Items with Index Term: data exchange
Abd-Elnaby, A-E H A and Reffat, R M (2024) Enhancing BIM-BEM integration: Solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(3), pp. 596-623. ISSN 1745-2007
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.
Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability. PhD thesis, University of Florida, USA.
Akindele, O; Ajayi, S; Oyegoke, A S; Alaka, H A and Omotayo, T (2025) Application of geographic information system (GIS) in construction: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 210-236. ISSN 2046-6099
Al-Biqami, N M (2001) Virtual procurement system for virtual enterprises. PhD thesis, University of Nottingham, UK.
Alani, Y (2023) A semantic framework for the life cycle of water assets data exchange. PhD thesis, Teesside University, UK.
Alexandrou, K; Thravalou, S and Artopoulos, G (2024) Heritage-BIM for energy simulation: A data exchange method for improved interoperability. Building Research & Information, 52(3), pp. 373-386. ISSN 0961-3218
Alothman, A and Vilventhan, A (2025) Development of building information model-enabled facility management for metro rail stations. Journal of Construction Engineering and Management, 151(3): 05024018, ISSN 0733-9364
Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175
Alwan, Z; Greenwood, D and Gledson, B (2015) Rapid LEED evaluation performed with BIM-based sustainability analysis on a virtual construction project. Construction Innovation, 15(2), pp. 134-150. ISSN 1471-4175
Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(6), pp. 749-770. ISSN 0969-9988
Anukaenyi, V; Gbadamosi, A Q; Mahamadu, A M and Olawale, O (2023) Enhancing offsite construction for UK SMEs through building information modelling: A comprehensive analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Banakar, Fereshteh (2024) Extending BIM (building information modelling) object model for road infrastructure operation and maintenance. PhD thesis, Queensland University of Technology, Australia.
Bjork, B-C (1996) Requirements and information structures for building product data models. DTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Bradley, A; Li, H; Qin, H; Xi, W; Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openbim ISO standards development. Construction Innovation, 22(4), pp. 705-726. ISSN 1471-4175
Caetano, I.; Pinto, D.; Amândio, M.; Silva, J.; Sanhudo, L.; Azenha, M.; El Sibaii, M.; Granja, J.; Patrício, H.; Ganhão, F. and Poças Martins, J. (2026) Algorithmic workflow for digitising inspection data in railway tunnel maintenance. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988
Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users perception. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988
Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364
Chen, C; Zhang, Y; Xiao, B; Cheng, M; Zhang, J and Li, H (2024) Deep learning-based image steganography for visual data cybersecurity in construction management. Journal of Construction Engineering and Management, 150(10): 04024125, ISSN 0733-9364
Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.
Chong, H Y; Wang, T; Lee, C Y; Goh, C S and Li, S (2026) Integrating BIM, ar, GPS, and 5g for real-time construction management: Application to water infrastructure projects. Journal of Construction Engineering and Management, 152(5): 05026001, ISSN 0733-9364
Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services. PhD thesis, University of Florida, USA.
Davila Delgado, J M and Oyedele, L O (2020) BIM data model requirements for asset monitoring and the circular economy. Journal of Engineering, Design and Technology, 18(5), pp. 1269-1285. ISSN 1726-0531
East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364
Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.
Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.
Farghaly, K (2020) Building information modelling and asset management: Semantic and syntactic interoperability. PhD thesis, Oxford Brookes University, UK.
Ferreira, Sérgio Leal (2005) Proposal of IFC model extension with ies LM-63 contribution: Luminaire in building lifecycle. PhD thesis, Universidade de São Paulo, Brazil.
Gibson, G E and Bell, L C (1992) Integrated data-base systems. Journal of Construction Engineering and Management, 118(1), pp. 50-59. ISSN 0733-9364
Gupta, A (2013) Developing a BIM-based methodology to support renewable energy assessment of buildings. PhD thesis, Cardiff University, UK.
Hassanain, M A (2002) Integrated systems for maintenance management. PhD thesis, University of British Columbia, Canada.
Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193
Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.
Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.
Jaskula, Klaudia (2024) Blockchain-enabled CBIM for lifecycle data provenance. PhD thesis, University College London, UK.
