Items with Index Term: design management
Aalto, L; Sirola, P; Kalliomäki-Levanto, T; Lahtinen, M; Ruohomäki, V; Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(6), pp. 1047-1062. ISSN 0969-9988
Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.
Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): Two case studies. Engineering, Construction and Architectural Management, 26(1), pp. 104-117. ISSN 0969-9988
Abdirad, H and Nazari, A (2015) Barriers to effective implementation of quality management systems in public design projects in Iran. Architectural Engineering and Design Management, 11(6), pp. 457-474. ISSN 1745-2007
Abdul Ghafar, M and Ibrahim, R (2025) Quantifying AEC professionals' cross-work culture productivity: Comparison between Malaysian and UK projects during industrialized building project. Smart and Sustainable Built Environment, 14(4), pp. 921-942. ISSN 2046-6099
Agri, M. E.; Le, A. and Phung, Q. (2026) AI integration in architectural design and management: Professionals' perspectives. Architectural Engineering and Design Management, 22(1), pp. 67-82. ISSN 1745-2007
Ajayi, S O; Oyedele, L O; Kadiri, K O; Akinade, O O; Bilal, M; Owolabi, H A and Alaka, H A (2016) Competency-based measures for designing out construction waste: Task and contextual attributes. Engineering, Construction and Architectural Management, 23(4), pp. 464-490. ISSN 0969-9988
Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.
Al Mousli, M H and El-Sayegh, S M (2016) Assessment of the design-construction interface problems in the UAE. Architectural Engineering and Design Management, 12(5), pp. 353-366. ISSN 1745-2007
Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007
Al-Bizri, S (1995) Design management plan generator, knowledge-based system for planning the design processes in the construction industry. PhD thesis, University of Reading, UK.
Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.
Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.
Aritua, B; Bower, D and Turner, M (2008) Managing the delivery of iconic football stadiums in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 55-60. ISSN 17514312
Arroyo, P; Tommelein, I D and Ballard, G (2016) Selecting globally sustainable materials: A case study using choosing by advantages. Journal of Construction Engineering and Management, 142(2): 05015015, ISSN 0733-9364
Asefi, Maziar (2007) Transformable architectural structures: Background, development, evaluation and design. PhD thesis, University of Liverpool, UK.
Assaf, S; Hassanain, M A and Abdallah, A (2018) Review and assessment of the causes of deficiencies in design documents for large construction projects. International Journal of Building Pathology and Adaptation, 36(3), pp. 300-317. ISSN 23984708
Ataman, C and Dino, İ G (2022) Performative design processes in architectural practices in Turkey: Architects' perception. Architectural Engineering and Design Management, 18(5), pp. 690-704. ISSN 1745-2007
Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.
Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Augenbroe, G; Verheij, H and Schwarzm Ller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(3), pp. 259-271. ISSN 0969-9988
Austin, S; Baldwin, A; Baizhan, L I and Waskett, P (2000) Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(2), pp. 173-182. ISSN 01446193
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: Lessons from the grenfell tower fire. Smart and Sustainable Built Environment, 12(3), pp. 488-506. ISSN 2046-6099
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Bangwal, D and Tiwari, P (2019) Environmental design and awareness impact on organization image. Engineering, Construction and Architectural Management, 26(1), pp. 29-45. ISSN 0969-9988
Barrett, J; Goulding, J and Qualter, P (2013) The social life of the novel idea: What did social psychologists ever do for us? Engineering, Construction and Architectural Management, 20(3), pp. 250-266. ISSN 0969-9988
Beim, A and Jensen, K V (2007) Forming core elements for strategic design management: How to define and direct architectural value in an industrialized context. Architectural Engineering and Design Management, 3(1), pp. 29-38. ISSN 1745-2007
Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007
Bibby, L (2003) Improving design management techniques in construction. EngD thesis, Loughborough University, UK.
Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988
Bibby, L; Bouchlaghem, D and Austin, S (2003) Design management in practice: Testing a training initiative to deliver tools and learning. Construction Innovation, 3(4), pp. 217-229. ISSN 1471-4175
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bosher, L; Dainty, A; Carrillo, P; Glass, J and Price, A (2009) Decision support for integrating disaster risk management strategies into construction practice. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.
