Items with Index Term: critical path
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Adesina, Adebola (2025) Examining influential factors on the success of project management in education: A content analysis. EdD thesis, University of Nevada, Reno, USA.
Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531
Ammar, M A (2003) Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5), pp. 535-542. ISSN 01446193
Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364
Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599
Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(3), pp. 327-337. ISSN 01446193
Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.
Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.
Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.
Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312
Franco-Duran, D M and Garza, J M D L (2019) Review of resource-constrained scheduling algorithms. Journal of Construction Engineering and Management, 145(11): 03119006, ISSN 0733-9364
Gao, W; Yan, X and Li, T (2024) Influencing factors and critical paths of virtual reality adoption by AEC enterprises based on TOE-SNA. Journal of Construction Engineering and Management, 150(2): 04023162, ISSN 0733-9364
Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.
Gessford, G N (1966) An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis, University of California, Los Angeles, USA.
Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364
Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.
Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364
Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364
Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364
Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364
Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364
Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988
Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X
Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988
Kallantzis, A; Soldatos, J and Lambropoulos, S (2007) Linear versus network scheduling: A critical path comparison. Journal of Construction Engineering and Management, 133(7), pp. 483-491. ISSN 0733-9364
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364
Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364
Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364
Moussourakis, J and Haksever, C (2007) Models for accurate computation of earliest and latest start times and optimal compression in project networks. Journal of Construction Engineering and Management, 133(8), pp. 600-608. ISSN 0733-9364
Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.
O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
Pace, C B (1999) A factor-based three dimensional model of the process of new technology development in the construction engineering industry. PhD thesis, University of California, Berkeley, USA.
Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364
Royer, K (1986) The federal government and the critical path. Journal of Construction Engineering and Management, 112(2), pp. 220-225. ISSN 0733-9364
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364
Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(5), pp. 358-369. ISSN 01446193
Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599
Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.
Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.
Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.
Tai, H W; Chen, J H; Cheng, J Y; Wei, H H; Hsu, S C and Liu, H C (2021) Determining worker training time for precast component production in construction: Empirical study in Taiwan. Journal of Construction Engineering and Management, 147(1): 0001964, ISSN 0733-9364
Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599
Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.
VanVactor, J D (2011) Cognizant healthcare logistics management: Ensuring resilience during crisis. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 245-255. ISSN 1759-5916
Vo, H M; Yang, J B and Rangasamy, V (2025) A comprehensive review of delay analysis techniques for solving concurrent delays. Engineering, Construction and Architectural Management, 32(5), pp. 3495-3521. ISSN 0969-9988
Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364
Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364
Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364
Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.
Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364
Zhang, W; Xue, N; Zhang, J and Zhang, X (2021) Identification of critical causal factors and paths of tower-crane accidents in China through system thinking and complex networks. Journal of Construction Engineering and Management, 147(12): 04021174, ISSN 0733-9364
Zwikael, O; Salmona, M; Meredith, J and Zarghami, S A (2023) Enhancing project stakeholder communication under insufficient knowledge of project management concepts. Engineering, Construction and Architectural Management, 30(10), pp. 5007-5029. ISSN 0969-9988
Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364