Items with Index Term: delay analysis

Number of items: 70.

Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England. PhD thesis, University of Strathclyde, UK.

Abdelhadi, Y; Dulaimi, M F and Bajracharya, A (2019) Factors influencing the selection of delay analysis methods in construction projects in UAE. International Journal of Construction Management, 19(4), pp. 329-340. ISSN 1562-3599

Abdul Majid, M Z (1997) Non-excusable delays in construction. PhD thesis, Loughborough University, UK.

Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.

Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175

Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.

Appireddy, K and George, G (2026) Lean tools for enhancing construction project performance: Integration of LPS and LBMS in utility power distribution projects. International Journal of Construction Management, 26(5), pp. 789-804. ISSN 1562-3599

Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364

Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.

Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364

Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(3), pp. 327-337. ISSN 01446193

Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.

Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364

Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364

Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X

Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(6), pp. 2463-2480. ISSN 0969-9988

Ekanayake, E M K and Perera, B A K S (2016) Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. Built Environment Project and Asset Management, 6(5), pp. 521-534. ISSN 2044-124X

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Franco-Duran, D M and Garza, J M D L (2019) Review of resource-constrained scheduling algorithms. Journal of Construction Engineering and Management, 145(11): 03119006, ISSN 0733-9364

Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation, 20(1), pp. 43-60. ISSN 1471-4175

Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364

Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364

Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.

Huynh, H T; Lucko, G and Eid, M S (2023) Game theory approach for concurrent delay analysis. Journal of Construction Engineering and Management, 149(3): 04023002, ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364

Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364

Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.

Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364

Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Marshall, J J (2008) City Inn v. Shepherd: A matter of judgement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 71-75. ISSN 17514312

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364

Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364

Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364

Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.

Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364

Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988

Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.

Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988

Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988

Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364

Standinger, M L (2000) The evaluation of time claims in construction projects. PhD thesis, Loughborough University, UK.

Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988

Vo, H M; Yang, J B and Rangasamy, V (2025) A comprehensive review of delay analysis techniques for solving concurrent delays. Engineering, Construction and Architectural Management, 32(5), pp. 3495-3521. ISSN 0969-9988

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.

Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364

Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364

Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364

ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175

Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364

This list was generated on Sat Aug 22 01:51:07 2026 UTC.