Items with Index Term: design error

Number of items: 62.

Abdallah, A; Assaf, S and Hassanain, M A (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management, 15(4), pp. 282-296. ISSN 1745-2007

Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988

Acharya, N K; Lee, Y D and Im, H M (2006) Design errors: Tragic for the clients. Journal of Construction Research, 7(1), pp. 177-190. ISSN 1609-9451

Agbaxode, P D K; Saghatforoush, E; Dlamini, S and Korsah, J K (2024) Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality. Built Environment Project and Asset Management, 14(6), pp. 817-834. ISSN 2044-124X

Akande, I.; Opoko, A. P. and Adewolu, A. O. (2026) Exploring the relationships between emerging technologies and design process in Nigerian architectural firms. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599

Assaf, S; Hassanain, M A and Abdallah, A (2018) Review and assessment of the causes of deficiencies in design documents for large construction projects. International Journal of Building Pathology and Adaptation, 36(3), pp. 300-317. ISSN 23984708

Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X

Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Bordalo, R; De Brito, J; Gaspar, P L and Silva, A (2011) Service life prediction modelling of adhesive ceramic tiling systems. Building Research & Information, 39(1), pp. 66-78. ISSN 0961-3218

Choudhry, R M; Gabriel, H F; Khan, M K and Azhar, S (2017) Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2), pp. 1-18. ISSN 1823-6499

Elbashbishy, T S; Ali, G G and El-adaway, I H (2022) Blockchain technology in the construction industry: Mapping current research trends using social network analysis and clustering. Construction Management and Economics, 40(5), pp. 406-427. ISSN 01446193

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Ghafoori, M (2023) Developing building maintenance and upgrade system (BMUS) to minimize operational cost of existing buildings within available budgets. PhD thesis, University of Colorado at Denver, USA.

Guadalupe, H (2020) Safety design management processes to mitigate design errors. PhD thesis, Walden University, USA.

Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price. PhD thesis, Indiana State University, USA.

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364

Han, B and Leite, F (2021) Measuring the impact of immersive virtual reality on construction design review applications: Head-mounted display versus desktop monitor. Journal of Construction Engineering and Management, 147(6): 04021042, ISSN 0733-9364

Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.

Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364

Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Johansson, P; Linderoth, H C J and Granth, K (2014) The role of BIM in preventing design errors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.

Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liyanawatta, T N; Francis, M and Ranadewa, K A T O (2024) Avoiding construction disputes: A comprehensive framework for pre-contract planning. International Journal of Construction Management, 24(12), pp. 1282-1294. ISSN 1562-3599

Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364

Love, P E D; Mandal, P; Smith, J and Heng, L I (2000) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics, 18(5), pp. 567-574. ISSN 01446193

Mostafa, S; Kim, K P; Tam, V W Y and Rahnamayiezekavat, P (2020) Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. International Journal of Construction Management, 20(2), pp. 146-156. ISSN 1562-3599

Nafe Assafi, M; Hossain, M M; Chileshe, N and Datta, S D (2023) Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in bangladeshi construction sector. Construction Innovation, 23(5), pp. 1255-1278. ISSN 1471-4175

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.

Pereira, N J G (2023) The impact of human errors on the performance to failure of concrete bridges. PhD thesis, Universidade do Minho, Portugal.

Perkins, R A (2009) Sources of changes in design: build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), pp. 588-593. ISSN 0733-9364

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Rachid, Ali Hassan (2021) Development of a framework to support embedding BIM within undergraduate architectural programmes in Lebanon. PhD thesis, University of Salford, UK.

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771

Siraj, N B and Fayek, A R (2019) Risk identification and common risks in construction: Literature review and content analysis. Journal of Construction Engineering and Management, 145(9): 03119004, ISSN 0733-9364

Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007

Sreram, P K and Thomas, A (2021) A framework for identification of critical material waste causes during construction using DEMATEL and social network analysis. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Stone, M L; Johnson, P W and Leopard, T A (2011) Using design-based change orders as a lessons learned metric in university dormitory construction. International Journal of Construction Education and Research, 7(3), pp. 226-240. ISSN 1557-8771

Tabarroki, S; Nazari, A and Banihashemi, S (2024) Risk stages and factors in architectural design- a structural equation modelling. Architectural Engineering and Design Management, 20(1), pp. 79-101. ISSN 1745-2007

Tarekegn Gurmu, A and Mahmood, M N (2024) Critical factors affecting quality in building construction projects: Systematic review and meta-analysis. Journal of Construction Engineering and Management, 150(3): 04024004, ISSN 0733-9364

Tea, S; Panuwatwanich, K; Ruthankoon, R and Kaewmoracharoen, M (2022) Multiuser immersive virtual reality application for real-time remote collaboration to enhance design review process in the social distancing era. Journal of Engineering, Design and Technology, 20(1), pp. 281-298. ISSN 1726-0531

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, J; Zhang, S; Fenn, P; Luo, X; Liu, Y and Zhao, L (2023) Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development. Journal of Construction Engineering and Management, 149(1): 03122010, ISSN 0733-9364

Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364

Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304

Zhang, N; Wang, J; Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), pp. 2683-2698. ISSN 1562-3599

This list was generated on Sat Aug 22 02:09:30 2026 UTC.