian construction industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(5), pp. 1541-1572. ISSN 1726-0531
Bello, N A; Agava, Y H and Olanrele, O O (2021) Investment property typology analysis; evidence from Nigerian urban property returns and macroeconomic variables. African Journal of Built Environment Research, 5(1), pp. 77-96. ISSN 2414-0236
Berglund-Brown, J; Dobie, I; Hewitt, J; De Wolf, C and Ochsendorf, J (2025) Lifetimes of demolished buildings in US and European cities. Buildings & Cities, 6(1), pp. 1099-1116. ISSN 2632-6655
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Blanche, K G (1996) Personal and professional characteristics, perceptions of barriers, and strategies of women in different levels of the superintendency. EdD thesis, University of Maryland, College Park, USA.
Boadi, R (2020) A best practice framework for public-private partnerships (PPPs) in road projects: the case of Ghana. PhD thesis, University of Salford, UK.
Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.
Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(6), pp. 441-454. ISSN 1466433X
Brizendine, A L (1997) Risk based analysis of levees. PhD thesis, West Virginia University, USA.
Bukari, C; Kheni, N A; Boateng, I; Owusu-Ansah, C M and Simpson, K B (2026) Integrating knowledge management with total quality management to enhance construction project delivery in Ghana. Construction Economics and Building, 26(1), ISSN 2204-9029
Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364
Cai, Q; Hu, Q and Ma, G (2021) Improved hybrid reasoning approach to safety risk perception under uncertainty for mountain tunnel construction. Journal of Construction Engineering and Management, 147(9): 04021105, ISSN 0733-9364
Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chen, S.; Guan, Z.; Zhang, Z.; Guo, H. and Han, Y. (2026) Impact of construction workers' physical fatigue on unsafe behavior: An ecg-based field experiment study. Journal of Construction Engineering and Management, 152(8): 04026128, ISSN 0733-9364
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, Q; Tian, Z; Lei, T and Huang, S (2023) An association rule mining model for evaluating the potential correlation of construction cross operation risk. Engineering, Construction and Architectural Management, 30(10), pp. 5109-5132. ISSN 0969-9988
Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Chen, Z; Li, H; Shen, Q and Xu, W (2004) An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry. Construction Management and Economics, 22(1), pp. 55-73. ISSN 01446193
Chua, S J L; Zubbir, N B; Ali, A S and Au-Yong, C P (2018) Maintenance of high-rise residential buildings. International Journal of Building Pathology and Adaptation, 36(2), pp. 137-151. ISSN 23984708
Chun, S and Nam, K (2022) Analyzation and prioritization of healthcare environment criteria for designing geriatric long-term care private hospitals in South Korea using an analytic hierarchy process. Architectural Engineering and Design Management, 18(5), pp. 723-738. ISSN 1745-2007
Chung, J Y (1984) Comparison of safety programs and employee attitudes within university of California facilities management departments. PhD thesis, University of California, Santa Barbara, USA.
Cothern, E J (2021) Exposure to respirable crystalline silica during five OSHA Table 1 tasks and the effectiveness of dust controls, the contribution of background silica dust to personal exposures, and the use of a photometric instrument to assess silica dust exposure in real time. PhD thesis, Colorado State University, USA.
Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.
Crowley, L G (1997) Robust statistical estimators for use within competitive bid data. Journal of Construction Engineering and Management, 123(1), pp. 53-63. ISSN 0733-9364
Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364
Dafeamekpor, C A; Adjei-Kumi, T; Nani, G; Kissi, E and Tengan, C (2023) Determinants for assessing self-help housing affordability in Ghana's housing sector: A Delphi approach. International Journal of Construction Management, 23(11), pp. 1815-1827. ISSN 1562-3599
Dandan, T H; Sweis, G; Sukkari, L S and Sweis, R J (2020) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology, 18(4), pp. 787-819. ISSN 1726-0531
Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364
Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.