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Kennington, J (1993) Development of an integrated HVAC design environment. PhD thesis, University College, Galway, Ireland.
Khudhair, A (2022) Knowledge-based automatic OpenBIM data exchanging framework supporting holistic building design. PhD thesis, Cardiff University, UK.
Kumar, V (2019) Developing COBie dataset management system (CDMS) to enhance usability of building information model-facilities management information exchange standard. PhD thesis, National University of Singapore, Singapore.
Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.
Le, T; Hassan, F; Le, C and Jeong, H D (2022) Understanding dynamic data interaction between civil integrated management technologies: A review of use cases and enabling techniques. International Journal of Construction Management, 22(6), pp. 1011-1032. ISSN 1562-3599
Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.
Liao, L; Man, Q; Teo, E A L; Li, L and Li, X (2014) Improving construction schedule and cost information feedback in building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 91-99. ISSN 17514304
Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.
Mahamadu, A M; Mahdjoubi, L and Booth, C A (2014) Determinants of building information modelling (BIM) acceptance for supplier integration: A conceptual model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Marshall-Ponting, A J (2006) nD modelling as an enabler of inter-disciplinary thinking among construction industry stakeholders. PhD thesis, University of Salford, UK.
Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.
Matipa, W M; Kelliher, D and Keane, M (2004) Contending with the challenges of deploying building product models in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Meyer, H W G (1991) Conceptual model for integrating business activity and data systems in the AEC industry. PhD thesis, University of Wisconsin - Madison, USA.
Moses, S (2008) Improving interoperability of AEC collaborative software through the creation of data exchange standards. PhD thesis, Loughborough University, UK.
Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.
Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.
Park, J H and Lee, G (2017) Design coordination strategies in a 2D and BIM mixed-project environment: Social dynamics and productivity. Building Research & Information, 45(6), pp. 631-648. ISSN 0961-3218
Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007
Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.
Ruikar, D (2004) Design process improvement using a model based approach. PhD thesis, University of Nottingham, UK.
Sameer, H and Bringezu, S (2021) Building information modelling application of material, water, and climate footprint analysis. Building Research & Information, 49(6), pp. 593-612. ISSN 0961-3218
Sehrawy, A; Amoudi, O; Tong, M and Callaghan, N (2022) Mobilising theory and practice for the enhancement of building information modelling based building sustainability assessment: An exploratory study and a conceptual framework. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364
Silva da Purificação, N R; Henrique, V B; Amorim, A; Carneiro, A and Souza, G H B (2024) Reconstruction and storage of a low-cost three-dimensional model for a cadastre of historical and artistic heritage. International Journal of Building Pathology and Adaptation, 42(2), pp. 237-256. ISSN 23984708
Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Taher, A; Vahdatikhaki, F and Hammad, A (2022) Formalizing knowledge representation in earthwork operations through development of domain ontology. Engineering, Construction and Architectural Management, 29(6), pp. 2382-2414. ISSN 0969-9988
Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.
Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.
Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.
Yang, W and Lam, P T I (2021) Evaluating non-market costs of ICT involving data transmission in smart cities. Building Research & Information, 49(7), pp. 715-728. ISSN 0961-3218
Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.
Yin, H (2026) Construction project information system management framework strategy based on version control and collaboration. International Journal of Construction Management, 26(6), pp. 1033-1058. ISSN 1562-3599
Yu, K Q (2002) Computer integrated construction based on total project systems framework. PhD thesis, University of British Columbia, Canada.
Zeb, J; Froese, T and Vanier, D (2015) An ontology-supported asset information integrator system in infrastructure management. Built Environment Project and Asset Management, 5(4), pp. 380-397. ISSN 2044-124X
Zhang, S; Zhang, S; Zhao, Z; Liu, H; Wang, C; Wang, X and Yan, L (2026) BIM and semantic web-based circular design system for sustainable construction management of hydropower engineering. Journal of Construction Engineering and Management, 152(3): 04026002, ISSN 0733-9364
Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.
van Rees, R (2007) New instruments for dynamic building-construction: Computer as partner in construction. PhD thesis, Delft University of Technology, Netherlands.
Up a level