Burford, N K and Smith, F W (1999) Developing a new military shelter system: A case study in innovation. Building Research & Information, 27(1), pp. 35-55. ISSN 0961-3218
Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531
Chacko, S. J.; Singh, D. P.; Ahuja, V. and Rai, R. S. (2026) Exploring the impact of critical risk interrelationships on design management outcomes in high-rise residential construction projects. Journal of Engineering, Design and Technology, pp. 1-23. ISSN 1726-0531
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.
Chapman, R J (1999) The likelihood and impact of changes of key project personnel on the design process. Construction Management and Economics, 17(1), pp. 99-106. ISSN 01446193
Chua, D K H; Tyagi, A; Ling, S and Bok, S H (2003) Process-parameter-interface model for design management. Journal of Construction Engineering and Management, 129(6), pp. 653-663. ISSN 0733-9364
Cidik, M S; Boyd, D and Thurairajah, N (2014) Leveraging collaboration through the use of building information models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Comiskey, D and Wilson, K (2020) A performance barrier? Cavity barrier installation in wall envelope makeups. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cooke, T (2013) Can knowledge sharing mitigate the effect of construction project complexity? Construction Innovation, 13(1), pp. 5-9. ISSN 1471-4175
Cooper, R; Bruce, M; Wootton, A; Hands, D and Daly, L (2003) Managing design in the extended enterprise. Building Research & Information, 31(5), pp. 367-378. ISSN 0961-3218
Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.
Criado-Perez, C; Collins, C G; Jackson, C J; Oldfield, P; Pollard, B and Sanders, K (2020) Beyond an 'informed opinion': Evidence-based practice in the built environment. Architectural Engineering and Design Management, 16(1), pp. 23-40. ISSN 1745-2007
Den Otter, A and Emmitt, S (2007) Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(5), pp. 408-419. ISSN 0969-9988
Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175
Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165
Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364
El Reifi, M H (2016) A novel lean briefing process for effective design management. PhD thesis, Loughborough University, UK.
El-Bibany, H E-D (1992) Architecture for human-computer design, management and coordination in a collaborative AEC environment. PhD thesis, Stanford University, USA.
El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007
Elmualim, A and Gilder, J (2014) BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3-4), pp. 183-199. ISSN 1745-2007
Emmitt, S (2006) Selection and specification of building products: Implications for design managers. Architectural Engineering and Design Management, 2(3), pp. 176-186. ISSN 1745-2007
Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(2), pp. 138-148. ISSN 1745-2007
Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Emmitt, S and Heaton, B (2003) The introduction of Approved Document L: A study of enforced change. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Fang, Y.; Minati, L.; Cosentino, S.; Voltolini, S.; Sadler, G. and Yoshimura, Y. (2025) Redefining walking: A bio-inspired kinetic architecture. Architectural Engineering and Design Management, 21(6), pp. 1562-1581. ISSN 1745-2007
Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193
Fernández-Solís, J L; Lü, X and Ryoo, B Y (2013) Corrigendum to building construction: A deterministic non-periodic flow: a case study of chaos theories in tracking production flow (architectural engineering and design management, (2013), 9, 1 (21-48)). Architectural Engineering and Design Management, 9(2), ISSN 1745-2007
Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture. PhD thesis, University of Newcastle upon Tyne, UK.
Gana, V F G (2018) Soft Landings based Design Management as a tool to enhance Sustainability: a case study of non-residential buildings in the UK. PhD thesis, University of Kent, UK.
Gerbov, A; Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(1), pp. 2-20. ISSN 0969-9988
Gledson, B; Rogage, K; Luk, M; Tallet, E; Thompson, A; Landy, M and Wigget, D (2022) Addressing design management challenges through the development of a web-based platform. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.
Gravina da Rocha, C; El Ghoz, H B C and Jr Guadanhim, S (2020) A model for implementing product modularity in buildings design. Engineering, Construction and Architectural Management, 27(3), pp. 680-699. ISSN 0969-9988
Gray, C and Al-Bizri, S (2007) Modelling trade contractor information production. Architectural Engineering and Design Management, 3(1), pp. 39-48. ISSN 1745-2007
Guadalupe, H (2020) Safety design management processes to mitigate design errors. PhD thesis, Walden University, USA.
Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Hadidi, L; Assaf, S; Aluwfi, K and Akrawi, H (2017) The effect of ISO 9001 implementation on the customer satisfaction of the engineering design services. International Journal of Building Pathology and Adaptation, 35(2), pp. 176-190.
Hadidi, L A (2016) Using quality function deployment to conduct assessment for engineering designs' contractors. Architectural Engineering and Design Management, 12(3), pp. 205-230. ISSN 1745-2007
Haji Md Yusof, I (2019) Development of lean design process for building construction projects. PhD thesis, University of Birmingham, UK.
Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(4), pp. 369-385. ISSN 1466433X
Hansen, G K and Olsson, N O E (2011) Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), pp. 70-84. ISSN 1745-2007
Hardwicke, J and King, A (2014) The use of evidence based design in NHS construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Heath, T; Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(6), pp. 543-549. ISSN 01446193
Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2021) Analyzing the association between lean design management practices and BIM uses in the design of construction projects. Journal of Construction Engineering and Management, 147(4): 04021010, ISSN 0733-9364
Herrera Valencia, R F (2020) Impact of BIM/lean on the interaction of construction project design teams. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hooper, M (2015) Automated model progression scheduling using level of development. Construction Innovation, 15(4), pp. 428-448. ISSN 1471-4175
Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193
Ismail, N M M I (2015) Factors in building design that improve building maintainability in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Jacob, J and Varghese, K (2018) A framework for ad hoc information management for the building design process. Engineering, Construction and Architectural Management, 25(8), pp. 1034-1052. ISSN 0969-9988
Jain, K and Devkar, G (2025) Development and testing of lean simulation game on set-based design. Construction Innovation, 25(4), pp. 1035-1057. ISSN 1471-4175
Jensen, P A (2009) Design integration of facilities management: A challenge of knowledge transfer. Architectural Engineering and Design Management, 5(3), pp. 124-135. ISSN 1745-2007
Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988
Johansen, E and Carson, J (2003) Improving the effectiveness of the building design management process in the UK. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Juan, Y K; Lin, I C and Tsai, J X (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(3), pp. 515-534. ISSN 0969-9988
Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.
Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175
Kamunda, A; Renukappa, S; Suresh, S and Jallow, H (2021) BIM in the water industry: Addressing challenges to improve the project delivery process. Engineering, Construction and Architectural Management, 28(2), pp. 510-529. ISSN 0969-9988
Kestle, L; London, K; Bodger, P and Storey, B (2002) The development of a typology for remote construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kestle, L; Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(2), pp. 139-153. ISSN 1745-2007
Kestle, L; Storey, B and Potangaroa, R (2008) Towards the validation of a conceptual design management model for remote site projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Koo, H J; O’Connor, J and Sprouse, R (2024) Analyzing the characteristics of design defect leading indicators on building construction projects. International Journal of Construction Management, 24(8), pp. 834-842. ISSN 1562-3599
Koo, Hyun Jeong (2021) Building design quality: Design complexity and BIM applications. Doctor thesis, University of Texas at Austin, USA.