De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364
Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364
Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218
Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988
Dmaidi, N (1995) Simplified estimating and control procedures for the offshore oil construction industry. PhD thesis, University of Dundee, UK.
Drew D.S, T S L Y (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(1), pp. 67-81. ISSN 01446193
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Duggan, G P; Bauleo, P; Authier, M; Aloise-Young, P A; Care, J and Zimmerle, D (2023) Electricity consumption in commercial buildings during COVID-19. Buildings & Cities, 4(1), pp. 851-866. ISSN 2632-6655
Dzeng, R J and Wang, S S (2008) An analysis of infrastructure development based on national competitiveness perspectives. Construction Management and Economics, 26(1), pp. 47-61. ISSN 1466433X
Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364
Easa, S M and Can, E K (1985) Optimization model for aggregate blending. Journal of Construction Engineering and Management, 111(3), pp. 216-230. ISSN 0733-9364
Easa, S M and Can, E K (1985) Stochastic priority model for aggregate blending. Journal of Construction Engineering and Management, 111(4), pp. 358-373. ISSN 0733-9364
Edwards, D J; Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(3), pp. 171-176. ISSN 0969-9988
Eiris, R; Jain, E; Gheisari, M and Wehle, A (2021) Online hazard recognition training: Comparative case study of static images, cinemagraphs, and videos. Journal of Construction Engineering and Management, 147(8): 04021082, ISSN 0733-9364
Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Aroud, A S (1980) Road network investment model for developing countries. PhD thesis, Pennsylvania State University, USA.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Emuze, F A (2022) Addressing violations of safe work procedures in South African construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 113-121. ISSN 17514304
Essiet, U M (2016) Developing a framework to facilitate the assessment of asset management information quality in facilities management operations. PhD thesis, University of Huddersfield, UK.
Ezzeddine, A; Shehab, L; Srour, I; Power, W; Zankoul, E and Freiha, E (2023) Ccc_implementing the construction control room on a fast-paced project: The case study of the beirut port explosion. International Journal of Construction Management, 23(5), pp. 745-755. ISSN 1562-3599
Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fateh, M A M; Supian, A N and Goh, C S (2024) Managing emotional intelligence of construction players during COVID-19 in Malaysia. Journal of Construction in Developing Countries, 29(1), pp. 191-210. ISSN 1823-6499
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.
Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364
Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.
Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Gamil, Y and Abdul Rahman, I (2019) Awareness and challenges of building information modelling (BIM) implementation in the Yemen construction industry. Journal of Engineering, Design and Technology, 17(5), pp. 1077-1084. ISSN 1726-0531
Gamil, Y and Abdul Rahman, I (2020) Assessment of critical factors contributing to construction failure in Yemen. International Journal of Construction Management, 20(5), pp. 429-436. ISSN 1562-3599
Gamil, Y; Abdullah, M A; Abdul Rahman, I and Asad, M M (2020) Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), pp. 1091-1102. ISSN 1726-0531
Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236
Gillen, M E (1996) Nonfatal falls in construction workers: Predictors of injury severity. PhD thesis, University of California, San Francisco, USA.
Giti, D M; K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction, 25(2), pp. 293-312. ISSN 1366-4387
Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.
Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364
Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364
Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.
Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193
Gómez-Cabrera, A; Gutierrez-Bucheli, L and Muñoz, S (2024) Causes of time and cost overruns in construction projects: A scoping review. International Journal of Construction Management, 24(10), pp. 1107-1125. ISSN 1562-3599
Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hajikazemi, S; Aaltonen, K; Ahola, T; Aarseth, W and Andersen, B (2020) Normalising deviance in construction project organizations: A case study on the collapse of Carillion. Construction Management and Economics, 38(12), pp. 1122-1138. ISSN 01446193
Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007
Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193
Han, Y; Yin, Z; Liu, J; Jin, R; Gidado, K; Painting, N; Yang, Y and Yan, L (2019) Defining and testing a safety cognition framework incorporating safety hazard perception. Journal of Construction Engineering and Management, 145(12): 04019081, ISSN 0733-9364
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364
Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988
Hatami, N and Rashidi, A (2025) Enhancing the adoption of building information modeling in the Iranian AEC sector: Insights from a Delphi study. Engineering, Construction and Architectural Management, 32(2), pp. 847-869. ISSN 0969-9988
Hernández, J M A (2024) Essays on public policy evaluation: The case of spain's supplier payment plan. PhD thesis, University of Exeter, UK.
