Items with Index Term: dam project

Number of items: 16.

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last PlannerĀ® System. PhD thesis, University of Wolverhampton, UK.

Alvanchi, A; Bajalan, Z and Iravani, P (2021) Emission assessment of alternative dam structure types, a novel approach to consider in new dam projects. Construction Innovation, 21(2), pp. 203-217. ISSN 1471-4175

Amankona, D (2021) Socio-ecological impacts and adaptations arising from Chinese-led infrastructure developments in Africa: A case study of the BUI hydropower dam in Ghana. PhD thesis, Open University, UK.

Amies, P; Jin, X and Senaratne, S (2025) Achieving design-phase success in dam construction: An exploration of project success elements through factor analysis and structural equation modeling. International Journal of Construction Education and Research, 21(4), pp. 554-584. ISSN 1557-8771

Amies, P; Jin, X and Senaratne, S (2025) Success in construction management of dams: An empirical study. International Journal of Construction Management, 25(10), pp. 1207-1217. ISSN 1562-3599

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599

Hamzaoui, F; Amine Allal, M; Taillandier, F and Achoui, M (2022) Risk management in construction projects by coupling the SMACC agent with the MADS MOSAR method: application to the dam project in Mascara, Algeria. International Journal of Construction Management, 22(4), pp. 644-658. ISSN 1562-3599

Ilyas, M; Shaojun, C; Li, Y; Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(5), pp. 551-560. ISSN 1562-3599

Lin, S C (2015) An analysis for construction engineering networks. Journal of Construction Engineering and Management, 141(5): 04014096, ISSN 0733-9364

Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: A case study. Built Environment Project and Asset Management, 1(2), pp. 176-194. ISSN 2044-124X

Olatunji, O A; Rotimi, J O B; Rotimi, F E and Silva, C C W (2025) Causal relationship between project financing and overruns in major dam projects in Africa. Engineering, Construction and Architectural Management, 32(10), pp. 6480-6508. ISSN 0969-9988

Samaras, G D; Gkanas, N I and Vitsa, K C (2014) Assessing risk in dam projects using AHP and ELECTRE I. International Journal of Construction Management, 14(4), pp. 255-266. ISSN 1562-3599

Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364

Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364

This list was generated on Sat Aug 22 02:22:52 2026 UTC.