Items with Index Term: design development
Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Abdirad, H and Dossick, C S (2019) Restructuration of architectural practice in integrated project delivery (IPD): Two case studies. Engineering, Construction and Architectural Management, 26(1), pp. 104-117. ISSN 0969-9988
Adafin, J; Rotimi, J O B and Wilkinson, S (2016) Risk impact assessments in project budget development: Architects' perspectives. Architectural Engineering and Design Management, 12(3), pp. 189-204. ISSN 1745-2007
Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599
Akin, S; Ergun, O; Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: A building information modeling-based approach. Engineering, Construction and Architectural Management, 28(4), pp. 1319-1344. ISSN 0969-9988
Al-Rqaibat, Sana'A Mohammad (2019) A framework for the implementation of digital technologies in the concept stage of the architectural design process. PhD thesis, Virginia Tech, USA.
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.
Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.
Badi, S and Diamantidou, D (2017) A social network perspective of building information modelling in Greek construction projects. Architectural Engineering and Design Management, 13(6), pp. 406-422. ISSN 1745-2007
Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.
Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.
Budayan, C; Koc, K; Erk, E Y and Tokdemir, O B (2025) Uncovering value creation factors for healthcare public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(8), pp. 5456-5483. ISSN 0969-9988
Bueno, C; Pereira, L M and Fabricio, M M (2018) Life cycle assessment and environmental-based choices at the early design stages: An application using building information modelling. Architectural Engineering and Design Management, 14(5), pp. 332-346. ISSN 1745-2007
Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364
Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach. PhD thesis, University of the West of England, Bristol, UK.
Coffey, M A (2010) An optimization model for subsurface utility engineering during the design process. PhD thesis, University of Florida, USA.
Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.
De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364
Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.
Erdogan, B; Anumba, C; Bouchlaghem, D and Nielsen, Y (2005) Change management in construction: The current context. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Fatayer, F A; Hassanain, M A; Abdallah, A and Al-Hammad, A M (2019) Investigation of facilities management practices for providing feedback during the design development and review stages. International Journal of Building Pathology and Adaptation, 37(5), pp. 597-614. ISSN 23984708
Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304
Fischer, M A and Tatum, C B (1997) Characteristics of design-relevant constructability knowledge. Journal of Construction Engineering and Management, 123(3), pp. 253-260. ISSN 0733-9364
Gerrish, T; Ruikar, K; Cook, M; Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(2), pp. 190-208. ISSN 0969-9988
Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.
Graham, B; Gahan, D and Thomas, K (2008) An action research approach to sharing specialist construction knowledge. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Haghighi, Z (2022) Architectural photovoltaic application. PhD thesis, Delft University of Technology, Netherlands.
Hassanain, M A; Adewale, B; Al-Hammad, A-M and Sanni-Anibire, M O (2018) Factors affecting building services' coordination during the design development and review stages. Built Environment Project and Asset Management, 8(1), pp. 64-77. ISSN 2044-124X
Hwang, S (2022) Framework for implementing integrated service-learning. International Journal of Construction Management, 22(7), pp. 1260-1273. ISSN 1562-3599
Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X
Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.
Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.
Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.
Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.
Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988
Khozaei Ravari, F; Hassan, A S; Abdul Nasir, M H and Mohammad Taheri, M (2024) The development of residential spatial configuration for visual privacy in Iranian dwellings, a space syntax approach. International Journal of Building Pathology and Adaptation, 42(4), pp. 672-703. ISSN 23984708
King, A P; Knight, A D and Griffith, A (2001) Understanding the dynamics of novation: A contractor's perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Koo, H J; O’Connor, J and Sprouse, R (2024) Analyzing the characteristics of design defect leading indicators on building construction projects. International Journal of Construction Management, 24(8), pp. 834-842. ISSN 1562-3599
Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988
Kumaraswamy, M M; Ng, S T; Ugwu, O O; Palaneeswaran, E and Rahman, M M (2004) Empowering collaborative decisions in complex construction project scenarios. Engineering, Construction and Architectural Management, 11(2), pp. 133-142. ISSN 0969-9988
Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304
Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.