Herrera, C and Lemus, L (2025) The "invasion of women"? Challenges to gender norms and relations with women's increasing presence in the Mexican construction industry. Construction Management and Economics, 43(9), pp. 723-745. ISSN 0144-6193
Herrera-Pérez, V.; Rubio-Romero, J. C.; Fuertes, A.; Salguero-Caparrós, F. and del Carmen Pardo-Ferreira, M. (2026) Investigating the impact of medication consumption on crane-related occupational health and safety risks in construction projects. Journal of Construction Engineering and Management, 152(8): 04026116, ISSN 0733-9364
Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218
Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599
Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364
Hoxha, E; Passer, A; Saade, M R M; Trigaux, D; Shuttleworth, A; Pittau, F; Allacker, K and Habert, G (2020) Biogenic carbon in buildings: A critical overview of LCA methods. Buildings & Cities, 1(1), pp. 504-524. ISSN 2632-6655
Hsu, P Y; Aurisicchio, M; Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2501-2522. ISSN 0969-9988
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007
Hulio, Z H; Yousufzai, G and Jiang, W (2021) Statistical analysis of wind resource and energy potential assessment of quaidabad site, sindh Pakistan. Journal of Engineering, Design and Technology, 19(6), pp. 1291-1316. ISSN 1726-0531
Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364
Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364
Hyari, K H; Tarawneh, Z S and Katkhuda, H N (2016) Detection model for unbalanced pricing in construction projects: A risk-based approach. Journal of Construction Engineering and Management, 142(12): 04016078, ISSN 0733-9364
Hyari, K H and Thneibat, M (2025) Detecting skewed pricing in tenders for public-sector projects. Construction Innovation, 25(4), pp. 1153-1170. ISSN 1471-4175
Ibbs, C W J (1980) Risk, complex decision-making and the application of multiattribute utility analysis in the construction industry. PhD thesis, University of California, Berkeley, USA.
Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708
Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364
Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364
Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated? Construction Management and Economics, 32(6), pp. 495-505. ISSN 01446193
Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jeon, J; Lee, J and Ham, Y (2019) Quantifying the impact of building envelope condition on energy use. Building Research & Information, 47(4), pp. 404-420. ISSN 0961-3218
Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X
Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364
Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Ju, J.; Liu, X.; Xu, F.; Cao, B.; Chen, W.; Wang, X. and Tian, G. (2026) Operational phase recognition and power matching under shoveling conditions in an autonomous loading mobile concrete mixer. Journal of Construction Engineering and Management, 152(9): 04026131, ISSN 0733-9364
Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.
Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.
Kashiwagi, D; Chong, N; Costilla, M; McMenimen, F and Egbu, C (2004) Impact of six sigma on construction performance. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Kenley, R and Wilson, O D (1986) A construction project cash flow model: an idiographic approach. Construction Management and Economics, 4(3), pp. 213-232. ISSN 01446193
Kenley, Russell (1986) Construction project cash flow modelling. PhD thesis, University of Melbourne, Australia.
Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599
Khodabocus, S and Seyis, S (2024) Multi-criteria decision-making model for risk management in modular construction projects. International Journal of Construction Management, 24(2), pp. 240-250. ISSN 1562-3599
Kim, H; Ahn, C R and Yang, K (2017) Identifying safety hazards using collective bodily responses of workers. Journal of Construction Engineering and Management, 143(2): 04016090, ISSN 0733-9364
Kim, H and Ham, Y (2021) Increasing reliability of participatory sensing for utility pole condition assessment using fuzzy inference. Journal of Construction Engineering and Management, 147(1): 0001968, ISSN 0733-9364
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Kim, S; Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(2), pp. 681-695. ISSN 0969-9988
Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.
Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Ko, W H (2021) View and environmental quality in buildings. PhD thesis, University of California, Berkeley, USA.
Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.
Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988
Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.
Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988
Laura Pisello, A; Xu, X; Taylor, J E and Cotana, F (2012) Network of buildings' impact on indoor thermal performance. Smart and Sustainable Built Environment, 1(1), pp. 73-86. ISSN 2046-6099
Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364
Lee, W; Lin, K Y; Johnson, P W and Seto, E Y W (2022) Selection of wearable sensor measurements for monitoring and managing entry-level construction worker fatigue: A logistic regression approach. Engineering, Construction and Architectural Management, 29(8), pp. 2905-2923. ISSN 0969-9988
Leo, L S; Buccolieri, R and Di Sabatino, S (2018) Scale-adaptive morphometric analysis for urban air quality and ventilation applications. Building Research & Information, 46(8), pp. 931-951. ISSN 0961-3218
Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364
Li, G; Chen, C; Zhang, G and Martek, I (2020) Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering, Construction and Architectural Management, 27(7), pp. 1619-1643. ISSN 0969-9988
Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364
Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364
Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364
Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.
Liang, R; Zhang, J; Wu, C; Sheng, Z and Wang, X (2019) Joint-venture contractor selection using competitive and collaborative criteria with uncertainty. Journal of Construction Engineering and Management, 145(2): 04018123, ISSN 0733-9364
Liao, L; Man, Q; Teo, E A L; Li, L and Li, X (2014) Improving construction schedule and cost information feedback in building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 91-99. ISSN 17514304
Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.
Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387
Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175
MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364
Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.
Maghrebi, M; Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(2), pp. 185-202. ISSN 1471-4175
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387
Mahamid, I and Bruland, A (2012) Cost deviation in road construction projects: The case of Palestine. Construction Economics and Building, 12(1), pp. 58-71. ISSN 2204-9029
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X
Maloney, W F (1990) Framework for analysis of performance. Journal of Construction Engineering and Management, 116(3), pp. 399-415. ISSN 0733-9364
Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Martínez-Carricondo, P; Carvajal-Ramírez, F; Yero-Paneque, L and Agüera-Vega, F (2020) Combination of nadiral and oblique UAV photogrammetry and HBIM for the virtual reconstruction of cultural heritage. Case study of Cortijo del Fraile in Níjar, Almería (Spain). Building Research & Information, 48(2), pp. 140-159. ISSN 0961-3218
Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation, 19(4), pp. 614-628. ISSN 1471-4175
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mbaraja, T Z and Moyo, T (2025) Insights on virtual reality adoption for construction workers' training in Zimbabwe. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 103-111. ISSN 17514304
McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.
McKim, R A (1990) Risk management for the construction owner. PhD thesis, University of Waterloo, Canada.
Meiling, J H; Sandberg, M and Johnsson, H (2014) A study of a plan-do-check-act method used in less industrialized activities: Two cases from industrialized housebuilding. Construction Management and Economics, 32(1-2), pp. 109-125. ISSN 01446193
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Miller, L; Mannering, F and Abraham, D M (2009) Effectiveness of speed control measures on nighttime construction and maintenance projects. Journal of Construction Engineering and Management, 135(7), pp. 614-619. ISSN 0733-9364
Moore, D R (1997) An analysis of experimental data to determine the validity of aspects of tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Moradi, S; Hirvonen, J and Sormunen, P (2024) A qualitative and life cycle-based study of the energy performance gap in building construction: Perspectives of Finnish project professionals and property maintenance experts. Building Research & Information, 52(5), pp. 564-576. ISSN 0961-3218
Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364
Moyanga, D; Ojo, L D; Awodele, O A and Ogunsemi, D R (2025) Prioritizing the survival determinants of quantity surveying firms in economic contraction. Engineering, Construction and Architectural Management, 32(1), pp. 673-704. ISSN 0969-9988
Moyanga, Dorcas Titilayo; Ojo, Lekan Damilola and Ogunsemi, Deji Rufus (2026) Prioritizing strategies for surviving economic turbulence: Case of quantity surveying consultancy organizations in Nigeria. Journal of Construction Business and Management, 8(2), pp. 15-27. ISSN 2521-0165
Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.