Koskela, L; Huovila, P and Leinonene, J (2002) Design management in building construction: From theory to practice. Journal of Construction Research, 3(1), pp. 1-16. ISSN 1609-9451
Koskela, L J (2000) An exploration towards a production theory and its application to construction. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Kwofie, T E; Amos-Abanyie, S and Afram, S O (2016) Principal component analysis of professional competencies of architects in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 23(5), pp. 571-587. ISSN 0969-9988
Kärnä, S and Junnonen, J-M (2017) Designers' performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(1), pp. 154-169. ISSN 0969-9988
Lahdenper, P and Tanhuanp, V (2000) Creation of a new design management system based on process optimization and proactive strategy. Engineering, Construction and Architectural Management, 7(3), pp. 267-277. ISSN 0969-9988
Laovisutthichai, V. and Lu, W. (2026) Design for excellence (dfx) in architecture, engineering, and construction: Definition, necessity, and knowledge management-based framework. Architectural Engineering and Design Management, 22(1), pp. 188-205. ISSN 1745-2007
Lavikka, R; Seppänen, O; Peltokorpi, A and Lehtovaara, J (2020) Fostering process innovations in construction through industry–university consortium. Construction Innovation, 20(4), pp. 569-586. ISSN 1471-4175
Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988
Leung, M Y; Famakin, I O and Wang, C (2019) Developing an integrated indoor built environment: Quality of life model for the elderly in public and subsidized housing. Engineering, Construction and Architectural Management, 26(7), pp. 1498-1517. ISSN 0969-9988
Liu, Q; Ye, G; Feng, Y; Wang, C and Peng, Y (2020) Case-based insights into rework costs of residential building projects in China. International Journal of Construction Management, 20(4), pp. 347-355. ISSN 1562-3599
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988
London, K (2010) Multi-market industrial organizational economic models for the internationalization process by small and medium enterprise construction design service firms. Architectural Engineering and Design Management, 6(2), pp. 132-152. ISSN 1745-2007
London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007
Love, P E D; Mandal, P; Smith, J and Heng, L I (2000) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics, 18(5), pp. 567-574. ISSN 01446193
Lu, W.; Wu, L.; Yang, Z.; Peng, Z. and Chu, L. (2025) A deployable agile blockchain as a service (abaas) framework for construction projects. Engineering, Construction and Architectural Management, 33(5), pp. 3919-3956. ISSN 0969-9988
Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599
Lundström, A; Savolainen, J and Kostiainen, E (2016) Case study: Developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(6), pp. 409-426. ISSN 1745-2007
Macpherson, S J; Kelly, J R and Webb, R S (1993) How designs develop: Insights from case studies in building engineering services. Construction Management and Economics, 11(6), pp. 475-485. ISSN 01446193
Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988
Marinelli, M; Dolan, M; Spillane, J and Konanahalli, A (2014) Material waste in the Northern Ireland construction industry: On-site management causes and methods of prevention. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988
McCarney, M and Gibb, A G (2012) Interface management from an offsite construction perspective. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
McCarney, M; Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: A conceptual model. Construction Innovation, 23(3), pp. 587-605. ISSN 1471-4175
McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.
Meniru, K C U (2005) Computer-aided conceptual building design. PhD thesis, Concordia University, Canada.
Mills, F T and Glass, J (2009) The construction design manager's role in delivering sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 75-90. ISSN 1745-2007
Mo, Y Y (2010) Measuring and enhancing the emotional intelligence of built environment students. PhD thesis, Loughborough University, UK.
Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(3), pp. 222-231. ISSN 0969-9988
Mujumdar, P and Maheswari, J U (2019) Alternate beeline diagramming method network analysis for interdependent design entities. Engineering, Construction and Architectural Management, 26(1), pp. 66-84. ISSN 0969-9988
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.
Mzyece, D; Ndekugri, I E and Ankrah, N A (2019) Building information modelling (BIM) and the CDM regulations interoperability framework. Engineering, Construction and Architectural Management, 26(11), pp. 2682-2704. ISSN 0969-9988
Nazeer, F S; Kamardeen, I and Hasan, A (2024) Research needs for enhancing pre-occupancy evaluation of buildings. Built Environment Project and Asset Management, 14(4), pp. 529-546. ISSN 2044-124X
Ng, M S; Graser, K and Hall, D M (2023) Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study. Architectural Engineering and Design Management, 19(1), pp. 39-55. ISSN 1745-2007
Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.
