Items with Index Term: design and build
Afful, A E; Ayarkwa, J; Acquah, G K K and Osei-Asibey, D (2023) Enablers of incorporating indoor environmental quality (IEQ) principles into buildings. Smart and Sustainable Built Environment, 12(1), pp. 38-59. ISSN 2046-6099
Aibinu, A and Papadonikolaki, E (2016) BIM implementation and project coordination in design-build procurement. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193
Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.
Akintoye, A and Fitzgerald, E (1995) Design and build: A survey of architects' views. Engineering, Construction and Architectural Management, 2(1), pp. 27-44. ISSN 0969-9988
Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.
Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.
Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(2), pp. 117-132. ISSN 1358-9180
Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.
Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Alhazmi, T and McCaffer, R (2000) Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184. ISSN 0733-9364
Amjad Mohammadi, A; Safaeipour, H; Chenaghlou, M R; Behnejad, A and Afghani Khoraskani, R (2024) Configuration processing and construction of large-span karbandi vaults: A case of the karbandi vaulting of haj-mohammad-qoli timche in tabriz historic bazaar. Engineering, Construction and Architectural Management, 31(1), pp. 432-468. ISSN 0969-9988
Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193
Aouad, G F; Ford, S R; Kirkham, J A; Child, T; Cooper, G S; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1994) Knowledge elicitation using protocol analysis in a workshop environment. Construction Management and Economics, 12(3), pp. 271-278. ISSN 01446193
Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.
Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988
Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.
Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988
Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364
Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.
Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599
Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.
Chamikara, K L; Perera, B A K S; Raigama Acharige, D P and Ekanayake, B (2026) Adaptability of BIM technology to mitigate the cost overruns in design and build projects. Construction Innovation, 26(2), pp. 464-490. ISSN 1471-4175
Chan, A P; Ho, D C K and Tam, C M (2001) Design and build: Views from some major public clients in Hong Kong. Construction Economics and Building, 1(1), pp. 22-31. ISSN 2204-9029
Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364
Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.
Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(6), pp. 659-669. ISSN 1466433X
Chritamara, S and Ogunlana, S O (2001) Problems experienced on design and build projects in Thailand. Journal of Construction Procurement, 7(1), pp. 73-93. ISSN 1358-9180
Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175
Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988
Dainty, A R J and Moore, D R (2000) The performance of integrated D&B project teams in unexpected change event management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Davis, S; Davis, T; Howell, D and Leitzke, D (2020) Building engineers and construction managers: The impact of international service projects on the development of undergraduate students. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.
Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.
Dickens, G (2002) Teamworking, perceptions and communication within construction projects. PhD thesis, University of Nottingham, UK.
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Eadie, R; Browne, M; Odeyinka, H; McKeown, C and McNiff, S (2015) A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(1), pp. 4-21. ISSN 2044-124X
Eadie, R; Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(1), pp. 89-104. ISSN 2044-124X
Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(2), pp. 138-148. ISSN 1745-2007
Emmitt, S; Pasquire, C and Mertia, B (2012) Is good enough "making do"? An investigation of inappropriate processing in a small design and build company. Construction Innovation, 12(3), pp. 369-383. ISSN 1471-4175
Eyiah-Botwe, E; Aigbavboa, C O and Thwala, W D (2020) Curbing PPP construction projects' failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(1), pp. 50-63. ISSN 2044-124X
Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture. PhD thesis, University of Newcastle upon Tyne, UK.
Forman, T and Tweed, C (2014) Solid wall insulation retrofit in UK dwellings: Critical factors affecting management and quality. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Fox, S J (2001) Application of design for manufacture principles to building design and construction. PhD thesis, Sheffield Hallam University, UK.
Francis, Annes Elsa (2025) Transforming stadiums into environmentally sustainable community infrastructure: A holistic perspective. PhD thesis, Griffith University, Australia.
Gamage, I S W; Osmani, M and Glass, J (2009) An investigation into the impact of procurement systems on waste generation: The contractors' perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Gichuiri, J W (2001) Process modelling: An evaluation approach in support of effective management of construction project information. PhD thesis, University of Salford, UK.
Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180
Griffith, A; King, A and Knight, A (2003) Examining the dynamics of novation from the principal contractor's and architect's perspectives. Construction Economics and Building, 3(1), pp. 13-18. ISSN 2204-9029
Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gruneberg, S and Hughes, W P (2004) Analysing the types of procurement used in the UK: A comparison of two data sets. Journal of Financial Management of Property and Construction, 9(2), pp. 63-74. ISSN 1366-4387
Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor. PhD thesis, University of Leeds, UK.
