Items with Index Term: design team
Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. PhD thesis, University of Manchester, UK.
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abrahams, G (2017) Revealing and exploring the insider/outsider role of the building control officer in England. Architectural Engineering and Design Management, 13(4), pp. 278-290. ISSN 1745-2007
Afful, A E; Ayarkwa, J; Acquah, G K K; Osei-Asibey, D and Osei Assibey, A A D (2023) Barriers to incorporation of indoor environmental quality (IEQ) principles into building designs. Engineering, Construction and Architectural Management, 30(6), pp. 2400-2419. ISSN 0969-9988
AlKheder, S; AlKandari, D and AlYatama, S (2022) Sustainable assessment criteria for airport runway material selection: A fuzzy analytical hierarchy approach. Engineering, Construction and Architectural Management, 29(8), pp. 3091-3113. ISSN 0969-9988
Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.
Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.
Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.
Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.
Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.
Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.
Arroyo, P; Tommelein, I D and Ballard, G (2016) Selecting globally sustainable materials: A case study using choosing by advantages. Journal of Construction Engineering and Management, 142(2): 05015015, ISSN 0733-9364
Assaf, S; Hassanain, M A and Abdallah, A (2018) Review and assessment of the causes of deficiencies in design documents for large construction projects. International Journal of Building Pathology and Adaptation, 36(3), pp. 300-317. ISSN 23984708
Ataman, C and Dino, İ G (2022) Performative design processes in architectural practices in Turkey: Architects' perception. Architectural Engineering and Design Management, 18(5), pp. 690-704. ISSN 1745-2007
Awawdeh, S A (2010) The potential of building regulations to improve the energy efficiency of high-rise residential buildings in the Gulf Countries. PhD thesis, Queen's University Belfast, UK.
Azari Najafabadi, R (2013) An evaluation framework for the integrated design process of sustainable high-performance buildings. PhD thesis, University of Washington, USA.
Bailey, D (2016) A performance evaluation of mainstream timber framed and traditional masonry housing in the UK. PhD thesis, University of Nottingham, UK.
Baldissera, P and Delprete, C (2020) From PBL to innovation: A decennial case-study from an HPV student team. Journal of Engineering, Design and Technology, 18(4), pp. 773-786. ISSN 1726-0531
Banteli, A; Stevenson, V and Patel, H (2020) Embodied energy considerations in a BIM-enabled building design process: An ethnographic case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Barrett, J; Goulding, J and Qualter, P (2013) The social life of the novel idea: What did social psychologists ever do for us? Engineering, Construction and Architectural Management, 20(3), pp. 250-266. ISSN 0969-9988
Barrett, J E (2018) An exploratory study of collaboration in built environment design teams: a social psychology perspective. PhD thesis, University of Central Lancashire, UK.
Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.
Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007
Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599
Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.
Binsarra, F A (2016) Uncovering the structure and the dynamic of information propagation in building. PhD thesis, University of Liverpool, UK.
Blindheim, J; Elverum, C W; Welo, T and Steinert, M (2020) Concept evaluation in new product development: A set-based method utilizing rapid prototyping and physical modelling. Journal of Engineering, Design and Technology, 18(5), pp. 1139-1151. ISSN 1726-0531
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218
Botti, A and Ramos, M (2017) Adapting the design of a new care home development for a changing climate. International Journal of Building Pathology and Adaptation, 35(4), pp. 417-433.
Boudeau, C (2013) Design team meetings and the coordination of expertise: The roof garden of a hospital. Construction Management and Economics, 31(1), pp. 78-89. ISSN 1466433X
Bowen, P and Cattell, K (2008) Job satisfaction of South African quantity surveyors. Engineering, Construction and Architectural Management, 15(3), pp. 260-269. ISSN 0969-9988
Bowen, P; Cattell, K; Michell, K and Edwards, P (2008) Job satisfaction of South Africa quantity surveyors: Are employers happier than employees? Journal of Engineering, Design and Technology, 6(2), pp. 124-144. ISSN 1726-0531
Brandon, P S (1984) Cost versus quality: A zero sum game? Construction Management and Economics, 2(2), pp. 111-126. ISSN 01446193
Burke, R D (2018) Early design decisions in building materials for higher performing buildings. PhD thesis, Arizona State University, USA.