Musarat, M A; Alaloul, W S and Liew, M S (2022) Inflation rate and labours' wages in construction projects: Economic relation investigation. Engineering, Construction and Architectural Management, 29(6), pp. 2461-2494. ISSN 0969-9988
Musonda, I; Lusenga, E and Okoro, C (2021) Rating and characterization of an organization's safety culture to improve performance. International Journal of Construction Management, 21(2), pp. 181-193. ISSN 1562-3599
Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364
Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Niskanen, T (1993) Accident risks and preventive measures in materials handling at construction sites. DrTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(1), pp. 14-42. ISSN 1471-4175
Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.
Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.
Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Odongo, N H and Motari, W O (2022) Consumers' perceptiveness towards store brands within supermarkets. International Journal of Construction Management, 22(13), pp. 2459-2468. ISSN 1562-3599
Ogbu, C P and Osazuwa, E M (2024) Barriers to the growth of indigenous construction firms in Nigeria. Engineering, Construction and Architectural Management, 31(12), pp. 5106-5127. ISSN 0969-9988
Ojo, L D; Chan, A P C and Sing, M C P (2026) Drivers of integrity-based approach to ethics management (ibaem) in the Nigerian construction organizations. International Journal of Construction Management, 26(3), pp. 396-411. ISSN 1562-3599
Ojo, L D and Ogunsemi, D R (2019) Critical drivers (CDs) of value management adoption in the Nigerian construction industry: A Delphi study. Journal of Engineering, Design and Technology, 17(1), pp. 250-264. ISSN 1726-0531
Ojo, L D; Ogunsemi, D R and Ogunsina, O (2022) Conceptual framework of value management adoption in the Nigerian construction industry. Construction Innovation, 22(4), pp. 939-961. ISSN 1471-4175
Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988
Oke, A; Atofarati, J and Bello, S (2022) Awareness of 3D printing for sustainable construction in an emerging economy. Construction Economics and Building, 22(2), pp. 52-68. ISSN 2204-9029
Oke, A E; Aliu, J; Ehiosun, L U; Ebekozien, A and Rotimi, A A (2024) From hurdles to heights: Blueprint for tackling distributed ledger technology challenges in the construction sector of a developing economy. Journal of Financial Management of Property and Construction, 29(3), pp. 405-424. ISSN 1366-4387
Oke, A E; Arowoiya, V A; Chan, M and Oyediran, A (2025) Digital twin technology (DTT) in a developing construction industry: Evaluation of the awareness and usage among professionals in Nigeria. International Journal of Construction Management, 25(11), pp. 1313-1323. ISSN 1562-3599
Oke, A E; Akintola, O A; Oluwatobiloba, O M; Aliu, J and Omoyajowo, N I (2025) Study on the awareness and practice of circular economy principles among construction stakeholders in Nigeria. Construction Economics and Building, 25(2), pp. 24-42. ISSN 2204-9029
Oladinrin, O T and Ojo, L D (2022) Characterisation of the drivers of environmental management system implementation. Engineering, Construction and Architectural Management, 29(10), pp. 3868-3892. ISSN 0969-9988
Olayinka Agboola, A; Ayodele, T O and Olofa, A (2018) Tax increment financing in the UK and USA: Its prospects for urban regeneration in Nigeria. Smart and Sustainable Built Environment, 7(3-4), pp. 277-292. ISSN 2046-6099
Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531
Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.
