Items with Index Term: design cost

Number of items: 33.

Alwisy, A; Bu Hamdan, S; Barkokebas, B; Bouferguene, A and Al-Hussein, M (2019) A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), pp. 187-205. ISSN 1562-3599

Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza. PhD thesis, University of Sheffield, UK.

Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193

Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.

Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.

Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180

Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dunston, P S and Reed, A G (2000) Benefits of small projects team initiative. Journal of Construction Engineering and Management, 126(1), pp. 22-28. ISSN 0733-9364

Gaur, S and Tawalare, A (2024) Assessing the implications of BIM on sustainability of construction projects through design risk management. Built Environment Project and Asset Management, 14(3), pp. 470-489. ISSN 2044-124X

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.

Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Jaillon, L and Poon, C S (2010) Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics, 28(10), pp. 1025-1042. ISSN 1466433X

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364

Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218

Lowe, D (2003) The development of early stage design cost estimating expertise: Effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(2), pp. 79-88. ISSN 1366-4387

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Mayer, R H J (1982) Cost estimates from stochastic geometric programs. PhD thesis, University of Delaware, USA.

Nicholson, M P and Naamani, Z (1992) Managing architectural design: a recent survey. Construction Management and Economics, 10(6), pp. 479-487. ISSN 01446193

Ogunlana, O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(2), pp. 133-150. ISSN 01446193

Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.

Pham Vu Hong, S and Nguyen Thanh, V (2023) Application of artificial intelligence algorithm to optimize the design of water distribution system. International Journal of Construction Management, 23(16), pp. 2830-2840. ISSN 1562-3599

Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175

Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387

Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Traynor, E H (1980) The application of factor analysis in the design of a cost control system. Construction Papers, 1(1), pp. 29-43. ISSN 0144-8587

Troive, S (1998) Structural LCC design of concrete bridges. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Wang, H; Yi, W; Zhen, L and Chan, A P C (2024) Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8): 04024093, ISSN 0733-9364

Willcock, J and Evans, S (2003) Co-development: A case study linking work from the automotive sector with the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Wuni, I Y; Wu, Z and Shen, G Q (2023) Exploring the challenges of implementing design for excellence in industrialized construction projects in China. Building Research & Information, 51(3), pp. 301-315. ISSN 0961-3218

Zhou, J; Tam, V W Y; Qin, Y and Illankoon, C (2024) A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022). International Journal of Construction Management, 24(9), pp. 997-1006. ISSN 1562-3599

This list was generated on Sat Aug 22 02:05:42 2026 UTC.