Burt, J and Purver, K (2014) Building information modelling for small-scale residential projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 134-140. ISSN 17514304
Cammarano, S; Pellegrino, A; Lo Verso, V R M and Aghemo, C (2015) Assessment of daylight in rooms with different architectural features. Building Research & Information, 43(2), pp. 222-237. ISSN 0961-3218
Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364
Chandra, V and Loosemore, M (2011) Communicating about organizational culture in the briefing process: Case study of a hospital project. Construction Management and Economics, 29(3), pp. 223-231. ISSN 1466433X
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.
Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599
Chen, L and Whyte, J (2022) Understanding design change propagation in complex engineering systems using a digital twin and design structure matrix. Engineering, Construction and Architectural Management, 29(8), pp. 2950-2975. ISSN 0969-9988
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.
Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach. PhD thesis, University of the West of England, Bristol, UK.
Cole, R J (2005) Building environmental assessment methods: Redefining intentions and roles. Building Research & Information, 33(5), pp. 455-467. ISSN 0961-3218
Cole, R J (2012) Transitioning from green to regenerative design. Building Research & Information, 40(1), pp. 39-53. ISSN 0961-3218
Cole, R J; Busby, P; Guenther, R; Briney, L; Blaviesciunaite, A and Alencar, T (2012) A regenerative design framework: Setting new aspirations and initiating new discussions. Building Research & Information, 40(1), pp. 95-111. ISSN 0961-3218
Collinge, W H (2014) Briefing as meaning making practice through signs: client requirement representations and transformations in construction project design. PhD thesis, University of Reading, UK.
Collinge, W H and Harty, C F (2014) Stakeholder interpretations of design: Semiotic insights into the briefing process. Construction Management and Economics, 32(7-8), pp. 760-772. ISSN 01446193
Collinge W H, H C F (2013) Evolving designs and stakeholder contributions to the briefing process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. EngD thesis, Brunel University, UK.
Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.
Den Otter, A and Emmitt, S (2007) Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(5), pp. 408-419. ISSN 0969-9988
Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.
Ding, Z (2007) Interpersonal trust and willingness to share knowledge among architects: a two-stage triangulation research. PhD thesis, University of Hong Kong, Hong Kong.
Ding, Z and Ng, F (2007) Reliability and validity of the Chinese version of McAllister's trust scale. Construction Management and Economics, 25(11), pp. 1107-1117. ISSN 01446193
Ding, Z and Ng, F (2010) Personal construct-based factors affecting interpersonal trust in a project design team. Journal of Construction Engineering and Management, 136(2), pp. 227-234. ISSN 0733-9364
Doloi, H (2008) Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives. Construction Management and Economics, 26(11), pp. 1181-1196. ISSN 1466433X
Domingo, L (2023) Influence of method and media interventions in creative remote design team collaboration. PhD thesis, Stanford University, USA.
Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Eadie, R; Browne, M; Odeyinka, H; McKeown, C and McNiff, S (2015) A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(1), pp. 4-21. ISSN 2044-124X
Edum-Fotwe, F T; Gregory, M J; Thorpe, A; Cooper, R and Deasley, P J (2002) Managing distributed design teams and processes: A cross-sector study of construction and aerospace. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.
Egbu, C O; Gaskell, C and Howes, J (2001) The role of organizational culture and motivation in the effective utilization of information technology for teamworking in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Elf, M; Svedbo Engström, M and Wijk, H (2012) An assessment of briefs used for designing healthcare environments: A survey in Sweden. Construction Management and Economics, 30(10), pp. 835-844. ISSN 1466433X
Elliott, J W; Glick, S and Valdes-Vasquez, R (2019) Student perceptions of model-based estimating. International Journal of Construction Education and Research, 15(2), pp. 118-135. ISSN 1557-8771
Elmualim, A and Gilder, J (2014) BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3-4), pp. 183-199. ISSN 1745-2007
Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.
Fapohunda, J A and Chileshe, N (2014) Essential factors towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(4), pp. 461-474.
Fatayer, F A; Hassanain, M A; Abdallah, A and Al-Hammad, A M (2019) Investigation of facilities management practices for providing feedback during the design development and review stages. International Journal of Building Pathology and Adaptation, 37(5), pp. 597-614. ISSN 23984708
Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007
Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.
Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Galasiu, A D and Reinhart, C F (2008) Current daylighting design practice: A survey. Building Research & Information, 36(2), pp. 159-174. ISSN 0961-3218
Gana, V F G (2018) Soft Landings based Design Management as a tool to enhance Sustainability: a case study of non-residential buildings in the UK. PhD thesis, University of Kent, UK.
Gana, V F G; Giridharan, R and Watkins, R (2018) Application of soft landings in the design management process of a non-residential building. Architectural Engineering and Design Management, 14(3), pp. 178-193. ISSN 1745-2007
Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.
Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Garvey, F P (1981) A study of the utilization of construction management in the design process of educational facilities. EdD thesis, Ball State University, USA.
Gething, B and Bordass, B (2006) Rapid assessment checklist for sustainable buildings. Building Research & Information, 34(4), pp. 416-426. ISSN 0961-3218
Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2021) Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (sbts) in the developing countries. Construction Innovation, 21(4), pp. 685-707. ISSN 1471-4175
Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2022) Assessing the level of awareness of smart building technologies (sbts) in the developing countries. Journal of Engineering, Design and Technology, 20(3), pp. 696-711. ISSN 1726-0531
Ghansah, F A; Owusu-Manu, D G; Edwards, D J; Thwala, W D; Yamoah Agyemang, D and Ababio, B K (2024) A framework for smart building technologies implementation in the Ghanaian construction industry: A PLS-SEM approach. Building Research & Information, 52(1-2), pp. 148-163. ISSN 0961-3218
Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180
Goldsmith, W and Flanagan, T (2017) Value methodology: case studies within climate resilience and sustainability policy application. Architectural Engineering and Design Management, 13(1), pp. 3-21. ISSN 1745-2007
Goncikowski, M (2024) Research by design: determining the form of the initial architectural concept of a skyscraper building in warsaw. Architectural Engineering and Design Management, 20(1), pp. 1-31. ISSN 1745-2007
Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.
Gorse, C; McKinney, I; Shepherd, A; Morley, D and Ellis, R (2006) Internal support mechanisms in groups and teams. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gorse, C A (2003) Conflict and conflict management in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Gorse, C A and Emmitt, S (2003) Investigating interpersonal communication during construction progress meetings: Challenges and opportunities. Engineering, Construction and Architectural Management, 10(4), pp. 234-244. ISSN 0969-9988
Gorse, C A and Emmitt, S (2007) Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11), pp. 1197-1213. ISSN 01446193
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2000) Interaction analysis during management and design team meetings. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2001) Project performance and management and design team communication. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Goubran, S; Masson, T and Walker, T (2020) Diagnosing the local suitability of high-rise timber construction. Building Research & Information, 48(1), pp. 101-123. ISSN 0961-3218
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Gray, C and Al-Bizri, S (2007) Modelling trade contractor information production. Architectural Engineering and Design Management, 3(1), pp. 39-48. ISSN 1745-2007
Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Grilo, L; Melhado, S; Silva, S A R; Edwards, P and Hardcastle, C (2007) International building design management and project performance: Case study in São Paulo, Brazil. Architectural Engineering and Design Management, 3(1), pp. 5-16. ISSN 1745-2007
Grinnell, R C (2017) Recipes for low carbon, adaptable design. PhD thesis, Loughborough University, UK.
Grist, E (2014) The implementation of innovative and sustainable construction materials. EngD thesis, University of Bath, UK.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Grosse, H (2023) Thrown into a construction dispute: The personal toll of aggressive claims management. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Guikema, S D (2003) Optimal resource allocation in an engineering design team with asymmetric information. PhD thesis, Stanford University, USA.
Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.
Gunasekara, D M H; Indikatiya, I H P R; Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(2), pp. 406-424. ISSN 1471-4175
Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.
Gül, L F (2009) Evaluating design behaviour when using emerging collaboration technologies. Architectural Engineering and Design Management, 5(3), pp. 107-123. ISSN 1745-2007
Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.
Haniff, A P and Kaka, A P (2001) A framework for development of a knowledge database for use within the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Hanna, S (2012) Addressing complex design problems through inductive learning. PhD thesis, University College London, UK.
Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.
Harty, C; Tryggestad, K and Jacobsen, P H (2015) Visualisations and calculations of spaces: Negotiating hospital design during on-boarding. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Harty, J (2012) The impact of digitalisation on the management role of architectural technology. PhD thesis, Robert Gordon University, UK.