Lee, K (1994) Software options for support of three-dimensional CAD in the architectural design process: A critical evaluation by practitioners and educators. PhD thesis, Texas A&M University, USA.
Liao, L; Teo Ai Lin, E and Low, S P (2020) Assessing building information modeling implementation readiness in building projects in Singapore: A fuzzy synthetic evaluation approach. Engineering, Construction and Architectural Management, 27(3), pp. 700-724. ISSN 0969-9988
Liu, Z (2014) Building information modelling (BIM) aided waste minimisation framework. PhD thesis, Loughborough University, UK.
Loosemore, M; Braham, R; Yiming, Y and Bronkhorst, C (2020) Relational determinants of construction project outcomes: A social network perspective. Construction Management and Economics, 38(11), pp. 1061-1076. ISSN 01446193
Macpherson, S J; Kelly, J R and Webb, R S (1993) How designs develop: Insights from case studies in building engineering services. Construction Management and Economics, 11(6), pp. 475-485. ISSN 01446193
Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599
Marcos, Micheline Helen Cot (2015) Method of obtaining environmental impact data, during the design development process through use of BIM tool. PhD thesis, Universidade de São Paulo, Brazil.
Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.
Mazzola, C; Zanelli, A; Stimpfle, B and Canobbio, R (2021) Temporactive pavilion: Second design-to-construction loop of an ultra-lightweight temporary architecture. Architectural Engineering and Design Management, 17(3-4), pp. 216-228. ISSN 1745-2007
Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.
Moses, T; Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology, 18(6), pp. 1867-1888. ISSN 1726-0531
Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Oliveira, Otávio José de (2005) Management model for small building design firms. PhD thesis, Universidade de São Paulo, Brazil.
Panayamkandi, R (2007) Development of a design process map for improving the efficiency of small and medium sized building consulting practices. PhD thesis, Heriot-Watt University, UK.
Park, H; Meacham, B J; Dembsey, N A and Goulthorpe, M (2014) Integration of fire safety and building design. Building Research & Information, 42(6), pp. 696-709. ISSN 0961-3218
Pastore, L and Andersen, M (2019) Detecting trends and further development potential of contemporary façade design for workspaces. Architectural Engineering and Design Management, 15(4), pp. 267-281. ISSN 1745-2007
Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193
Ponton, H; Osbourne, A; Greenwood, G and Thompson, N (2018) Understanding the dynamics of construction design team meetings through joint laughter. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.
Pérez-Bou, S; Kishnani, N and Dutta, A (2024) Human factors for a successful integrated design process in zero energy buildings: Leadership, trust, and goal orientation: A case study in Singapore. Architectural Engineering and Design Management, 20(4), pp. 928-945. ISSN 1745-2007
Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(1), pp. 20-39. ISSN 1466433X
Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Sarkar, A; Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(1), pp. 51-58. ISSN 0961-3218
Seyman Guray, T and Kismet, B (2023) Applicability of a digitalization model based on augmented reality for building construction education in architecture. Construction Innovation, 23(1), pp. 193-212. ISSN 1471-4175
Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.
Silva, Tássia Farssura Lima da (2022) BIM and risk management interface in the design phase: A multi-method approach. PhD thesis, Universidade de São Paulo, Brazil.
Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364
Tochukwu, M G (2018) The development of 5D BIM framework to facilitate costing in contractor-led projects. PhD thesis, University of Wolverhampton, UK.
Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364
Tzortzopoulos, P and Cooper, R (2007) Design management from a contractor's perspective: The need for clarity. Architectural Engineering and Design Management, 3(1), pp. 17-28. ISSN 1745-2007
Uddin, S M J; Albert, A and Karakhan, A A (2024) Leveraging YouTube to aid Construction Hazard Prevention through Design (CHPtD). Construction Management and Economics, 42(9), pp. 847-865. ISSN 01446193
Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Zeng, R; Chini, A and Ries, R (2021) Innovative design for sustainability: Integrating embodied impacts and costs during the early design phase. Engineering, Construction and Architectural Management, 28(3), pp. 747-764. ISSN 0969-9988
Up a level