Omopariola, E D; Olanrewaju, O I; Albert, I; Oke, A E and Ibiyemi, S B (2024) Sustainable construction in the Nigerian construction industry: Unsustainable practices, barriers and strategies. Journal of Engineering, Design and Technology, 22(4), pp. 1158-1184. ISSN 1726-0531
Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.
Opawole, A; Alao, O O; Yusuf, A O; Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos state, Nigeria. Journal of Construction Business and Management, 5(2), pp. 1-19. ISSN 2521-0165
Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Otegbulu, A C (2011) A contingent valuation model for assessing electricity demand. Journal of Financial Management of Property and Construction, 16(2), pp. 126-146. ISSN 1366-4387
Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599
Parasonis, J; Keizikas, A and Kalibatiene, D (2012) The relationship between the shape of a building and its energy performance. Architectural Engineering and Design Management, 8(4), pp. 246-256. ISSN 1745-2007
Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.
Parkinson, T; de Dear, R and Candido, C (2016) Thermal pleasure in built environments: Alliesthesia in different thermoregulatory zones. Building Research & Information, 44(1), pp. 20-33. ISSN 0961-3218
Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771
Pham, V H S; Nguyen Dang, N T and Nam, N V (2025) Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning. Engineering, Construction and Architectural Management, 32(7), pp. 4852-4886. ISSN 0969-9988
Pham, V H S; Trang, N T N and Dat, C Q (2024) Optimization of production schedules of multi-plants for dispatching ready-mix concrete trucks by integrating grey wolf optimizer and dragonfly algorithm. Engineering, Construction and Architectural Management, 31(11), pp. 4602-4624. ISSN 0969-9988
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Pilanawithana, Nethmin M (2022) Developing resilience for safety management systems in the building repair and maintenance sector. PhD thesis, Western Sydney University, Australia.
Pittri, H; Agyekum, K; Botchway, E A; Alencastro, J; Oladinrin, O T and Dompey, A M A (2024) Drivers for design for deconstruction (DfD) implementation among design professionals. Smart and Sustainable Built Environment, 13(5), pp. 1134-1154. ISSN 2046-6099
Polat, G (2010) Using ANP priorities with goal programming in optimally allocating marketing resources. Construction Innovation, 10(3), pp. 346-365. ISSN 1471-4175
Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(9): 04023088, ISSN 0733-9364
Rajabi Asadabadi, M and Zwikael, O (2024) Unrealistic project goals: Detection and modification. Journal of Construction Engineering and Management, 150(3): 04023166, ISSN 0733-9364
Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.
Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029
Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(4), pp. 395-406. ISSN 01446193
Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Rasheed, E O and Rotimi, J O B (2024) The green office environment: New Zealand workers' perception of IEQ. Smart and Sustainable Built Environment, 13(5), pp. 1240-1259. ISSN 2046-6099
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364
Sachs, T; Tiong, R and Wagner, D (2007) Political risk quantification using fuzzy set approach. Journal of Financial Management of Property and Construction, 12(2), pp. 107-126. ISSN 1366-4387
Sadrinooshabadi, S; Taheri, A; Yitmen, I and Jongeling, R (2021) Requirement management in a life cycle perspective based on ISO 19650-1 and coclass as the new classification system in Sweden. Engineering, Construction and Architectural Management, 28(9), pp. 2736-2753. ISSN 0969-9988
Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364
Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364
Salehipour, A; Naeni, L M; Khanbabaei, R and Javaheri, A (2016) Lessons learned from applying the individuals control charts to monitoring autocorrelated project performance data. Journal of Construction Engineering and Management, 142(5): 04015105, ISSN 0733-9364
Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.
Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499
Sawan, R; Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(8), pp. 974-988. ISSN 0969-9988
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Schönbeck, P; Löfsjögård, M and Ansell, A (2022) Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), pp. 2405-2412. ISSN 1562-3599
Scott-Young, C M; Turner, M and Holdsworth, S (2018) Fit for work? Comparative mental health of built environment undergraduates. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193
Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364
Seyman-Guray, T and Kismet, B (2024) Drivers and barriers on implementing XR technologies in the construction industry in Turkey. International Journal of Construction Management, 24(9), pp. 959-974. ISSN 1562-3599
Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364
Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.
Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771
Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364
Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599
Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364
Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Skitmore, M (2004) Predicting the probability of winning sealed bid auctions: The effects of outliers on bidding models. Construction Management and Economics, 22(1), pp. 101-109. ISSN 01446193
Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(5), pp. 449-465. ISSN 1466433X
Skitmore, M and Lo, H P (2002) A method for identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(2), pp. 90-130. ISSN 0969-9988
Skrzypczak, I; Oleniacz, G; Leśniak, A; Zima, K; Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: Assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(8), pp. 859-880. ISSN 0961-3218
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.
Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.
Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics. PhD thesis, University of Michigan, USA.
Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364
Sun, C; MacKley, A and Edara, P (2014) Programmatic examination of missouri incentive/disincentive contracts for mitigating work zone traffic impacts. Journal of Construction Engineering and Management, 140(1): 05013004, ISSN 0733-9364
Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218
Talebi, S (2019) Improvement of dimensional tolerance management in construction. PhD thesis, University of Huddersfield, UK.
Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.
Tambwe, O T; Aigbavboa, C O and Akinradewo, O (2025) Benefits of construction data risks management in the construction industry. Journal of Engineering, Design and Technology, 23(2), pp. 458-476. ISSN 1726-0531
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.
Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175
Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Thomas, H R and Sakarcan, A S (1994) Forecasting labor productivity using factor model. Journal of Construction Engineering and Management, 120(1), pp. 228-239. ISSN 0733-9364
Tian, F.; Zeng, N.; Li, Z.; Ge, Q.; Wang, Q. and Li, Q. (2026) Defect trigger identification in a construction digital twin using quality linked data and iterative deviation computation. Journal of Construction Engineering and Management, 152(8): 04026105, ISSN 0733-9364
Tilde, A I and Fernando, N G (2024) Knowledge, attitude and practices of energy utilisation behaviours: A study of residential building occupants. Built Environment Project and Asset Management, 14(3), pp. 349-365. ISSN 2044-124X
Toh, S C L; Wong, S Y and Ding, C S (2026) The impact of artificial intelligence on the quantity surveying profession in sarawak, Malaysia. Journal of Engineering, Design and Technology, 24(1), pp. 171-192. ISSN 1726-0531
Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988
Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(6), pp. 758-779. ISSN 0969-9988
Tunji-Olayeni, P; Kajimo-Shakantu, K and Ayodele, T O (2024) Factors influencing the intention to adopt green construction: An application of the theory of planned behaviour. Smart and Sustainable Built Environment, 13(2), pp. 291-308. ISSN 2046-6099
Tunji-Olayeni, P F; Kajimo–Shakantu, K; Ayodele, T O and Philips, B I (2023) Students' perception of sustainable construction: Accelerating progress towards construction education for sustainable development. International Journal of Construction Management, 23(2), pp. 276-285. ISSN 1562-3599
Tutesigensi, A; Kibwami, N and Matege, S B (2021) The status of value management practice on construction projects in Uganda and strategies for improvement. Journal of Construction in Developing Countries, 26(2), pp. 251-267. ISSN 1823-6499
Udofia, W U; Hadikusumo, B H W and Santoso, D S (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction, 20(3), pp. 208-234. ISSN 1366-4387
Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects. PhD thesis, University of Maryland, College Park, USA.