Hassanain, M A; Adewale, B; Al-Hammad, A-M and Sanni-Anibire, M O (2018) Factors affecting building services' coordination during the design development and review stages. Built Environment Project and Asset Management, 8(1), pp. 64-77. ISSN 2044-124X
Hassanain, M A; Aljuhani, M; Sanni-Anibire, M O and Abdallah, A (2019) Interdisciplinary design checklists for mechanical, electrical and plumbing coordination in building projects. Built Environment Project and Asset Management, 9(1), pp. 29-43. ISSN 2044-124X
Hegazy, T; Zaneldin, E and Grierson, D (2001) Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127(4), pp. 322-329. ISSN 0733-9364
Henderson, J R (2013) Enhancing buildability through improving design-construction feedback loops within complex projects. PhD thesis, Loughborough University, UK.
Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2020) Understanding interactions between design team members of construction projects using social network analysis. Journal of Construction Engineering and Management, 146(6): 04020053, ISSN 0733-9364
Herrera Valencia, R F (2020) Impact of BIM/lean on the interaction of construction project design teams. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Hes, D; Morrison, A W and Bates, M (2005) Assessment and selection of materials for Melbourne city Council House 2. Construction Economics and Building, 5(2), pp. 8-19. ISSN 2204-9029
Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.
Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.
Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193
Hosseini, M R; Chileshe, N; Baroudi, B; Zuo, J and Mills, A (2016) Factors affecting perceived level of virtuality in hybrid construction project teams: A qualitative study. Construction Innovation, 16(4), pp. 460-482. ISSN 1471-4175
Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.
Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007
Hudson, R (2010) Strategies for parametric design in architecture: an application of practice-led research. PhD thesis, University of Bath, UK.
Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599
Imani, E and Asefi, M (2021) Empirical investigation of factors that enhance development of technology in design process improvement in architecture education: Analyses of students' views. Engineering, Construction and Architectural Management, 28(10), pp. 3164-3189. ISSN 0969-9988
Jacobsen, P H; Harty, C and Tryggestad, K (2016) (re)constructing the wicked problem through the visual and the verbal: The case of a dialogue based architectural competition. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kabiri, S (2014) Role conflict and role ambiguity in construction projects. PhD thesis, University of Reading, UK.
Kabiri, S; Hughes, W P and Schweber, L (2014) Role conflict in project team dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kadan, R and Wium, J (2025) Fuzzy synthesis analysis of social network risk factors in supply chains of African megaprojects. Built Environment Project and Asset Management, 15(1), pp. 125-148. ISSN 2044-124X
Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 0969-9988
Kasapolu, E (2011) Leadership behaviors in project design offices. Journal of Construction Engineering and Management, 137(5), pp. 356-363. ISSN 0733-9364
Kasapoǧlu, E (2014) Leadership styles in architectural design offices in Turkey. Journal of Construction Engineering and Management, 140(2): 04013047, ISSN 0733-9364
Kattein, J (2009) The architecture chronicle: Diary of an architectural practice. PhD thesis, University of London, University College London, UK.
Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),
Khalife, S; Pourrahimian, E; Didluck, T and Hamzeh, F (2024) Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework. Architectural Engineering and Design Management, 20(6), pp. 1357-1380. ISSN 1745-2007
Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531
Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988
Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. PhD thesis, University of Reading, UK.
Kissi, E; Adjei-Kumi, T; Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(3), pp. 252-268. ISSN 1366-4387
Knotten, V; Lædre, O and Hansen, G K (2017) Building design management: key success factors. Architectural Engineering and Design Management, 13(6), pp. 479-493. ISSN 1745-2007
Kohler, N and Lützkendorf, T (2002) Integrated life-cycle analysis. Building Research & Information, 30(5), pp. 338-348. ISSN 0961-3218
Kolokotroni, M; Robinson-Gayle, S; Tanno, S and Cripps, A (2004) Environmental impact analysis for typical office facades. Building Research & Information, 32(1), pp. 2-16. ISSN 0961-3218
Koutsikouri, D; Austin, S and Dainty, A (2008) Critical success factors in collaborative multi-disciplinary design projects. Journal of Engineering, Design and Technology, 6(3), pp. 198-226. ISSN 1726-0531
Koutsikouri, D; Austin, S and Dainty, A (2008) Critical success factors in collaborative multidisciplinary design projects. Journal of Engineering, Design and Technology, 6(3), pp. 198-226. ISSN 1726-0531
Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.