Hall, M and Tomkins, C (2001) A cost of quality analysis of building project: Towards a complete methodology for design and build. Construction Management and Economics, 19(7), pp. 727-740. ISSN 01446193
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988
Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
King, A P (2008) Enhancing the effectiveness of design and build tendering. PhD thesis, Sheffield Hallam University, UK.
King, A P; Knight, A D and Griffith, A (2001) Understanding the dynamics of novation: A contractor's perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Koch, C and Beemsterboer, S (2017) Making an engine: Performativities of building information standards. Building Research & Information, 45(6), pp. 596-609. ISSN 0961-3218
Lam, E W; Chan, A P C and Chan, D W (2003) Why is design-build commonly used in the public sector? An illustration from Hong Kong. Construction Economics and Building, 3(1), pp. 53-62. ISSN 2204-9029
Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X
Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193
Larkin, K; Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
McIntosh, G and Sloan, B (2001) The potential impact of electronic procurement and global sourcing within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Moore, D R and Dainty, A R J (2001) Intra-team boundaries as inhibitors of performance improvemeent in UK design and build projects: A call for change. Construction Management and Economics, 19(6), pp. 559-562. ISSN 01446193
Moore, D R and Dainty, A R J (2002) Criticizing the 'techniques of communication' approach: A response. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers. PhD thesis, University of Salford, UK.
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(2), pp. 211-220. ISSN 1358-9180
O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer- aided estimating systems for the construction industry. Construction Management and Economics, 11(1), pp. 30-44. ISSN 01446193
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(2), pp. 187-196. ISSN 1358-9180
Perera, A A D A J (1989) Cost effective designs. PhD thesis, Loughborough University, UK.
Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099
Preece, C and Tarawneh, S (1997) Service quality for client satisfaction on design & build projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364
Roulet, C A; Flourentzou, F; Foradini, F; Bluyssen, P; Cox, C and Aizlewood, C (2006) Multicriteria analysis of health, comfort and energy efficiency in buildings. Building Research & Information, 34(5), pp. 475-482. ISSN 0961-3218
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.
Sarshar, M; Haigh, R; Finnemore, M; Aouad, G; Barrett, P; Baldry, D and Sexton, M (2000) Spice: A business process diagnostics tool for construction projects. Engineering, Construction and Architectural Management, 7(3), pp. 241-250. ISSN 0969-9988
Schoenwitz M, G J and Naim M, P A (2013) How to build what buyers want: Unveiling customer preferences for prefabricated homes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X
Shrivastava, S and Chini, A (2012) Using building information modeling to assess the initial embodied energy of a building. International Journal of Construction Management, 12(1), pp. 51-63. ISSN 1562-3599
Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193
Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531
Sumanarathna, N and Rowlinson, R (2019) Examining construction contractors' innovation through the lens of exploration and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.
Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531
Tarawneh, S A (1999) Service quality and its relationship with client satisfaction and behavioural intentions in UK construction: The case of design and build contracting services. PhD thesis, University of Leeds, UK.
Thorpe, T and Mead, S (2001) Project-specific web sites: Friend or foe? Journal of Construction Engineering and Management, 127(5), pp. 406-413. ISSN 0733-9364
Tookey, J E; Murray, M; Hardcastle, C and Langford, D (2001) Construction procurement routes: Re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(1), pp. 20-30. ISSN 0969-9988
Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531
Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988
Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Whitmore, D; Krystallis, I; Papadonikolaki, E; Ford, J; Cleaver, M and Alexander, D (2024) Digital twins in the asset life cycle: are we there yet? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 184-192. ISSN 17514304
Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects. PhD thesis, Loughborough University, UK.
Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364
Xia, B; Chan, A P C and Yeung, J F Y (2009) Identification of key competences of design-builders in the construction market of the people's Republic of China (PRC). Construction Management and Economics, 27(11), pp. 1141-1152. ISSN 1466433X
Yean, F; Ling, Y; Fu, E and Leong, K (2002) Performance of design-build projects in terms of cost, quality and time: Views of clients, architects and contractors in Singapore. Construction Economics and Building, 2(1), pp. 37-46. ISSN 2204-9029
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Zapata-Poveda, G (2012) Detailed design ethnography: Architects embedding low carbon performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.