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Vermande, H M and Van Mulligen, P H (1999) Construction costs in the Netherlands in an international context. Construction Management and Economics, 17(3), pp. 269-283. ISSN 01446193
Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.
Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988
Volmink, P (2018) The treatment of non-responsive bids in South African public procurement law. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364
Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364
Wang, Z; Hu, T; Liu, J; Xia, B and Chileshe, N (2025) Spatial differences, evolutionary characteristics and driving factors on economic resilience of the construction industry: Evidence from China. Engineering, Construction and Architectural Management, 32(10), pp. 6888-6916. ISSN 0969-9988
Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007
Wang, Z; Han, F; Xia, B; Liu, J and Zhang, C (2023) Regional differences and heterogeneity of construction and demolition waste with economic growth: Evidence from China. Construction Management and Economics, 41(1), pp. 44-59. ISSN 01446193
Wani, D (1997) Strategies to increase the degree of participation of local companies in construction projects in developing countries. PhD thesis, University of Leeds, UK.
Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(4), pp. 632-643. ISSN 1562-3599
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Wood, G; Davis, P and Olaleye, A (2011) The effects of adding real estate into mixed-asset portfolios in South Africa. Journal of Financial Management of Property and Construction, 16(3), pp. 272-282. ISSN 1366-4387
Workineh, N; Terefe, B and Nigussie, W (2025) Nonconformity in social service space use: A case study of injibara town's plan implementation. International Journal of Construction Management, 25(14), pp. 1755-1768. ISSN 1562-3599
Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988
Wu, J; Kumaraswamy, M and Soo, G K L (2011) Dubious benefits from future exchange: An explanation of payment arrears from 'continuing clients' in mainland China. Construction Management and Economics, 29(1), pp. 15-23. ISSN 1466433X
Wu, J; Yan, B; Sun, G; Liu, M; Li, Y and Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9): 05025008, ISSN 0733-9364
Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.
Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988
Yap, J B H; Leong, W J and Skitmore, M (2020) Capitalising teamwork for enhancing project delivery and management in construction: Empirical study in Malaysia. Engineering, Construction and Architectural Management, 27(7), pp. 1479-1503. ISSN 0969-9988
Ye, Z; Kapogiannis, G; Tang, S; Zhang, Z; Jimenez-Bescos, C and Yang, T (2025) Influence of an integrated value-based asset condition assessment in built asset management. Construction Innovation, 25(2), pp. 248-269. ISSN 1471-4175
Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007
Zahoor, H; Chan, A P C; Utama, W P; Gao, R and Memon, S A (2017) Determinants of safety climate for building projects: SEM-based cross-validation study. Journal of Construction Engineering and Management, 143(6): 05017005, ISSN 0733-9364
Zani, C M; Brandalise, F M P; Pedó, B; Formoso, C T; Tommelein, I D; Ortiz-Marcos, I; Viana, D D; Bataglin, F S and Koskela, L (2025) Devising a taxonomy for visual management requirements by considering different purposes and contexts. Construction Management and Economics, 43(7), pp. 518-536. ISSN 0144-6193
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M and Halpin, D W (2004) Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490-499. ISSN 0733-9364
Zhang, X.; Huang, J. and Wang, D. (2026) A quantitative method for indoor trajectory analysis of older adults for spatial evaluation and optimization. Building Research & Information, 54(6), pp. 753-774. ISSN 0961-3218
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zhang, S; Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(5): 04024036, ISSN 0733-9364
Zhou, Y; Wang, Y; Li, C; Ding, L and Wang, C (2024) Automatic generative design and optimization of hospital building layouts in consideration of public health emergency. Engineering, Construction and Architectural Management, 31(4), pp. 1391-1407. ISSN 0969-9988
Zhu, L; Wei, X and Liang, R (2024) Navigating uncertainty: Optimizing contractor selection for megaprojects in group decision-making with multiple criteria. Journal of Construction Engineering and Management, 150(11): 04024157, ISSN 0733-9364
zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364
Up a level