Kumar, S (2016) Assessment and selection of psychological attributes: Design team perspectives. Journal of Engineering, Design and Technology, 14(4), pp. 874-896.
Kunz, J and Fischer, M (2020) Virtual design and construction. Construction Management and Economics, 38(4), pp. 355-363. ISSN 01446193
Kärnä, S and Junnonen, J-M (2017) Designers' performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(1), pp. 154-169. ISSN 0969-9988
Lai, H Y and Chiang, W H (2024) Generative design of terraced concert hall: A case study of Taipei music and library centre. Building Research & Information, 52(1-2), pp. 49-67. ISSN 0961-3218
Lallimo, J (2014) From pedagogical ideas to a school building: Analysis of user involvement in building design. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Lam, P T I and Wong, F W H (2009) Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1), pp. 41-52. ISSN 1466433X
Lam, P T I and Wong, F W H (2011) A comparative study of buildability perspectives between clients, consultants and contractors. Construction Innovation, 11(3), pp. 305-320. ISSN 1471-4175
Lam, P T I; Wong, F W H; Chan, A P C; Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(2), pp. 216-238. ISSN 1471-4175
Landgren, M; Skovmand Jakobsen, S; Wohlenberg, B and Jensen, L M B (2019) Integrated design processes–a mapping of guidelines with Danish conventional 'silo' design practice as the reference point. Architectural Engineering and Design Management, 15(4), pp. 233-248. ISSN 1745-2007
Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218
Leon, M (2015) Development of a computer mediated multidisciplinary design protocol and its application to the early architectural design stages. PhD thesis, Robert Gordon University, UK.
Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193
Liu, J; Xie, Q; Xia, B and Bridge, A J (2017) Impact of design risk on the performance of design-build projects. Journal of Construction Engineering and Management, 143(6): 04017010, ISSN 0733-9364
Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218
Long, P W (2021) A conceptual framework for sharing knowledge and information between facility management/operations and building design teams. PhD thesis, University of Salford, UK.
Loria Arcila, J H (2002) Major issues impacting affordable housing developments in Mexico. PhD thesis, Georgia Institute of Technology, USA.
Lu, H and Juan, Y K (2023) Applying the DQI-based kano model and QFD to develop design strategies for visitor centers in national parks. Architectural Engineering and Design Management, 19(3), pp. 215-232. ISSN 1745-2007
Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599
Luck, R (2015) Organising design in the wild: Locating multidisciplinarity as a way of working. Architectural Engineering and Design Management, 11(2), pp. 149-162. ISSN 1745-2007
Macmillan, S; Steele, J; Kirby, P; Spence, R and Austin, S (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(3), pp. 174-180. ISSN 0969-9988
Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988
Maftei, L (2015) The use of immersive virtual reality technology in the design process: a reflective practice approach. PhD thesis, University of Reading, UK.
Maftei L, H C (2013) Accounting for users: Design team work in immersive virtual reality environments. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.
Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193
Maseko, L and Root, D (2021) Collaborative risk management within the design phase of green buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
McCarney, M; Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: A conceptual model. Construction Innovation, 23(3), pp. 587-605. ISSN 1471-4175
McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.
Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction. PhD thesis, University of Colorado at Boulder, USA.
Michell, K; Bowen, P and Cattell, K (2007) Modeling the design team as a temporary management structure: Reality versus theory. Construction Economics and Building, 7(1), pp. 19-28. ISSN 2204-9029
Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.
Mohd Hafir, N H B (2019) The investigation of the interplay between professional identity and attitudes towards sustainability for more sustainability practices in the built environment sector. PhD thesis, University of Reading, UK.
Mokhtar, A H M (1998) An information model for managing design changes in a collaborative multidisciplinary design environment. PhD thesis, Concordia University, Canada.
Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.
Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.