Norell, M and Stehn, L (2025) Architects coping with continuous fragmentation. Architectural Engineering and Design Management, 21(1), pp. 1-16. ISSN 1745-2007
Novak, V M (2012) Managing sustainability value in design: A systems approach. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Novak, V M (2014) Design management of sustainability values: A learning organization perspective. Architectural Engineering and Design Management, 10(3-4), pp. 218-232. ISSN 1745-2007
Oke, A E; Kineber, A F; Al-Bukhari, I; Famakin, I and Kingsley, C (2023) Exploring the benefits of cloud computing for sustainable construction in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 973-990. ISSN 1726-0531
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Oyedele, L O (2010) Sustaining architects' and engineers' motivation in design firms: An investigation of critical success factors. Engineering, Construction and Architectural Management, 17(2), pp. 180-196. ISSN 0969-9988
Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2015) BIM adoption in integrated supply chains: A multiple case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Park, J H and Lee, G (2017) Design coordination strategies in a 2D and BIM mixed-project environment: Social dynamics and productivity. Building Research & Information, 45(6), pp. 631-648. ISSN 0961-3218
Pasquire, C; Pennanen, A; Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(1), pp. 52-63. ISSN 1366-4387
Pasquire, C and Salvatierra-Garrido, J (2011) Introducing the concept of first and last value to aid lean design: Learning from social housing projects in Chile. Architectural Engineering and Design Management, 7(2), pp. 128-138. ISSN 1745-2007
Pereira, Lucas Melchiori (2019) The organizational influence on design quality of built environment. PhD thesis, Universidade de São Paulo, Brazil.
Pikas, E; Koskela, L and Seppänen, O (2022) Causality and interpretation: A new design model inspired by the Aristotelian legacy. Construction Management and Economics, 40(7-8), pp. 507-525. ISSN 01446193
Ponton, H; Osborne, A; Greenwood, D and Thompson, N (2019) Exploring the designer-constructor teamwork interface to improve collaboration: A review of current literature. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Price, T; Wamuziri, S and Gupta, N (2009) Magnet safety in magnetic resonance imaging suite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Pérez-Bou, S; Kishnani, N and Dutta, A (2024) Human factors for a successful integrated design process in zero energy buildings: Leadership, trust, and goal orientation: A case study in Singapore. Architectural Engineering and Design Management, 20(4), pp. 928-945. ISSN 1745-2007
Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(1), pp. 20-39. ISSN 1466433X
Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599
Raphael, B (2011) Multi-criteria decision making for collaborative design optimization of buildings. Built Environment Project and Asset Management, 1(2), pp. 122-136. ISSN 2044-124X
Rekola, M; Mäkeläinen, T and Häkkinen, T (2012) The role of design management in the sustainable building process. Architectural Engineering and Design Management, 8(2), pp. 78-89. ISSN 1745-2007
Rob Danie Raijmakers, S V and Remko Cremers, A D (2023) Two paths colliding at one road: Integrating split municipal climate action agendas. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Roupé, M; Johansson, M; Maftei, L; Lundstedt, R and Viklund-Tallgren, M (2020) Virtual collaborative design environment: Supporting seamless integration of multitouch table and immersive VR. Journal of Construction Engineering and Management, 146(12): 04020132, ISSN 0733-9364
Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X
Salam, M; Killen, C and Forsythe, P (2025) Assessing interdisciplinary collaboration in the detailed design phase of construction projects: applying practice-based inter-organisational theories. International Journal of Construction Management, 25(2), pp. 238-247. ISSN 1562-3599
Salvatierra, J L; Gálvez, M Á; Bastías, F; Castillo, T; Herrera, R F and Alarcón, L F (2019) Developing a benchmarking system for architecture design firms. Engineering, Construction and Architectural Management, 26(1), pp. 139-152. ISSN 0969-9988
Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Savolainen, J M; Saari, A; Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), pp. 674-691. ISSN 1726-0531
Sebastian, R (2004) Critical appraisal of design management in architecture. Journal of Construction Research, 5(2), pp. 255-266. ISSN 1609-9451
Sebastian, R (2006) Evaluating a proposed approach for managing collaborative design in the conceptual design phase. Architectural Engineering and Design Management, 2(3), pp. 216-224. ISSN 1745-2007
Sebastian, R (2007) Managing collaborative design. Dr thesis, Delft University of Technology, Netherlands.
Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988
Senthilkumar, V and Varghese, K (2009) Structured methodology to formulate drawing dependency structure matrix for construction design. Architectural Engineering and Design Management, 5(4), pp. 225-248. ISSN 1745-2007
Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007
Shen, W; Liu, Y; Tang, W; Wang, S; Duffield, C F; Hui, F K P and Zhang, L (2024) Configuring success: Unveiling key configurations for enhanced design coordination in hydropower projects. Journal of Construction Engineering and Management, 150(12): 04024173, ISSN 0733-9364
Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Souza, Flávia Rodrigues de (2015) The design management process into real estate developers companies. PhD thesis, Universidade de São Paulo, Brazil.
Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988
Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.
Söderholm, E and Johnsson, H (2009) Housing design performance: How is it measured? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Thajudeen, S; Elgh, F and Lennartsson, M (2022) A framework supporting mixed production strategies in platform development: A case study in post and beam building system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Thajudeen, S; Lennartsson, M and Elgh, F (2019) Challenges and critical success factors for the design phase in Swedish industrialised house building. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Thomson, D S; Austin, S A; Devine-Wright, H and Mills, G R (2003) Managing value and quality in design. Building Research & Information, 31(5), pp. 334-345. ISSN 0961-3218
Thyssen, M H; Emmitt, S; Bonke, S and Kirk-Christoffersen, A (2010) Facilitating client value creation in the conceptual design phase of construction projects: A workshop approach. Architectural Engineering and Design Management, 6(1), pp. 18-30. ISSN 1745-2007
Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988
Tiew, S Y (2025) Performance barriers and competence development of graduate architects in construction contract administration (cca): The mediating role of cca skills. Engineering, Construction and Architectural Management, 32(8), pp. 5609-5637. ISSN 0969-9988
Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988
Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988
Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165
Tombesi, P; Dave, B; Gardiner, B and Scriver, P (2007) Rules of engagement: Testing the attributes of distant outsourcing marriages. Architectural Engineering and Design Management, 3(1), pp. 49-64. ISSN 1745-2007
Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007
Tzortzopoulos, P and Cooper, R (2007) Design management from a contractor's perspective: The need for clarity. Architectural Engineering and Design Management, 3(1), pp. 17-28. ISSN 1745-2007
Uusitalo, P; Lappalainen, E; Seppänen, O; Pikas, E; Peltokorpi, A; Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: Is trust a prerequisite for solving design quality problems? Construction Management and Economics, 39(4), pp. 279-297. ISSN 01446193
Uusitalo, P; Seppänen, O; Peltokorpi, A and Olivieri, H (2019) Solving design management problems using lean design management: The role of trust. Engineering, Construction and Architectural Management, 26(7), pp. 1387-1405. ISSN 0969-9988
Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988
Volker, L and Prins, M (2006) Critical reflections on measuring the effect of steering activities in architectural design. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Walker, A; Greenwood, D and Johansen, E (2009) The lack of design quality focus in UK construction: A case for examining suitable design processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Wang, T; Tang, W; Qi, D; Shen, W and Huang, M (2016) Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4): 04015099, ISSN 0733-9364
Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2019) Design re-use: Critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(3), pp. 350-366. ISSN 0969-9988
Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988
Whang, S W and Flanagan, R (2015) Minimisation of risk exposure at the pre-production stage through the use of contractor-led design management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Whang, S W; Flanagan, R; Kim, S and Kim, S (2017) Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5): 06016009, ISSN 0733-9364
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Wong, F W H; Lam, P T I and Shen, L Y (2004) A dynamic design management system for improving buildability of construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Zerjav, V; Hartmann, T and Achammer, C (2013) Managing the process of interdisciplinary design: Identifying, enforcing, and anticipating decision-making frames. Architectural Engineering and Design Management, 9(2), pp. 121-133. ISSN 1745-2007
Zou, P X W and Leslie-Carter, R (2010) Lessons learned from managing the design of the 'water cube' national swimming centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), pp. 175-188. ISSN 1745-2007
Zoya Kpamma, E and Adjei-Kumi, T (2011) Management of waste in the building design process: The Ghanaian consultants' perspective. Architectural Engineering and Design Management, 7(2), pp. 102-112. ISSN 1745-2007
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
den Otter, A and Emmitt, S (2008) Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management, 4(2), pp. 121-129. ISSN 1745-2007
van den Berg, Marc Casper (2019) Managing circular building projects. PhD thesis, University of Twente, Netherlands.
Çıdık, M S and Boyd, D (2020) "Shared sense of purposefulness": A new concept to understand the practice of coordinating design in construction. Construction Management and Economics, 38(1), pp. 18-31. ISSN 01446193
Up a level