Munaro, M R and Tavares, S F (2025) Design for adaptability and disassembly: Guidelines for building deconstruction. Construction Innovation, 25(2), pp. 665-687. ISSN 1471-4175
Murtagh, N; Achkar, L and Roberts, A (2016) “The people that no-one notices”: The power of building control inspectors in sustainable construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Nawi, M N M (2012) Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects. PhD thesis, University of Salford, UK.
Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Novak, V M (2012) Managing sustainability value in design: A systems approach. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Novak, V M (2014) Design management of sustainability values: A learning organization perspective. Architectural Engineering and Design Management, 10(3-4), pp. 218-232. ISSN 1745-2007
Nóbrega Júnior, Claudino Lins (2012) Building projects coordinator: Study and proposal for profile, activities and autonomy. PhD thesis, Universidade de São Paulo, Brazil.
Ohueri, C. C.; Liew, S. C.; Bamgbade, J. A. and Enegbuma, W. I. (2026) Critical components for successful BIM-based sustainable building design collaboration: Structural equation model analysis. Journal of Engineering, Design and Technology, 24(2), pp. 472-493. ISSN 1726-0531
Ohueri, C C; Bamgbade, J A; Chuin, A L S; Hing, M W N and Enegbuma, W I (2022) Best practices in building information modelling process implementation in green building design: Architects' insights. Journal of Construction in Developing Countries, 27(1), pp. 79-93. ISSN 1823-6499
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531
Oliver, A and Smith, S D (2018) Perceptions of sustainability in domestic housing: How do those who must deliver it understand it? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Oliver, A K (2020) Perceptions of sustainability and their influence in the design and delivery of Scottish housing. PhD thesis, University of Edinburgh, UK.
Oliver, G (2007) Erosion of drawing as a thinking and collaborative tool. Building Research & Information, 35(5), pp. 571-575. ISSN 0961-3218
Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.
Othman, A A E and Kamal, A R (2024) A framework for enhancing building maintainability through facilitating early suppliers' involvement in the design process. Journal of Engineering, Design and Technology, 22(4), pp. 1231-1256. ISSN 1726-0531
Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.
Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.
Pavitt, T C (2002) Managing construction interfaces within the building facade. PhD thesis, Loughborough University, UK.
Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.
Pim-Wusu, M; Simpeh, E K and Simberi, J N N (2025) Ascertaining adequacy of fire suppression systems: The perspective of Accra central of Ghana. Journal of Engineering, Design and Technology, 23(3), pp. 917-934. ISSN 1726-0531
Ponton, H (2021) Social interactions in construction design team meetings. PhD thesis, Northumbria University, UK.
Ponton, H; Osborne, A; Thompson, N and Greenwood, D (2020) The power of humour to unite and divide: A case study of design coordination meetings in construction. Construction Management and Economics, 38(1), pp. 32-54. ISSN 01446193
Ponton, H; Osbourne, A; Greenwood, G and Thompson, N (2018) Understanding the dynamics of construction design team meetings through joint laughter. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Porwal, A and Hewage, K N (2012) Building information modeling-based analysis to minimize waste rate of structural reinforcement. Journal of Construction Engineering and Management, 138(8), pp. 943-954. ISSN 0733-9364
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.
Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Manu, P; Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: An empirical study. Engineering, Construction and Architectural Management, 28(5), pp. 1440-1467. ISSN 0969-9988
Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364
Quanjel, E M C J (2013) Collaborative design support: workshops to stimulate interaction and knowledge exchange between practitioners. PhD thesis, Eindhoven University of Technology, Netherlands.
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Redmond, A and West, R (2012) The use of cloud enabled building information models: an expert analysis. Construction Economics and Building, 12(4), pp. 53-67. ISSN 2204-9029
Reilly, R (2022) Development of a management framework to improve the building services engineering design process: a case study of engineering management in an Irish consultancy practice. DProf thesis, University of Salford, UK.
Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.
Robinson A, A S G A (2013) Reinventing the wheel? Case study of research into linear/non-linear and framing processes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Rohde, L; Jensen, R L; Larsen, O K; Jønsson, K T and Larsen, T S (2021) Holistic indoor environmental quality assessment as a driver in early building design. Building Research & Information, 49(4), pp. 460-481. ISSN 0961-3218
Roshani, D (2005) Integrated collaborative building design using internet technology. PhD thesis, University of Nottingham, UK.
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Saratsis, E; Dogan, T and Reinhart, C F (2017) Simulation-based daylighting analysis procedure for developing urban zoning rules. Building Research & Information, 45(5), pp. 478-491. ISSN 0961-3218
Schade, J; Olofsson, T and Schreyer, M (2011) Decision-making in a model-based design process. Construction Management and Economics, 29(4), pp. 371-382. ISSN 1466433X
Schweber, L. and Green, M. (2026) Negotiating net-zero carbon: An ant analysis of two buildings. Buildings & Cities, 7(1), pp. 791-807. ISSN 2632-6655
Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(1), pp. 1-20. ISSN 1745-2007
Senthilkumar, V and Varghese, K (2009) Structured methodology to formulate drawing dependency structure matrix for construction design. Architectural Engineering and Design Management, 5(4), pp. 225-248. ISSN 1745-2007
Sha'ar, K. Z.; Assaf, S. A.; Bambang, T.; Babsail, M. and Fattah, A. M. A. E. (2017) Design-construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Sha'ar, K Z; Assaf, S A; Bambang, T; Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Sharqi, R I A (2017) Developing a system for health and safety enhancement and automation in construction sites. PhD thesis, Heriot-Watt University, UK.
Sheth, A Z; Price, A D F and Glass, J (2010) BIM and refurbishment of existing healthcare facilities. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Shohet, I M and Frydman, S (2003) Communication patterns in construction at construction manager level. Journal of Construction Engineering and Management, 129(5), pp. 570-577. ISSN 0733-9364
Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218
Singhaputtangkul, N (2012) Knowledge-based decision support system quality function deployment (kbdss-qfd) tool for assessment of building envelope materials and designs in the early design stage. PhD thesis, National University of Singapore, Singapore.
Singhaputtangkul, N (2017) A decision support tool to mitigate decision-making problems faced by a building design team. Smart and Sustainable Built Environment, 6(1), pp. 2-18. ISSN 2046-6099
Singhaputtangkul, N and Zhao, X (2016) Applying a fuzzy consensus scheme to enhance the group decision making of a building envelope design team. Journal of Construction Engineering and Management, 142(8): 4016025, ISSN 0733-9364
Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007
Smith, J and Wyatt, R (1998) Criteria for strategic decision-making at the pre-briefing stage. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, J M; Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: An exploratory study. Engineering, Construction and Architectural Management, 5(4), pp. 387-398. ISSN 0969-9988
Smith, Jim (2002) Strategic client briefing: A model for building project inception. PhD thesis, University of Melbourne, Australia.
Smyth, H (2005) Trust in the design team. Architectural Engineering and Design Management, 1(3), pp. 211-223. ISSN 1745-2007
Soetanto, R; Poh, P; Austin, S; Hao, J and Katsanis, C (2012) Communication modes and performance of virtual design teams in an undergraduate building project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531
Spaeth, A B and Khali, R (2018) The place of VR technologies in UK architectural practice. Architectural Engineering and Design Management, 14(6), pp. 470-487. ISSN 1745-2007
Steele, J (2000) The interdisciplinary conceptual design of buildings. PhD thesis, Loughborough University, UK.
Steele, J; Austin, S A; Macmillan, S; Kirby, P and Spence, R (1999) Interdisciplinary interaction during concept design. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Stevenson, F (2019) Embedding building performance evaluation in UK architectural practice and beyond. Building Research & Information, 47(3), pp. 305-317. ISSN 0961-3218
Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.
Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387
Tabassi, A A; Ramli, M; Roufechaei, K M and Tabasi, A A (2014) Team development and performance in construction design teams: An assessment of a hierarchical model with mediating effect of compensation. Construction Management and Economics, 32(9), pp. 932-949. ISSN 01446193
Tembo Silungwe, C K and Khatleli, N (2020) An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management, 20(4), pp. 321-334. ISSN 1562-3599
Tjell, J and Bosch-Sijtsema, P (2015) Client’s presence during design: A study on roles, practice and visual management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Treloar, G J; Love, P E D and Crawford, R H (2004) Hybrid life-cycle inventory for road construction and use. Journal of Construction Engineering and Management, 130(1), pp. 43-49. ISSN 0733-9364
Tucker, S; Gamage, A and Wijeyesekera, C (2014) Some design aspects of sustainable post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 163-181. ISSN 1759-5916
Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.
Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364
Tutt D, H C (2013) Journeys through the cave: The use of 3D immersive environments for client engagement practices in hospital design. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ulang, N M; Gibb, A G F and Anumba, C J (2009) Communication of health and safety information in construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Venkataraman, V and Cheng, J C P (2014) Social network analysis on the inter-organizational interactions in green building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Volker, L (2010) Deciding about design quality: value judgements and decision making in the selection of architects by public clients under European tendering regulations. PhD thesis, Delft University of Technology, Netherlands.
Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180
Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193
Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180
Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(1), pp. 51-57. ISSN 0969-9988
Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988
Wallace, W A (1987) The influence of design team communication content upon the architectural decision making process in the pre-contract design stages. PhD thesis, Heriot-Watt University, UK.
Wallace, W A (1987) Capital costs versus costs-in-use: A content analysis of design team member communication patterns. Construction Management and Economics, 5(4), ISSN 01446193
Wang, N; Horner, R M W and El-Haram, M (2004) Fuzzy logic approach to a generic elemental whole life costing model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wanigarathna, N; Sherratt, F; Price, A D F and Austin, S (2021) Sources and flow of healthcare built environment design evidence. Built Environment Project and Asset Management, 11(5), pp. 851-869. ISSN 2044-124X
Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218
Weerasekara, G K T; Shandraseharan, A; Perera, B A K S and Disaratna, V (2023) The impact of building morphology factors on the cost and aesthetical appearance of urban detached residential buildings in Sri Lanka. Journal of Engineering, Design and Technology, 21(1), pp. 58-74. ISSN 1726-0531
Weerasinghe, U G D (2012) Development of a framework to assess sustainability of building projects. PhD thesis, University of Calgary, Canada.
Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988
Whang, S W and Flanagan, R (2015) Minimisation of risk exposure at the pre-production stage through the use of contractor-led design management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Whang, S W; Flanagan, R; Kim, S and Kim, S (2017) Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5): 06016009, ISSN 0733-9364
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Whyte, A and Edge, H M (1999) Addressing discord in the team: Beyond third party management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Wilson, G (2013) An integrated decision support model for the sustainable refurbishment of hospitals and healthcare facilities: Developing a prototype. PhD thesis, Robert Gordon University, UK.
Wilson, G and Kishk, M (2012) Key criteria of sustainable hospital refurbishment: A stakeholder review. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175
Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Wu, K-C (2012) A multi-functional collaborative design environment. PhD thesis, University of Salford, UK.
Xuereb, K (2015) Future-proofing buildings: A novel approach to measure the performance of building structures. PhD thesis, University College London, UK.
Xuereb, K (2015) Future-proofing buildings: a novel approach to measure the performance of building structures. PhD thesis, University College London, UK.
Zaneldin, E (2000) An information model for improving design coordination in building projects. PhD thesis, University of Waterloo, Canada.
Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.
Zanni, M A; Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), pp. 101-129. ISSN 1745-2007
Zapata-Lancaster, G and Tweed, C (2016) Tools for low-energy building design: An exploratory study of the design process in action. Architectural Engineering and Design Management, 12(4), pp. 279-295. ISSN 1745-2007
Zhao, J; Lam, K P; Biswas, T and Wang, H (2015) An online platform to automate LEED energy performance evaluation and submission process. Construction Innovation, 15(3), pp. 313-332. ISSN 1471-4175
Zhikun, D; Fungfai, N G and Jiayuan, W (2010) Personal construct based factors affecting willingness to share knowledge between architects in a project design team. International Journal of Construction Management, 10(3), pp. 1-11. ISSN 1562-3599
Zulu, E; Zulu, S L; Chabala, M; Kavishe, N; Chifunda, C and Musonda, I (2024) Infrastructure design stage considerations for environmental sustainability in Zambia. Journal of Engineering, Design and Technology, 22(3), pp. 836-853. ISSN 1726-0531
den Otter, A and Emmitt, S (2008) Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management, 4(2), pp. 121-129. ISSN 1745-2007
den Otter, A F and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(3), pp. 162-173. ISSN 0969-9988
Çıdık, M S and Boyd, D (2020) "Shared sense of purposefulness": A new concept to understand the practice of coordinating design in construction. Construction Management and Economics, 38(1), pp. 18-31. ISSN 01446193
Up a level